The file's text, extracted by GovTribe without its formatting.
01 SEPTEMBER 2020
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 7 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1013, 1020 |
| A |
| TDP _____ |
| TM _____ |
| OTHER: SESS |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FISCAL YEAR 2022 (FY22) READY RELEVANT LEARNING (RRL) CONTENT CONVERSION (CC)
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A002 |
| SOFTWARE PRODUCT DESIGN (SPD) |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
TOTAL PRICE
| DI-SESS-82036 |
| 3.1.6, 3.5.2.7, 3.5.2.8, 3.5.4.2.2.1, 3.5.4.2.3.1, 3.5.4.3.2, 3.5.4.5.2, 3.5.4.5.4 |
| NAWCTSD ENGR |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| ASREQ |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| NAWCTSD ENGR |
| 1 |
| 1 |
| 0 |
1. BLK 4: TAILOR OUT PARAGRAPHS 9 THROUGH 11 FROM DI-SESS-82036 FOR THE FIRST SUBMISSION. SUBSEQUENT SUBMISSIONS SHALL NOT HAVE PARAGRAPHS FROM DI-SESS-82036 TAILORED OUT. TO AID REVIEW OF COMPLEX MEDIA PRODUCTS, SUBMISSIONS SHALL BE SCHEDULED IN THE IMS TO ALSO ACCOMPANY THE TEST PACKAGE (ASSESSMENTS (F005), TRAINING COUNDUCT SUPPORT DOCUMENT (F007), AND TRAINING PROGRAM STRUCTURE DOCUMENT (F008) DELIVERABLES.
2. BLK 8: THE GOVERNMENT WILL HAVE TWENTY (20) WORKING DAYS FOR REVIEW AND ACCEPT, ACCEPT WITH COMMENTS, OR REJECT FOR EACH SUBMISSION. THE CONTRACTOR SHALL HAVE FIFTEEN (15) CALENDAR DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
3. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY. (ADMINISTRATIVE OR OPERATIONAL USE) (DATE DETERMINED AT CONTRACT AWARD). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER TRAINING SYSTEMS DIVISION (NAWCTSD), 12211 SCIENCE DRIVE, ORLANDO, FL 32826.
4. BLK 12: FIRST SUBMISSION SHALL BE DUE FORTY-FIVE (45) CALENDAR DAYS PRIOR TO PRELIMINARY DESIGN REVIEW ENGINEERING TECHNICL INTERCHANGE MEETING (PDR ETIM).
5. BLK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE AS FOLLOWS:
a. SECOND SUBMISSION SHALL BE DUE TWENTY-FIVE 25) CALENDAR DAYS PRIOR TO CRITICAL DESIGN REVIEW (CDR) ETIM.
b. REVISIONS SHALL BE DUE AS REQUIRED THROUGH END OF CONTRACT WHEN THERE IS A SOFTWARE DESIGN CHANGE AFTER CDR (OR EQUIVALENT TIM, WHEN APPLICABLE).
6. BLK 14: SUBMISSIONS SHALL BE ELECTRONIC IN MICROSOFT OFFICE (WORD) 2010 OR LATER FORMAT. SUBMISSIONS SHALL BE POSTED TO THE CONTRACTOR DELIVERABLE ONLINE MANAGEMENT SYSTEM, INCLUDING NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE THE GOVERNMENT REVIEW COMMENCES. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAYS NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE PROVIDED IN SECTION F OF THE CONTRACT.
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
LEE PAGE, RRL FY22 CONTENT CONVERSION ENGINEER
LCDR MAURA BETTS, RRL FY22 PROGRAM MANAGER
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page 2 of 8 Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) | |
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1013, 1020 |
| A |
| TDP _____ |
| TM _____ |
| OTHER: MGMT |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FISCAL YEAR 2022 (FY22) READY RELEVANT LEARNING (RRL) CONTENT CONVERSION (CC)
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A003 |
| REQUIREMENTS TRACEABILITY VERIFICATION MATRIX (RTVM) |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-MGMT-82133 |
| 3.5.4.1.3, 3.5.4.2.1.1, 3.5.4.2.2.1, 3.5.4.2.3.1, 3.5.4.3.1, 3.5.4.4.1 |
| NAWCTSD ENGR |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| 7TIME/R |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| NAWCTSD ENGR |
| 1 |
| 1 |
| 0 |
1. BLK 4: DELETE RELATIONAL DATABASE OR DATABASE FILES AND REPLACE WITH MICROSOFT OFFICE EXCEL 2010 OR LATER FILE SOFTWARE FORMAT. DELETE PARAGRAPH 3.2.9.1. HYPERLINK.
