Attachment 2 - ITB 00002676 Bid Pricing Form.xlsx

XLSX spreadsheet 206 KB Posted

Attached to
Elevator Modernization Construction, for 7 elevators at 5 different sites
Solicitation number
00002676
Issued by
Oregon

About this file

This is a bid pricing form for Invitation to Bid (ITB) 00002676 issued by the City of Portland, Oregon for elevator modernization and maintenance services across multiple municipal facilities. The project encompasses modernization of six elevators located at four base bid sites: 1900 Building (three geared traction passenger elevators), East Precinct (one hydraulic elevator), North Precinct (one hydraulic elevator), and Portland Communication Center (one hydraulic elevator). The scope of work includes full modernization of each elevator system, electrical and fire life safety work, cab interior finishes with allowances, interim preventive maintenance during construction, and two-year warranty preventive maintenance following project completion. Two alternates are available: Alternate 1 for St. John's Building (one hydraulic elevator) and Alternate 2 for expedited scheduling at the Portland Communication Center. The bid form requires contractors to provide detailed pricing, installation schedules, and project duration estimates beginning from the Notice to Proceed date. Bid irrevocability is required for at least sixty calendar days after the bid opening date.

The total base bid cost is $120,000.00, comprised of $60,000 for the 1900 Building modernization, $20,000 for East Precinct, $20,000 for North Precinct, and $20,000 for Portland Communication Center. All pricing for modernization, interim maintenance, and two-year warranty maintenance must be submitted on the form, with cab interior allowances pre-established at $60,000 for the 1900 Building and $20,000 for each single-elevator location, subject to adjustment based on final finish selections. The project is designated as a BOLI prevailing wage project with April 5, 2025 prevailing wage rates to be applied. Contractors must provide all engineering, labor, materials, and services on a turnkey basis with no additional change orders permitted except as allowed by contract terms. The contractor accepts full responsibility for compliance with all applicable codes, regulations, manufacturer instructions, and current industry standards, including requirements of the State of Oregon Elevator Inspector and project consultant.

View the file

Other files

File Type Posted
Invitation to Bid 00002676 Pre-Bid Meeting Attendance Sheet.pdf PDF
Exhibit E4 - Portland Control Center Sump Piping.pdf PDF
Exhibit F - Alternate 1 - St. Johns Building Technical Specification.pdf PDF
Exhibit E - Portland Communication Center Technical Specifications.pdf PDF
Exhibit C - City East Precinct Building Technical Specifications.pdf PDF
Exhibit D3 - North Precinct Sump Piping~1.pdf PDF
Exhibit B - City 1900 Building Technical Specifications.pdf PDF
Exhibit D - North Precinct Building Technical Specifications.pdf PDF
Addendum 01 ITB 0000676 Pre-Bid Meeting Details.pdf PDF
Exhibit C1 - City East Precinct Building As Builts.pdf PDF
Exhibit C2 - East Precinct - Architectural and Plumbing As Builts.pdf PDF
Exhibit F1 - Alternate 1 - Technical Specification Page 4 Modification.pdf PDF
Notice of Intent to Award ITB 2676.pdf PDF
Exhibit E3 - Portland Control Center HVAC outdoor unit placement.pdf PDF
Addendum 04 ITB 00002676 Address Exceptions and Deviations.pdf PDF
ITB 00002676 Elevator Modernization Proposal Receipt Record.pdf PDF
Addendum 05 ITB 00002676 Plumbing Scope Clarifications.pdf PDF
Exhibit E2 - PCC Architectural As Builts.pdf PDF
Addendum 02 ITB 00002676 Pre-Bid Meeting Details.pdf PDF
Exhibit B2 -1900 Building Plumbing As Builts.pdf PDF
Attachment 4 - Buyspeed Submittal Instructions~1.pdf PDF
Exhibit D1 - North Precinct Building As Builts.pdf PDF
ITB 00002676 Elevator Modernization Construction.pdf PDF
Exhibit B1 - 1900 Building Architectural As Builts.pdf PDF
Addendum 03 ITB 00002676 Update Close Date and Add Documents~1.pdf PDF
Exhibit E1 - Portland Communication Center As Builts.pdf PDF
Exhibit D2 - North Precinct Architectural As Builts.pdf PDF
Updated Exhibit A - ITB 00002676 Elevator Modernization Services Contract.pdf PDF
Attachment 5 - PPB Background Check Forms.pdf PDF
ITB 00002676 Elevator Modernization Bid Tabulation~1.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Summary - do not modify

