BID DRAWINGS SUMMARY
This document comprises bid drawings and technical specifications for the Southeast Expansion Area Landfill Leachate Pond construction project by Volusia County's Solid Waste Division in Port Orange, Florida. The project scope includes the design and construction of a new leachate pond system with supporting infrastructure, including a 72-linear-foot 30-inch reinforced concrete pipe, dual-contained high-density polyethylene forcemain piping (ranging from 8 inches to 10 inches in diameter), three proposed lift stations, a truck loading station with secondary containment, leak detection systems, and over 45,900 linear feet of forcemain pipe routing across the landfill property. The leachate pond features a primary 60-mil and secondary 80-mil geomembrane liner system with geosynthetic clay liner protection, leak detection risers, and subgrade preparation to prevent infiltration. The drawings were prepared by SCS Engineers (Florida Firm Registration RY-4892) and are sealed by Licensed Professional Engineer Robert B. Curtis (License No. 73758), dated February 2026, with construction hours specified as 7:00 a.m. to 5:30 p.m. Monday through Saturday.
The contractor is responsible for all site preparation, utility location and protection, erosion and sediment control implementation, dewatering operations, surveying services, and compliance with landfill operations protocols that prohibit interference with active waste management activities. The project requires strict adherence to horizontal and vertical control standards based on Florida State Plane Coordinates (East Zone) NAD 1983 (2011) and NGVD 1929 datums, with topographic surveys completed in May and December 2024. The contractor must obtain all necessary licenses and permits, provide professional land surveyor services for site layout, maintain temporary barriers and safety controls, coordinate utility outages 48 hours in advance, and assume full responsibility for any regulatory fines imposed due to contractor actions. Additional requirements include development of a comprehensive site safety plan addressing landfill-specific hazards such as combustible gases and ground subsidence, protection of all monitoring wells and existing utilities, and restoration of disturbed areas beyond the construction limits with seeding and sodding at no cost to the County.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ta m -fs
\T am pa
\F ile s\
PR
O
JE
CT
\0
8.
\T as k
Le ac ha te T an ks
\D ra w in gs \E ng in ee rin g Dr aw in gs \C
O N
ST
RU
CT
IO
N D
RA
W
IN
GS
\0
8.
_C O
VE
R.
dw g
F eb
2,
- 7
:1 3p m L ay ou t N am e:
C
O
VE
R
AN
D
IN
DE
X
O F
DR
AW
IN
GS
B y:
a br en se l
LOCATION MAP
ROBERT B. CURTIS, P.E.
LICENSE NO. 73758
JEFFREY BROWER
JAKE JOHANSSON
DON DEMPSEY
MATT REINHART
DANNY ROBINS
TROY KENT
DAVID SANTIAGO
GEORGE RECKTENWALD
REGINA MONTGOMERY
TOMOKA FARMS
LANDFILL
NOT TO SCALE
SCS ENGINEERS
SCS PROJECT NO. 09219088.13
BID DRAWINGS
SOUTHEAST EXPANSION AREA LANDFILL
LEACHATE POND
10150 HIGHLAND MANOR DR., SUITE 320
TAMPA, FL 33610
PH. (813) 621-0080 FAX. (813) 623-6757
FLORIDA FIRM REGISTRATION: RY-4892
WWW.SCSENGINEERS.COM
STEARNS, CONRAD AND SCHMIDT
CONSULTING ENGINEERS, INC.
VOLUSIA COUNTY
FEBRUARY 2026
PORT ORANGE, FLORIDA
BOARD OF COUNTY COMISSIONERS:
PROJECT
LOCATION
TOMOKA FARMS ROAD
CAUTION: IF THIS SHEET IS NOT 24"x36" SCALE IS NOT VALID
COUNTY CHAIR
AT LARGE REPRESENTATIVE
DISTRICT 1
VICE CHAIR, DISTRICT 2
DISTRICT 3
DISTRICT 4
DISTRICT 5
COUNTY MANAGER
SOLID WASTE DIRECTOR
N
SHUNZ ROAD
TOM
OKA FARM
S ROAD
INTERSTATE 4
SOLID WASTE AND RECYCLING DIVISION
PUBLIC WORKS DEPARTMENT
BID DRAWINGS
SHEET LIST TABLE
SHEET NUMBER SHEET TITLE
C01 COVER AND INDEX OF DRAWINGS
C02 GENERAL NOTES AND ABBREVIATIONS
C03 LEACHATE SITE LOCATION PLAN
C04 LEACHATE POND AND FORCEMAIN
C05 LEACHATE POND
C06 TRUCK LOADING STATION
C07 LEACHATE POND PROFILES
C08 SECTIONS AND PROFILES
C09 PLAN AND PROFILE (1)
C10 PLAN AND PROFILE (2)
C11 PLAN AND PROFILE (3)
C12 PLAN AND PROFILE (4)
C13 PLAN AND PROFILE (5)
C14 PLAN AND PROFILE (6)
C15 SECTION AND DETAILS
C16 DETAILS I
C17 DETAILS II
C18 DETAILS III
P-1 PLUMBING SITE PLAN
P-2 TRUCK ACCESS AREA
P-3 LIFT STATION 1 AREA
P-4 CELL 1
P-5 PLUMBING DETAILS
S-1 TRUCK LOADING STATION FOUNDATION PLAN
S-2 TRUCK LOADING STATION SECTIONS AND DETAILS
S-3 PUMP STATION CONCRETE SLAB
E-1A ELECTRICAL DETAILS, LEGEND, AND NOTES
E-1B ELECTRICAL SPECIFICATIONS
E-2A ELECTRICAL SITE PLAN
E-2B ELECTRICAL SITE PLAN - PROPOSED MEDIUM VOLTAGE UTILITY OH
AND NORTH ROADWAY
E-3A ELECTRICAL PLAN - TRUCK ACCESS
E-3B ELECTRICAL RISER DIAGRAM AND PANEL SCHEDULES - TRUCK
ACCESS
E-3C ELECTRICAL PLAN - EXISTING POND PUMP STATION
E-4A ELECTRICAL PLAN - MAIN LIFT STATION NORTH
E-4B ELECTRICAL RISER AND SCHEDULES - MAIN LIFT STATION NORTH
E-5A ELECTRICAL PLAN - MAIN LIFT STATION SOUTH
E-5B ELECTRICAL PLAN - CELL 1 NORTH PUMP STATION
E-5C ELECTRICAL PLAN - CELL 1 SOUTH PUMP STATION
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
S
O U
TH
H
A
LL
L N
, S U
IT
E
, M A
IT
LA
N D
, F L
P
H
7)
-3
F
A X
N O
3)
-1
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
FEBRUARY 2026
RB
C
TM
A
I_ M
RB
C
SR
F
.1
S O
U
TH
E A
S T
E X
P A
N S
IO
N
A R
E A
LA
N
D
FI
LL
LE
A C
H A
TE
P
O N
D
V O
LU
S
IA
C
O U
N
TY
S O
LI
D
W A
S
TE
D
IV
IS
IO
N
SU
BM
IT
TE
D
FO
R
BI
D
RB
C
1/
/2
BID DRAWINGS
This item has been digitally signed and sealed by Robert B. Curtis, P.E. on the date indicated on the cover page. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
CAUTION: IF THIS SHEET IS NOT 24"x36" SCALE IS NOT VALID
ABBREVIATIONS:
C02
G E
N E
R A
L N
O
TE
S A
N D
A B
B R
E V
IA
TI
O N
S
09219088.13_NOTES
ANCHOR TRENCH
CENTERLINE
CONSTRUCTION QUALITY ASSURANCE
DIAMETER (Ø)
ELEVATION
EXISTING
FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION
FLORIDA DEPARTMENT OF TRANSPORTATION
FLORIDA POWER AND LIGHT COMPANY
FEMALE PIPE THREAD
FORCEMAIN
GAS COLLECTION AND CONTROL SYSTEM
GEOSYNTHETIC CLAY LINER
GROUNDWATER MONITORING WELL
HIGH-DENSITY POLYETHYLENE
INSIDE DIAMETER
LEACHATE COLLECTION SYSTEM
LEAK DETECTION SYSTEM
LANDFILL GAS
MAXIMUM
THOUSANDTH OF AN INCH (0.001")
MINIMUM
NORTH AMERICAN DATUM
NORTH AMERICAN VERTICAL DATUM
NATIONAL PIPE THREAD
ON CENTER
OUNCE
OUNCES PER SQUARE YARD
PERFORATED
POUNDS PER SQUARE INCH
PRESSURE TREATED
PROPOSED
QUOD ERAT DEMONSTRANDUM
REINFORCED CONCRETE PIPE
STAINLESS STEEL
STANDARD DIMENSION RATIO
TYPICAL
ULTRAVIOLET
VOLT
AT
CL
CQA
DIA.
EL.
EXIST.
FDEP
FDOT
FPL
FPT
FM
GCCS
GCL
GMW
HDPE
I.D.
LCS
LDS
LFG
MAX.
MIL
MIN.
NAD
NAVD
NPT
O.C.
OZ.
OZ/SY
PERF.
PSI
PT
PROPOSED
QED
RCP
S.S.
SDR
TYP.
UV
V
CAUTION: IF THIS SHEET IS NOT 24"x36" SCALE IS NOT VALID
A
DESIGNATION LETTER
INDICATES SECTION
SHEET NUMBER WHERE
SECTION IS TAKEN
INDICATES DIRECTION OF
CUTTING PLANE
SHEET NUMBER WHERE
SECTION IS SHOWN
SEE DETAIL
(DETAIL NAME)
SHEET NUMBER WHERE
DETAIL IS TAKEN
SHEET NUMBER WHERE
DETAIL IS SHOWN
DESIGNATION NUMBER
INDICATES DETAIL
INDICATES WHERE
DETAIL IS TAKEN
SECTION AND DETAIL DESIGNATION:
SYMBOLS:
EXISTING GROUND WATER
MONITORING WELLSF-MB
W PW-## EXISTING POTABLE WELLS
SOIL BORINGS
SE-# CLUSTER
PROPOSED GROUND WATER
MONITORING WELLS
EXISTING CLUSTER WELLS
PROPOSED FLOW ARROWS
PROPOSED SLOPE ARROWS
0.40%#.##%
PROPOSED CONTROL POINT###
PROPOSED SAND BAGS
SW-## EXISTING SURFACE WATER
MONITORING WELLS
GW-XX
B-##
GENERAL:
1. HOURS FOR CONSTRUCTION: 7:00 AM TO 5:30 PM MONDAY THRU
SATURDAY. CLOSED NEW YEAR'S DAY, THANKSGIVING DAY, CHRISTMAS DAY
AND SUNDAYS.
