This is Addendum No. 05 to ITB No. 00002676 for Elevator Modernization Services issued by the City of Portland, Oregon's Procurement Services division. The addendum provides clarifications to the plumbing scope of work across five municipal facilities and modifies the technical specifications for sump pump and associated plumbing installations. Responses are due January 23, 2026, by 4:00 pm. The scope changes affect the 1900 Building, Portland Communication Center (PCC) Building, North Precinct Building, East Precinct, and St. John's Building, with two new exhibits (D-3 North Precinct Sump Piping and E-4 Portland Communication Center Sump Piping) added to clarify plumbing locations and requirements.
The addendum removes all sump, sump pump, and associated plumbing and electrical work from the 1900 Building, East Precinct, and St. John's Building. For the PCC Building, the scope requires installation of one new sump, one new sump pump, and associated plumbing and electrical support, with elevator pit sump piping tied at a location specified in Exhibit E-4, along with restoration of finishes and a mandatory 4-inch cleanout to meet code requirements. For the North Precinct Building, the scope requires one new sump pump and associated plumbing and electrical, with elevator pit sump piping tied at a location specified in Exhibit D-3, also requiring finish restoration and a 4-inch cleanout. Any insufficient cleanout sizes require contractor coordination with the owner and submission of cost changes via contract change order. Questions should be directed to Kristina Kolata, Senior Procurement Specialist, at 971-509-0713.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Page | 1
Procurement Services City Operations City of Portland, Oregon
@PortlandGov portlandgov
PortlandORGov
January 20, 2026
ADDENDUM NO. 05
ITB No. 00002676
FOR
Elevator Modernization Services
Responses Due: January 23, 2026 By: 4:00 pm
This Addendum provides changes to the specifications for the above-entitled project to be considered by each respondent. Any changes made by this Addendum to said specifications offset only the portion of the words or paragraphs specifically mentioned herein, and the balance of the specifications remain in full force. It is the responsibility of all respondents to conform to this addendum.
This Addendum shall:
1. Add the following language into the solicitation to provide plumbing scope clarification into the ITB. New language is in bold and underline.
I. SECTION 1 INTRODUCTION
1.2 Scope of Work
EXHIBIT D-3 NORTH PRECINCT SUMP PIPING
EXHIBIT E-4 PORTLAND COMMUNICATION CENTER SUMP PIPING
2. Provide the following clarification for the plumbing scope and add Exhibit D-3 North Precinct Sump Piping and Exhibit E-4 Portland Communication Center Sump Piping.
The technical specifications for each site as part of the plumbing scope currently require contractor to provide (1) sump in cases where no sump currently exists, (2) new sump pump at each site, (3) associated plumbing and electrical in pit to support new sump pump.
The Plumbing Scope for each site will be clarified per below:
A. 1900 Building – All sump / sump pump / associated plumbing and electrical scope removed from this site.
Sylvester Donelson, Jr. Sara Morrissey Michael Jordan Chief Procurement Officer Deputy City Administrator Chief Administrative Officer https://twitter.com/PortlandGov https://www.instagram.com/PortlandGov/ https://www.facebook.com/PortlandORGov
Page | 2
B. PCC Building – No change from technical specification.
i. This site requires (1) new sump, (2) new sump pump, (3) associated plumbing and electrical in pit to support new sump pump.
ii. Contractor to provide per bid specifications.
iii. Tie elevator pit sump piping at location highlighted on Exhibit E-4 Portland
Communication Center Sump Piping.
iv. Contractor to restore all finishes to pre-construction condition.
v. Cleanout must be 4” in order to meet code. If cleanout at this location is not sufficient in size, contractor to work with owner to determine alternate approach and submit any change in cost via contract change order.
C. North Precinct Building – No change from technical specification.
i. This site requires (1) new sump pump, (2) associated plumbing and electrical in pit to support new sump pump.
ii. Contractor to provide per bid specifications.
iii. Tie elevator pit sump piping at location highlighted on Exhibit D-3 North
Precinct Sump Piping.
iv. Contractor to restore all finishes to pre-construction condition.
v. Cleanout must be 4” in order to meet code. If cleanout at this location is not sufficient in size, contractor to work with owner to determine alternate approach and submit any change in cost via contract change order.
D. East Precinct - All sump / sump pump / associated plumbing and electrical
E. St. John’s Building - All sump / sump pump / associated plumbing and electrical
Please direct all questions and concerns to Kristina Kolata, Senior Procurement Specialist at 971-509-0713.
End of Addendum bt :kmk