Exhibit_G_-_Bid_Price_Sheet_26-B-51IF.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- 26-B-51IF
- Issued by
- Volusia County, Florida
About this file
This is a Bid Price Sheet (Exhibit G) for Volusia County, Florida's construction of the Tomoka Farms Road Landfill Southeast Area Construction Cell I project (ITB No. 26-B-51IF, Contract No. C-2071). The project encompasses comprehensive landfill construction including site mobilization, survey work, erosion control, site clearing, unsuitable soil excavation (100 cubic yards for Cell 1 and 21,000 cubic yards for the leachate pond), subbase and embankment construction, installation of geosynthetic clay liners and dual 60-mil textured HDPE geomembrane liners (both primary and secondary), leak detection and leachate collection infrastructure with trenches and sumps, drainage sand layers, pump stations with piping and electrical controls, limerock roads and access ramps, video inspection of installed pipes, early landfill gas collection system, a lined leachate pond with truck loading station, dual-contained forcemain piping, groundwater monitoring well installation (7 wells) and abandonment (31 wells), landfill gas monitoring probes (6 units), sodding and seeding, and electrical system integration. Electronic bids must be submitted through the County's eProcurement Portal by 3:00 PM on April 2, 2026. A non-mandatory pre-bid meeting is scheduled for March 12, 2026, at 11:00 AM with virtual attendance available, and the deadline for submitting questions is March 19, 2026. Substantial Completion is required within 244 days of Notice to Proceed, with Final Completion within 365 days total.
The bid price sheet contains 39 line items with quantities and unit pricing fields for contractors to complete; all items are currently blank with zero dollar amounts shown. The estimated construction cost is $43,293,495.00. Bidders must submit a Bid Bond of not less than five percent of the total bid amount and a Payment and Performance Bond equal to 100 percent of the contract price. Comprehensive insurance requirements include Workers' Compensation (Florida Statutory Coverage), Commercial General Liability ($1,000,000 per occurrence/$2,000,000 aggregate), Commercial Auto Liability ($1,000,000 combined single limit), Excess Liability ($10,000,000 per occurrence/aggregate), and Contractors Pollution Liability ($5,000,000 per incident/aggregate), with Volusia County named as additional insured. Eligible bidders must possess a current State of Florida General Contractors license. Local preference up to 5 percent applies to bidders and subcontractors with documented business presence in Brevard, Lake, Orange, Osceola, Seminole, or Volusia County for at least six months prior to bid submission. Liquidated damages of $1,000 per day apply for failure to meet completion dates. Monthly progress payments will be made within 20 business days of invoice submission with the County retaining 5 percent until final completion. The contractor is responsible for obtaining all necessary Florida Department of Environmental Protection permits and must comply with OSHA regulations, federal and state employment laws, Fair Labor Standards Act requirements, and U.S.-produced iron and steel requirements per Florida Statute 255.0993.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1 Exhibit G - Bid Price Sheet 26-B-51IF Tomoka Farms Road Landfill Southeast Area Landfill Construction Cell I Contractor Name:
| Item No. | Description | Unit | Qty | Unit Price($) | Amount ($) | |