2. THE CONTRACTOR IS ADVISED THAT NO ACTIVITIES MAY INTERFERE, DISRUPT,
BLOCK, OR OTHERWISE CONFLICT WITH LANDFILL OPERATIONS. IF CONFLICTS
ARE ANTICIPATED, THEY SHALL BE COORDINATED AND APPROVED BY THE
COUNTY AND ENGINEER PRIOR TO DISRUPTION.
3. THE CONTRACTOR SHALL NOT INTERFERE WITH FACILITY OPERATIONS. THE
CONTRACTOR SHALL COORDINATE WITH AND NOTIFY THE OWNER A
MINIMUM OF 48 HOURS IN ADVANCE OF ALL PLANNED UTILITY OUTAGES
AND ROAD CROSSINGS.
4. THE PROJECT SITE IS A SOLID WASTE CLASS I LANDFILL, AS SUCH, CONDITIONS
ARE SUBJECT TO CHANGE WITH TIME. IN PARTICULAR VERTICAL GROUND
ELEVATION SHOULD BE EXPECTED (AND ANTICIPATED) TO VARY FROM THOSE
SHOWN ON THESE DRAWINGS DUE TO ONGOING SUBSIDENCE RESULTING
FROM REFUSE DECOMPOSITION WITHIN THE PROJECT LIMITS. RELATIVE
ELEVATION DIFFERENCES IN EXISTING AND PROPOSED ELEVATIONS SHOWN
ON THE DRAWINGS SHALL BE ADJUSTED ACCORDINGLY AND THE ENGINEER
NOTIFIED. LOCATION OF STRUCTURES SHALL BE PLACED IN ACCORDANCE
WITH HORIZONTAL CONTROLS. VERTICAL PLACEMENT OF STRUCTURES SHALL
BE IN ACCORDANCE WITH CONSTRUCTION DOCUMENTS, OR AS APPROVED
BY THE ENGINEER.
5. SINCE THE PROJECT SITE IS ON A SOLID WASTE CLASS I LANDFILL
COMBUSTIBLE GAS SHOULD BE EXPECTED (AND ANTICIPATED) ESPECIALLY
WHEN EXCAVATING TRENCHES.
6. ANY AND ALL FINES IMPOSED ON THE COUNTY BY ANY REGULATORY AGENCY
DUE TO ACTIONS OF THE CONTRACTOR SHALL BE PAID BY THE CONTRACTOR
AT NO EXPENSE TO THE COUNTY.
7. EXAMINE AREAS FOR CONDITIONS UNDER WHICH WORK IS TO BE
PERFORMED. REPORT IN WRITING TO THE ENGINEER ALL CONDITIONS
CONTRARY TO THOSE SHOWN ON THE DRAWINGS OR SPECIFIED HEREIN AND
ALL OTHER CONDITIONS THAT WILL AFFECT SATISFACTORY EXECUTION OF
WORK. DO NOT PROCEED WITH WORK UNTIL UNSATISFACTORY CONDITIONS
HAVE BEEN CORRECTED. STARTING WORK CONSTITUTES ACCEPTANCE OF
THE CONDITIONS UNDER WHICH WORK IS TO BE PERFORMED. AFTER SUCH
ACCEPTANCE, THE CONTRACTOR SHALL, AT CONTRACTORS EXPENSE, BE
RESPONSIBLE FOR CORRECTING ALL UNSATISFACTORY AND DEFECTIVE WORK
RESULTING FROM SUCH UNSATISFACTORY CONDITIONS.
8. INSTALL TEMPORARY BARRIERS, FENCES, BARRICADES, LIGHTS, WARNING
SIGNS AND OTHER DEVICES NECESSARY TO PROTECT STRUCTURES, UTILITIES,
LANDSCAPING, EXCAVATIONS, AND OTHER ITEMS AS NECESSARY. PROTECT
SURVEY BENCHMARKS AND MONUMENTS FROM DISPLACEMENT.
9. DEVIATIONS FROM THESE PLANS AND SPECIFICATIONS WITHOUT PRIOR
WRITTEN CONSENT OF THE ENGINEER OR COUNTY MAY CAUSE THE WORK
TO BE UNACCEPTABLE AND WILL BE ADJUSTED OR REPAIRED AT THE
CONTRACTOR'S EXPENSE.
10. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL NECESSARY LICENSES
AND PERMITS ASSOCIATED WITH THE CONSTRUCTION OF THIS PROJECT
UNLESS NOTIFIED OTHERWISE IN WRITING BY THE COUNTY.
11. ACTUAL DIMENSIONS AND LOCATIONS MAY VARY BASED ON FIELD
LOCATIONS WITH PRIOR APPROVAL OF THE ENGINEER.
12. THE CONTRACTOR SHALL NOTIFY THE ENGINEER IMMEDIATELY WHEN
CONFLICTS BETWEEN THE DRAWINGS AND ACTUAL CONDITIONS ARE
DISCOVERED.
13. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH EXISTING COUNTY
DESIGN AND CONSTRUCTION STANDARDS UNLESS THOSE STANDARDS
CONFLICT WITH THESE CONTRACT DOCUMENTS IN WHICH CASE THESE
CONTRACT DOCUMENTS SHALL GOVERN. SUCH CONFLICTS SHALL
IMMEDIATELY BE BROUGHT TO THE ENGINEER'S ATTENTION.
14. PIPE LENGTHS SHOWN ARE APPROXIMATE AND MAY BE ADJUSTED AS
REQUIRED IN THE FIELD, UPON APPROVAL BY ENGINEER.
15. THE LIMITS OF CONSTRUCTION SHOWN ON THE PLANS SHALL BE STRICTLY
OBSERVED BY THE CONTRACTOR. ALL INGRESS, EGRESS AND TRAFFIC
PATTERNS ON THE SITE SHALL BE WITHIN THE LIMITS OF CONSTRUCTION.
16. THE CONTRACTOR'S ATTENTION IS CALLED TO THE FACT THAT THERE MAY BE
SOME AREAS OF POSSIBLE UTILITY CONFLICTS. IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO LOCATE AND PROTECT ANY AND ALL
EXISTING UTILITIES ON THIS PROJECT. THE CONTRACTOR SHALL REPAIR ALL
DAMAGE TO EXISTING UTILITIES AT NO ADDITIONAL COST TO THE COUNTY.
17. THE COUNTY AND THE CONTRACTOR WILL COORDINATE ON THE FINAL
BOUNDARIES OF THE CONTRACTOR'S CONSTRUCTION LAYDOWN/STAGING
AREA AND CONTRACTOR'S ACCESS FROM THE AREA TO THE MAIN ROAD AT
THE PRE-CONSTRUCTION MEETING. THE CONSTRUCTION LAYDOWN/STAGING
AREA SHALL BE GRADED TO EXISTING GRADES, SEEDED AND MULCHED AS
REQUIRED UPON COMPLETION OF THE PROJECT PER THE SPECIFICATIONS AT
THE CONTRACTOR'S EXPENSE.
18. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR SITE SAFETY ASSOCIATED
WITH THE WORK UNDER THIS CONTRACT AND FOR COMPLIANCE WITH ALL
FEDERAL, STATE, AND LOCAL HEALTH AND SAFETY LAWS, CODES,
REGULATIONS, AND ORDINANCES, INCLUDING BUT NOT LIMITED BY OSHA
AND THE FLORIDA TRENCH SAFETY ACT. CONTRACTOR SHALL COORDINATE A
SITE SAFETY PLAN WITH OWNER'S PERSONNEL. THE CONTRACTOR SHALL
INCLUDE IN THE TOTAL BID PRICE ALL COSTS FOR COMPLIANCE WITH THESE
REGULATIONS.
19. THE CONTRACTOR IS RESPONSIBLE FOR DEVELOPING AND MAINTAINING A
SITE AND PERSONNEL SAFETY PROGRAM TO ADDRESS MONITORING OF THE
WORK WITHIN AND ADJACENT TO THE LANDFILL.
20. EXISTING CONDITIONS FOR THE SOUTHEAST EXPANSION AREA COMPILED
FROM TRC ENGINEERS, INC. DRAWINGS TITLED "SOUTHEAST STORMWATER
MANAGEMENT SYSTEM CONSTRUCTION" DATED JANUARY 2025.
21. GROUND WATER MONITORING WELL LOCATIONS, SURFACE WATER
MONITORING LOCATIONS, AND POTABLE WELL LOCATIONS OBTAINED FROM
HDR ENGINEERING NORTH CELL PHASE III AREA 4 PERMIT MODIFICATION
AND LATERAL EXPANSION DRAWINGS DATED MAY 2, 2018.
22. THE INFORMATION PROVIDED IN THESE PLANS AND REFERENCED IN THE
AVAILABLE SOILS REPORT IS SOLELY TO ASSIST THE CONTRACTOR IN
ACCESSING THE NATURE AND EXTENT OF CONDITIONS WHICH WILL BE
ENCOUNTERED DURING THE COURSE OF WORK. ALL CONTRACTORS ARE
DIRECTED PRIOR TO BIDDING, TO CONDUCT WHATEVER INVESTIGATION
THEY MAY DEEM NECESSARY TO ARRIVE AT THEIR OWN CONCLUSION
REGARDING THE ACTUAL CONDITIONS THAT WILL BE ENCOUNTERED, AND
UPON WHICH THEIR BIDS WILL BE BASED.