2. BLK 8: THE GOVERNMENT WILL HAVE TWENTY (20) WORKING DAYS FOR REVIEW AND ACCEPT, ACCEPT WITH COMMENTS, OR REJECT FOR EACH SUBMISSION. THE CONTRACTOR SHALL HAVE FIFTEEN (15) CALENDAR DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
3. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY. (ADMINISTRATIVE OR OPERATIONAL USE) (DATE DETERMINED AT CONTRACT AWARD). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER TRAINING SYSTEMS DIVISION (NAWCTSD), 12211 SCIENCE DRIVE, ORLANDO, FL 32826.
4. BLK 12: FIRST SUBMISSION SHALL BE DUE FORTY-FIVE (45) CALENDAR DAYS PRIOR TO SYSTEM REQUIREMENTS REVIEW-II/SYSTEM FUNCTIONAL REVIEW ENGINEERING TECHNICAL INTERCHANGE MEETING (SRR-II/SFR ETIM) AND SHALL INCORPORATE ALL REQUIREMENTS (PERFORMANCE SPECIFICATION AND CONTRACTOR DECOMPOSED AND DERIVED REQUIREMENTS) AND INCLUDE TRACEABILITY BETWEEN ALL REQUIREMENTS TO THE FUNCTIONAL BASELINE.
5. BLK 13: SUBSEQUENT SUBMISSIONS SHALL BE DUE AS FOLLOWS:
a. SECOND SUBMISSION SHALL BE DUE FORTY-FIVE (45) CALENDAR DAYS PRIOR TO PRELIMINARY DESIGN REVIEW (PDR) ETIM AND SHALL INCLUDE TRACEABILITY BETWEEN ALL REQUIREMENTS TO THE ALLOCATED BASELINE.
b. THIRD SUBMISSION SHALL BE DUE FORTY-FIVE (45) CALENDAR DAYS PRIOR TO CRITICAL DESIGN REVIEW (CDR) ETIM AND SHALL INCLUDE TRACEABILITY BETWEEN ALL REQUIREMENTS TO THE INITIAL PRODUCT BASELINE.
c. FOURTH SUBMISSION SHALL BE DUE FORTY-FIVE (45) CALENDAR DAYS PRIOR TO EACH ON-SCREEN LESSONS (OSL) INCREMENTAL INSPECTION AND SHALL INCLUDE A FILTERING MECHANISM TO SHOW THE REQUIREMENTS APPLICABLE TO THE OSL INCREMENT TO BE INSPECTED (APPLIES TO COURSEWARE ONLY).
d. FIFTH (FINAL) SUBMISSION SHALL BE DUE FORTY-FIVE (45) CALENDAR DAYS PRIOR TO EACH SIMULATION TEST READINESS REVIEW (TRR ETIM)AND SHALL INCLUDE TRACEABILITY BETWEEN ALL REQUIREMENTS AND THE DETAILED TEST PROCEDURES.
e. REVISIONS SHALL BE DUE AS REQUIRED THROUGH END OF CONTRACT.
6. BLK 14: SUBMISSIONS SHALL BE ELECTRONIC IN MICROSOFT OFFICE (WORD) 2010 OR LATER FORMAT. SUBMISSIONS SHALL BE POSTED TO THE CONTRACTOR DELIVERABLE ONLINE MANAGEMENT SYSTEM, INCLUDING NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE THE GOVERNMENT REVIEW COMMENCES. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAYS NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE PROVIDED IN SECTION F OF THE CONTRACT.