| 1 | PROJECT Mobilization/Demobilization (not to exceed 5%) | LS | 1 | $ - 0 | $ - 0 | |
| 2 | PROJECT Survey | LS | 1 | $ - 0 | $ - 0 | |
| 3 | PROJECT Erosion and Sediment Control | LS | 1 | $ - 0 | $ - 0 | |
| 4 | PROJECT Site Clearing, Grubbing, and Stripping | LS | 1 | $ - 0 | $ - 0 | |
| 5 | PROJECT Dewatering | LS | 1 | $ - 0 | $ - 0 | |
| 6 | CELL 1 Unsuitable Soil Excavation and Disposal | CY | 100 | $ - 0 | $ - 0 | |
| 7 | CELL 1 Subbase and Embankment Construction | LS | 1 | $ - 0 | $ - 0 | |
| 8 | CELL 1 Geosynthetic Clay Liner | LS | 1 | $ - 0 | $ - 0 | |
| 9 | CELL 1 60 mil Textured HDPE Geomembrane Liner | |||||
| (Primary) | LS | 1 | $ - 0 | $ - 0 | ||
| 10 | CELL 1 60 mil Textured HDPE Geomembrane Liner | |||||
| (Secondary) | LS | 1 | $ - 0 | $ - 0 | ||
| 11 | CELL 1 Geocomposite (Primary) | LS | 1 | $ - 0 | $ - 0 | |
| 12 | CELL 1 Geocomposite (Secondary) | LS | 1 | $ - 0 | $ - 0 | |
| 13 | CELL 1 Geocomposite (Additional Layer in LCS Trench | |||||
| Secondary) | LS | 1 | $ - 0 | $ - 0 | ||
| 14 | CELL 1 Leak Detection and Leachate Collection Trenches | |||||
| and Cleanouts (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 15 | CELL 1 Leachate Collection and Detection Sumps and Riser | |||||
| Pipes (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 16 | CELL 1 Drainage Sand Layer | LS | 1 | $ - 0 | $ - 0 | |
| 17 | CELL 1 Rain Tarp | LS | 1 | $ - 0 | $ - 0 | |
| 18 | CELL 1 Pump Stations, Piping, Valving, Electrical System | |||||
| and Controls (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 19 | CELL 1 Embankment Limerock Road | LS | 1 | $ - 0 | $ - 0 | |
| 20 | CELL 1 Limerock Access Ramp | LS | 1 | $ - 0 | $ - 0 | |
| 21 | CELL 1 Jetclean/Video Inspect and Record Installed Pipes | LS | 1 | $ - 0 | $ - 0 | |
| 22 | CELL 1 Early Landfill Collection System | LS | 1 | $ - 0 | $ - 0 | |
| 23 | LEACHATE POND Unsuitable Soil Excavation and Disposal | CY | 21,000 | $ - 0 | $ - 0 | |
| 24 | LEACHATE POND Subbase and Embankment Construction | LS | 1 | $ - 0 | $ - 0 | |
| 25 | LEACHATE POND Geosynthetic Clay Liner | LS | 1 | $ - 0 | $ - 0 | |
| 26 | LEACHATE POND 60 mil Textured HDPE Geomembrane | |||||
| Liner (Primary) | LS | 1 | $ - 0 | $ - 0 | ||
| 27 | LEACHATE POND Geocomposite | LS | 1 | $ - 0 | $ - 0 | |
| 28 | LEACHATE POND 80 mil Textured HDPE Geomembrane | |||||
| Liner (Secondary) | LS | 1 | $ - 0 | $ - 0 | ||
| 29 | LEACHATE POND Leachate Detection Sump and Riser Pipe | |||||
| (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 30 | LEACHATE POND Pump Stations, Piping, Valving, Electrical | |||||
| System and Controls (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 31 | LEACHATE POND Truck Loading Station | LS | 1 | $ - 0 | $ - 0 | |
| 32 | LEACHATE POND Dual Contained Forcemain Pipe | LS | 1 | $ - 0 | $ - 0 | |
| 33 | PROJECT Pump Stations, Piping, Valving, Electrical System | |||||
| and Controls (All Inclusive) | LS | 1 | $ - 0 | $ - 0 | ||
| 34 | PROJECT Electrical System Installation and Integration | LS | 1 | $ - 0 | $ - 0 | |
| 35 | PROJECT Sodding | SY | 1 | $ - 0 | $ - 0 | |
| 36 | PROJECT Seeding | SY | 1 | $ - 0 | $ - 0 | |
| 37 | PROJECT LFG Monitoring Probes | EA | 6 | $ - 0 | $ - 0 | |
| 38 | PROJECT Groundwater Monitoring Well Installation | EA | 7 | $ - 0 | $ - 0 | |
| 39 | PROJECT Groundwater Monitoring Well Abandonment | EA | 31 | $ - 0 | $ - 0 | |
| SUBTOTAL BID | $ - 0 | |||||
| PAYMENT AND PERFORMANCE BOND | $ - 0 | |||||
| TOTAL BID PRICE (inclusive of Payment and Performance Bond) | $ - 0 |
File details come from the government source that posted it. Updated .