EARTHWORK:
1. EXCAVATION IS UNCLASSIFIED AND INCLUDES REMOVAL OF EARTH FILLS,
RUBBLE, AND OTHER MATERIALS ENCOUNTERED IN EXCAVATION AND
GRADING OPERATIONS TO DEPTH AND EXTENT SHOWN ON DRAWINGS OR
SPECIFIED. THE ENGINEER SHALL BE THE FINAL AUTHORITY AND SHALL MAKE
THE FINAL DECISION DURING CONSTRUCTION AS TO THE DEPTH AND EXTENT
TO WHICH MATERIALS MUST BE REMOVED AND REPLACED.
2. LIMIT DIRT, DUST, NOISE AND OTHER OBJECTIONABLE NUISANCES PER
PERMIT REQUIREMENTS.
3. CUT AND FILL SLOPES FOR STRUCTURAL EMBANKMENTS SHALL NOT EXCEED
3 HORIZONTAL TO 1 VERTICAL (3:1). THE CONTRACTOR IS RESPONSIBLE FOR
ALL SHORING AND BRACING DURING CONSTRUCTION.
4. THE COUNTY WILL PROVIDE FOR THE ON-SITE SERVICES OF A CQA INSPECTOR
OR A COUNTY AUTHORIZED REPRESENTATIVE TO TEST MATERIALS AND
MONITOR COMPLIANCE WITH THE REQUIREMENTS OF THE SPECIFICATIONS.
5. THE CONTRACTOR WILL AFFORD THESE REPRESENTATIVES ACCESS TO THE
JOB SITE FOR THE PERFORMANCE OF THEIR DUTIES.
6. ALL HANDLING (EXCAVATION, HAULING, STOCKPILING, ETC.) WILL BE
COMPLETED BY THE CONTRACTOR.
7. DEWATERING (AS REQUIRED): PROVIDE AND MAINTAIN DEWATERING OF ALL
SURFACE WATER AND/OR GROUNDWATER AS REQUIRED FOR EXCAVATION.
WHERE GROUNDWATER IS EXPECTED TO BE ENCOUNTERED DURING
BORROW AREA EXCAVATION, INSTALL A DEWATERING SYSTEM TO PREVENT
SOFTENING AND DISTURBANCE OF EXCAVATION, ALLOW BORROW MATERIAL
TO BE EXCAVATED DRY, AND MAINTAIN A STABLE EXCAVATION.
DEWATERING PERMITTING, IF REQUIRED, SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR.
UTILITIES:
1. THERE MAY BE OTHER UTILITIES NOT SHOWN ON THESE PLANS. THE
ENGINEER ASSUMES NO RESPONSIBILITY FOR LOCATIONS SHOWN AND IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
LOCATIONS OF ALL UTILITIES WITHIN THE LIMITS OF THE WORK PRIOR TO
CONSTRUCTION. ALL DAMAGE MADE TO EXISTING UTILITIES SHALL BE THE
SOLE RESPONSIBILITY OF THE CONTRACTOR. ALL COORDINATION AND
REQUIRED UTILITY COMPANY TEMPORARY PROTECTION SHALL BE AT THE
CONTRACTOR'S EXPENSE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
ENSURE UNINTERRUPTED SERVICE AND REPLACEMENT OF DAMAGED
UTILITIES.
2. THE CONTRACTOR SHALL PROVIDE AT LEAST 48 HOURS NOTICE TO THE
VARIOUS UTILITY COMPANIES TO PERMIT THE LOCATION OF EXISTING
UNDERGROUND UTILITIES IN ADVANCE OF CONSTRUCTION. CONTACT
UTILITIES NOTIFICATION CENTER AT 811 OR 1-800-432-4770.
SURVEYING:
1. HORIZONTAL DATUM IS BASED ON THE FLORIDA STATE PLANE COORDINATE
SYSTEM (EAST ZONE) NAD 1983 (2011). VERTICAL DATUM IS BASED ON THE
NATIONAL GEODETIC VERTICAL DATUM (NGVD) 1929.
2. SURVEY BENCHMARKS, MONUMENTS AND OTHER REFERENCE POINTS WILL
BE PROTECTED FROM DAMAGE AND DISPLACEMENT. IF DISTURBED OR
DESTROYED, THEY WILL BE REPLACED BY THE CONTRACTOR AT NO EXPENSE
TO THE COUNTY.
3. ALL REQUESTED SURVEY DATA MUST BE PROVIDED TO THE ENGINEER IN
FLORIDA STATE PLANE COORDINATES AND BE SIGNED AND SEALED BY A
STATE OF FLORIDA LICENSED SURVEYOR.
4. THE CONTRACTOR SHALL PROVIDE A PROFESSIONAL SURVEYOR AND MAPPER
LICENSED IN FLORIDA TO ESTABLISH THE CONSTRUCTION SITE LAYOUT,
PERFORM TOPOGRAPHIC SURVEYS, AND PERFORM ALL OTHER REQUIRED
SURVEYING SERVICES.
5. LOCATIONS, ELEVATIONS, AND DIMENSIONS OF EXISTING UTILITIES,
STRUCTURES, AND OTHER FEATURES ARE SHOWN BASED ON THE BEST
INFORMATION AVAILABLE AT THE TIME OF PREPARING THESE PLANS. BEFORE
CONSTRUCTION, THE CONTRACTOR SHALL VERIFY THE LOCATIONS,
ELEVATIONS, AND DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES,
AND OTHER FEATURES (WHETHER OR NOT SHOWN ON THE PLANS)
AFFECTING THEIR OWN WORK.
6. THE CONTRACTOR SHALL PROVIDE A PROFESSIONAL LAND SURVEYOR
LICENSED IN FLORIDA TO ESTABLISH THE CONSTRUCTION SITE LAYOUT,
PERFORM TOPOGRAPHIC SURVEYS, AND PERFORM ALL OTHER REQUIRED
SURVEYING SERVICES.
7. THE INFORMATION PROVIDED IN THESE PLANS IS SOLELY TO ASSIST THE
CONTRACTOR IN ASSESSING THE NATURE AND EXTENT OF THE CONDITIONS
THAT MAY BE ENCOUNTERED DURING THE COURSE OF WORK. BEFORE
BIDDING, ALL CONTRACTORS ARE DIRECTED TO CONDUCT WHATEVER
INVESTIGATIONS THEY MAY DEEM NECESSARY TO ARRIVE AT THEIR OWN
CONCLUSIONS REGARDING THE ACTUAL CONDITIONS THAT WILL BE
ENCOUNTERED, AND UPON WHICH THEIR BIDS SHALL BE BASED.
8. TOPOGRAPHIC SURVEY WAS COMPLETED ON MAY 21, 2024, BY INGENAE.
EROSION AND SEDIMENT CONTROL:
IT IS THE CONTRACTOR'S RESPONSIBILITY TO IMPLEMENT THE EROSION AND TURBIDITY CONTROLS AS SHOWN ON THE EROSION CONTROL PLAN. IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THESE CONTROLS ARE PROPERLY INSTALLED, MAINTAINED AND FUNCTIONING PROPERLY AT
THE END OF EACH WORKING DAY TO PREVENT TURBID OR POLLUTED WATER FROM LEAVING THE
PROJECT SITE. THE CONTRACTOR WILL ADJUST THE EROSION AND TURBIDITY CONTROLS SHOWN ON
THE EROSION CONTROL PLAN AND ADD ADDITIONAL CONTROL MEASURES, AS REQUIRED, TO
ENSURE THE SITE MEETS ALL FEDERAL, STATE AND LOCAL EROSION AND TURBIDITY CONTROL
REQUIREMENTS. CONTRACTOR IS RESPONSIBLE FOR THE SEQUENCE AND TIMING OF ALL EROSION
AND SEDIMENT CONTROL MEASURES.
1. EROSION CONTROL MEASURES SHALL BE CONSTRUCTED AS A FIRST STEP
BEFORE ANY LAND-DISTURBING ACTIVITIES TAKE PLACE TO MEET THE
EROSION AND TURBIDITY REQUIREMENTS IMPOSED ON THE PROJECT.
2. INSTALL EROSION AND SEDIMENT CONTROL AS NECESSARY TO PREVENT
SEDIMENTATION AND DAMAGE FROM STORMWATER RUNOFF TO ADJACENT
AREAS.
3. CONTRACTOR SHALL INSPECT AND REPAIR, AS NECESSARY, ANY EROSION
AND SEDIMENT CONTROL DAILY AND FOLLOWING EACH MEASURABLE RAIN
EVENT AS DEFINED BY NATIONAL POLLUTANT DISCHARGE ELIMINATION
SYSTEM RULES AND REGULATIONS.
4. CONTRACTOR SHALL MONITOR DOWNSTREAM CONDITIONS THROUGHOUT
THE CONSTRUCTION PERIOD, CLEARING ANY DEBRIS AND SEDIMENT
RESULTING FROM CONSTRUCTION.
5. ADDITIONAL EROSION AND SEDIMENT CONTROL MEASURES WILL BE
INSTALLED IF DEEMED NECESSARY BY ON-SITE INSPECTION.
6. EROSION CONTROL FENCING MUST MEET THE REQUIREMENTS OF THE
DEPARTMENT OF TRANSPORTATION, STATE OF FLORIDA STANDARD
SPECIFICATIONS. EROSION CONTROL MEASURES WILL BE MAINTAINED AT
ALL TIMES.
7. AREAS DISTURBED BEYOND THE LIMITS OF CONSTRUCTION SHALL BE
RE-SODDED AT NO COST TO THE COUNTY OR ENGINEER.
8. THE CONTRACTOR SHALL KEEP ALL SEEDED AND SODDED AREAS WATERED
AND IN GOOD CONDITION UNTIL THE CONTRACTOR HAS RECEIVED FINAL
PAYMENT INCLUDING THE CERTIFICATE OF FINAL COMPLETION AND ALL
SUBCONTRACTOR AFFIDAVITS (FINAL COMPLETION).
