Attachment 6 Logic Table Example - 9 Sep 2020.docx

DOCX document 42 KB Posted

Attached to
SAILOR 2025 (S2025) READY RELEVANT LEARNING (RRL) FISCAL YEAR 2022 CONTENT CONVERSION
Solicitation number
N61340-21-R-0032
Issued by

About this file

This document contains a logic table example and related federal contract opportunity solicitation. The logic table provides step-by-step instructions for testing and troubleshooting the Auxiliary Power Unit battery charger circuit on an E-6B aircraft. It outlines 14 steps to inspect components, ensure circuit breakers are closed, check voltages and lights, and install covers.

The related solicitation seeks proposals for the Fiscal Year 2022 Ready Relevant Learning Content Conversion effort. Proposals are due by July 19, 2021 and shall be submitted via the DoD SAFE website according to instructions in Section L. The Naval Air Warfare Center Training Systems Division is seeking a Single Award Indefinite Delivery Indefinite Quantity contract to convert training content for the Sailor 2025 project, which aims to modernize Navy training delivery methods and allow rapid infusion of relevant course content. The North American Industry Classification code is 541330 with a size standard of $41.5 million.

View the file

Other files

File Type Posted
Atch (L-10) - Solicitation Question - Answers 070221.pdf PDF
N6134021R0032_Amend0001_Final_SecL-Track_Changes.pdf PDF
Atch (1)_APPENDIX M Sailor 2025 RRL CC Blend Process 061621.odt ODT document
N6134021R0032U0001 FY22 CC RFP Amendment mod 070221.docx DOCX document
Attachment 1 FY22CC IDIQ SOW - RFP Amendmemt - 23 June 2021.pdf PDF
Attachment 1 FY22CC IDIQ SOW - RFP - 23 June 2021 - TC.pdf PDF
DD 254 PLAN N61340-21-R-0032 IDIQ RRL FY22-signed.pdf PDF
N6134021R0032U0001 FY22 CC RFP Amendment conformed 070221.docx DOCX document
N6134021R0032_Amend0001_Final_SecM-Track_Changes.pdf PDF
Exhibit B_FY22 RRL CONTENT CONVERSION (B00X) Admin 06May2021.docx DOCX document
Atch (L-9) Estimated IDIQ DO Award Schedule 050521.pdf PDF
Atch (L-6) Small Business Participation Committment Document (SBPCD).docx DOCX document
Atch (L-7) FY22 GFI Matrix 052021.xlsx XLSX spreadsheet
Exhibit F_FY22 RRL CONTENT CONVERSION (F00X) Train 20May2021.docx DOCX document
Atch (L-4) Relevancy Information of the PP Contract.docx DOCX document
Atch (L-3) Contractor Performance Assessment Questionaire (CPAQ).docx DOCX document
Atch (L-1) Q-A Form.xlsx XLSX spreadsheet
Atch (L-8) RFP GFI Request Form.docx DOCX document
Exhibit A_FY22 RRL CONTENT CONVERSION (A00X) Eng 27 May 2021.docx DOCX document
Atch (L-5) CLIN Pricing Form.xlsx XLSX spreadsheet
N6134021R0032 FY22 CC RFP 052821 FINAL.docx DOCX document
Atch (1)_APPENDIX D CDRL List - 10 May 2021.docx DOCX document
Atch (1)_APPENDIX J Mobile Learning Roadmap - 09 Sep 2020.docx DOCX document
Atch (1)_APPENDIX H Sailor 2025 RRL Use of Blooms Taxonomy 090920.odt ODT document
Attachment 4 FY22 CC DD 254 (Draft) 24 Mar 2021.pdf PDF
Atch (1)_APPENDIX M Sailor 2025 RRL CC Blend Process 040721.odt ODT document
Atch (1)_APPENDIX B Acronym List - 10 May 2021.docx DOCX document
Attachment 5 NETC RRL Style Guide - v1- 30 March 2021.docx DOCX document
Attachment 3 - Form 4330_Data-Item-Transmittal_Form.pdf PDF
Atch (1)_APPENDIX G Sailor 2025 RRL Operational Engaging 090920.docx DOCX document
Atch (1)_APPENDIX C Terms and Definitions - 15 Apr 2021.docx DOCX document
Attachment 2 - (SAMPLE) FY22 CC DO 001 - 27 May 2021.docx DOCX document
Atch (1)_APPENDIX I Sailor 2025 RRL CC Media Type Char 090920.pdf PDF
Atch (1)_APPENDIX K NETC RRL Single User Gam and Sim 091018.odt ODT document
Atch (1)_APPENDIX E Risk Assessment Example Format - 090920.pptx PPTX presentation
Atch (1)_APPENDIX F Sailor 2025 RRL Content Delivery Modes 090920.odt ODT document
Attachment 1 FY22CC IDIQ SOW - RFP - 26 May 2021.docx DOCX document
Atch (1)_APPENDIX L NETC RRL Video Stream Guidance 102417.odt ODT document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APU Battery Charger Circuit Testing and Troubleshooting Logic Table (Storyboard) NAVAIR A1-E6AAB-420-100, WP010 02, Table 10 for

E-6B Auxiliary Power Systems (APS) Personal Computer Simulation (PC Sim)

Security Classification: Unclassified

Prepared for

Naval Air Warfare Center Training Systems Division 12350 Research Parkway Orlando, FL 32826-3275

09 September 2020 Version: Final Table of Contents

1. APU Battery Charger Circuit Testing and Troubleshooting 1

E-6B Fuel System PC Simulation – Maintenance Procedures – Fuel Quantity Indicator (N11) is Defective E-6B Auxiliary Power Systems PC Sim – APU Battery Charger Circuit Testing and Troubleshooting

Page ii 09 September 2020 APU Battery Charger Circuit Testing and Troubleshooting

Step

Step Description
User Actions
PC Sim Response
Functional Reference
1
Ground the aircraft.
Access the Power Options menu.
The Power Options menu opens.
FS_Power Options Menu
Select the <Apply> radio button from the Grounding options set.
Pop-up text displays:

You just performed an automated action to ground the aircraft. The aircraft has been grounded.

Refer to A1-E6AAB-GAI-000, WP010 00, for the procedures to follow while maintaining the actual aircraft.

Pop-up

Select <Close>.
The pop-up window closes.
N/A
Select <Close>.
The Power Options window closes.
FS_Power Options Menu
2
Gain access to the Aft Lower Lobe.
N/A
N/A
420-100, WP010 02, Table 10, Step 1; * Not applicable to APU PC Sim
3
Remove the access panel from the APU Power and Control Cabinet.
N/A
N/A
420-100, WP010 02, Table 10, Step 2; * Not applicable to APU PC Sim
4
Remove the APU Battery cover, and ensure the APU Start Battery is connected.
Access the APU Battery.
The APU Battery opens.
420-100, WP010 02, Table 10, Step 3; 420-100, WP010 02, Figure 4 [8]
Select the Inspect icon.
The Inspect icon glows.
N/A
Select the APU Battery cover.
The APU Battery cover glows, and the Component Inspector Toolbox opens.
420-100, WP010 02, Figure 4 [8]
Select the Remove icon from the Component Inspector Toolbox.
The APU Battery cover animates to illustrate removal.
CIT [remove]
Select <X> to close the Component Inspector Toolbox.
The Component Inspector Toolbox closes.
FS_CIT [bottom]
Observe the APU Battery.
The APU Battery is connected.
420-100, WP010 02, Figure 4 [8]
5
Ensure the following circuit breakers are closed:

P61-2 Circuit Breaker Panel P61-5 Circuit Breaker Panel P61-6 Circuit Breaker Panel APCC Circuit Breaker Panel