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
LEE PAGE, RRL FY22 CONTENT CONVERSION ENGINEER
LCDR MAURA BETTS, RRL FY22 PROGRAM MANAGER
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1013, 1020 |
| A |
| TDP _____ |
| TM _____ |
| OTHER: IPSC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FISCAL YEAR 2022 (FY22) READY RELEVANT LEARNING (RRL) CONTENT CONVERSION (CC)
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A004 |
| SOFTWARE DEVELOPMENT PLAN (SDP) |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-IPSC-81427B |
| SOW, PARA 3.5.4.3 |
| NAWCTSD ENGR |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| ONE/R |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| NAWCTSD ENGR |
| 0 |
| 1 |
| 0 |
1. BLK 4: SIMILAR CONTENT REQUIREMENTS MAY BE COMBINED TOGETHER TO AVOID DUPLICATION OF INFORMATION IN THE SDP. REFERENCES TO EXISTING CONTRACTOR INTERNAL PROCESSES AND PLANNING DOCUMENTS MAY BE USED, PROVIDED THE REFERENCED DOCUMENTS ARE INCORPORATED AS APPENDICES TO THE SDP. THE SDP SHALL BE PROGRAM-WIDE AND SPECIFIC TO THE FY22 CC PROGRAM.
2. BLK 8: THE GOVERNMENT WILL HAVE TWENTY (20) WORKING DAYS FOR REVIEW AND ACCEPT, ACCEPT WITH COMMENTS, OR REJECT FOR EACH SUBMISSION. THE CONTRACTOR SHALL HAVE THIRTY (30) CALENDAR DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
3. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY. (ADMINISTRATIVE OR OPERATIONAL USE) (DATE DETERMINED AT CONTRACT AWARD). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER TRAINING SYSTEMS DIVISION (NAWCTSD), 12211 SCIENCE DRIVE, ORLANDO, FL 32826.
4. BLK 12: FIRST SUBMISSION SHALL BE DUE THIRTY (30) CALENDAR DAYS AFTER CONTRACT AWARD.
5. BLK 13: REVISIONS SHALL BE DUE AS REQUIRED THROUGH END OF CONTRACT WHEN THERE IS A CHANGE IN THE DEVELOPMENT PLAN. DOCUMENT CHANGES INCORPORATED AFTER THE FIRST SUBMISSION SHALL BE IDENTIFIABLE BY CHANGE BARS IN THE MARGINS, OR A SIMILAR MARKING TECHNIQUE.
6. BLK 14: SUBMISSIONS SHALL BE ELECTRONIC IN MICROSOFT OFFICE (WORD) 2010 OR LATER FORMAT. SUBMISSIONS SHALL BE POSTED TO THE CONTRACTOR DELIVERABLE ONLINE MANAGEMENT SYSTEM, INCLUDING NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE THE GOVERNMENT REVIEW COMMENCES. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAYS NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE PROVIDED IN SECTION F OF THE CONTRACT.
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
LEE PAGE, RRL FY22 CONTENT CONVERSION ENGINEER
LCDR MAURA BETTS, RRL FY22 PROGRAM MANAGER
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1013, 1020 |
| A |
| TDP _____ |
| TM _____ |
| OTHER: IPSC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FISCAL YEAR 2022 (FY22) READY RELEVANT LEARNING (RRL) CONTENT CONVERSION (CC)
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A005 |
| SOFTWARE PRODUCT PACKAGE (SPP) |
| N/A |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-IPSC-82090C |
| 3.5.2.7, 3.5.2.8, 3.5.4.3.6, 3.5.4.5.2, 3.5.4.5.4, 3.5.4.5.5.4, 3.5.4.5.5.6, 3.5.4.5.5.6.1, 3.5.8.3 |
| NAWCTSD ENGR |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| ASREQ |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| NAWCTSD ENGR |
| 1 |
| 1 |
| 0 |
1. BLK 8: THE GOVERNMENT WILL HAVE TWENTY (20) WORKING DAYS FOR REVIEW AND ACCEPT, ACCEPT WITH COMMENTS, OR REJECT FOR EACH SUBMISSION. THE CONTRACTOR SHALL HAVE FIFTEEN (15) CALENDAR DAYS TO CORRECT AND RESUBMIT REJECTED MATERIALS.
