Exhibit E3 - Portland Control Center HVAC outdoor unit placement.pdf

PDF 307 KB Posted

Attached to
Elevator Modernization Construction, for 7 elevators at 5 different sites
Solicitation number
00002676
Issued by
Oregon

About this file

This is an exhibit document related to a Portland Control Center HVAC system project. The exhibit, designated as E3, provides technical specifications for the outdoor unit placement of the heating, ventilation, and air conditioning system serving the control center facility. The document contains a callout annotation prepared by R. Vandewalle that designates the specific location where the HVAC outdoor unit is to be positioned within the project site. This exhibit serves as a visual reference guide for contractors and construction personnel executing the HVAC installation work as part of the broader Portland Control Center improvement project.

The exhibit functions as a technical drawing component within the project documentation package and does not independently establish pricing, contract terms, or performance schedules. As a spatial reference document, it supports the coordination between mechanical system design and facility layout requirements, ensuring that the outdoor HVAC unit placement aligns with overall project specifications and site constraints. This type of exhibit is typically incorporated into bidding documents to provide clarity on installation expectations and to minimize design ambiguity during the construction phase.

View the file

Other files

File Type Posted
Exhibit B - City 1900 Building Technical Specifications.pdf PDF
Exhibit D - North Precinct Building Technical Specifications.pdf PDF
Addendum 01 ITB 0000676 Pre-Bid Meeting Details.pdf PDF
Exhibit C1 - City East Precinct Building As Builts.pdf PDF
Exhibit C2 - East Precinct - Architectural and Plumbing As Builts.pdf PDF
Exhibit F1 - Alternate 1 - Technical Specification Page 4 Modification.pdf PDF
Notice of Intent to Award ITB 2676.pdf PDF
Exhibit D1 - North Precinct Building As Builts.pdf PDF
ITB 00002676 Elevator Modernization Construction.pdf PDF
Exhibit B1 - 1900 Building Architectural As Builts.pdf PDF
Addendum 03 ITB 00002676 Update Close Date and Add Documents~1.pdf PDF
Exhibit E1 - Portland Communication Center As Builts.pdf PDF
Exhibit D2 - North Precinct Architectural As Builts.pdf PDF
Updated Exhibit A - ITB 00002676 Elevator Modernization Services Contract.pdf PDF
Attachment 5 - PPB Background Check Forms.pdf PDF
ITB 00002676 Elevator Modernization Bid Tabulation~1.pdf PDF
Attachment 2 - ITB 00002676 Bid Pricing Form.xlsx XLSX spreadsheet
Addendum 04 ITB 00002676 Address Exceptions and Deviations.pdf PDF
ITB 00002676 Elevator Modernization Proposal Receipt Record.pdf PDF
Addendum 05 ITB 00002676 Plumbing Scope Clarifications.pdf PDF
Exhibit E2 - PCC Architectural As Builts.pdf PDF
Addendum 02 ITB 00002676 Pre-Bid Meeting Details.pdf PDF
Exhibit B2 -1900 Building Plumbing As Builts.pdf PDF
Attachment 4 - Buyspeed Submittal Instructions~1.pdf PDF
Invitation to Bid 00002676 Pre-Bid Meeting Attendance Sheet.pdf PDF
Exhibit E4 - Portland Control Center Sump Piping.pdf PDF
Exhibit F - Alternate 1 - St. Johns Building Technical Specification.pdf PDF
Exhibit E - Portland Communication Center Technical Specifications.pdf PDF
Exhibit C - City East Precinct Building Technical Specifications.pdf PDF
Exhibit D3 - North Precinct Sump Piping~1.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

rvandewalle Rectangle rvandewalle Callout placement of HVAC outdoor unit

File details come from the government source that posted it. Updated .