Cells to Auto-Populate from individual sites' tabs
SECTION 1: MODERNIZATION PRICING SUMMARYPRICE
1900 Building - Total Modernization Cost$60,000.00
East Precinct$20,000.00
North Precinct$20,000.00
PCC$20,000.00
TOTAL BASE BID$120,000.00
SECTION 2: MAINTENANCE PRICING SUMMARY PER ELEVATOR
INTERIM MAINTENANCE - based on projection of 6 months interim maintenance per elevator
1900 Building
Elevator 1$0.00
Elevator 2$0.00
Elevator 3$0.00
Total Maintenance For 2 Year Period$0.00
WARRANTY MAINTENANCE - insert monthly cost (spreadsheet will calculate total cost)
1900 Building
Elevator 1 (24 months)$0.00
Elevator 2 (24 months)$0.00
Elevator 3 (24 months)$0.00
East Precinct$0.00
North Precinct$0.00
PCC$0.00
Total Maintenance For 2 Year Period$0.00
TOTALTOTAL BID MODERNIZATION AND MAINTENANCE$120,000.00
ALTERNATESPRICE
Alternate 1: St. John's Building - Section 1 Modernization Pricing$0.00
Alternate 1: St. John's Building - Section 2 Warranty Maintenance Pricing -insert monthly cost and spreadsheet will calculate total cost$0.00
Total w/ Alternate 1$120,000.00
Alternate 2: PCC Expedited Pricing$0.00
Total w/ Alternate 2$120,000.00

1900 Building

ERROR:#VALUE!
1900 Building

1900 SW 4th Avenue, Portland, OR 97201

ELEVATOR MODERNIZATION & MAINTENANCE FOR THREE (3) GEARED TRACTION PASSENGER ELEVATORS
BID FORM

SECTION 1: MODERNIZATION

A.Base Bid for Full Modernization of Three (3) Geared Traction Passenger Elevators$ - 0
See technical specifications for required scope of work
Do Not Include the following in Base Bid:
*Item B below
*Item C below
*Warranty elevator preventive maintenance
B.Electrical/Fire Life Safety/Misc. Work by Others$ - 0
See technical specifications for required scope of work
C.Cab Interior Allowance$60,000
See technical specfor required scope of work. Include all labor and materials. Allowance will be adjusted based on final selection of finishes. Elevator Contractor shall provide documentation of cost after material selection by Owner, with a contract change order (additive or deductive) to reflect actual cost of the selected cab materials.

TOTAL MODERNIZATION COST (sum of Item A, Item B, Item C) $ 60,000.00

SECTION 2: MAINTENANCE

A.Interim Elevator Preventive Maintenance
Interim Elevator Service will commence when Elevator 1 is taken out of service for modernization and conclude when Elevator 3 modernization is completed and all elevators have been accepted by the Owner, Stat of Oregon Elevator Inspector and Consultant. The scope of work required for the Interim Elevator Preventive Maintenance shall be as stated in technical specifications - item 1.10
Total Cost per Month
Elevator 1$ - 0
Elevator 2$ - 0
Elevator 3$ - 0
A.Two Year Warranty Elevator Preventive Maintenance
Warranty Preventive Maintenance will commence when all elevators have been accepted by the Owner, State of Oregon Elevator Inspector and Consultant., which also includes the Elevator Contractor’s completion of all punch list items required by the Elevator Inspector and Consultant. The scope of work required for the Warranty Elevator Preventive Maintenance shall be as stated in technical specifications - item 1.10
Total Cost per Month
Elevator 1$ - 0
Elevator 2$ - 0
Elevator 3$ - 0
SECTION 3: SCHEDULE / DURATIONS
A.Elevator Installation Schedule
The construction schedule will begin at week 0, which is when a Contract is signed and a Notice to Proceed is issued by Owner. All elevator schedules for the elevator out of service shall be approved by Owner and Consultant.
Weeks from
Duration in weeks (from NTP)NTP
Provide Shop Drawings and Submittals0
Add 1 week for consultant review1
Equipment on site0
Start Elevator 10
Complete Elevator 10
Start Elevator 2
Complete Elevator 2
Start Elevator 3
Complete Elevator 3

ADDENDA

Addendums Received: Choose One

Elevator Contractor:
Name:
Phone:
Email:
Signature of Authorization for the

above price and delivery as specified:

An Offeror submitting a bid certifies that no officer, agent or employee of the City who has a pecuniary interest in this bid has participated in preparation of the bid, that the bid is made in good faith without fraud, collusion, or connection of any kind with any other Offeror of the same call for bids, and that the Offeror is competing solely in its own behalf without connection with, or obligation to any undisclosed person or firm.
END OF BID FORM
Choose One
Attached
No Exceptions/Clarifications
1
2
3
4
5
6
0
Choose One

FORM OF PROPOSAL FOR MODERNIZATION AND PREVENTIVE MAINTENANCE ON

VERTICAL TRANSPORTATION EQUIPMENT

This project shall be completed entirely by the Elevator Contractor as a TURNKEY project. No extra cost or change orders shall be allowed above bid pricing, except as allowed by the terms of this Contract. Elevator Contractor accepts full responsibility for the entire Elevator Project to be completed as per all Contract Documents and in full compliance with all codes, regulations and rules that are in force at the date stated on the Contract Documents.

The undersigned agrees to provide all engineering, tools, labor, materials and all services necessary for the completion of all work indicated and subject to all terms and conditions as stated in the Elevator Modernization and Maintenance Contract Documents.

FORM OF PROPOSAL FOR MODERNIZATION AND PREVENTIVE MAINTENANCE ON

VERTICAL TRANSPORTATION EQUIPMENT

This project shall be completed entirely by the Elevator Contractor as a TURNKEY project. No extra cost or change orders shall be allowed above bid pricing, except as allowed by the terms of this Contract. Elevator Contractor accepts full responsibility for the entire Elevator Project to be completed as per all Contract Documents and in full compliance with all codes, regulations and rules that are in force at the date stated on the Contract Documents.

The undersigned agrees to provide all engineering, tools, labor, materials and all services necessary for the completion of all work indicated and subject to all terms and conditions as stated in the Elevator Modernization and Maintenance Contract Documents.

This project will be a BOLI prevailing wage project and April 5, 2025 prevailing wage costs are to be used in estimating project costs. Contractor shall conform to current industry standards and shall comply with all Manufacturer’s instructions.

The undersigned having full knowledge of the specifications for the item(s) listed herein offers and agrees that this bid shall be irrevocable for at least sixty (60) calendar days after the bid opening date and time, and if accepted shall furnish any and/or all items(s) at the prices offered, all required documents, licenses and certifications, guarantees, titles and warranties as required and deliver at the designated point(s) within the time specified in the schedule.

The undersigned agrees to provide all engineering, tools, labor, materials and all services necessary for the completion of all work indicated and subject to all terms and conditions as stated in EXHIBIT B, DIVISION 14 SECTION 14 21 00 TECHNICAL SPECIFICATIONS FOR MODERNIZATION OF THREE (3) GEARED TRACTION PASSENGER ELEVATORS AT 1909 BUILDING, 1900 SW FOURTH AVE. PORTLAND, OR 97201

East Precinct

ERROR:#VALUE!
EAST PRECINCT

737 SE 106th Avenue, Portland, OR 97216

ELEVATOR MODERNIZATION & MAINTENANCE FOR ONE (1) HYDRAULIC PASSENGER ELEVATOR
BID FORM

SECTION 1: MODERNIZATION

A.Base Bid for Full Modernization of One (1) Hydraulic Elevator$ - 0
See technical specifications for required scope of work
Do Not Include the following in Base Bid:
*Item B below
*Item C below
*Warranty elevator preventive maintenance
B.Electrical/Fire Life Safety/Misc. Work by Others$ - 0
See technical specifications for required scope of work
C.Cab Interior Allowance$20,000
See technical specfor required scope of work. Include all labor and materials. Allowance will be adjusted based on final selection of finishes. Elevator Contractor shall provide documentation of cost after material selection by Owner, with a contract change order (additive or deductive) to reflect actual cost of the selected cab materials.

TOTAL MODERNIZATION COST (sum of Item A, Item B, Item C) $ 20,000.00

SECTION 2: MAINTENANCE
A.Two Year Warranty Elevator Preventive Maintenance
Warranty Preventive Maintenance will commence when all elevators have been accepted by the Owner, State of Oregon Elevator Inspector and Consultant., which also includes the Elevator Contractor’s completion of all punch list items required by the Elevator Inspector and Consultant. The scope of work required for the Warranty Elevator Preventive Maintenance shall be as stated in technical specifications - item 1.10
Total Cost per Month
Elevator 1$ - 0
SECTION 3: SCHEDULE / DURATIONS
A.Elevator Installation Schedule
The construction schedule will begin at week 0, which is when a Contract is signed and a Notice to Proceed is issued by Owner. All elevator schedules for the elevator out of service shall be approved by Owner and Consultant.
Weeks from
Duration in weeks (from NTP)NTP
Provide Shop Drawings and Submittals0
Add 1 week for consultant review1
Equipment on site0
Start Elevator 10
Complete Elevator 10

ADDENDA

Addendums Received: Choose One

Elevator Contractor:
Name:
Phone:
Email:
Signature of Authorization for the

above price and delivery as specified:

An Offeror submitting a bid certifies that no officer, agent or employee of the City who has a pecuniary interest in this bid has participated in preparation of the bid, that the bid is made in good faith without fraud, collusion, or connection of any kind with any other Offeror of the same call for bids, and that the Offeror is competing solely in its own behalf without connection with, or obligation to any undisclosed person or firm.
END OF BID FORM
Choose One
Attached
No Exceptions/Clarifications
1
2
3
4
5
6
0
Choose One

FORM OF PROPOSAL FOR MODERNIZATION AND PREVENTIVE MAINTENANCE ON

VERTICAL TRANSPORTATION EQUIPMENT

This project shall be completed entirely by the Elevator Contractor as a TURNKEY project. No extra cost or change orders shall be allowed above bid pricing, except as allowed by the terms of this Contract. Elevator Contractor accepts full responsibility for the entire Elevator Project to be completed as per all Contract Documents and in full compliance with all codes, regulations and rules that are in force at the date stated on the Contract Documents.

The undersigned agrees to provide all engineering, tools, labor, materials and all services necessary for the completion of all work indicated and subject to all terms and conditions as stated in the Elevator Modernization and Maintenance Contract Documents.

FORM OF PROPOSAL FOR MODERNIZATION AND PREVENTIVE MAINTENANCE ON

VERTICAL TRANSPORTATION EQUIPMENT

This project shall be completed entirely by the Elevator Contractor as a TURNKEY project. No extra cost or change orders shall be allowed above bid pricing, except as allowed by the terms of this Contract. Elevator Contractor accepts full responsibility for the entire Elevator Project to be completed as per all Contract Documents and in full compliance with all codes, regulations and rules that are in force at the date stated on the Contract Documents.

The undersigned agrees to provide all engineering, tools, labor, materials and all services necessary for the completion of all work indicated and subject to all terms and conditions as stated in the Elevator Modernization and Maintenance Contract Documents.

This project will be a BOLI prevailing wage project and April 5, 2025 prevailing wage costs are to be used in estimating project costs. Contractor shall conform to current industry standards and shall comply with all Manufacturer’s instructions.

The undersigned having full knowledge of the specifications for the item(s) listed herein offers and agrees that this bid shall be irrevocable for at least sixty (60) calendar days after the bid opening date and time, and if accepted shall furnish any and/or all items(s) at the prices offered, all required documents, licenses and certifications, guarantees, titles and warranties as required and deliver at the designated point(s) within the time specified in the schedule.

The undersigned agrees to provide all engineering, tools, labor, materials and all services necessary for the completion of all work indicated and subject to all terms and conditions as stated in EXHIBIT C, DIVISION 14 SECTION 14 24 00 TECHNICAL SPECIFICATIONS FOR MODERNIZATION OF ONE (1) HYDRAULIC PASSENGER ELEVATOR AT COP EAST PRECINCT, 737 SE 106TH AVE. PORTLAND, OR 97216

North Precinct

ERROR:#VALUE!
NORTH PRECINCT

499 NE Emerson St. Portland, OR 97211

ELEVATOR MODERNIZATION & MAINTENANCE FOR ONE (1) HYDRAULIC PASSENGER ELEVATOR
BID FORM

SECTION 1: MODERNIZATION

A.Base Bid for Full Modernization of One (1) Hydraulic Elevator$ - 0
See technical specifications for required scope of work
Do Not Include the following in Base Bid:
*Item B below
*Item C below
*Warranty elevator preventive maintenance
B.Electrical/Fire Life Safety/Misc. Work by Others$ - 0
See technical specifications for required scope of work
C.Cab Interior Allowance$20,000
See technical specfor required scope of work. Include all labor and materials. Allowance will be adjusted based on final selection of finishes. Elevator Contractor shall provide documentation of cost after material selection by Owner, with a contract change order (additive or deductive) to reflect actual cost of the selected cab materials.

TOTAL MODERNIZATION COST (sum of Item A, Item B, Item C) $ 20,000.00

SECTION 2: MAINTENANCE
A.Two Year Warranty Elevator Preventive Maintenance
Warranty Preventive Maintenance will commence when all elevators have been accepted by the Owner, State of Oregon Elevator Inspector and Consultant., which also includes the Elevator Contractor’s completion of all punch list items required by the Elevator Inspector and Consultant. The scope of work required for the Warranty Elevator Preventive Maintenance shall be as stated in technical specifications - item 1.10
Total Cost per Month
Elevator 1$ - 0
SECTION 3: SCHEDULE / DURATIONS
A.Elevator Installation Schedule
The construction schedule will begin at week 0, which is when a Contract is signed and a Notice to Proceed is issued by Owner. All elevator schedules for the elevator out of service shall be approved by Owner and Consultant.
Weeks from
Duration in weeks (from NTP)NTP
Provide Shop Drawings and Submittals0
Add 1 week for consultant review1
Equipment on site0
Start Elevator 10
Complete Elevator 10

ADDENDA

Addendums Received: Choose One

Elevator Contractor:
Name:
Phone:
Email:
Signature of Authorization for the

above price and delivery as specified:

An Offeror submitting a bid certifies that no officer, agent or employee of the City who has a pecuniary interest in this bid has participated in preparation of the bid, that the bid is made in good faith without fraud, collusion, or connection of any kind with any other Offeror of the same call for bids, and that the Offeror is competing solely in its own behalf without connection with, or obligation to any undisclosed person or firm.
END OF BID FORM
Choose One
Attached
No Exceptions/Clarifications
1
2
3
4
5
6
0
Choose One

FORM OF PROPOSAL FOR MODERNIZATION AND PREVENTIVE MAINTENANCE ON

VERTICAL TRANSPORTATION EQUIPMENT

This project shall be completed entirely by the Elevator Contractor as a TURNKEY project. No extra cost or change orders shall be allowed above bid pricing, except as allowed by the terms of this Contract. Elevator Contractor accepts full responsibility for the entire Elevator Project to be completed as per all Contract Documents and in full compliance with all codes, regulations and rules that are in force at the date stated on the Contract Documents.

The undersigned agrees to provide all engineering, tools, labor, materials and all services necessary for the completion of all work indicated and subject to all terms and conditions as stated in the Elevator Modernization and Maintenance Contract Documents.

This project will be a BOLI prevailing wage project and April 5, 2025 prevailing wage costs are to be used in estimating project costs. Contractor shall conform to current industry standards and shall comply with all Manufacturer’s instructions.

The undersigned having full knowledge of the specifications for the item(s) listed herein offers and agrees that this bid shall be irrevocable for at least sixty (60) calendar days after the bid opening date and time, and if accepted shall furnish any and/or all items(s) at the prices offered, all required documents, licenses and certifications, guarantees, titles and warranties as required and deliver at the designated point(s) within the time specified in the schedule.

The undersigned agrees to provide all engineering, tools, labor, materials and all services necessary for the completion of all work indicated and subject to all terms and conditions as stated in EXHIBIT D, DIVISION 14 SECTION 14 24 00 TECHNICAL SPECIFICATIONS FOR MODERNIZATION OF ONE (1) HYDRAULIC PASSENGER ELEVATOR AT COP NORTH PRECINCT, 499 NE EMERSON ST. PORTLAND, OR 97211.

Portland Comm Center-incl Alt 2

ERROR:#VALUE!
PORTLAND COMMUNICATION CENTER

3732 SE 99th Avenue, Portland, OR 97266

ELEVATOR MODERNIZATION & MAINTENANCE FOR ONE (1) HYDRAULIC PASSENGER ELEVATOR
BID FORM

SECTION 1: MODERNIZATION

A.Base Bid for Full Modernization of One (1) Hydraulic Elevator$ - 0
See technical specifications for required scope of work
Do Not Include the following in Base Bid:
*Item B below
*Item C below
*Warranty elevator preventive maintenance
B.Electrical/Fire Life Safety/Misc. Work by Others$ - 0
See technical specifications for required scope of work
C.Cab Interior Allowance$20,000
See technical specfor required scope of work. Include all labor and materials. Allowance will be adjusted based on final selection of finishes. Elevator Contractor shall provide documentation of cost after material selection by Owner, with a contract change order (additive or deductive) to reflect actual cost of the selected cab materials.

TOTAL MODERNIZATION COST (sum of Item A, Item B, Item C) $ 20,000.00

SECTION 2: MAINTENANCE
A.Two Year Warranty Elevator Preventive Maintenance
Warranty Preventive Maintenance will commence when all elevators have been accepted by the Owner, State of Oregon Elevator Inspector and Consultant., which also includes the Elevator Contractor’s completion of all punch list items required by the Elevator Inspector and Consultant. The scope of work required for the Warranty Elevator Preventive Maintenance shall be as stated in technical specifications - item 1.10
Total Cost per Month
Elevator 1$ - 0
SECTION 3: SCHEDULE / DURATIONS
A.Elevator Installation Schedule
The construction schedule will begin at week 0, which is when a Contract is signed and a Notice to Proceed is issued by Owner. All elevator schedules for the elevator out of service shall be approved by Owner and Consultant.
Weeks from
Duration in weeks (from NTP)NTP
Provide Shop Drawings and Submittals0
Add 1 week for consultant review1
Equipment on site0
Start Elevator 10
Complete Elevator 10

SECTION 4: ALTERNATES

A.Alternate 2 - Expedited Schedule
Provide pricing for expedited work schedule to reduce elevator downtime. Include specific amount of consecutive days elevator will be out of service.
# of consecutive days that elevator will be out of service
Add alternate pricing for expedited schedule$ - 0

ADDENDA

Addendums Received: Choose One

Elevator Contractor:
Name:
Phone:
Email:
Signature of Authorization for the

above price and delivery as specified:

An Offeror submitting a bid certifies that no officer, agent or employee of the City who has a pecuniary interest in this bid has participated in preparation of the bid, that the bid is made in good faith without fraud, collusion, or connection of any kind with any other Offeror of the same call for bids, and that the Offeror is competing solely in its own behalf without connection with, or obligation to any undisclosed person or firm.
END OF BID FORM
Choose One
Attached
No Exceptions/Clarifications
1
2
3
4
5
6
0
Choose One

FORM OF PROPOSAL FOR MODERNIZATION AND PREVENTIVE MAINTENANCE ON

VERTICAL TRANSPORTATION EQUIPMENT

This project shall be completed entirely by the Elevator Contractor as a TURNKEY project. No extra cost or change orders shall be allowed above bid pricing, except as allowed by the terms of this Contract. Elevator Contractor accepts full responsibility for the entire Elevator Project to be completed as per all Contract Documents and in full compliance with all codes, regulations and rules that are in force at the date stated on the Contract Documents.

The undersigned agrees to provide all engineering, tools, labor, materials and all services necessary for the completion of all work indicated and subject to all terms and conditions as stated in the Elevator Modernization and Maintenance Contract Documents.

FORM OF PROPOSAL FOR MODERNIZATION AND PREVENTIVE MAINTENANCE ON

VERTICAL TRANSPORTATION EQUIPMENT

This project shall be completed entirely by the Elevator Contractor as a TURNKEY project. No extra cost or change orders shall be allowed above bid pricing, except as allowed by the terms of this Contract. Elevator Contractor accepts full responsibility for the entire Elevator Project to be completed as per all Contract Documents and in full compliance with all codes, regulations and rules that are in force at the date stated on the Contract Documents.

The undersigned agrees to provide all engineering, tools, labor, materials and all services necessary for the completion of all work indicated and subject to all terms and conditions as stated in the Elevator Modernization and Maintenance Contract Documents.

This project will be a BOLI prevailing wage project and April 5, 2025 prevailing wage costs are to be used in estimating project costs. Contractor shall conform to current industry standards and shall comply with all Manufacturer’s instructions.

The undersigned having full knowledge of the specifications for the item(s) listed herein offers and agrees that this bid shall be irrevocable for at least sixty (60) calendar days after the bid opening date and time, and if accepted shall furnish any and/or all items(s) at the prices offered, all required documents, licenses and certifications, guarantees, titles and warranties as required and deliver at the designated point(s) within the time specified in the schedule.

The undersigned agrees to provide all engineering, tools, labor, materials and all services necessary for the completion of all work indicated and subject to all terms and conditions as stated in EXHIBIT E, DIVISION 14 SECTION 14 24 00 TECHNICAL SPECIFICATIONS FOR MODERNIZATION OF ONE (1) HYDRAULIC PASSENGER ELEVATOR AT PORTLAND COMMUNICATION CENTER, 3732 SE 99TH AVENUE, PORTLAND, OR.

Alternate 1 - St. John's

ERROR:#VALUE!
St. John's Building

7214 N. Philadelphia Ave, Portland, OR 97203

ELEVATOR MODERNIZATION & MAINTENANCE FOR ONE (1) HYDRAULIC PASSENGER ELEVATOR
BID FORM

tc={AA40A8DC-1433-4EAF-A396-4D7B59ABA811}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

somewhere on this form we need to note that this site's pricing is bid alternate 1

SECTION 1: MODERNIZATION

A.Base Bid for Full Modernization of One (1) Hydraulic Elevator$ - 0
See technical specifications for required scope of work
Do Not Include the following in Base Bid:
*Item B below
*Warranty elevator preventive maintenance
B.Electrical/Fire Life Safety/Misc. Work by Others$ - 0
See technical specifications for required scope of work

TOTAL MODERNIZATION COST (sum of Item A, Item B) $ - 0

SECTION 2: MAINTENANCE
A.Two Year Warranty Elevator Preventive Maintenance
Warranty Preventive Maintenance will commence when all elevators have been accepted by the Owner, State of Oregon Elevator Inspector and Consultant., which also includes the Elevator Contractor’s completion of all punch list items required by the Elevator Inspector and Consultant. The scope of work required for the Warranty Elevator Preventive Maintenance shall be as stated in technical specifications - item 1.10
Total Cost per Month
Elevator 1$ - 0
SECTION 3: SCHEDULE / DURATIONS
A.Elevator Installation Schedule
The construction schedule will begin at week 0, which is when a Contract is signed and a Notice to Proceed is issued by Owner. All elevator schedules for the elevator out of service shall be approved by Owner and Consultant.
Weeks from
Duration in weeks (from NTP)NTP
Provide Shop Drawings and Submittals0
Add 1 week for consultant review1
Equipment on site0
Start Elevator 10
Complete Elevator 10

ADDENDA

Addendums Received: Choose One

Elevator Contractor:
Name:
Phone:
Email:
Signature of Authorization for the

above price and delivery as specified:

An Offeror submitting a bid certifies that no officer, agent or employee of the City who has a pecuniary interest in this bid has participated in preparation of the bid, that the bid is made in good faith without fraud, collusion, or connection of any kind with any other Offeror of the same call for bids, and that the Offeror is competing solely in its own behalf without connection with, or obligation to any undisclosed person or firm.
END OF BID FORM
Choose One
Attached
No Exceptions/Clarifications
1
2
3
4
5
6
0
Choose One

somewhere on this form we need to note that this site's pricing is bid alternate 1

FORM OF PROPOSAL FOR MODERNIZATION AND PREVENTIVE MAINTENANCE ON

VERTICAL TRANSPORTATION EQUIPMENT

This project shall be completed entirely by the Elevator Contractor as a TURNKEY project. No extra cost or change orders shall be allowed above bid pricing, except as allowed by the terms of this Contract. Elevator Contractor accepts full responsibility for the entire Elevator Project to be completed as per all Contract Documents and in full compliance with all codes, regulations and rules that are in force at the date stated on the Contract Documents.

The undersigned agrees to provide all engineering, tools, labor, materials and all services necessary for the completion of all work indicated and subject to all terms and conditions as stated in the Elevator Modernization and Maintenance Contract Documents.

FORM OF PROPOSAL FOR MODERNIZATION AND PREVENTIVE MAINTENANCE ON

VERTICAL TRANSPORTATION EQUIPMENT

This project shall be completed entirely by the Elevator Contractor as a TURNKEY project. No extra cost or change orders shall be allowed above bid pricing, except as allowed by the terms of this Contract. Elevator Contractor accepts full responsibility for the entire Elevator Project to be completed as per all Contract Documents and in full compliance with all codes, regulations and rules that are in force at the date stated on the Contract Documents.

The undersigned agrees to provide all engineering, tools, labor, materials and all services necessary for the completion of all work indicated and subject to all terms and conditions as stated in the Elevator Modernization and Maintenance Contract Documents.

This project will be a BOLI prevailing wage project and April 5, 2025 prevailing wage costs are to be used in estimating project costs. Contractor shall conform to current industry standards and shall comply with all Manufacturer’s instructions.

The undersigned having full knowledge of the specifications for the item(s) listed herein offers and agrees that this bid shall be irrevocable for at least sixty (60) calendar days after the bid opening date and time, and if accepted shall furnish any and/or all items(s) at the prices offered, all required documents, licenses and certifications, guarantees, titles and warranties as required and deliver at the designated point(s) within the time specified in the schedule.

The undersigned agrees to provide all engineering, tools, labor, materials and all services necessary for the completion of all work indicated and subject to all terms and conditions as stated in EXHIBIT F, DIVISION 14 SECTION 14 24 00 TECHNICAL SPECIFICATIONS FOR MODERNIZATION OF ONE (1) HYDRAULIC PASSENGER ELEVATOR AT COP ST. JOHN'S BUILDING, 7214 N. PHILADELPHIA AVE, PORTLAND, OR 97203

File details come from the government source that posted it. Updated .