2. BLK 9: THE FOLLOWING STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY. (ADMINISTRATIVE OR OPERATIONAL USE) (DATE DETERMINED AT CONTRACT AWARD). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO THE COMMANDING OFFICER, NAVAL AIR WARFARE CENTER TRAINING SYSTEMS DIVISION (NAWCTSD), 12211 SCIENCE DRIVE, ORLANDO, FL 32826.
3. BLK 12: FIRST SUBMISSION SHALL BE DUE TWENTY (20) BUSINESS DAYS PRIOR TO SIMULAION DT-D1 (CONTRACTOR INTERNAL TESTING) AND SHALL INCLUDE COMMERCIAL AND NON-COMMERCIAL SOFTWARE, TOOLS AND DATA. TO AID REVIEW OF COMPLEX MEDIA PRODUCTS, SUBMISSIONS SHALL BE SCHEDULED IN THE IMS TO ALSO ACCOMPANY THE TEST PACKAGE (ASSESSMENTS (F005), TRAINING COUNDUCT SUPPORT DOCUMENT (F007), AND TRAINING PROGRAM STRUCTURE DOCUMENT (F008) DELIVERABLES.
4. BLK 13: SUBSEQUENT SUBMISSIONS SHALL BE TWENTY (20) BUSINESS DAYS PRIOR TO SIMULATION IT-D1 (INTEGRATED TESTING), TEN (10) BUSINESS DAYS PRIOR TO REGRESSION TESTING AND FIVE (5) BUSINESS DAYS AFTER REGRESSION TESTING.
a. REVISIONS SHALL BE DUE AS REQUIRED THROUGH END OF CONTRACT. REVISIONS SHALL INCORPORATE A MARKING TECHNIQUE TO IDENTIFY AREAS OF MODIFICATION TO THE DOCUMENT.
5. BLK 14: SOURCE CODE SHALL BE IN A GIT REPOSITORY FORMAT. COMMERCIAL SOFTWARE ITEM SHALL BE ON ORIGINAL MEDIA. SUBMISSIONS SHALL BE ELECTRONIC IN MICROSOFT OFFICE (WORD) 2010 OR LATER FORMAT. SUBMISSIONS SHALL BE POSTED TO THE CONTRACTOR DELIVERABLE ONLINE MANAGEMENT SYSTEM, INCLUDING NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE THE GOVERNMENT REVIEW COMMENCES. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAYS NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE PROVIDED IN SECTION F OF THE CONTRACT.
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
LEE PAGE, RRL FY22 CONTENT CONVERSION ENGINEER
LCDR MAURA BETTS, RRL FY22 PROGRAM MANAGER
| DD FORM 1423-1, FEB 2001 | PREVIOUS EDITION MAY BE USED | Page 5 of 8 Pages |
| CONTRACT DATA REQUIREMENTS LIST (CDRL) | |
| Form Approved | |
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1010, 1011, 1012, 1013, 1014, 1015, 1016, 1017, 1018, 1019, 1020 |
| A |
| TDP ______ |
| TM _______ |
| OTHER ENGINEERING DATA |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
S2025 RRL FY22CC
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A006 |
| TEST PROCEDURES (TP) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-NDTI-80603A |
| 3.5.2.11.4, 3.5.2.11.6, 3.5.4.4.1, 3.5.4.4.5, 3.5.4.5.5.4, 3.5.4.5.5.6, 3.5.7.2, 3.5.8.2, 3.5.8.3 |
| NAWCTSD RRL TSPM |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| VARIES |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
SEE BLK 16
| 16. REMARKS |
| NAWCTSD TPOC |
| 0 |
| 1 |
| 1 |
1. BLK 4: TEST PROCEDURES SHALL INCLUDE FUNCTIONAL TESTS, EXAMINATION/INSPECTION TESTS, AND INFORMATION ASSURANCE TESTS.
2. BLK 12: FOR IMI PRODUCTS BEING HOSTED IN NON-NEL TRAINING ENVIRONMENTS, THE FIRST SUBMISSION SHALL BE 35 WORKDAYS PRIOR TO THE NON-NEL ENVIRONMENTS CONTRACTOR INTERNAL TESTING (NON-NEL DT-D1). FOR MODIFIED PC SIMULATION, AR/MR/VR, AND IVE PRODUCTS, THE FIRST SUBMISSION SHALL BE 35 WORKDAYS PRIOR TO THE BASELINE CONFIGURATION AUDIT (BCA). FOR NEW PC SIMULATION, AR/MR/VR, AND IVE PRODUCTS, THE FIRST SUBMISSION SHALL BE 35 WORKDAYS PRIOR TO SIMULATION CONTRACTOR INTERNAL TESTING (SIMULATION DT-D1).
