Exhibit_C,_Bid_Price_Sheet_NRCS_Hurricane_Milton_26-B-01JS_(MUST_COMPLTE_AND_SUBMIT)_.xls

XLS spreadsheet 52 KB Posted

Attached to
Open Channel Debris and Sediment Removal and Bank Stabilization Related to Damages Caused by Hurricane Milton
Solicitation number
26-B-01JS
Issued by
Volusia County, Florida

About this file

This is a Bid Price Sheet for ITB No. 26-B-01JS issued by Volusia County, Florida, Department of Public Works, Road & Bridge Division, in partnership with the U.S. Department of Agriculture Natural Resources Conservation Services (NRCS). The solicitation requests open channel debris and sediment removal and bank stabilization services across three locations: Open Channel A-10 and Bridge #794072 over Groover Creek in Ormond Beach, Open Channel B-19 (Sweetwater Creek) in Port Orange, and Open Channel C-36 (Samsula Canal) in New Smyrna Beach. Project work includes mobilization, maintenance of traffic, debris and obstruction removal with hauling and disposal, riprap ditch lining (1,150 total tons across locations), filter fabric installation (2,556 total square yards), bedding stone placement (575 total tons), performance turf installation (639 total square yards), vegetative restoration measures (600 total square yards), and sediment removal (300 cubic yards). The bid due date is October 30, 2025, at 3:01 pm, with a contract duration of 120 days comprising 90 days for substantial completion and 30 days for final completion.

The bid price sheet requires contractors to provide lump sum pricing for the total base bid across all project locations, including performance and payment bond costs. The total estimated construction cost is $625,350.00, fully funded through a federal NRCS Emergency Watershed Protection Project cooperative agreement with no local cost-sharing requirement. Award will be made to the lowest responsive and responsible bidder meeting specified qualifications, including Florida state construction contractor licensure, required insurance coverage (Commercial General Liability of $1,000,000, Auto Liability of $1,000,000, and Contractors Pollution Liability of $500,000), performance and payment bonds, and compliance with federal contract provisions including E-Verify requirements and human trafficking attestation. Liquidated damages are assessed at $1,685 per day for project delays. The County reserves the right to reject any or all bid proposals.

View the file

Other files

File Type Posted
Open_Channel_Debris_and_Sediment_Removal_and_Bank_Stabilization_Related_to_Damages_Caused_by_Hurricane_Milton_(Addendum_#5_Revision).pdf PDF
Open_Channel_Debris_and_Sediment_Removal_and_Bank_Stabilization_Related_to_Damages_Caused_by_Hurricane_Milton.pdf PDF
Exhibit_C,_Bid_Documents,_26-B-01JS_(Must_Complete_and_Submit).pdf PDF
Exhibit_D,_Payment_and_Performance_Bond,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_L._Location_Maps_NRCS_Huricane_Milton,_26-B-01JS_.pdf PDF
Exhibit_D,_Contract,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_F,_C36_Samsula_Canal_Stream_Debris_Removal_Specs_MIL-VOL-001_C-36,_26-B-01JS.pdf PDF
Exhibit_G,_C36_Samsula_Canal_New_Smyrna_Beach,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_H,_FEDERAL_CONTRACT_PROVISIONS_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-002_B-19,_26-B-01JS.pdf PDF
Exhibit_E,_B19_Sweetwater_Creek_Port_Orange,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_QAP_Structural_Work_MIL-VOL-003_A-10_and_BRIDGE_#794072,_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_Stream_Debris_Removal_Specs_MIL-VOL-002_B-19,_25-B-01JS.pdf PDF
Exhibit_F,_C36_Samsula_Canal_QAP_Debris_Removal_MIL-VOL-001_C-36,_26-B-01JS.pdf PDF
Exhibit_F,_B19_Sweetwater_Creek_QAP_Structural_Work_MIL-VOL-002_B-19,_26-B-01JS.pdf PDF
Exhibit_G,_A10_Groover_Branch_Canal_Ormond_Beach,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_E,_A10_Groover_Branch_Canal_Ormond_Beach,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-003_A-10,_26-B-01JS.pdf PDF
Exhibit_E,_C36_Samsula_Canal_New_Symrna,_Construction_Plans,_26-B-01JS.pdf PDF
Exhibit_G,_B19_Sweetwater_Creek_Port_Orange,_FDOT_Standard_Spec,_26-B-01JS.pdf PDF
Exhibit_F,_A10_Groover_Branch_Canal_Stream_Debris_Removal_Specs_MIL-VOL-003_A-10,_26-B-01JS.pdf PDF
Exhibit_B,_INFO_NRCS_Milton_Funding_Agreement_NR254209XXXXC008_EXECUTED,_26-B-01JS_(REVIEW).pdf PDF
Exhibit_C,_Bid_Price_Sheet_NRCS_Hurricane_Milton_26-B-01JS_(MUST_COMPLTE_AND_SUBMIT)_.xls XLS spreadsheet
Exhibit_B,_General_Notes_Supplement_NRCS_Hurricane_Milton_,26-B-01JS.pdf PDF
Exhibit_C_PRIME-SUB_FOR_for_Contractors_26-B-01JS_(MUST_COMPLETE_AND_SUBMIT).xls XLS spreadsheet
Exhibit_B,_Project_Specifications_NRCS_Hurricane_Milton,_26-B-01JS.pdf PDF
Exhibit_C,_Insurance_Requirements,_26-B-01JS_(Must_Submit).pdf PDF
Exhibit_B,_Special_Provisions_and_General_Notes_NRCS_Hurricane_Milton,_26-B-01JS.pdf PDF
Volusia_Human_Trafficking_Affidavit_08-07-2024_Solicitation_Document.docx DOCX document
B19_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
C36_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
B19_FDOT_Standard_Spec_MIL-VOL-002.pdf PDF
A10_FDOT_Standard_Spec_MIL-VOL-003.pdf PDF
C36_FDOT_Standard_Spec_MIL-VOL-001.pdf PDF
A10_Construction_Plans_SET_Signed_9-18-2025.pdf PDF
B19_QAP_Structural_Work_MIL-VOL-002_B-19.pdf PDF
1._Scope_of_Work_NRCS_Hurricane_Milton_Projects.pdf PDF
C36_Stream_Debris_Removal__Specs_MIL-VOL-001_C-36.pdf PDF
C36_QAP_Debris_Removal_MIL-VOL-001_C-36.pdf PDF
B19_Stream_Debris_Removal__Specs_MIL-VOL-002_B-19.pdf PDF
5._Construction_Bid_Request_NRCS_projects_Milton.pdf PDF
6._Special_Provisions_and_General_Notes_NRCS_Hurricane_Milton.pdf PDF
B19_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-002_B-19.pdf PDF
3._Location_Maps_NRCS_Huricane_Milton.pdf PDF
2._Project_Specifications_NRCS_Hurricane_Milton.pdf PDF
A10_Stream_Debris_Removal__Specs_MIL-VOL-003_A-10.pdf PDF
A10_QAP_Structural_Work_MIL-VOL-003_A-10_and_BRIDGE_794072.pdf PDF
7._General_Notes_Supplement_NRCS_Hurricane_Milton.pdf PDF
INFO_NRCS_Milton_Funding_Agreement_NR254209XXXXC008_EXECUTED.pdf PDF
A10_Streambank.Stabilization.O_&_M_Plan_MIL-VOL-003_A-10.pdf PDF
Show 40 more