9. THE REPAIR OF ANY EROSION OR SOD RELOCATION NECESSARY PRIOR TO
THE SOD BECOMING FIRMLY ROOTED WILL BE THE RESPONSIBILITY OF THE
CONTRACTOR.
10. BEGIN MAINTENANCE OF SEEDED AND SODDED AREAS IMMEDIATELY AFTER
EACH PORTION IS PLANTED AND CONTINUE UNTIL FINAL ACCEPTANCE.
11. BEFORE BEGINNING WORK, THE CONTRACTOR SHALL PROVIDE
STORMWATER AND EROSION CONTROL PLANS TO PREVENT PONDING AND
CONTROL EROSION AND RUNOFF. NO PONDING OF WATER SHALL BE
ALLOWED. THE CONTRACTOR SHALL USE WHATEVER MEANS NECESSARY TO
PREVENT EROSION AND SHALL BE RESPONSIBLE FOR ALL WORK, INCLUDING
PROVIDING EQUIPMENT, LABOR, FILL, ETC. NECESSARY TO REMEDIATE
AND/OR RESTORE ALL AREAS IMPACTED BY EROSION.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING STORMWATER
RUNOFF, SOLID WASTE, LANDFILL GAS, AND LEACHATE FROM ENTERING OR
IMPACTING THE AREAS OF THE WORK. THE CONTRACTOR SHALL INSTALL
AND MAINTAIN MANAGEMENT AND CONTROL DEVICES INCLUDING
DIVERSION/COLLECTION BERMS, DITCHES, PUMPING STATIONS, SWALES,
LINERS, ETC. TO COMPLY WITH THE REQUIREMENTS OF THE CONTRACT
DOCUMENTS WITHOUT INCREASE IN THE CONTRACT PRICE OR TIME.
13. THE CONTRACTOR SHALL MAINTAIN A CLEAR PATH FOR ALL SURFACE WATER
DRAINAGE STRUCTURES AND DITCHES DURING ALL PHASES OF
CONSTRUCTION AND SHALL USE WHATEVER MEANS NECESSARY TO MANAGE
STORMWATER SUCH THAT THE IMPACT TO CONSTRUCTION IS MINIMIZED.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIR OF DAMAGE DUE TO
STORMWATER.
14. THE CONTRACTOR SHALL TAKE WHATEVER MEANS NECESSARY TO PROTECT
MONITORING WELLS FROM DAMAGE DURING CONSTRUCTION. THE
CONTRACTOR SHALL REPAIR OR REPLACE MONITORING WELLS DAMAGED
DURING CONSTRUCTION WITH LIKE MATERIALS AND CONSTRUCTION
METHODS AS APPROVED BY THE ENGINEER AND THE FLORIDA DEPARTMENT
OF ENVIRONMENTAL PROTECTION (FDEP) WITHOUT INCREASE IN THE
CONTRACT PRICE OR TIME. THE CONTRACTOR SHALL NOTIFY THE ENGINEER
IMMEDIATELY SHOULD DAMAGE OCCUR TO ANY MONITORING WELLS.
15. THE CONTRACTOR SHALL COMPLY WITH ALL TERMS, CONDITIONS, AND
REQUIREMENTS OF ALL APPLICABLE PERMITS, INCLUDING BUT NOT LIMITED
TO FDEP AND WATER MANAGEMENT DISTRICT PERMITS FOR THE SITE.
AutoCAD SHX Text \\TAM-FS01\TAMPA\FILES\PROJECT\09219088.13\TASK 14 ROAD ERP MODIFICATIONS\DRAWINGS\ENGINEERING DRAWINGS\ERP\
D
D
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E
O H
E O
H E
O H
E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
O H
E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E
O H
E O
H E
O H
E
OHE
OHE
O
HE
OHE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
OHE OHE
OHE OHE OHE OHE OHE OHE OHE OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
OHE
OHE
OHEOHEOHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHEOHE
OHE
O H
E
O H
E
O H
E
O H
E
O H
E
OHE
OHE
OHE
OHE
OHE
O H
E
O H
E
O H
E
OHEOHEOHE
O H
E O
H E
OHE
OHE
OHEOHE
OHE
OHE
OHE
OHEO
H
E
OHE
OHE
OHE
O H
EOHE
OHE
OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE
O
HE
O
HE
O
HE
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E
O H
E
O H
E
OHE
OHE
O H
E O
H E
O H
E
30'
VCL_27
5013 5014
1000210005 10006
10012
BATEMAN 1
BATEMAN 2
VCL18-AT
NOTES:
1. MERGED TOPOGRAPHIC SURVEYS ARE PROVIDED BY INGEN AE. FLIGHT
DATED MAY 21, 2024 AND SURVTECH SOLUTIONS, INC. FLIGHT DATED
DECEMBER 30, 2024.
2. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LOCATING ALL
EXISTING ABOVE AND UNDERGROUND UTILITIES AND PIPING IN THE
VICINITY OF THE CONSTRUCTION AREA PRIOR TO CONSTRUCTION.
3. OTHER UTILITIES NOT SHOWN ON THESE PLANS MAY BE PRESENT. THE
ENGINEER ASSUMES NO RESPONSIBILITY FOR LOCATIONS SHOWN AND IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
LOCATIONS OF ALL UTILITIES WITHIN THE LIMITS OF THE WORK PRIOR TO
CONSTRUCTION. ALL DAMAGE MADE TO EXISTING UTILITIES SHALL BE THE
SOLE RESPONSIBILITY OF THE CONTRACTOR. ALL COORDINATION AND
REQUIRED UTILITY COMPANY TEMPORARY PROTECTION SHALL BE AT THE
CONTRACTOR'S EXPENSE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
ENSURE UNINTERRUPTED SERVICE AND REPLACEMENT OF DAMAGED
UTILITIES.
4. FPL EASEMENT IS APPROXIMATE AND BASED ON SURVEY DRAWINGS BY
SLIGER MAY 2019.
5. STORMWATER DESIGN PROVIDED BY TRC ENGINEERS, INC. DATED JANUARY
3, 2025.
6. REFER TO THE SEPTEMBER 2024 WATER QUALITY TECHNICAL REPORT
PREPARED BY HDR AND SUBMITTED TO THE FDEP ON AUGUST 12, 2024 FOR
SEASONAL HIGH GROUNDWATER ELEVATION.
7. TOPOGRAPHIC SURVEY OF THE LEACHATE POND AREA IS PROVIDED BY
SLIGER & ASSOCIATES DATED SEPTEMBER 11, 2025.
8. EXCAVATED POND MATERIAL TO BE STOCKPILED AT THE MOUNT MACK
STOCKPILE AREA NORTH OF THE EXISTING LEACHATE EVAPORATION PONDS.
SEE THE SOUTHEAST EXPANSION AREA LANDFILL CELL 1 BID DRAWINGS.
N
4000 200
1" = 400'
EXISTING CLASS III LANDFILL
(ACTIVE)
EXISTING CLASS I LANDFILL
SOUTH CELL
(CLOSED)
EXISTING CLASS I LANDFILL
NORTH CELL
(ACTIVE)
SOUTHEAST
CELL EXPANSION
PROPOSED ACCESS ROAD
TO BE CONSTRUCTED IN
THE FUTUREPROPOSED MAINTENANCE
ROAD TO BE CONSTRUCTED
IN THE FUTURE
PROPOSED LIFT STATION
PROPOSED LIFT STATION
PROPOSED LIFT STATION
PROPOSED TRUCK LOADING STATION
PROPOSED
LEACHATE
POND
PROPOSED LIFT
STATION
PROPOSED FORCEMAIN
FORCEMAIN TO BE CAPPED
FOR FUTURE CONNECTION
WITH BLIND FLANGE
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
S
O U
TH
H
A
LL
L N
, S U
IT
E
, M A
IT
LA
N D
, F L
P
H
7)
-3
F
A X
N O
3)
-1
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
FEBRUARY 2026
RB
C
TM
A
I_ M
RB
C
SR
F
.1
S O
U
TH
E A
S T
E X
P A
N S
IO
N
A R
E A
LA
N
D
FI
LL
LE
A C
H A
TE
P
O N
D
V O
LU
S
IA
C
O U
N
TY
S O
LI
D
W A
S
TE
D
IV
IS
IO
N
SU
BM
IT
TE
D
FO
R
BI
D
RB
C
1/
/2
BID DRAWINGS
This item has been digitally signed and sealed by Robert B. Curtis, P.E. on the date indicated on the cover page. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
CAUTION: IF THIS SHEET IS NOT 24"x36" SCALE IS NOT VALID
C03
LE
A
C H
A
TE
S
IT
E L
O C
A
TI
O N
P
LA
N
09219088.13_SITE PLANS & SECTIONS
EXISTING
LEACHATE
EVAPORATION
PONDS
LEGEND:
EXISTING CONTOURS
## EXISTING BUILDING
EXISTING UNPAVED ROAD
UTILITY EASEMENT
PROPOSED LIMEROCK ROAD
OVERHEAD ELECTRICAL LINESOHEOHEOHE
PROPOSED CONTOURS
POWER POLE
PROPOSED FORCE MAIN
EXISTING WATER MAIN
LIMITS OF LEACHATE POND LINER
CONTRACTOR LAYDOWN AND
STAGING AREA
LIGHT POLE
LIMIT OF CONSTRUCTION
CELL 1 NORTH
CELL 1 SOUTH
CONTRACTOR
LAYDOWN AND
STAGING AREA
SURVEY CONTROL POINTS
CONTRACTOR
LAYDOWN AND
STAGING AREA
\\TAM-FS01\TAMPA\FILES\PROJECT\09219088.13\TASK 14 ROAD ERP MODIFICATIONS\DRAWINGS\ENGINEERING DRAWINGS\ERP\
NOTES:
1. MERGED TOPOGRAPHIC SURVEYS ARE PROVIDED BY INGEN AE. FLIGHT
DATED MAY 21, 2024 AND SURVTECH SOLUTIONS, INC. FLIGHT DATED
DECEMBER 30, 2024.
2. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LOCATING ALL
EXISTING ABOVE AND UNDERGROUND UTILITIES AND PIPING IN THE
VICINITY OF THE CONSTRUCTION AREA PRIOR TO CONSTRUCTION.
3. OTHER UTILITIES NOT SHOWN ON THESE PLANS MAY BE PRESENT. THE
ENGINEER ASSUMES NO RESPONSIBILITY FOR LOCATIONS SHOWN AND IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
LOCATIONS OF ALL UTILITIES WITHIN THE LIMITS OF THE WORK PRIOR TO
CONSTRUCTION. ALL DAMAGE MADE TO EXISTING UTILITIES SHALL BE THE
SOLE RESPONSIBILITY OF THE CONTRACTOR. ALL COORDINATION AND
REQUIRED UTILITY COMPANY TEMPORARY PROTECTION SHALL BE AT THE
CONTRACTOR'S EXPENSE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
ENSURE UNINTERRUPTED SERVICE AND REPLACEMENT OF DAMAGED
UTILITIES.
4. FPL EASEMENT IS APPROXIMATE AND BASED ON SURVEY DRAWINGS BY
SLIGER MAY 2019.
5. STORMWATER DESIGN PROVIDED BY TRC ENGINEERS, INC. DATED JANUARY
3, 2025.
6. REFER TO THE SEPTEMBER 2024 WATER QUALITY TECHNICAL REPORT
PREPARED BY HDR AND SUBMITTED TO THE FDEP ON AUGUST 12, 2024 FOR
SEASONAL HIGH GROUNDWATER ELEVATION.
7. TOPOGRAPHIC SURVEY OF THE LEACHATE POND AREA IS PROVIDED BY
SLIGER & ASSOCIATES DATED SEPTEMBER 11, 2025.
THE LEACHATE LOADING STATION IS TO ACT AS A SECONDARY
D
D
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
OHE
OHE
OHE
OHE
OHE
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E
O H
E O
H E
O H
E O
H E
O H
E O
H E
OHE
OHE
OHE
OHE
O
HE
O
HE
OHE
O
HE
OHE
O
HE
OHE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
OHE OHE OHE
OHE OHE
OHE OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHEOHEOHE
OHE
OHE
OHEOHEOHEOHE
O H
E O
H E
O H
E
OHE
OHE
O H
E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
O H
E
OHEOHEOHE
OHE
OHE
OHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHEOHE
OHE
O
HE
O
HE
O
HE
O
HE
O
HE
O H
E O
H E
O H
E O
H E
O H
E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
OHE
OHE
OHE
O H
E O
H E
VCL_27
1000210005 10006
10012
VCL18-AT
N
1" = 200'
0 200100 400
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
S
O U
TH
H
A
LL
L N
, S U
IT
E
, M A
IT
LA
N D
, F L
P
H
7)
-3
F
A X
N O
3)
-1
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
FEBRUARY 2026
RB
C
TM
A
I_ M
RB
C
SR
F
.1
S O
U
TH
E A
S T
E X
P A
N S
IO
N
A R
E A
LA
N
D
FI
LL
LE
A C
H A
TE
P
O N
D
V O
LU
S
IA
C
O U
N
TY
S O
LI
D
W A
S
TE
D
IV
IS
IO
N
SU
BM
IT
TE
D
FO
R
BI
D
RB
C
1/
/2
BID DRAWINGS
This item has been digitally signed and sealed by Robert B. Curtis, P.E. on the date indicated on the cover page. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
CAUTION: IF THIS SHEET IS NOT 24"x36" SCALE IS NOT VALID
C04
LE
A
C H
A
TE
P O
N D
A N
D
FO
R C
E M
A
IN
09219088.13_SITE PLANS & SECTIONS
EXISTING CLASS III LANDFILL
(ACTIVE)
EXISTING CLASS I LANDFILL
SOUTH CELL
(CLOSED)
EXISTING CLASS I LANDFILL
NORTH CELL
(ACTIVE)
SOUTHEAST
CELL EXPANSION
PROPOSED
ROAD
PROPOSED
ACCESS ROAD
C
C
C
PROPOSED
MAINTENANCE ROAD
EXISTING WATER MAIN
PROPOSED MAIN LIFT
STATION SOUTH
(SEE SHEET P-4)
PROPOSED LEACHATE POND
(SEE SHEET C05)
PROPOSED MAIN LIFT
STATION NORTH
(SEE SHEET P-3)
LEGEND:
EXISTING CONTOURS
## EXISTING BUILDING
EXISTING UNPAVED ROAD
UTILITY EASEMENT
PROPOSED LIMEROCK ROAD
OVERHEAD ELECTRICAL LINESOHEOHEOHE
PROPOSED CONTOURS
POWER POLE
PROPOSED FORCE MAIN
EXISTING WATER MAIN
LIMITS OF LEACHATE POND LINER
CONTRACTOR LAYDOWN AND
STAGING AREA
LIGHT POLE
PROPOSED LANDFILL
(SEE LANDFILL SET)
LIMIT OF CONSTRUCTION
SURVEY CONTROL POINTS
\\TAM-FS01\TAMPA\FILES\PROJECT\09219088.13\TASK 14 ROAD ERP MODIFICATIONS\DRAWINGS\ENGINEERING DRAWINGS\ERP\
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
O
HE
O
HE
O
HE
OHE
O
HE
OHE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O
HE
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
VCL_2710012
NOTES:
1. MERGED TOPOGRAPHIC SURVEYS ARE PROVIDED BY INGEN AE. FLIGHT
DATED MAY 21, 2024 AND SURVTECH SOLUTIONS, INC. FLIGHT DATED
DECEMBER 30, 2024.
2. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LOCATING ALL
EXISTING ABOVE AND UNDERGROUND UTILITIES AND PIPING IN THE
VICINITY OF THE CONSTRUCTION AREA PRIOR TO CONSTRUCTION.
3. OTHER UTILITIES NOT SHOWN ON THESE PLANS MAY BE PRESENT. THE
ENGINEER ASSUMES NO RESPONSIBILITY FOR LOCATIONS SHOWN AND IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
LOCATIONS OF ALL UTILITIES WITHIN THE LIMITS OF THE WORK PRIOR TO
CONSTRUCTION. ALL DAMAGE MADE TO EXISTING UTILITIES SHALL BE THE
SOLE RESPONSIBILITY OF THE CONTRACTOR. ALL COORDINATION AND
REQUIRED UTILITY COMPANY TEMPORARY PROTECTION SHALL BE AT THE
CONTRACTOR'S EXPENSE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
ENSURE UNINTERRUPTED SERVICE AND REPLACEMENT OF DAMAGED
UTILITIES.
4. FPL EASEMENT IS APPROXIMATE AND BASED ON SURVEY DRAWINGS BY
SLIGER MAY 2019.
5. STORMWATER DESIGN PROVIDED BY TRC ENGINEERS, INC. DATED JANUARY
3, 2025.
6. REFER TO THE SEPTEMBER 2024 WATER QUALITY TECHNICAL REPORT
PREPARED BY HDR AND SUBMITTED TO THE FDEP ON AUGUST 12, 2024 FOR
SEASONAL HIGH GROUNDWATER ELEVATION.
7. TOPOGRAPHIC SURVEY OF THE LEACHATE POND AREA IS PROVIDED BY
SLIGER & ASSOCIATES DATED SEPTEMBER 11, 2025.
8. THE LEACHATE LOADING STATION IS TO ACT AS A SECONDARY
CONTAINMENT, HOLDING LEACHATE/STORMWATER INSIDE THE BARRIER
FORMED BY THE CURBS AND THE SPEEDBUMPS, DRAINING INTO THE
CENTRAL GRATE OF THE LOADING PAD. WATERSTOPS SHOULD BE USED AT
ALL JOINTS.
9. TRUCK LOADING ROADS ARE AT LEAST 15' WIDE TO ALLOW FOR FIRE TRUCK
ACCESS.
N
400 20
1" = 40'
LIMITS OF
LEACHATE
POND LINER
GRADED 3:1
SEE DETAIL
C16
ANCHOR TRENCH
C05
C
C
A
C05 C07
B
DISCHARGE FROM EXISTING
LEACHATE POND
SEE DETAIL
18,19
C17
LEACHATE TRUCK LOADING STATION DETAILS
C05
SEE DETAIL
C15
LEACHATE DETECTION SUMP AND LINER SYSTEM
C05
72 LF 30" RCP
INVERT ELEV. = 28.70'
SEE DETAIL
C16
PIPE STRAP DOWN ANCHOR DETAIL (TYP.)
C05
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
S
O U
TH
H
A
LL
L N
, S U
IT
E
, M A
IT
LA
N D
, F L
P
H
7)
-3
F
A X
N O
3)
-1
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
FEBRUARY 2026
RB
C
TM
A
I_ M
RB
C
SR
F
.1
S O
U
TH
E A
S T
E X
P A
N S
IO
N
A R
E A
LA
N
D
FI
LL
LE
A C
H A
TE
P
O N
D
V O
LU
S
IA
C
O U
N
TY
S O
LI
D
W A
S
TE
D
IV
IS
IO
N
SU
BM
IT
TE
D
FO
R
BI
D
RB
C
1/
/2
BID DRAWINGS
This item has been digitally signed and sealed by Robert B. Curtis, P.E. on the date indicated on the cover page. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
CAUTION: IF THIS SHEET IS NOT 24"x36" SCALE IS NOT VALID
SEE DETAIL
C15
TYPICAL FDOT MES CULVERT
C05
INVERT ELEV. = 28.30
SEE DETAIL
C15
TYPICAL FDOT MES CULVERT
C05
SEE DETAIL
C16
DUAL CONTAINED FORCEMAIN PIPE (TYP.)
