Exhibit_C,_Bid_Price_Sheet_NRCS_Hurricane_Milton_26-B-01JS_(MUST_COMPLTE_AND_SUBMIT)_.xls
XLS spreadsheet 52 KB Posted
- Solicitation number
- 26-B-01JS
- Issued by
- Volusia County, Florida
About this file
This is a Bid Price Sheet for ITB No. 26-B-01JS issued by Volusia County, Florida, Department of Public Works, Road & Bridge Division, in partnership with the U.S. Department of Agriculture Natural Resources Conservation Services (NRCS). The solicitation requests open channel debris and sediment removal and bank stabilization services across three locations: Open Channel A-10 and Bridge #794072 over Groover Creek in Ormond Beach, Open Channel B-19 (Sweetwater Creek) in Port Orange, and Open Channel C-36 (Samsula Canal) in New Smyrna Beach. Project work includes mobilization, maintenance of traffic, debris and obstruction removal with hauling and disposal, riprap ditch lining (1,150 total tons across locations), filter fabric installation (2,556 total square yards), bedding stone placement (575 total tons), performance turf installation (639 total square yards), vegetative restoration measures (600 total square yards), and sediment removal (300 cubic yards). The bid due date is October 30, 2025, at 3:01 pm, with a contract duration of 120 days comprising 90 days for substantial completion and 30 days for final completion.
The bid price sheet requires contractors to provide lump sum pricing for the total base bid across all project locations, including performance and payment bond costs. The total estimated construction cost is $625,350.00, fully funded through a federal NRCS Emergency Watershed Protection Project cooperative agreement with no local cost-sharing requirement. Award will be made to the lowest responsive and responsible bidder meeting specified qualifications, including Florida state construction contractor licensure, required insurance coverage (Commercial General Liability of $1,000,000, Auto Liability of $1,000,000, and Contractors Pollution Liability of $500,000), performance and payment bonds, and compliance with federal contract provisions including E-Verify requirements and human trafficking attestation. Liquidated damages are assessed at $1,685 per day for project delays. The County reserves the right to reject any or all bid proposals.
View the file
Other files
Show 40 more
Latest 50 of 52 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ITB No. 26-B-01JS | ||||||
| Open Channel Debris Removal and Bank Stabilization Related to Damages Caused by Hurricane Milton | ||||||
| Bid Price Sheet | ||||||
| LINE ITEM | FDOT ITEM NUMBER | ITEM DESCRIPTION | UNIT | ESTIMATED QUANTITY | UNIT PRICE | TOTAL |
| Open Channel A-10 & Bridge #794072 over Groover Creek Box Culvert: SEDIMENT AND DEBRIS REMOVAL AND BANK STABILIZATION | ||||||
| 1 | 101 | Mobilization | LS | 1 | $ - 0 | |
| 2 | 102 | Maintenance of Traffic | LS | 1 | $ - 0 | |
| 3 | 110, 400 | Debris/Obstruction/Tree Removal, Hauling, & Disposal | LS | 1 | $ - 0 | |
| 4 | 530 | Riprap Ditch Lining - Rock Rubble | TN | 900 | $ - 0 | |
| 5 | 514, 985 | Filter Fabric - Type D-2 Geotextile | SY | 2000 | $ - 0 | |
| 6 | 530 | Bedding Stone #57 - Beneath Riprap | TN | 450 | $ - 0 | |
| 7 | 570 | Performance Turf - Bahia Sod | SY | 500 | $ - 0 | |
| 8 | 981,982, 983 | Vegetative Restoration Measures | SY | 300 | $ - 0 | |
| 9 | Sediment Removal, Hauling, & Disposal | CY | 300 | $ - 0 | ||
| SUBTOTAL for Open Channel A-10 and Bridge #794072 | $ - 0 | |||||
| Open Channel B-19 in Port Orange (Sweetwater Creek): BANK STABILIZATION | ||||||
| 1 | 101 | Mobilization | LS | 1 | $ - 0 | |
| 2 | 102 | Maintenance of Traffic | LS | 1 | $ - 0 | |
| 3 | 110, 400 | Debris Removal, Hauling, & Disposal | LS | 1 | $ - 0 | |
| 4 | 530 | Riprap Ditch Lining - Rock Rubble | TN | 250 | $ - 0 | |
| 5 | 514, 985 | Filter Fabric - Type D-2 Geotextile | SY | 556 | $ - 0 | |
| 6 | 530 | Bedding Stone #57 - Beneath Riprap | TN | 125 | $ - 0 | |
| 7 | 570 | Performance Turf - Bahia Sod | SY | 139 | $ - 0 | |
| 8 | 981,982, 983 | Vegetative Restoration Measures | SY | 100 | $ - 0 | |
| SUBTOTAL for Open Channel B-19 | $ - 0 | |||||
| Open Channel C-36 in New Smyrna Beach (Samsula Canal): DEBRIS REMOVAL | ||||||
| 1 | 101 | Mobilization | LS | 1 | $ - 0 | |
| 2 | 102 | Maintenance of Traffic | LS | 1 | $ - 0 | |
| 3 | 110, 400 | Debris Removal, Hauling, & Disposal | LS | 1 | $ - 0 | |
| 4 | 981,982, 983 | Vegetative Restoration Measures | SY | 200 | $ - 0 | |
| SUBTOTAL for Open Channel C-36 | $ - 0 | |||||
| Total Base Bid for All Project Locations: | $ - 0 | |||||
| Performance and Payment Bond: | $ - 0 | |||||
| TOTAL LUMP SUM BID | $ - 0 | |||||
| Notes: All quantities are given for the convenience of the Contractor and are not guaranteed to be complete. The Contractor shall assume all responsibility for estimating the size, kind, and quantity of materials and equipment included in work to be done under the terms of the Contract. |
&C&"Arial,Bold"&14 &L&"Times New Roman,Regular"&11&F&C&"Times New Roman,Regular"&11______ - &P