Latest 50 of 52 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ITB No. 26-B-01JS
Open Channel Debris Removal and Bank Stabilization Related to Damages Caused by Hurricane Milton
Bid Price Sheet
LINE ITEMFDOT ITEM NUMBERITEM DESCRIPTIONUNITESTIMATED QUANTITYUNIT PRICETOTAL
Open Channel A-10 & Bridge #794072 over Groover Creek Box Culvert: SEDIMENT AND DEBRIS REMOVAL AND BANK STABILIZATION
1101MobilizationLS1$ - 0
2102Maintenance of TrafficLS1$ - 0
3110, 400Debris/Obstruction/Tree Removal, Hauling, & DisposalLS1$ - 0
4530Riprap Ditch Lining - Rock RubbleTN900$ - 0
5514, 985Filter Fabric - Type D-2 GeotextileSY2000$ - 0
6530Bedding Stone #57 - Beneath RiprapTN450$ - 0
7570Performance Turf - Bahia SodSY500$ - 0
8981,982, 983Vegetative Restoration MeasuresSY300$ - 0
9Sediment Removal, Hauling, & DisposalCY300$ - 0
SUBTOTAL for Open Channel A-10 and Bridge #794072$ - 0
Open Channel B-19 in Port Orange (Sweetwater Creek): BANK STABILIZATION
1101MobilizationLS1$ - 0
2102Maintenance of TrafficLS1$ - 0
3110, 400Debris Removal, Hauling, & DisposalLS1$ - 0
4530Riprap Ditch Lining - Rock RubbleTN250$ - 0
5514, 985Filter Fabric - Type D-2 GeotextileSY556$ - 0
6530Bedding Stone #57 - Beneath RiprapTN125$ - 0
7570Performance Turf - Bahia SodSY139$ - 0
8981,982, 983Vegetative Restoration MeasuresSY100$ - 0
SUBTOTAL for Open Channel B-19$ - 0
Open Channel C-36 in New Smyrna Beach (Samsula Canal): DEBRIS REMOVAL
1101MobilizationLS1$ - 0
2102Maintenance of TrafficLS1$ - 0
3110, 400Debris Removal, Hauling, & DisposalLS1$ - 0
4981,982, 983Vegetative Restoration MeasuresSY200$ - 0
SUBTOTAL for Open Channel C-36$ - 0
Total Base Bid for All Project Locations:$ - 0
Performance and Payment Bond:$ - 0
TOTAL LUMP SUM BID$ - 0
Notes: All quantities are given for the convenience of the Contractor and are not guaranteed to be complete. The Contractor shall assume all responsibility for estimating the size, kind, and quantity of materials and equipment included in work to be done under the terms of the Contract.