C05
PROPOSED STORMWATER
CONVEYANCE SWALE
C05
LE
A
C H
A
TE
P O
N D
09219088.13_SITE PLANS & SECTIONS
SEE DETAIL
C16
POST INDICATOR VALVE
C05
SEE DETAIL
C16
POST INDICATOR VALVE
C05
LEGEND:
EXISTING CONTOURS
## EXISTING BUILDING
EXISTING UNPAVED ROAD
UTILITY EASEMENT
PROPOSED LIMEROCK ROAD
OVERHEAD ELECTRICAL LINESOHEOHEOHE
PROPOSED CONTOURS
POWER POLE
PROPOSED FORCE MAIN
EXISTING WATER MAIN
LIMITS OF LEACHATE POND LINER
CONTRACTOR LAYDOWN AND
STAGING AREA
LIGHT POLE
LIMIT OF CONSTRUCTION
SEE DETAIL
C16
PIPE STRAP DOWN ANCHOR DETAIL (TYP.)
C05
PROPOSED TRUCK ACCESS
(SEE SHEET C06)
FENCE
GATE (TYP.)
GATE (TYP.)
GATE (TYP.)
SEE DETAIL
C18
FENCE DETAIL
C05
BOLLARD (TYP.)
(SEE SHEET S-2 FOR DETAIL)
BOLLARD (TYP.)
(SEE SHEET S-2 FOR DETAIL)
CHECK DAMS
INSTALLED AT
100' INTERVALS
FDOT TYPE III SILT FENCE
\\TAM-FS01\TAMPA\FILES\PROJECT\09219088.13\TASK 14 ROAD ERP MODIFICATIONS\DRAWINGS\ENGINEERING DRAWINGS\ERP\
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
O H
E O
H E
NOTES:
1. MERGED TOPOGRAPHIC SURVEYS ARE PROVIDED BY INGEN AE. FLIGHT
DATED MAY 21, 2024 AND SURVTECH SOLUTIONS, INC. FLIGHT DATED
DECEMBER 30, 2024.
2. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LOCATING ALL
EXISTING ABOVE AND UNDERGROUND UTILITIES AND PIPING IN THE
VICINITY OF THE CONSTRUCTION AREA PRIOR TO CONSTRUCTION.
3. OTHER UTILITIES NOT SHOWN ON THESE PLANS MAY BE PRESENT. THE
ENGINEER ASSUMES NO RESPONSIBILITY FOR LOCATIONS SHOWN AND IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE
LOCATIONS OF ALL UTILITIES WITHIN THE LIMITS OF THE WORK PRIOR TO
CONSTRUCTION. ALL DAMAGE MADE TO EXISTING UTILITIES SHALL BE THE
SOLE RESPONSIBILITY OF THE CONTRACTOR. ALL COORDINATION AND
REQUIRED UTILITY COMPANY TEMPORARY PROTECTION SHALL BE AT THE
CONTRACTOR'S EXPENSE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
ENSURE UNINTERRUPTED SERVICE AND REPLACEMENT OF DAMAGED
UTILITIES.
4. FPL EASEMENT IS APPROXIMATE AND BASED ON SURVEY DRAWINGS BY
SLIGER MAY 2019.
5. STORMWATER DESIGN PROVIDED BY TRC ENGINEERS, INC. DATED JANUARY
3, 2025.
6. REFER TO THE SEPTEMBER 2024 WATER QUALITY TECHNICAL REPORT
PREPARED BY HDR AND SUBMITTED TO THE FDEP ON AUGUST 12, 2024 FOR
SEASONAL HIGH GROUNDWATER ELEVATION.
7. TOPOGRAPHIC SURVEY OF THE LEACHATE POND AREA IS PROVIDED BY
SLIGER & ASSOCIATES DATED SEPTEMBER 11, 2025.
8. THE LEACHATE LOADING STATION IS TO ACT AS A SECONDARY
CONTAINMENT, HOLDING LEACHATE/STORMWATER INSIDE THE BARRIER
FORMED BY THE CURBS AND THE SPEEDBUMPS, DRAINING INTO THE
CENTRAL GRATE OF THE LOADING PAD. WATERSTOPS SHOULD BE USED AT
ALL JOINTS.
9. TRUCK LOADING ROADS ARE AT LEAST 15' WIDE TO ALLOW FOR FIRE TRUCK
ACCESS.
EXISTING
ASPHALT
ROAD
N
400 20
1" = 40'
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
S
O U
TH
H
A
LL
L N
, S U
IT
E
, M A
IT
LA
N D
, F L
P
H
7)
-3
F
A X
N O
3)
-1
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
FEBRUARY 2026
RB
C
TM
A
I_ M
RB
C
SR
F
.1
S O
U
TH
E A
S T
E X
P A
N S
IO
N
A R
E A
LA
N
D
FI
LL
LE
A C
H A
TE
P
O N
D
V O
LU
S
IA
C
O U
N
TY
S O
LI
D
W A
S
TE
D
IV
IS
IO
N
SU
BM
IT
TE
D
FO
R
BI
D
RB
C
1/
/2
BID DRAWINGS
This item has been digitally signed and sealed by Robert B. Curtis, P.E. on the date indicated on the cover page. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
CAUTION: IF THIS SHEET IS NOT 24"x36" SCALE IS NOT VALID
BOLLARDS
DRAINAGE SUMP GRATE
TRUCK LOADING
CONTAINMENT PAD
8" CONTAINMENT CURB
(SEE NOTE)
CONCRETE SPEED BUMP
(SEE NOTE)
C06
TR
U
C K
L O
A D
IN
G
S
TA
TI
O
N
09219088.13_SITE PLANS & SECTIONS
LEGEND:
EXISTING CONTOURS
## EXISTING BUILDING
EXISTING UNPAVED ROAD
UTILITY EASEMENT
PROPOSED LIMEROCK ROAD
OVERHEAD ELECTRICAL LINESOHEOHEOHE
PROPOSED CONTOURS
POWER POLE
PROPOSED FORCE MAIN
EXISTING WATER MAIN
LIMITS OF LEACHATE POND LINER
CONTRACTOR LAYDOWN AND
STAGING AREA
LIGHT POLE
C06 C17
LIMIT OF CONSTRUCTION
INVERT ELEV. = 28.70'
INVERT ELEV. = 28.30
FENCE
\\TAM-FS01\TAMPA\FILES\PROJECT\09219088.13\TASK 14 ROAD ERP MODIFICATIONS\DRAWINGS\ENGINEERING DRAWINGS\ERP\
EL
EV
AT
IO
N (F
T)
EL
EV
AT
IO
N (F
T)
LONGITUDINAL PROFILE Pond_South-North
EL
EV
AT
IO
N (F
T)
EL
EV
AT
IO
N (F
T)
LONGITUDINAL PROFILE PV - (16)
A C05 C07
SOUTH TO NORTH LEACHATE POND PROFILE
SCALE: 1"=30'
B C05 C07
WEST TO EAST LEACHATE POND PROFILE
SCALE: 1"=30'
ELEV. = 26'
EXISTING GRADES
PROPOSED GRADES
ELEV. = 26'
PROPOSED GRADES
LEAK DETECTION SUMP
LEAK DETECTION SUMP
ELEV. = 40'
SEE DETAIL
C15
LDS PIPE TRENCH
C07
28'
55'
10'
24'
ELEV. = 28'
ELEV. = 28'
10'
10'
ELEV. = 40'
ELEV. = 31'
ELEV. = 31'
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
S
O U
TH
H
A
LL
L N
, S U
IT
E
, M A
IT
LA
N D
, F L
P
H
7)
-3
F
A X
N O
3)
-1
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
FEBRUARY 2026
RB
C
TM
A
I_ M
RB
C
SR
F
.1
S O
U
TH
E A
S T
E X
P A
N S
IO
N
A R
E A
LA
N
D
FI
LL
LE
A C
H A
TE
P
O N
D
V O
LU
S
IA
C
O U
N
TY
S O
LI
D
W A
S
TE
D
IV
IS
IO
N
SU
BM
IT
TE
D
FO
R
BI
D
RB
C
1/
/2
BID DRAWINGS
This item has been digitally signed and sealed by Robert B. Curtis, P.E. on the date indicated on the cover page. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
CAUTION: IF THIS SHEET IS NOT 24"x36" SCALE IS NOT VALID
10'
10'
NOTES:
1. PROFILE VIEWS DRAWN AT 5:1 VERTICAL EXAGGERATION, UNLESS OTHERWISE NOTED.
TRUCK LOADING STATION
EXISTING GRADES
C07
LE
A
C H
A
TE
P O
N D
P R
O
FI
LE
S
09219088.13_SITE PLANS & SECTIONS
\\TAM-FS01\TAMPA\FILES\PROJECT\09219088.13\TASK 14 ROAD ERP MODIFICATIONS\DRAWINGS\ENGINEERING DRAWINGS\ERP\
EL
EV
AT
IO
N (F
T)
EL
EV
AT
IO
N (F
T)
LONGITUDINAL PROFILE PV - (2)
EL
EV
AT
IO
N (F
T)
EL
EV
AT
IO
N (F
T)
LONGITUDINAL PROFILE PV - (18)
EL
EV
AT
IO
N (F
T)
EL
EV
AT
IO
N (F
T)
LONGITUDINAL PROFILE PV - (18) (1) (1)
EXISTING SURFACE
SOUTHERN BORDER OF
CITY OF DAYTONA BEACH
UTILITY EASEMENT
PERIMETER ROAD
NORTHERN EDGE
PERIMETER ROAD
SOUTHERN EDGE
C C04 C08
FORCEMAIN ACROSS ROADWAY AND FPL EASEMENT
NOT TO SCALE
PROPOSED FORCEMAIN
LOCATION
SOUTHERN
STORMWATER
DITCH WATERLINE
NORTHERN
STORMWATER
DITCH WATERLINE
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
S
O U
TH
H
A
LL
L N
, S U
IT
E
, M A
IT
LA
N D
, F L
P
H
7)
-3
F
A X
N O
3)
-1
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
FEBRUARY 2026
RB
C
TM
A
I_ M
RB
C
SR
F
.1
S O
U
TH
E A
S T
E X
P A
N S
IO
N
A R
E A
LA
N
D
FI
LL
LE
A C
H A
TE
P
O N
D
V O
LU
S
IA
C
O U
N
TY
S O
LI
D
W A
S
TE
D
IV
IS
IO
N
SU
BM
IT
TE
D
FO
R
BI
D
RB
C
1/
/2
BID DRAWINGS
This item has been digitally signed and sealed by Robert B. Curtis, P.E. on the date indicated on the cover page. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
CAUTION: IF THIS SHEET IS NOT 24"x36" SCALE IS NOT VALID
SOUTHERN FPL BORDER
D C14 C08
FORCEMAIN AND LEACHATE POND PROFILE
SCALE: 1"=30'
8" IN 12" DUAL
CONTAINED HDPE
FORCEMAIN PIPE
C08
S E
C
TI
O N
S A
N D
P R
O
FI
LE
S
09219088.13_SITE PLANS & SECTIONS
CONTRACTOR TO GRADE UP TO
LIFT STATION AT A MAXIMUM
SLOPE OF 6:1 H:V TO MEET THE
DESIGNS ON SHEETS P-3 AND S-3
PROPOSED
GROUND
SURFACE
PROPOSED LIFT
STATION LOCATION
(PLEASE SEE SHEET P4)
EXISTING WATER MAIN
(FIELD VERIFY)
NORTHERN
FPL BORDER
NORTHERN BORDER OF
CITY OF DAYTONA BEACH
UTILITY EASEMENT
\\TAM-FS01\TAMPA\FILES\PROJECT\09219088.13\TASK 14 ROAD ERP MODIFICATIONS\DRAWINGS\ENGINEERING DRAWINGS\ERP\
Station
0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 5+50 6+00 6+50 7+00 7+50 8+00 8+50 9+00 9+50 10+00
Pipe - 1 Pipe - 2 Pipe - 3 Pipe - 4 Pipe - 6 Pipe - 7Pipe - 5
OHE
OHE
OHE
0+
1+
2+00
3+00
4+00
5+00 6+00
7+00
8+00
9+00
10+00
11+00
Pipe Table
Pipe Name
Pipe - 1
Pipe - 2
Pipe - 3
Pipe - 4
Pipe - 5
Pipe - 6
Pipe - 7
Pipe Start
Inv. El: 29.667 N: 1741612.4798 E: 624704.1358
Inv. El: 29.667 N: 1741631.2082 E: 624693.1571
Inv. El: 29.667 N: 1741790.5957 E: 624611.1081
Inv. El: 29.667 N: 1741974.9123 E: 624593.3647
Inv. El: 29.667 N: 1741992.8071 E: 624595.3029
Inv. El: 29.667 N: 1742182.8519 E: 624655.9258
Inv. El: 29.667 N: 1742340.5267 E: 624807.9533
Pipe End
Inv. El: 29.667 N: 1741631.2082 E: 624693.1571
Inv. El: 29.667 N: 1741790.5957 E: 624611.1081
Inv. El: 29.667 N: 1741974.9123 E: 624593.3647
Inv. El: 29.667 N: 1741992.8071 E: 624595.3029
Inv. El: 29.667 N: 1742182.8519 E: 624655.9258
Inv. El: 29.667 N: 1742340.5267 E: 624807.9533
Inv. El: 29.667 N: 1742355.6263 E: 625114.3126
Length
21.709
179.266
185.169
18.000
199.480
219.029
306.731
Stations
ST: 0+00.59
END: 0+22.29
ST: 0+22.29
END: 2+00.49
ST: 2+00.49
END: 3+84.28
ST: 3+84.28
END: 4+02.10
ST: 4+02.10
END: 6+00.30
ST: 6+00.30
END: 8+17.70
ST: 8+17.70
END: 11+22.41
N
0 4020
1" = 40'
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
S
O U
TH
H
A
LL
L N
, S U
IT
E
, M A
IT
LA
N D
, F L
P
H
7)
-3
F
A X
N O
3)
-1
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
FEBRUARY 2026
RB
C
TM
A
I_ M
RB
C
SR
F
.1
S O
U
TH
E A
S T
E X
P A
N S
IO
N
A R
E A
LA
N
D
FI
LL
LE
A C
H A
TE
P
O N
D
V O
LU
S
IA
C
O U
N
TY
S O
LI
D
W A
S
TE
D
IV
IS
IO
N
SU
BM
IT
TE
D
FO
R
BI
D
RB
C
1/
/2
BID DRAWINGS
This item has been digitally signed and sealed by Robert B. Curtis, P.E. on the date indicated on the cover page. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
CAUTION: IF THIS SHEET IS NOT 24"x36" SCALE IS NOT VALID
LEGEND:
EXISTING CONTOURS##
EXISTING BUILDING
EXISTING UNPAVED ROAD
UTILITY EASEMENT
PROPOSED PAVED ROAD
OVERHEAD ELECTRICAL LINES
TRC PROPOSED
STORMWATER POND (SEE NOTE 6)
OHEOHEOHE
PROPOSED CONTOURS##
POWER POLE
PROPOSED FORCE MAIN
MATCHLINE: STA. 10+00.00
EXISTING GROUND SURFACE
SEE DETAIL
C16
DUAL CONTAINED FORCEMAIN PIPE
C09
DUAL CONTAINED FORCEMAIN PIPE
22.5° PIPE BEND 11° PIPE BEND 22.5° PIPE BEND
22.5° PIPE BEND
C09
P
LA
N A
N D
P R
O
FI
LE
1)
09219088.13_PLAN&PROFILES
11° PIPE BEND
PROPOSED GROUND SURFACE
MIN. REQUIRED DEPTH (3')
FORCEMAIN TO BE CAPPED
FOR FUTURE CONNECTION
WITH BLIND FLANGE
SEE SOUTHEAST EXPANSION AREA
LANDFILL CELL 1 BID DRAWINGS
FOR PUMP STATION DETAIL
SEE SOUTHEAST EXPANSION AREA
LANDFILL CELL 1 BID DRAWINGS
FOR PUMP STATION DETAIL
NOTES:
1. PROFILE VIEWS DRAWN AT A 10:1 VERTICAL EXAGGERATION, UNLESS OTHERWISE
NOTED.
2. MERGED TOPOGRAPHIC SURVEYS ARE PROVIDED BY INGEN AE. FLIGHT DATED MAY
21, 2024 AND SURVTECH SOLUTIONS, INC. FLIGHT DATED DECEMBER 30, 2024.
3. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LOCATING ALL EXISTING ABOVE
AND UNDERGROUND UTILITIES AND PIPING IN THE VICINITY OF THE CONSTRUCTION
AREA PRIOR TO CONSTRUCTION.
4. OTHER UTILITIES NOT SHOWN ON THESE PLANS MAY BE PRESENT. THE ENGINEER
ASSUMES NO RESPONSIBILITY FOR LOCATIONS SHOWN AND IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATIONS OF ALL UTILITIES
WITHIN THE LIMITS OF THE WORK PRIOR TO CONSTRUCTION. ALL DAMAGE MADE TO
EXISTING UTILITIES SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ALL
COORDINATION AND REQUIRED UTILITY COMPANY TEMPORARY PROTECTION SHALL
BE AT THE CONTRACTOR'S EXPENSE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
ENSURE UNINTERRUPTED SERVICE AND REPLACEMENT OF DAMAGED UTILITIES.
5. FPL EASEMENT IS APPROXIMATE AND BASED ON SURVEY DRAWINGS BY SLIGER MAY
2019.
6. STORMWATER DESIGN PROVIDED BY TRC ENGINEERS, INC. DATED JANUARY 3, 2025.
7. REFER TO THE SEPTEMBER 2024 WATER QUALITY TECHNICAL REPORT PREPARED BY
HDR AND SUBMITTED TO THE FDEP ON AUGUST 12, 2024 FOR SEASONAL HIGH
GROUNDWATER ELEVATION.