3. BLK 13: SUBSEQUENT REVISONS SHALL BE DUE 35 WORKDAYS PRIOR TO A PLANNED TEST EVENT AND PRE-MODIFICATION INSPECTION. FINAL SUBMISSION SHALL BE DUE 20 WORKDAYS AFTER COMPLETION OF THE NON-NEL AND SIMULATION INTEGRATED TESING (NON-NEL IT-D1 AND SIMULATION IT-D1).
4. BLK 14: SUBMISSIONS SHALL BE ELECTRONIC IN MICROSOFT OFFICE (WORD) 2010 OR LATER FORMAT. SUBMISSIONS SHALL BE POSTED TO THE CONTRACTOR DELIVERABLE ONLINE MANAGEMENT SYSTEM, INCLUDING NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE THE GOVERNMENT REVIEW COMMENCES. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAYS NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. MAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE..
5. THE GOVERNMENT WILL HAVE FIFTEEN (15) WORKDAYS FROM RECEIPT OF DISTRIBUTION OF COPIES FOR REVIEW AND ACCEPTANCE/REJECTION OF THE FIRST SUBMISSION AND WILL HAVE TEN (10) WORKDAYS FOR EACH SUBSEQUENT SUBMISSION. THE CONTRACTOR SHALL HAVE 10 WORKDAYS TO INCORPORATE GOVERNMENT COMMENTS.
6. BLK 9: THE FOLLOWING STATEMENTS SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION D. DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY ADMINISTRATIVE OR OPERATIONAL USE, 24 JUL 2018. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL AIR WARFARE CENTER TRAINING SYSTEMS DIVISION, 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3275 READY RELEVANT LEARNING TRAINING SYSTEMS PROGRAM MANAGER.
DESTRUCTION NOTICE - FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD 5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11-19 OR DOD 5200.1-R, INFORMATION SECURITY PROGRAM REGULATION, CHAPTER IX. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.
| NAWCTSD ACQ LEAD |
| 0 |
| LTR |
| ONLY |
| NAWCTSD RRL LSE |
| 0 |
| LTR |
| ONLY |
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
MARCELO ROSAS-ANDERSON, RRL FY22 CONTENT CONVERSION T&E
LCDR MAURA BETTS, RRL FY22 PROGRAM MANAGER
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 6 of 8 Pages
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1010, 1011, 1012, 1013, 1014, 1015, 1016, 1019, 1020 |
| A |
| TDP ______ |
| TM _______ |
| OTHER ENGINEERING DATA |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
S2025 RRL FY22CC
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A007 |
| TEST / INSPECTION REPORT (T/IR) |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-NDTI-80809B |
| 3.5.2.11.4, 3.5.2.11.6, 3.5.2.11.6.1, 3.5.2.11.9, 3.5.4.4.5, 3.5.4.5.5.4, 3.5.4.5.5.6, 3.5.4.5.5.6.1, 3.5.7.2, 3.5.8.2, 3.5.8.3 |
| NAWCTSD RRL TSPM |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| LT |
| REQUIRED |
| VARIES |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBMISSION |
SEE BLK 16
1. BLK 12: FOR IMI PRODUCTS BEING HOSTED IN NON-NEL TRAINING ENVIRONMENTS, THE FIRST SUBMISSION SHALL BE 10 WORKDAYS AFTER COMPLETION OF THE NON-NEL ENVIRONMENTS CONTRACTOR INTERNAL TESTING (NON-NEL DT-D1). FOR NEW PC SIMULATION, AR/MR/VR, AND IVE PRODUCTS, THE FIRST SUBMISSION SHALL BE 10 WORKDAYS AFTER COMPLETION OF THE SIMULATION CONTRACTOR INTERNAL TESTING (SIMULATION DT-D1).
