This is a Bid Price Sheet (Exhibit G) for Volusia County, Florida's Tomoka Farms Road Landfill Southeast Area Construction Cell I project. The document outlines 39 line items encompassing all major construction elements required for developing a new Class I landfill cell and associated leachate pond infrastructure. Project scope includes mobilization/demobilization, site preparation (clearing, grubbing, stripping, dewatering), unsuitable soil excavation, subbase and embankment construction, installation of geosynthetic clay liners and 60-mil textured HDPE geomembrane liners (primary and secondary), geocomposite drainage layers, leak detection and leachate collection systems with trenches and sumps, pump stations with piping and electrical controls, limerock roads and access ramps, pipe inspection and cleaning, and a complete landfill collection system. The leachate pond work includes 21,000 cubic yards of unsuitable soil excavation, dual geomembrane liner installation, detection sumps, pump stations, and a truck loading station with dual-contained forcemain piping. Additional items include groundwater and landfill gas monitoring infrastructure, with 7 monitoring wells to be installed and 31 to be abandoned, along with vegetation management (sodding and seeding) and site electrical system integration.
The bid price sheet contains unit pricing fields for all 39 line items with designated units (lump sum, cubic yards, square yards, and each), though the specific unit prices and total amounts are blank in this template form. Contractors are required to populate the unit prices for each item to calculate the subtotal bid amount, after which a payment and performance bond is added to establish the total bid price. The project represents a significant capital investment in long-term Class I solid waste disposal capacity, with the Southeast Expansion Area designed to provide the County with over 100 years of disposal capability. This bid price sheet serves as the standardized pricing document that all contractors must complete and submit as part of their formal bid proposals for this landfill construction project.
View the file
Other files
Show all 31
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 Exhibit G - Bid Price Sheet 26-B-51IF Tomoka Farms Road Landfill Southeast Area Landfill Construction Cell I Contractor Name:
| Item No. | Description | Unit | Qty | Unit Price($) | Amount ($) | |
| 1 | PROJECT Mobilization/Demobilization (not to exceed 5%) | LS | 1 | $ - 0 | $ - 0 | |
| 2 | PROJECT Survey | LS | 1 | $ - 0 | $ - 0 | |
| 3 | PROJECT Erosion and Sediment Control | LS | 1 | $ - 0 | $ - 0 | |
| 4 | PROJECT Site Clearing, Grubbing, and Stripping | LS | 1 | $ - 0 | $ - 0 | |
| 5 | PROJECT Dewatering | LS | 1 | $ - 0 | $ - 0 | |
| 6 | CELL 1 Unsuitable Soil Excavation and Disposal | CY | 100 | $ - 0 | $ - 0 | |
| 7 | CELL 1 Subbase and Embankment Construction | LS | 1 | $ - 0 | $ - 0 | |
| 8 | CELL 1 Geosynthetic Clay Liner | LS | 1 | $ - 0 | $ - 0 | |
| 9 | CELL 1 60 mil Textured HDPE Geomembrane Liner | |||||
| (Primary) | LS | 1 | $ - 0 | $ - 0 | ||
| 10 | CELL 1 60 mil Textured HDPE Geomembrane Liner | |||||
| (Secondary) | LS | 1 | $ - 0 | $ - 0 | ||
| 11 | CELL 1 Geocomposite (Primary) | LS | 1 | $ - 0 | $ - 0 | |
| 12 | CELL 1 Geocomposite (Secondary) | LS | 1 | $ - 0 | $ - 0 | |
| 13 | CELL 1 Geocomposite (Additional Layer in LCS Trench | |||||
| Secondary) | LS | 1 | $ - 0 | $ - 0 | ||
| 14 | CELL 1 Leak Detection and Leachate Collection Trenches | |||||
| and Cleanouts (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 15 | CELL 1 Leachate Collection and Detection Sumps and Riser | |||||
| Pipes (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 16 | CELL 1 Drainage Sand Layer | LS | 1 | $ - 0 | $ - 0 | |
| 17 | CELL 1 Rain Tarp | LS | 1 | $ - 0 | $ - 0 | |
| 18 | CELL 1 Pump Stations, Piping, Valving, Electrical System | |||||
| and Controls (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 19 | CELL 1 Embankment Limerock Road | LS | 1 | $ - 0 | $ - 0 | |
| 20 | CELL 1 Limerock Access Ramp | LS | 1 | $ - 0 | $ - 0 | |
| 21 | CELL 1 Jetclean/Video Inspect and Record Installed Pipes | LS | 1 | $ - 0 | $ - 0 | |
| 22 | CELL 1 Early Landfill Collection System | LS | 1 | $ - 0 | $ - 0 | |
| 23 | LEACHATE POND Unsuitable Soil Excavation and Disposal | CY | 21,000 | $ - 0 | $ - 0 | |
| 24 | LEACHATE POND Subbase and Embankment Construction | LS | 1 | $ - 0 | $ - 0 | |
| 25 | LEACHATE POND Geosynthetic Clay Liner | LS | 1 | $ - 0 | $ - 0 | |
| 26 | LEACHATE POND 60 mil Textured HDPE Geomembrane | |||||
| Liner (Primary) | LS | 1 | $ - 0 | $ - 0 | ||
| 27 | LEACHATE POND Geocomposite | LS | 1 | $ - 0 | $ - 0 | |
| 28 | LEACHATE POND 80 mil Textured HDPE Geomembrane | |||||
| Liner (Secondary) | LS | 1 | $ - 0 | $ - 0 | ||
| 29 | LEACHATE POND Leachate Detection Sump and Riser Pipe | |||||
| (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 30 | LEACHATE POND Pump Stations, Piping, Valving, Electrical | |||||
| System and Controls (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 31 | LEACHATE POND Truck Loading Station | LS | 1 | $ - 0 | $ - 0 | |
| 32 | LEACHATE POND Dual Contained Forcemain Pipe | LS | 1 | $ - 0 | $ - 0 | |
| 33 | PROJECT Pump Stations, Piping, Valving, Electrical System | |||||
| and Controls (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 34 | PROJECT Electrical System Installation and Integration | LS | 1 | $ - 0 | $ - 0 | |
| 35 | PROJECT Sodding | SY | 1 | $ - 0 | $ - 0 | |
| 36 | PROJECT Seeding | SY | 1 | $ - 0 | $ - 0 | |
| 37 | PROJECT LFG Monitoring Probes | EA | 6 | $ - 0 | $ - 0 | |
| 38 | PROJECT Groundwater Monitoring Well Installation | EA | 7 | $ - 0 | $ - 0 | |
| 39 | PROJECT Groundwater Monitoring Well Abandonment | EA | 31 | $ - 0 | $ - 0 | |
| SUBTOTAL BID | $ - 0 | |||||
| PAYMENT AND PERFORMANCE BOND | $ - 0 | |||||
| TOTAL BID PRICE (inclusive of Payment and Performance Bond) | $ - 0 |