Attachment 2 - (SAMPLE) FY22 CC DO 001 - 27 May 2021.docx
DOCX document 44 KB Posted
- Solicitation number
- N61340-21-R-0032
About this file
This solicitation seeks proposals for the Fiscal Year 2022 Ready Relevant Learning Content Conversion effort. The Naval Air Warfare Center, Training Systems Division will award an Indefinite Delivery Indefinite Quantity contract to design, develop, test and deliver courseware converting ratings for Gunner's Mate, Machinist's Mate Auxiliary, Torpedoman's Mate, and Construction Mechanic to new learning platforms. Proposals are due by July 19, 2021 and shall be submitted via the DoD SAFE website in accordance with instructions in the solicitation. The effort aims to modernize Navy training delivery methods and accelerate Sailor learning through mobile, multi-media solutions. The contractor will provide products including software design documents, requirements traceability matrices, test procedures, training packages, and final curriculum delivery files.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sample FY22 CC DO Statement of Work 27 May 2021 Change Log
| Date |
| Section |
| Page # |
| Change |
SCOPE
In performing this delivery order (DO) the Contractor shall meet the requirements of the IDIQ, including the IDIQ SOW. This DO defines the specific requirements (in addition to those identified in the IDIQ) for design, development, testing, and delivery of products in support of the Sailor 2025 (S2025) Fiscal Year 2022 (FY22) Ready Relevant Learning (RRL) Content Conversion (CC) effort for the following ratings and rating paths. Associated travel will be required.
1. Gunner’s Mate (GM) rating
· GM 0000, “A” School, A-100-0094B, A-100-0099, A-100-0152
· GM V62B, 5-INCH 54 CAL GUN MOUNT MK 45 MOD 2, A-113-1118A
· GM V63B, 5-INCH 62 CAL MK 45 MOD 4, A-113-2102
· GM V64B, VLS MK 41, A-121-0522, A-121-0580
· GM V61B, 30MM MK 46 MOD 2 GWS, A-113-0039
· GM 779B, 25MM MGS MK 38 MOD O&M, A-041-0004
2. Machinist’s Mate Auxiliary (MMA) rating
· Q31A, Machinist’s Mate Auxiliary Block 0, A-652-0750
3. Torpedoman’s Mate (TM) rating
· Q33A, Torpedoman’s Mate Block 0, A-123-0300
· 737B, SSN688 and 774 Block 1/11 VLS Basic Operation and Tube Maintenance, A-123-0207
· Q77A, SSN774 Class Weapons Shipping, Handling, Stowage, and Launch Combined Maintenance, A-123-0130
· 728A, Virginia Payload System, A-123-0310, A-123-0220
4. Construction Mechanic (CM) rating
· CM 0000, “A” School, A-610-0022
The content delivery modes and courseware hours for each rating/rating path are summarized in Table 1.
Table 1 – DO 001 Courseware Totals per CLIN
| Delivery Mode |
| GM |
| TM |
| MMA |
| CM |
| TOTAL |
| GM 0000 |
| V62B |
| V63B |
| V64B |
| V61B |
| 779B |
| Q33A |
| 737B |
| Q77A |
| 782A |
| Q31A |
| CM 0000 |
| -- |
| IFIT - IMI1 |
| 0 |
| 0 |
| 121 |
| 0 |
| 0 |
| 1 |
| 4 |
| 1 |
| 2 |
| 1 |
| 3 |
| 1 |
| 134 |
| IFIT - IMI2 |
| 244 |
| 473 |
| 572 |
| 106 |
| 109 |
| 122 |
| 327 |
| 107 |
| 142 |
| 71 |
| 249 |
| 52 |
| 2574 |
| IFIT - IMI3 |
| 39 |
| 1 |
| 0 |
| 0 |
| 7 |
| 8 |
| 4 |
| 1 |
| 2 |
| 1 |
| 3 |
| 1 |
| 67 |
| SDIT - IMI1 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| SDIT - IMI2 |
| 1 |
| 0 |
| 3 |
| 0 |
| 17 |
| 0 |
| 15 |
| 5 |
| 6 |
| 3 |
| 11 |
| 2 |
| 63 |
| SDIT - IMI3 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 5 |
| 2 |
| 2 |
| 1 |
| 3 |
| 1 |
| 14 |
| Complex Media |
| 7 |
| 0 |
| 0 |
| 0 |
| 0 |
| 0 |
| 14 |
| 5 |
| 6 |
| 3 |
| 11 |
| 2 |
| 48 |
Complex Media Requirement The Government anticipates providing complex media fidelity data as GFI after DO award but prior to System Requirements Review. Based on the GFI complex media fidelity data, FRD, and associated workbook, the contractor shall design, develop, test and deliver complex media addressing each of the media characteristics in support of the specified learning objectives.
THE FOLLOWING CDRLS APPLY:
ENGINEERING CDRLS
· A002 - Software Product Design (SPD) - DI-SESS-82036
· A003 - Requirements Traceability Verification Matrix (RTVM) - DI-MGMT-82133
· A004 - Software Development Plan (SDP) - DI-IPSC-81427B
· A005 - Software Product Package (SPP) DI-IPSC-82090B
· A006 - Test Procedures (TPs) - DI-NDTI-80603A
· A007 - Test/Inspection Report (T/IR) - DI-NDTI-80809B
· A008 - Scientific and Technical Report, Logic Tables - DI-MISC-80711A
MGMT/ADMN CDRLS
· B001 - DI-MGMT-81117 - Integrated Master Plan (IMP)
· B002 - DI-MGMT-81861B - Integrated Program Management Report (IPMR/IMS)
· B003 - DI-MGMT-81334D - Contract Work Breakdown Structure (CWBS)
· B004 - DI-MGMT-81928 - Contractor’s Progress, Status, and Management Report (CPSMR)
· B005 - DI-ADMN-81249B - Conference Agenda
· B006 - DI-ADMN-81250B - Conference Minutes
· B007 - DI-ADMN-81249B - Site Visit Plan
· B008 - DI-MGMT-80934C - Operations Security (OPSEC) Plan
· B009 - DI-MISC-80711A - Scientific and Technical Report, Vendor Integrity Statement
TRAINING CDRLS
· F001 - Instructional Media Design Package (IMDP) - DI-SESS-81520B
· F002 - Instructional Media Design Package (IMDP) Development (Updated Style Guide) and Model Products (i.e. Prototypes) - DI-SESS-81520B
· F003 - Instructional Media Package (IMP) (Script Storyboards) - DI-SESS-81526C
· F004 - Instructional Media Package (IMP) (On-screen Lessons - DI-SESS-81526C
· F005 - Test Package Development (Assessments) - DI-SESS-81525C
· F006 - Course Testing Plan (Administration) - DI-SESS-81525C
· F007 - Training Conduct Support Document (TCSD) (Curriculum Package) (LP, Training Handouts and Presentation Materials and a TG) - DI-PSSS-81523D
· F008 - Training Program Structure Documents (TPSD) (TPP, TCCD, CMS, and RRL) - DI-SESS-81521B
· F009 - Training Systems Support Document (TSSD) - DI-PSSS-81527D
· F00A - Instructional Media Package (Media Source Files) - DI-SESS-81526C
· F00B - Instructional Media Package (Final Curriculum Delivery) - DI-SESS-81526C
WORK PLAN
1. Contractor and Government shall establish a weekly or biweekly IPT meetings to be held via teleconference.
2. Establish initial Data Gathering Trip.
3. In Progress Reviews (IPRs) to be held at Contractor’s facility.