2. BLK 13: SUBSEQUENT REVISONS SHALL BE DUE 10 WORKDAYS AFTER COMPLETION OF EACH PLANNED TEST EVENT. FINAL SUBMISSION SHALL BE DUE 15 WORKDAYS AFTER COMPLETION OF THE NON-NEL AND SIMULATION INTEGRATED TESING (NON-NEL IT-D1 AND SIMULATION).
3. BLK 14: SUBMISSIONS SHALL BE ELECTRONIC IN MICROSOFT OFFICE (WORD) 2010 OR LATER FORMAT. SUBMISSIONS SHALL BE POSTED TO THE CONTRACTOR DELIVERABLE ONLINE MANAGEMENT SYSTEM, INCLUDING NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE THE GOVERNMENT REVIEW COMMENCES. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAYS NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE..
4. THE GOVERNMENT WILL HAVE TEN (10) WORKDAYS FROM RECEIPT OF DISTRIBUTION OF COPIES FOR REVIEW AND ACCEPTANCE/REJECTION OF EACH SUBMISSION. THE CONTRACTOR SHALL HAVE 10 WORKDAYS TO INCORPORATE GOVERNMENT COMMENTS.
5. BLK 9: THE FOLLOWING STATEMENTS SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION D. DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY ADMINISTRATIVE OR OPERATIONAL USE, 24 JUL 2018. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO NAVAL AIR WARFARE CENTER TRAINING SYSTEMS DIVISION, 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3275 READY RELEVANT LEARNING TRAINING SYSTEMS PROGRAM MANAGER.
DESTRUCTION NOTICE - FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD 5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11-19 OR DOD 5200.1-R, INFORMATION SECURITY PROGRAM REGULATION, CHAPTER IX. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.
6. CONTRACTOR FORMAT IS ACCEPTABLE.
NAWCTSD ATPOC
NAWCTSD ACQ LEAD
NAWCTSD PCO
NAWCTSD PJM
NAWCTSD RRL LSE
NAWCTSD FY22CC LSE
NAWCTSD RRL T&E
15. TOTAL ▬▬▬▬►
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
MARCELO ROSAS-ANDERSON, RRL FY22 CONTENT CONVERSION T&E
LCDR MAURA BETTS, RRL FY22 PROGRAM MANAGER
CONTRACT DATA REQUIREMENTS LIST (CDRL)
Form Approved
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
| 1013, 1020 |
| A |
| TDP _____ |
| TM _____ |
| OTHER: IPSC |
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
FISCAL YEAR 2022 (FY22) READY RELEVANT LEARNING (RRL) CONTENT CONVERSION (CC)
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
17. PRICE GROUP
| A008 |
| SCIENTIFIC AND TECHNICAL REPORT |
| LOGIC TABLES |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
18. ESTIMATED
| DI-MISC-80711A |
| 3.5.2.7, 3.5.2.8, 3.5.4.5.1, 3.5.4.5.2, 3.5.4.5.4 |
| NAWCTSD ENGR |
| 7. DD 250 REQ |
| 9. DIST STATEMENT |
| 10. FREQUENCY |
| 12. DATE OF FIRST SUBMISSION |
| 14. DISTRIBUTION |
| XX |
| REQUIRED |
| ASREQ |
| SEE BLK 16 |
| a. ADDRESSEE |
| b. COPIES |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT SUBM. |
A
| 16. REMARKS |
| NAWCTSD ENGR |
| 0 |
| 1 |
| 0 |
16. REMARKS
1. BLK 4: CONTRACTOR FORMAT IS ACCEPTABLE. LOGIC TABLES SHALL, AT A MINIMUM, PROVIDE TRACEABILITY FOR EACH STEP, STEP DESCRIPTION, USER ACTION, SIMULATION (I.E. ON-SCREEN) RESPONSE, AND FUNCTIONAL REFERENCE. LOGIC TABLES SHALL CONTAIN REFERENCES USED TO CREATE THE CURRICULUM (INCLUDING TITLE, PAGE, AND PARAGRAPH FOR CONTENT/TEXT).
2. BLKS 10/12/13: SUBMISSIONS SHALL BE DELIVERED IN INCREMENTS IN ACCORDANCE WITH (IAW) THE GOVERNMENT-ACCEPTED INTEGRATED MASTER SCHEDULE (IMS). TO AID REVIEW OF COMPLEX MEDIA PRODUCTS, SUBMISSIONS SHALL BE SCHEDULED IN THE IMS TO BE DELIVERED WITH THE TEST PACKAGE (ASSESSMENTS (F005), TRAINING COUNDUCT SUPPORT DOCUMENT (F007), AND TRAINING PROGRAM STRUCTURE DOCUMENT (F008) DELIVERABLES SO GOVERNMENT SMES MAY REVIEW ACCURATELY.
3. BLK 14: SUBMISSIONS SHALL BE ELECTRONIC IN MICROSOFT OFFICE (WORD) 2010 OR LATER FORMAT. SUBMISSIONS SHALL BE POSTED TO THE CONTRACTOR DELIVERABLE ONLINE MANAGEMENT SYSTEM, INCLUDING NAWCTSD FORM 4330 WITH THE APPROPRIATE INFORMATION FILLED IN. AN E-MAIL INDICATING THE SUBMISSION IS READY FOR GOVERNMENT REVIEW SHALL BE SENT TO DESIGNATED ADDRESSES, ALSO INDICATING THE DATE THE GOVERNMENT REVIEW COMMENCES. THE CONTRACTOR SHALL PROVIDE THE GOVERNMENT WITH AT LEAST ONE DAYS NOTICE PRIOR TO THE BEGINNING OF THE GOVERNMENT REVIEW PERIOD. EMAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE.. EMAIL ADDRESSES ARE IN SECTION F OF THE CONTRACT SCHEDULE.
4. THE GOVERNMENT WILL HAVE 20 WORKING DAYS FOR REVIEW AND CONDITIONAL ACCEPTANCE/REJECTION OF EACH SUBMISSION
5. CONTRACTOR INCORPORATION OF GOVERNMENT COMMENTS SHALL BE DUE WITHIN IN 10 WORKING DAYS OF RECEIPT OF COMMENTS IF REJECTED.
6. LOGIC TABLES SUBMISSIONS SHALL INCLUDE APPLICABLE TEST PACKAGE ASSESSMENT ITEMS CREATED AND INCLUDE REQUIREMENTS IDENTIFIED IN CDRL F005 TEST PACKAGE.
7. ACCEPTANCE OF CHANGES IN CONTRACT REQUIREMENTS/STANDARDS/SPECIFICATIONS DOES NOT CONSTITUTE GOVERNMENT AGREEMENT TO THOSE CHANGES. ONLY BY DIRECTION OF THE CONTRACTING OFFICER CAN SUCH CHANGES BE MADE.
8. THE FOLLOWING DISTRIBUTION STATEMENT SHALL BE INCLUDED ON THE DELIVERABLE:
DISTRIBUTION D. DISTRIBUTION AUTHORIZED TO DOD AND U.S. DOD CONTRACTORS ONLY; ADMINISTRATIVE OR OPERATIONAL USE, 24 JUL 2018. OTHER REQUESTS FOR THIS DOCUMENT MUST BE REFERRED TO NAVAL AIR WARFARE CENTER TRAINING SYSTEMS DIVISION, 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3275 READY RELEVANT LEARNING TRAINING SYSTEMS PROGRAM MANAGER.
DESTRUCTION NOTICE - FOR CLASSIFIED DOCUMENTS, FOLLOW THE PROCEDURES IN DOD 5220.22-M, INDUSTRIAL SECURITY MANUAL, SECTION 11-19 OR DOD 5200.1-R, INFORMATION SECURITY PROGRAM REGULATION, CHAPTER IX. FOR UNCLASSIFIED, LIMITED DOCUMENTS, DESTROY BY ANY METHOD THAT WILL PREVENT DISCLOSURE OF CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| J. DATE |
VINCE FLANGO, RRL FY22 CONTENT CONVERSION TPOC
LCDR MAURA BETTS, RRL FY22 PROGRAM MANAGER
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 7 of 7