Access the P61-2 Circuit Breaker Panel.
The P61-2 Circuit Breaker Panel opens.
420-100, WP010 02, Table 10, Step 4; 420-100, WP025 01, Figure 10A
Observe the circuit breakers.
All circuit breakers are in the closed position.
420-100, WP025 01, Figure 10A
Access the P61-5 Circuit Breaker Panel.
The P61-5 Circuit Breaker Panel opens.
420-100, WP025 01, Figure 13A
Observe the circuit breakers.
All circuit breakers are in the closed position.
420-100, WP025 01, Figure 13A
Access the P61-6 Circuit Breaker Panel.
The P61-6 Circuit Breaker Panel opens.
420-100, WP025 01, Figure 14A
Observe the circuit breakers.
All circuit breakers are in the closed position.
420-100, WP025 01, Figure 14A
Access the APCC Circuit Breaker Panel.
The APCC Circuit Breaker Panel opens.
420-100, WP010 02, Figure 4
Observe the circuit breakers.
All circuit breakers are in the closed position.
420-100, WP010 02, Figure 4
6
Ensure the APU BATTERY switch is in the ON position.
Access the P60 APU Battery Control Panel.
The P60 APU Battery Control Panel opens.
420-100, WP010 02, Table 10, Step 5; 420-100, WP010 02, Figure 5
Select and drag the BATTERY switch cover to the guarded position.
The BATTERY switch cover moves to the guarded position.
420-100, WP010 02, Figure 5
The BATTERY switch moves to the ON position with the switch cover.
420-100, WP010 02, Figure 5
7
Check the Voltage and Amperes on the APU Battery Control Panel.
Observe the APU BATTERY VOLTS meter.
The voltage is 28.0 volts (± 1 volt).
420-100, WP010 02, Table 10, Step 6; 420-100, WP010 02, Figure 5
Observe the APU BATTERY AMPS meter.
The current is 0011 amps (± 1 amp).
420-100, WP010 02, Figure 5
8
Check for the BATTERY FAULT light on the P60 APU Battery Panel, or the Battery Charger – BATTERY LED illuminated green.
Observe the FAULT – BATTERY light.
The FAULT – BATTERY light is off.
420-100, WP010 02, Table 10, Step 7; 420-100, WP010 02, Figure 5
Access the Battery Charger.
The Battery Charger opens.
420-100, WP010 02, Figure 4
Observe the BATTERY LED.
The BATTERY LED illuminates green.
420-100, WP010 02, Figure 4
9
Check for the CHARGER FAULT light on the P60 APU Battery Panel, or the Battery Charger – CHARGER LED illuminated green.
Access the P60 APU Battery Control Panel.
The P60 APU Battery Control Panel opens.
420-100, WP010 02, Table 10, Step 8; 420-100, WP010 02, Figure 5
Observe the FAULT – CHARGER light.
The FAULT – CHARGER light is off.
420-100, WP010 02, Figure 5
Access the Battery Charger.
The Battery Charger opens.
420-100, WP010 02, Figure 4
Observe the CHARGER LED.
The CHARGER LED illuminates green.
420-100, WP010 02, Figure 4
10
Ensure the APU BATTERY switch is in the OFF position.
Access the P60 APU Battery Control Panel.
The P60 APU Battery Control Panel opens.
420-100, WP010 02, Table 10, Step 9; 420-100, WP010 02, Figure 5
Select and drag the BATTERY switch cover to the unguarded position.
The BATTERY switch cover opens.
420-100, WP010 02, Figure 5
Select and drag the BATTERY switch to the OFF position.
The BATTERY switch moves to the OFF position.
420-100, WP010 02, Figure 5
12
Install the APU Battery cover.
Access the APU Battery.
The APU Battery opens.
420-100, WP010 02, Table 10, Step 10; 420-100, WP010 02, Figure 4 [8]
Select the Inspect icon.
The Inspect icon glows.
N/A
Select the APU Battery cover.
The APU Battery cover glows, and the Component Inspector Toolbox opens.
420-100, WP010 02, Figure 4 [8]
Select the Install icon from the Component Inspector Toolbox.
The APU Battery cover animates to illustrate installation to the aircraft.
CIT [install]
Select <X> to close the Component Inspector Toolbox.
The Component Inspector Toolbox closes.
FS_CIT [bottom]
12
Close the access panel for the APU Power and Control Cabinet.
N/A
N/A
420-100, WP010 02, Table 10, Step 11; * Not applicable to APU PC Sim
13
Close the Aft Lower Lobe.
N/A
N/A
420-100, WP010 02, Table 10, Step 12; * Not applicable to APU PC Sim