\\TAM-FS01\TAMPA\FILES\PROJECT\09219088.13\TASK 14 ROAD ERP MODIFICATIONS\DRAWINGS\ENGINEERING DRAWINGS\ERP\
10+00 10+50 11+00 11+50 12+00 12+50 13+00 13+50 14+00 14+50 15+00 15+50 16+00 16+50 17+00 17+50 18+00 18+50 19+00 19+50 20+00
Pipe - 12
Pipe - 11
Pipe - 7
Pipe - 15
Pipe - 8
Pipe - 14 Pipe - 14A
Pipe - 13
Pipe - 7A
Pipe - 9
Pipe - 10
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
10+00
11+00
12+00
13+00
14+00
15+00
16+00
17+00
18+00
19+00
20+00
21+00
Pipe Table
Pipe Name Pipe Start Pipe End Length Stations
Pipe - 8
Pipe - 9
Pipe - 10
Pipe - 11
Pipe - 12
Pipe - 13
Pipe - 14
Pipe - 14A
Inv. El: 29.667 N: 1742355.8724 E: 625119.3065
Inv. El: 28.667 N: 1742373.9741 E: 625136.7313
Inv. El: 30.167 N: 1742410.8234 E: 625136.7195
Inv. El: 22.667 N: 1742429.1530 E: 625136.7195
Inv. El: 20.000 N: 1742445.3799 E: 625136.7110
Inv. El: 20.000 N: 1742465.6721 E: 625136.7020
Inv. El: 23.833 N: 1742688.6584 E: 625136.6308
Inv. El: 24.638 N: 1742703.2133 E: 625122.0154
Inv. El: 28.667 N: 1742373.9741 E: 625136.7313
Inv. El: 30.167 N: 1742410.8234 E: 625136.7195
Inv. El: 22.667 N: 1742429.1530 E: 625136.7195
Inv. El: 20.000 N: 1742445.3799 E: 625136.7110
Inv. El: 20.000 N: 1742465.6721 E: 625136.7020
Inv. El: 23.833 N: 1742688.6584 E: 625136.6308
Inv. El: 24.638 N: 1742703.2133 E: 625122.0154
Inv. El: 24.833 N: 1742706.7415 E: 625118.4725
25.126
36.849
18.330
16.227
20.292
222.986
20.627
5.000
ST: 11+27.41
END: 11+52.53
ST: 11+52.53
END: 11+89.38
ST: 11+89.38
END: 12+07.71
ST: 12+07.71
END: 12+23.94
ST: 12+23.94
END: 12+44.23
ST: 12+44.23
END: 14+67.22
ST: 14+67.22
END: 14+87.85
ST: 14+87.85
END: 14+92.85
Pipe - 7
Pipe - 7A
Inv. El: 29.667 N: 1742340.5267 E: 624807.9533
Inv. El: 29.667 N: 1742355.6263 E: 625114.3126
Inv. El: 29.667 N: 1742355.6263 E: 625114.3126
Inv. El: 29.667 N: 1742355.8724 E: 625119.3065
306.731
5.000
ST: 8+17.70
END: 11+22.41
ST: 11+22.41
END: 11+27.41
Pipe - 15 Inv. El: 24.833
N: 1742706.7415 E: 625118.4725
Inv. El: 24.833 N: 1742705.6567 E: 623861.3184
1257.155 ST: 14+92.85
END: 27+50.00
N
0 4020
1" = 40'
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
S
O U
TH
H
A
LL
L N
, S U
IT
E
, M A
IT
LA
N D
, F L
P
H
7)
-3
F
A X
N O
3)
-1
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
FEBRUARY 2026
RB
C
TM
A
I_ M
RB
C
SR
F
.1
S O
U
TH
E A
S T
E X
P A
N S
IO
N
A R
E A
LA
N
D
FI
LL
LE
A C
H A
TE
P
O N
D
V O
LU
S
IA
C
O U
N
TY
S O
LI
D
W A
S
TE
D
IV
IS
IO
N
SU
BM
IT
TE
D
FO
R
BI
D
RB
C
1/
/2
BID DRAWINGS
This item has been digitally signed and sealed by Robert B. Curtis, P.E. on the date indicated on the cover page. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
CAUTION: IF THIS SHEET IS NOT 24"x36" SCALE IS NOT VALID
LEGEND:
EXISTING CONTOURS##
EXISTING BUILDING
EXISTING UNPAVED ROAD
UTILITY EASEMENT
PROPOSED PAVED ROAD
OVERHEAD ELECTRICAL LINES
TRC PROPOSED
STORMWATER POND (SEE NOTE 6)
OHEOHEOHE
PROPOSED CONTOURS##
POWER POLE
PROPOSED FORCE MAIN
NOTES:
1. PROFILE VIEWS DRAWN AT A 10:1 VERTICAL EXAGGERATION, UNLESS OTHERWISE
NOTED.
2. MERGED TOPOGRAPHIC SURVEYS ARE PROVIDED BY INGEN AE. FLIGHT DATED MAY
21, 2024 AND SURVTECH SOLUTIONS, INC. FLIGHT DATED DECEMBER 30, 2024.
3. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR LOCATING ALL EXISTING ABOVE
AND UNDERGROUND UTILITIES AND PIPING IN THE VICINITY OF THE CONSTRUCTION
AREA PRIOR TO CONSTRUCTION.
4. OTHER UTILITIES NOT SHOWN ON THESE PLANS MAY BE PRESENT. THE ENGINEER
ASSUMES NO RESPONSIBILITY FOR LOCATIONS SHOWN AND IT SHALL BE THE
RESPONSIBILITY OF THE CONTRACTOR TO VERIFY THE LOCATIONS OF ALL UTILITIES
WITHIN THE LIMITS OF THE WORK PRIOR TO CONSTRUCTION. ALL DAMAGE MADE TO
EXISTING UTILITIES SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ALL
COORDINATION AND REQUIRED UTILITY COMPANY TEMPORARY PROTECTION SHALL
BE AT THE CONTRACTOR'S EXPENSE. IT IS THE CONTRACTOR'S RESPONSIBILITY TO
ENSURE UNINTERRUPTED SERVICE AND REPLACEMENT OF DAMAGED UTILITIES.
5. FPL EASEMENT IS APPROXIMATE AND BASED ON SURVEY DRAWINGS BY SLIGER MAY
2019.
6. STORMWATER DESIGN PROVIDED BY TRC ENGINEERS, INC. DATED JANUARY 3, 2025.
7. REFER TO THE SEPTEMBER 2024 WATER QUALITY TECHNICAL REPORT PREPARED BY
HDR AND SUBMITTED TO THE FDEP ON AUGUST 12, 2024 FOR SEASONAL HIGH
GROUNDWATER ELEVATION.
M
ATCHLINE: STA. 10+00.00
M
ATCHLINE: STA. 20+00.00
EXISTING GROUND
45° PIPE BENDS
SEE DETAIL
C16
DUAL CONTAINED FORCEMAIN PIPE
C10
45° PIPE BENDS
10" IN 16" DUAL CONTAINED FORCEMAIN PIPE
C10
P
LA
N A
N D
P R
O
FI
LE
2)
09219088.13_PLAN&PROFILES
PLEASE SEE SHEET P-4 FOR
FORCEMAIN CONNECTION TO
MAIN LIFT STATION SOUTH
MIN. REQUIRED DEPTH (3')
MIN. REQUIRED
DEPTH (3')
SEE DETAIL
C18
AIR RELEASE VALVE
C10
SEE DETAIL
C18
AIR RELEASE VALVE
C10
AIR RELEASE VALVE
AIR RELEASE VALVE
PROPOSED LIFT STATION 1
(SEE SHEET P-4)
PLEASE SHEET SHEET P-4 FOR PIPE CONNECTION TO THE MAIN
LIFT STATION SOUTH
PLEASE SHEET SHEET P-4 FOR PIPE CONNECTION TO THE MAIN
LIFT STATION SOUTH
\\TAM-FS01\TAMPA\FILES\PROJECT\09219088.13\TASK 14 ROAD ERP MODIFICATIONS\DRAWINGS\ENGINEERING DRAWINGS\ERP\
20+00 20+50 21+00 21+50 22+00 22+50 23+00 23+50 24+00 24+50 25+00 25+50 26+00 26+50 27+00 27+50 28+00 28+50 29+00 29+50 30+00
Pipe - 17Pipe - 15 Pipe - 16
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
OHE
20+00
21+00
22+00
23+00
24+00
25+00
26+00
27+00 28+00
29+00
30+00
31+00
32+00
Pipe Table
Pipe Name Pipe Start Pipe End Length Stations
Pipe - 15
Pipe - 16
Pipe - 17
Inv. El: 24.833 N: 1742706.7415 E: 625118.4725
Inv. El: 24.833 N: 1742705.6567 E: 623861.3184
Inv. El: 24.833 N: 1742705.6438 E: 623846.3159
Inv. El: 24.833 N: 1742705.6567 E: 623861.3184
Inv. El: 24.833 N: 1742705.6438 E: 623846.3159
Inv. El: 24.833 N: 1743401.1779 E: 623451.0898
1257.155
15.002
799.982
ST: 14+92.85
END: 27+50.00
ST: 27+50.00
END: 27+65.00
ST: 27+65.00
END: 35+64.98
N
0 4020
1" = 40'
DRAWING NO.
SCALE:
DATE:
PR
O
J.
N
O
DS
N
. B Y:
DW
N
. B Y:
CH
K.
B Y:
Q /A
R
VW
B Y:
AP
P.
B Y:
PR
O
JE
CT
T
IT
LE
CADD FILE:
SH
EE
T
TI
TL
E
CL
IE
N T
SHEET of
DA
TE
RE
V
DE
SC
RI
PT
IO
N
CH
K.
BY
S
C S
E N
G
IN
E E
R S
S
TE
A R
N S
, C O
N R
A D
A N
D S
C H
M
ID
T C
O N
S U
LT
IN
G E
N G
IN
E
E R
S
S
O U
TH
H
A
LL
L N
, S U
IT
E
, M A
IT
LA
N D
, F L
P
H
7)
-3
F
A X
N O
3)
-1
FL
O
R
ID
A F
IR
M
R E
G
IS
TR
A
TI
O
N R
Y-
AS SHOWN
FEBRUARY 2026
RB
C
TM
A
I_ M
RB
C
SR
F
.1
S O
U
TH
E A
S T
E X
P A
N S
IO
N
A R
E A
LA
N
D
FI
LL
LE
A C
H A
TE
P
O N
D
V O
LU
S
IA
C
O U
N
TY
S O
LI
D
W A
S
TE
D
IV
IS
IO
N
SU
BM
IT
TE
D
FO
R
BI
D
RB
C
1/
/2
BID DRAWINGS
This item has been digitally signed and sealed by Robert B. Curtis, P.E. on the date indicated on the cover page. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
CAUTION: IF THIS SHEET IS NOT 24"x36" SCALE IS NOT VALID
LEGEND:
EXISTING CONTOURS##
EXISTING BUILDING
EXISTING UNPAVED ROAD
UTILITY EASEMENT
PROPOSED PAVED ROAD
OVERHEAD ELECTRICAL LINES
TRC PROPOSED
STORMWATER POND (SEE NOTE 6)
OHEOHEOHE
PROPOSED CONTOURS##
POWER POLE
PROPOSED FORCE MAIN
M
ATCHLINE: STA. 20+00.00
M
ATC
HLIN
E:
ST
A. 3
0+
.00
EXISTING GROUND
SEE DETAIL
C16
DUAL CONTAINED FORCEMAIN PIPE
C11
SEE DETAIL
C16
DUAL CONTAINED CLEANOUT
C11
C11
P
LA
N A
N D
P R
O
FI
LE
3)
09219088.13_PLAN&PROFILES
MIN. REQUIRED DEPTH (3')
NOTES:
1. PROFILE VIEWS DRAWN AT A 10:1 VERTICAL EXAGGERATION, UNLESS OTHERWISE
NOTED.
2. MERGED TOPOGRAPHIC SURVEYS ARE PROVIDED BY INGEN AE. FLIGHT DATED MAY
21, 2024 AND SURVTECH SOLUTIONS, INC.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .