This is a solicitation for a single-award Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide Ready Relevant Learning (RRL) Fiscal Year 2022 (FY22) Content Conversion services for the Sailor 2025 project. The Naval Air Warfare Center Training Systems Division (NAWCTSD) seeks proposals due no later than July 19, 2021 to be submitted via the DoD SAFE website. The work includes designing, developing, testing, and delivering training products in support of converting content for various Navy ratings into interactive multimedia instruction, mobile technologies, performance support, and structured on-the-job training. The North American Industry Classification System (NAICS) code is 541330 with a size standard of $41.5 million.

View the file

Other files

File Type Posted
Atch (L-10) - Solicitation Question - Answers 070221.pdf PDF
N6134021R0032_Amend0001_Final_SecL-Track_Changes.pdf PDF
Atch (1)_APPENDIX M Sailor 2025 RRL CC Blend Process 061621.odt ODT document
N6134021R0032U0001 FY22 CC RFP Amendment mod 070221.docx DOCX document
Attachment 1 FY22CC IDIQ SOW - RFP Amendmemt - 23 June 2021.pdf PDF
Attachment 1 FY22CC IDIQ SOW - RFP - 23 June 2021 - TC.pdf PDF
DD 254 PLAN N61340-21-R-0032 IDIQ RRL FY22-signed.pdf PDF
N6134021R0032U0001 FY22 CC RFP Amendment conformed 070221.docx DOCX document
N6134021R0032_Amend0001_Final_SecM-Track_Changes.pdf PDF
Exhibit B_FY22 RRL CONTENT CONVERSION (B00X) Admin 06May2021.docx DOCX document
Atch (L-9) Estimated IDIQ DO Award Schedule 050521.pdf PDF
Atch (L-6) Small Business Participation Committment Document (SBPCD).docx DOCX document
Atch (L-7) FY22 GFI Matrix 052021.xlsx XLSX spreadsheet
Exhibit F_FY22 RRL CONTENT CONVERSION (F00X) Train 20May2021.docx DOCX document
Atch (L-4) Relevancy Information of the PP Contract.docx DOCX document
Atch (L-3) Contractor Performance Assessment Questionaire (CPAQ).docx DOCX document
Atch (L-1) Q-A Form.xlsx XLSX spreadsheet
Atch (L-8) RFP GFI Request Form.docx DOCX document
Exhibit A_FY22 RRL CONTENT CONVERSION (A00X) Eng 27 May 2021.docx DOCX document
Atch (L-5) CLIN Pricing Form.xlsx XLSX spreadsheet
N6134021R0032 FY22 CC RFP 052821 FINAL.docx DOCX document
Atch (1)_APPENDIX D CDRL List - 10 May 2021.docx DOCX document
Atch (1)_APPENDIX J Mobile Learning Roadmap - 09 Sep 2020.docx DOCX document
Atch (1)_APPENDIX H Sailor 2025 RRL Use of Blooms Taxonomy 090920.odt ODT document
Attachment 4 FY22 CC DD 254 (Draft) 24 Mar 2021.pdf PDF
Atch (1)_APPENDIX M Sailor 2025 RRL CC Blend Process 040721.odt ODT document
Atch (1)_APPENDIX B Acronym List - 10 May 2021.docx DOCX document
Attachment 5 NETC RRL Style Guide - v1- 30 March 2021.docx DOCX document
Attachment 3 - Form 4330_Data-Item-Transmittal_Form.pdf PDF
Atch (1)_APPENDIX G Sailor 2025 RRL Operational Engaging 090920.docx DOCX document
Atch (1)_APPENDIX C Terms and Definitions - 15 Apr 2021.docx DOCX document
Attachment 2 - (SAMPLE) FY22 CC DO 001 - 27 May 2021.docx DOCX document
Atch (1)_APPENDIX I Sailor 2025 RRL CC Media Type Char 090920.pdf PDF
Attachment 6 Logic Table Example - 9 Sep 2020.docx DOCX document
Atch (1)_APPENDIX K NETC RRL Single User Gam and Sim 091018.odt ODT document
Atch (1)_APPENDIX E Risk Assessment Example Format - 090920.pptx PPTX presentation
Atch (1)_APPENDIX F Sailor 2025 RRL Content Delivery Modes 090920.odt ODT document
Atch (1)_APPENDIX L NETC RRL Video Stream Guidance 102417.odt ODT document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

SAILOR 20205 (S2025) Fiscal Year (FY) 22 READY RELEVANT LEARNING (RRL)

CONTENT CONVERSION (CC)

Prepared For:

Commander, United States Fleet Forces Command (CFFC) Norfolk, VA 23551-2487 Prepared By:

Naval Air Warfare Center Training Systems Division (NAWCTSD) 12211 Science Drive Orlando, FL 32826

DISTRIBUTION A. Approved for public release. Distribution is unlimited.

This page intentionally left blank.

REVIEWED BY:DATE: _____________
Diane Richie
RRL TSPM Lead Systems Engineer
NAVAIR – 5.7.7.
REVIEWED BY:DATE: _____________
Vince Flango
FY22 Content Conversion (CC) Technical Point of Contact
NAVAIR – 5.3.6
APPROVED BY:DATE: _______________
LCDR Maura Betts
Program Management Office
NAVAIR –

Change Log

Date
Section Number
Section Title
Change

Table of CONTENTS

1. Scope11
1.1 Rating Requirements11
1.2 Course, Module and Lesson Structure12
1.3 Content Delivery Modes and Media Types12
1.4 Content Conversion Process Flows14
1.4.1 Performance Support (PS) and Structured On The Job Training (SOJT) Development Process14
1.4.1.1 PS Hosted in Training Delivery Environments14
1.4.1.2 PS Hosted in Operational Environments15
1.4.2 Complex Media Development Process15
1.4.3 Coordination with Third-Parties16
1.5 List of SOW Appendices16
1.6 Terms and Definitions17
1.7 Government-Furnished Information (GFI)17
1.8 Government-Furnished Software, Tools and Equipment17
1.9 Government-Furnished Subject Matter Experts (SMEs)18
2. Applicable Documents18
2.1 Government Documents18
2.2 Department of Defense (DOD) Documents19
2.3 Department of the Navy (DON) Documents20
2.4 Authoring Instructional Materials (AIM) Documents21
2.5 Industry Standards21
2.6 Other Documents22
3. Requirements25
3.1 General Requirements26
3.1.1 RRL Content Conversion Planning26
3.1.1.1 Life-Cycle Model Management26
3.1.1.2 Infrastructure Management26
3.1.1.3 Program Assessment and Control26
3.1.1.4 Program Decision Management27
3.1.2 Contract Data Requirements Lists (CDRLs)27
3.1.3 Online Management System (OMS)27
3.1.3.1 OMS Basic Requirements28
3.1.3.1.1 OMS Required Functionality for IMI, Supporting Material and Complex Media Reviews28
The OMS shall:28
3.1.3.1.2 OMS Comment Submission Capability for IMI, Supporting Material and Complex Media Reviews28
The OMS shall have the following lesson comment submission capabilities:28
3.1.3.1.3 OMS Comment Review and Administration Capability for IMI, Supporting Material and Complex Media Reviews29
The OMS shall have the following lesson comment review and administration capabilities:29
3.1.4 Configuration Management (CM)30
3.1.5 Contractor SMEs30
3.1.6 Copyrights30
3.1.7 Quality Assurance and Management Plan (QAMP)31
3.1.7.1 Control of GFI31
3.1.8 Communications Plan31
3.2 Security31
3.2.1 Classified Processing and Access to Classified Systems32
3.2.2 Operations Security (OPSEC)32
3.2.3 Unclassified Contractor-Owned Network Security – Safeguarding of Unclassified Controlled Technical Information33
3.2.4 Cyber Incident and Compromise Reporting33
3.2.5 Access to DOD Installations, Government Information and Information Technology (IT) Systems – Personnel Security Background Checks34
3.2.6 Personnel Security – Background Checks34
3.2.7 International Traffic and Arms Regulation35
3.2.8 Personnel Security – Reporting of Adverse or Derogatory Information Related to Contractors35
3.2.9 Government-Issued Personal Identification Credentials35
3.2.10 Contractor “Out-Processing” Policy36
3.2.11 Supply Chain Risk Management (SCRM) For National Security Systems36
3.2.12 Protection of Critical Program Information (CPI)36
3.2.13 Transmission of Controlled Unclassified Information (CUI) Via Email36
3.2.14 Transmission of CUI Via DoD Safe Access File Exchange (DoD SAFE)37
3.3 Cybersecurity37
3.3.1 Critical Program Information (CPI)37
3.3.2 Cybersecurity Training & Certification38
3.3.3 Software Integrity Testing and Certification38
3.4 Management Requirements39
3.4.1 Integrated Product Team (IPT)39
3.4.2 Integrated Management Plan (IMP)39
3.4.3 Work Planning and Scheduling39
3.4.4 Development of the Contract Work Breakdown Structure (CWBS)40
3.4.5 Subcontractor Management and Reporting40
3.4.6 Risk Management40
3.4.6.1 Schedule Risk Assessment (SRA)41
3.4.7 Program Progress, Tracking, and Reporting41
3.4.8 Conferences, Meetings, and Reviews41
3.4.8.1 Post Award Conference (PAC)42
3.4.8.2 In-Process Review (IPR) Meetings43
3.4.8.3 Weekly or Biweekly IPT Meetings44
3.4.8.4 Data-Gathering Trips44
3.5 RRL Content Conversion Requirements44
3.5.1 Instructional Media Design Package (IMDP) Development45
3.5.1.1 Design for Training Product Delivery Environments45
3.5.1.1.1 Design Implementations to Reduce TRANET VDI Bandwidth Usage46
3.5.1.1.2 Design for Experience Application Program Interface (xAPI) Requirements47
3.5.1.1.3 Design for Mobile Requirements48
3.5.2 IMI, Mobile Ready, Mobile Optimized, and Responsive Design Mobile Website Media Types48
3.5.2.1 Instructional Media Design Package (IMDP) Development (Updated Style Guide) and Model Products (i.e., Prototypes)48
3.5.2.2 Instructional Media Package (IMP) (Script Storyboards)49
3.5.2.3 Instructional Media Package (IMP) (On-screen Lessons [OSLs])49
3.5.2.4 Courseware Reviews49
3.5.2.5 Test Package Development (Assessments)49
3.5.2.6 Course Testing Plan (Administration)50
3.5.2.7 Training Conduct Support Document (TCSD)50
3.5.2.8 Training Program Structure Documents (TPSD)51
3.5.2.9 Training Systems Support Document (TSSD)51
3.5.2.10 IMI Test & Evaluation (T&E) Program Components (IMI Product Acceptance) for Hosting in NeL Training Environment51
3.5.2.10.1 NeL Contractor Testing (NeL DT-D1)52
3.5.2.10.2 NeL Content Test Readiness Review (TRR) ETIM52
3.5.2.10.3 NeL Government Testing (NeL DT-D2)52
3.5.2.10.4 NeL DT-D2 Corrections53
3.5.2.10.5 Government Content Acceptance Testing (GCAT)53
3.5.2.10.6 Instructional Media Package (Media Source Files)53
3.5.2.10.7 Instructional Media Package (Final Curriculum Delivery)53
3.5.2.10.8 IMI Hosted in NeL Environment T3 and Course Pilot Preparation53
3.5.2.11 IMI T&E Program Components (IMI Product Acceptance Testing) for Hosting in Non-NeL Training Environments54
3.5.2.11.1 NeL Contractor Testing (NeL DT-D1)54
3.5.2.11.2 NeL Content TRR ETIM54
3.5.2.11.3 NeL Government Testing (NeL DT-D2)54
3.5.2.11.4 Non-NeL Environments Contractor Internal Testing (Non-NeL DT-D1)54
3.5.2.11.5 Non-NeL Environments TRR ETIM55
3.5.2.11.6 Non-NeL Environments Integrated Testing (Non-NeL IT-D1)55
3.5.2.11.6.1 Non-NeL IT-D1 Entry Criteria56
3.5.2.11.7 Instructional Media Package (Media Source Files)56
3.5.2.11.8 Instructional Media Package (Final Curriculum Delivery)56
3.5.2.11.9 IMI Hosted in Non-NeL Environment T3 and Course Pilot Preparation56
3.5.3 Performance Support (PS) and Structured On-The-job Training (SOJT) Media Types57
3.5.3.1 PS and SOJT Model Products (i.e. Prototypes)57
3.5.3.2 PS and SOJT Design57
3.5.3.3 PS and SOJT Instructional Media Package (IMP) (Script Storyboards)58
3.5.3.4 PS and SOJT Instructional Media Package (IMP) (On-screen Lessons (OSLs))58
3.5.3.5 PS and SOJT Training Conduct Support Document58
3.5.3.6 PS and SOJT Acceptance Testing58
3.5.3.7 PS and SOJT Instructional Media Package (Media Source Files)58
3.5.3.8 PS and SOJT Instructional Media Package-IMP (Final Curriculum Delivery59
3.5.4 Complex Media Types (e.g. PC Simulation, Augmented/Mixed/Virtual Reality, and Immersive Virtual Environment)59
3.5.4.1 Systems Engineering Processes59
3.5.4.1.1 System Requirements Definition59
3.5.4.1.2 System Requirements Analysis59
3.5.4.1.3 Traceability60
3.5.4.1.4 System Architectural Design60
3.5.4.1.5 System Implementation60
3.5.4.1.6 System Integration61
3.5.4.1.7 System Verification61
3.5.4.1.8 System Transition61
3.5.4.2 Engineering Technical Interface Meetings (ETIMs)61
3.5.4.2.1 Systems Requirements Review-II/System Functional Review (SRR-II/SFR) ETIM61
3.5.4.2.1.1 SRR-II/SFR ETIM Entry Criteria62
3.5.4.2.1.2 SRR-II/SFR ETIM Exit Criteria63
3.5.4.2.2 Preliminary Design Review (PDR) ETIM63
3.5.4.2.2.1 PDR ETIM Entry Criteria65
3.5.4.2.2.2 PDR ETIM Exit Criteria65
3.5.4.2.3 Critical Design Review (CDR)66
3.5.4.2.3.1 CDR ETIM Entry Criteria67
3.5.4.2.3.2 CDR ETIM Exit Criteria68
3.5.4.2.4 Test Readiness Review68
3.5.4.3 Software Engineering Processes69
3.5.4.3.1 Software Requirements Analysis69
3.5.4.3.2 Software Architectural Design69
3.5.4.3.3 Software Product Design69
3.5.4.3.4 Software Implementation70
3.5.4.3.4.1 Software Unit Construction and Testing70
3.5.4.3.5 Software Integration70
3.5.4.3.6 Cold Start Process70
3.5.4.3.6.1 Software Product Execution71
3.5.4.3.6.2 Media and Storage Devices71
3.5.4.4 Test and Evaluation (T&E) Processes72
3.5.4.4.1 Test Planning and Procedures72
3.5.4.4.2 Responsibility for Tests72
3.5.4.4.3 Test Authority72
3.5.4.4.4 Test Resources and Facilities72
3.5.4.4.5 Test Methods73
3.5.4.4.6 Verification Criteria73
3.5.4.4.7 Configuration73
3.5.4.4.8 Verification Log74
3.5.4.4.9 Changes During Testing74
3.5.4.4.10 Software Changes During Government Testing74
3.5.4.4.11 Changes After Testing74
3.5.4.4.12 T&E Non-Conformance Reporting System74
3.5.4.4.13 Deficiency Review Board (DRB)75
3.5.4.4.14 Deficiency and Discrepancy Adjudication75
3.5.4.5 Detailed Tasks for Complex Media (e.g. PC Simulation, Augmented/Mixed/Virtual Reality, and Immersive Virtual Environment Blended Approach) Courseware76
3.5.4.5.1 Logic Tables76
3.5.4.5.2 Test Package (Assessments)76
3.5.4.5.3 Navy Preliminary Evaluation76
3.5.4.5.4 Training Support Products76
3.5.4.5.5 Complex Media (e.g. PC Simulation, AR/MR/VR, and IVE Blended Approach) T&E Program Components77
3.5.4.5.5.1 Baseline Configuration Audit77
3.5.4.5.5.2 Navy Preliminary Evaluation (per increment – lessons delivered in increments)78
3.5.4.5.5.3 Pre-Modification Inspection (PMI)79
3.5.4.5.5.4 Contractor Internal Testing (Simulation DT-D1)79
3.5.4.5.5.5 Test Readiness Review80
3.5.4.5.5.6 Integrated Testing (Simulation IT-D1)82
3.5.4.5.5.7 Complex Media T3 and Course Pilot Preparation83
3.5.5 Human Factors Engineering (HFE)83
3.5.6 Gap Implementation83
3.5.7 Train the Trainer (T3)83
3.5.7.1 T3 Entry Criteria84
3.5.7.2 T3 Exit Criteria84
3.5.8 Course Pilot85
3.5.8.1 Course Pilot Entry Criteria86
3.5.8.2 Course Pilot Exit Criteria86
3.5.8.3 Regression Testing Following T3 and Course Pilot Events86

LIST OF TABLES

Table 1. Rating and Classification Requirements13
Table 2. Content delivery modes and Media Types15
Table 3. Government Documents20
Table 4. DOD Documents21
Table 5. DON Documents22
Table 6. AIM Documents23
Table 7. Industry Standards23
Table 8. Other Documents25

LIST OF FIGURES

Figure 1. IMI Levels 1 – 3 (and Mobile Ready, Mobile Optimized and Responsive Design Mobile Website) Content Conversion Process16
Figure 2. Training Environment and Devices17
Figure 3. Complex Media Content Conversion Process18

This page intentionally left blank.

Statement of Work for the RRL FY22 Content Conversion 29 June 2020 xi

STATEMENT OF WORK (SOW)

FOR

SAILOR 2025 (S2025) FY22 READY RELEVANT LEARNING (RRL)

CONTENT CONVERSION (CC)

Scope This Statement of Work (SOW) defines the basic requirements to be performed under this Ready Relevant Learning Fiscal Year 2022 Content Conversion (RRL FY22 CC) Indefinite Delivery/Indefinite Quantity (ID/IQ) contract. The detailed requirements will be defined in this ID/IQ SOW and each specific Delivery Order (DO). This ID/IQ documents the contractor tasks for the design, development, testing, and delivery of products in support of the RRL FY22 CC effort (see especially Appendices C, G, I, J, K, L, M). The contractor shall employ innovative instructional systems design (see Appendices H, L, and M), systems engineering, and training assessment approaches in conjunction with new and modernized technologies (see Appendix G) to support specified ratings accession training while simultaneously supporting the broader Sailor 2025 (S2025) overarching goal of improving Sailors’ transfer of training to the operational work environment. The following represents examples of the broader S2025 goals:

· Converting and/or improving designated courses so they are compatible with the waterfront or shipboard environment and contribute to the acquisition of actionable knowledge (i.e., practical knowledge that will be activated by and recognized as relevant to operational work contexts and events).

· Employing modernized media, instructional, and motivational strategies that are engaging (see Appendices G and I).

· Scheduling the converted and/or improved content closer in time to when the training will be put into practice in the work environment.

Rating Requirements The contractor shall perform tasks for the design, development, testing, and delivery of products for the ratings listed in Table 1 (highest classification is SECRET NOFORN unless otherwise noted). The contractor shall also prepare for and conduct Train-the-Trainer (T3) events and Course Pilot events as part of this effort.

Table 1. Rating and Classification Requirements

Rating
Highest Information Classification
Facilities Access Classification
When Classification Required
Fire Controlman (FC)
Unclassified
Unclassified
At Contract Award
Fire Controlman (AEGIS) (FCA)
SECRET NOFORN
SECRET NOFORN
At Contract Award
Gunner’s Mate (GM)
Unclassified
Unclassified
At Contract Award
Interior Communications Electrician (IC)
Unclassified
Unclassified
At Contract Award
Machinist's Mate - Submarine Auxiliary (MMA)
UNCLASS/ NOFORN
UNCLASS/ NOFORN
At Contract Award
Torpedoman's Mate (TM)
Unclassified
Unclassified
At Contract Award
Construction Mechanic (CM)
Unclassified
Unclassified
At Contract Award
Aviation Ordnanceman (AO)
Unclassified
Unclassified
At Contract Award
Aviation Support Equipment Technician (AS)
Unclassified
Unclassified
At Contract Award

Course, Module and Lesson Structure Using the Government provided Supporting Data Workbook (SDW) as corresponding SOW Appendix A, Knowledge Capture Reports (KCRs), and complex media fidelity data as a basis, the contractor shall determine the course, module, and lesson structure for each course for each rating and shall design, develop, test, and deliver products meeting the specified requirements. A given course may be reused as-is across paths within a rating and across ratings. In such case, the government will order the course once and the contractor shall design, develop, test, and deliver for such as-is reuse as described in a DO. Similarly, a given course may be repackaged in a different sequence for use across paths within a rating and across ratings. In such case, the government will order the course once and the contractor shall design, develop, test, repackage, and deliver for such use as described in a DO.

Content Delivery Modes and Media Types Training products are grouped under four content delivery modes: Instructor-Facilitated Interactive Training (IFIT), Self-Directed Interactive Training (SDIT), Structured On-The-Job Training (SOJT), and Performance Support (PS) (see Appendices C, G, and J). Table 2 shows the four overarching content delivery modes and a high-level view of associated media types to support the RRL effort, as identified in the SDW and complex media fidelity data.

NOTE: there is no traditional Instructor-Led Training Computer-Assisted Instruction (ILT-CAI) media type or instructional strategy in the RRL Content Conversion effort; rather, the contractor shall design and develop interactive multimedia instruction (IMI) for use as IFIT that meets the requirements for being hosted in Navy eLearning (NeL). In context for Ready Relevant Learning, “IMI” is the preferred term and shall be interpreted generically as electronic media, replacing both Interactive Courseware (“ICW”) and “ILT-CAI” as terms regardless of whether the product is instructor-led or student-led, and including considerations for software management tools (e.g. Learning Management System, Learning Record Store).

Table 2. Content Delivery Modes and Media Types

Media
Delivery Method
IFIT
SDIT
PS
SOJT
Actual Equipment
X
X
X
Actual Equipment Trainer
X

X

Augmented Reality (AR)
X
Checklist
X
X
X
X
Decision Tables
X
X
X
X
Demonstration Animation
X
X
X
X
Demonstration Video
X
X
X
X

Electronic Performance Support System (EPSS)

X
X
Hybrid Mobile App
X
X
X
X
Immersive Virtual Environment (IVE)
X
X

Intelligent Tutoring System

X
X
X

Job Aid (JA)

X
X
Level 1 IMI
X
X
Level 2 IMI
X
X
Level 3 IMI
X
X
Mixed Reality (MR)
X
Mobile Friendly/Mobile Ready Website
X
X
X
Mobile Optimized Website
X
X
X
Mobile Web App
X
X
X
X
Native App
X
X
X
X
Paper/Paper-based
X
X
X
X
PC Simulation
X
X
Picture/Diagram
X
X
X
X
Responsive Design Website
X
X
X
Training Aid
X
X
X
X
Training Support Material
X
X
X
X
Virtual Reality (VR)
X

Content Conversion Process Flows Depending on the specific content delivery method and media type, the contractor shall follow slightly different development process flows with different CDRL deliverables, some following traditional ISD processes, some following systems engineering processes, and some blending the two. The blended content conversion process is represented in Appendix N.

The contractor shall follow a systematic approach for converting content into IMI, Mobile Ready, Mobile Optimized, and Responsive Design Mobile Website media types detailed within the SOW (see SOW Appendices C and G). Figure 1 identifies such a high-level process.

Figure 1. IMI Levels 1 – 3 (and Mobile Ready, Mobile Optimized and Responsive Design Mobile Website) Content Conversion Process Performance Support (PS) and Structured On The Job Training (SOJT) Development Process The contractor shall follow a systematic approach for converting content into Performance Support (PS) and Structured On-the-job Training (SOJT) media types detailed within the SOW (see SOW Appendices C and G). SOJT products shall be designed, developed and tested to be hosted in MyNavy Portal. The contractor shall design, develop, and test PS products to be used in both (1) a training setting and hosted in a training environment, such as NeL, and (2) an on-the-job operation setting and hosted in an operation environment, such as MyNavy Portal. Each host environment may have specific requirements that affect media development and test.

PS Hosted in Training Delivery Environments The contractor shall create and convert PS products to be used in a training setting (i.e. training aids, training support materials, supplemental training materials), following the same general process in Figure 1, to be hosted within specific training environments (e.g. NeL). Figure 2 identifies some of the training environments and devices capable of presenting training content within the current Naval training enterprise.

Figure 2. Training Environment and Devices PS Hosted in Operational Environments The contractor shall create and convert on-the-job PS products to be hosted within specific workplace (operation) environments and devices capable of presenting PS content within the current Naval training enterprise (e.g. MyNavy Portal).

Complex Media Development Process The contractor shall follow a systematic approach for converting content into complex media types (e.g. PC simulation, Augmented/Mixed/Virtual Reality, and Immersive Virtual Environment (IVE)) detailed within the SOW (see SOW Appendices C and G).

Figure 3 identifies such a high-level process that blends the traditional IMI development process with the Systems Engineering Process specifically for these types of media products.

NOTE: Any reference in an SDW (Appendix A), KCR, complex media fidelity data, and supporting data workbook to “VSIM” or “ICW 4” or a variant of that term shall be interpreted as complex media (either, or a blend of, PC simulation, Augmented/ Mixed/Virtual Reality, or Immersive Virtual Environment (see SOW Appendix C)).

Figure 3. Complex Media Content Conversion Process Coordination with Third-Parties As required, the contractor shall coordinate with the Government and any third-party contractor responsible for developing complex media (e.g. PC simulation, Augmented/Mixed/Virtual Reality, or Immersive Virtual Environment system development (e.g. Government labs, Multipurpose Reconfigurable Training System (MRTS) 3D, PORTS, etc.)). In such cases contractor shall be required to design and develop training support materials that work together with the third-party developed system.

List of SOW Appendices To complete this effort, the contractor shall follow the guidance and requirements in the following Content Conversion appendices to this SOW:

· Appendix A (per rating): rating requirements covered by this SOW.

· Appendix B: acronyms used within this SOW.

· Appendix C: terms and definitions used within and outside this SOW regarding RRL Content Conversion.

· Appendix D: list of the Contract Data Requirements Lists (CDRLs) identified within this SOW.

· Appendix E: Risk Assessment Example Format.

· Appendix F: descriptions of the four RRL content delivery modes.

· Appendix G: operational definitions of engaging instructional strategies to be used in content development under this SOW.

· Appendix H: list of Bloom’s taxonomy action verbs.

· Appendix I: description of media type characteristics.

· Appendix J: mobile learning roadmap.

· Appendix K: guidance on Naval Educational Training Center (NETC) RRL Single User Gaming and Simulation. Appendix L: guidance on NETC RRL Video Streaming.

· Appendix M: RRL Content Conversion Blended Process.

Terms and Definitions Appendix C provides the terms definitions that are critical to this SOW. These terms and definitions supersede any similar terms and definitions that may be found in other sources.

Government-Furnished Information (GFI) The Government will provide the following on an as-is basis:

1. Supporting Data Workbook (Appendix A) for each rating, at DO award.

1. Complex media fidelity data for each rating, as available.

1. Knowledge Capture (KC) data for each rating, if available, at DO award.

1. Existing Trainee Guides, Lesson Plans, Training Course Control Document (TCCD), Training Project Plan (TPP), Curriculum Outline of Instruction (COI) ) for each rating, as available, at DO award. Updates, if available, NLT 30 days after DO award.

1. Access to existing data for each rating in Content Planning Module/Learning Object Module (CPM/LOM), if available, such as existing Trainee Guides, Lesson Plans, TCCD, TPP, COI, NLT 30 days after DO award.

1. Examples of existing courseware for each rating, if available, at DO award. (For RRL the Government does not intend to provide all existing IMI or source files as GFI to discourage the contractor from simply copying and pasting content into a different format. The contractor shall plan as though no existing courseware materials are available.)

1. Applicable Style Guides, if available, at DO award. Updates, if available, NLT 30 days after DO award.

1. Technical Publications (e.g. technical manuals) for each rating, if available, at DO award. Updates, if available, NLT 30 days after DO award.

Any other GFI not listed here is ancillary and its absence does not prevent the contract from being executed.

Government-Furnished Software, Tools and Equipment The Government will not furnish software (Microsoft [MS] Office, Adobe Acrobat, etc.) or tools. The Government will not furnish equipment, hardware, software personnel, personnel, or materials for the Contractor’s use during this effort. The Government will provide access to a test bed at NAWCTSD for TRANET-U VDI content for the Contractor to test training materials. The Contractor shall provide the necessary hardware, software, tools, personnel, materials, and facilities, not otherwise furnished by the Government, to perform the tasks specified by this SOW.

Government-Furnished Subject Matter Experts (SMEs) Government SME access will be provided on a not-to-interfere basis. The Government is sensitive to overburdening SMEs. NAWCTSD will serve as the liaison between the fleet, Type Commander (TYCOM), Learning Centers (LCs) and/or Schoolhouses and the Contractor to coordinate access to SMEs in support of SOW activities and requirements. Location for SME support will be provided by the Government. The Government’s SMEs will be available face-to-face for key data collection activities (interviews, workshops, and reviews) and will be available for providing follow up information via phone, video-teleconference (VTC), or by Defense Collaboration Services (DCS), whenever practical.

Applicable Documents The following represent a list of applicable guidance documents for this effort. In the event of a conflict between the SOW and the references cited herein, the contents of this SOW take precedence. Nothing in this SOW, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained. These documents will be provided to the Contractor as GFI, if they are not readily available to the Contractor via the Internet. For all documents listed below, the latest versions apply.

Government Documents Table 3. Government Documents

Document Number
Document Title and/or Description

National Security Agency (NSA) Configuration Guide

NAVAIRINST 4355.19E
System Engineering Technical Review Process
National Institute of Standards and Technology (NIST) Special Publication (SP) 800-44
Guidelines on Securing Public Web Servers

United States (U.S.) Office of Personnel Management (OPM) Final Credentialing Standards for Issuing Personal Identity Verification

Institute of Electrical and Electronics Engineers (IEEE) Std. 15288-2015
Systems and Software Engineering- Systems Life Cycle Processes

· Copies of Defense Intelligence Security Agency (DISA) Configuration Guide can be obtained from http://disa.mil/.

· Copies of NSA Configuration Guides can be obtained from http://www.nsa.gov/ia/mitigation_guidance/security_configuration_guides/index.shtml.

· Copies of National Institute of Standards and Technology (NIST) documents can be obtained from http://csrc.nist.gov/publications/PubsSPs.html. Copies of OSHA standards can be obtained from http://www.osha.gov.

· Copies of OPM document can be obtained from http://www.opm.gov/investigate/resources/index.aspx.

· Copies of IEEE Std 15288-2015 can be obtained from http://www.ieee.org/.

Department of Defense (DOD) Documents Table 4. DOD Documents

DOD Document Number
Document Title and/or Description
Department of Defense Instruction (DODI) 1322.26
Distributed Learning (DL) dated 05 October 2017

(https://adlnet.gov/dodi/dodi-xapi)

DODI 5000.02
Operation of the Defense Acquisition System
DODI 5200.39
Critical Program Information (CPI) Identification and Protection Within Research, Development, Test, and Evaluation (RDT&E) dated October 15, 2018
DODI 5200.48
Controlled Unclassified Information (CUI) dated March 6, 2020
DODI 8500.01
Department of Defense Instruction 8500.01 Cyber Security dated 14 Mar 2014
DODI 8510.01
Risk Management Framework (RMF) for DoD Information Technology (IT), Change 1, dated 24 May 2016
DODI 5220.22-M
National Industrial Security Program Operating Manual, dated 28 Feb 2006
DOD 8570.01-M
Information Assurance (IA) Workforce Improvement Program, dated 19 Dec 2005 w/Change 4, 11/10/2015

DOD Implementation Plan for Advanced Distributed Learning (ADL) dated 19 May 2000

Military Handbook (MIL-HDBK)-881D
Work Breakdown Structures for Defense Materiel Items
MIL-HDBK-29612-1A
Department of Defense Handbook for Guidance for Acquisition of Training Data Products and Services (Part 1 of 5)
MIL-HDBK-29612-2A
Department of Defense Handbook for Instructional Systems Development/Systems Approach to Training and Education (Part 2 of 5)
MIL-HDBK-29612-3A
Development of Interactive Multimedia Instruction (Part 3 of 5)
MIL-HDBK-29612-4A
Department of Defense Handbook Glossary for Training (Part 4 of 5)
MIL-HDBK-29612-5A
Department of Defense Handbook for Advanced Distributed Learning (ADL) Products and Systems (Part 5 of 5)
MIL-PRF-29612B
Performance Specification Training Data Products
MIL-HDBK-217F, Notice 2
Reliability Prediction of Electronic Equipment
MIL-HDBK-472, Notice 1
Maintainability Prediction

· Copies of DOD Directives and Instructions can be obtained from the DOD Issuances Website (http://www.dtic.mil/whs/directives/).

· DOD Implementation Plan for ADL can be obtained from http://prhome.defense.gov/Portals/52/Documents/RFM/Readiness/docs/adl_implementplan.pdf.

· Copies of the DOD Specifications and Handbooks can be obtained online from the DOD Single Stock Point or from the Acquisition Streamlining and Standardization Information System (ASSIST) website (http://everyspec.com/DoD/DoD-HDBK/)

Department of the Navy (DON) Documents Table 5. DON Documents

DON Documents
Document Title and/or Description

DON Department of Defense Information Assurance Certification and Accreditation Process (DIACAP) Handbook Version 1, dated 15 July 2008

NETCINST 5510.1
Content Segmentation and Classification Guide
NETCNOTE 1500.6
Metadata Instruction
NMCI.10011.01.UA3.E
Core Build Contents Version 2.3, 02 Aug 07

Copies of the Navy Marine Corps Intranet (NMCI) Core Build Standard can be obtained from http://www.nmci-eds.com/downloads/core-build

OPNAVINST 1500.76C
Naval Training System Requirements, Acquisition, and Management
Secretary of the Navy Instruction (SECNAVINST) 5000.36A
Department of the Navy Information Technology Application and Data Management
SECNAVINST 5870.4A
Copyright, dated 16 Aug 2005
Secretary of the Navy (SECNAV) M-5239.1
Department of the Navy Information Assurance Program, Information Assurance Manual, dated Nov 2005
SECNAV M-5510.36
Department of the Navy, Information Security Program, dated Jun 2006

· Copies of the CON DIACAP Handbook can be obtained from https://www.doncio.navy.mil/tagResults.aspx?ID=96

· Copies of the DON documents can be obtained online from the Navy’s Integrate Learning Environment website: https://www.secnav.navy.mil/doni/Directives/Forms/AllItems.aspx

Authoring Instructional Materials (AIM) Documents Table 6. AIM Documents

Document Number
Document Title and/or Description

AIM Content Planning Module (CPM) User’s Manual

AIM Learning Object Module (LOM) User’s Manual

· Copies of the AIM documentation can be obtained from https://www.public.navy.mil/netc/ntt/pdfs/End_to_End_Process_SOP_(7-11-14)_Final.pdf

Industry Standards Table 7. Industry Standards

Document Owner
Document Title and/or Description
ADL Co-Laboratories
Shareable Content Object Reference Model (SCORM) 2004—SCORM is a collection of standards and specifications adapted from multiple sources to provide a comprehensive suite of e-learning capabilities that enable interoperability, accessibility and reusability of Web-based learning content. SCORM documents and important information about SCORM can be obtained from: http://www.adlnet.gov/policy.
ADL Co-Laboratories
SCORM 2004 Conformance Testing Tool—This is a self-testing tool downloaded from http://www.adlnet.org to verify SCORM compliant courseware.
ADL Co-Laboratories
The Advanced Distributed Learning Registry (ADL-R): Best Practices for Updating Registered Content https://www.atsc.army.mil/tadlp/implementation/scorm/conformance/tools_scorm.asp
Experience API SCORM Profile
Guidelines for representing SCORM data and events as xAPI Statements. Provides a representation of the SCORM® data model as well as limited SCORM®-specific features, but uses xAPI for run time communications and tracking. The SCORM® profile was created as a compatibility approach to xAPI. It can be used to:

· create content that can track to both a Learning Management System (LMS) and learning record store (LRS)

· convert existing SCORM® data to xAPI Statements that can be stored in an LRS

· track experiences from a learning record provider in a manner consistent with how they would've been tracked in SCORM® (http://adlnet.github.io/xAPI-SCORM-Profile/)

xAPI LRS Conformance Requirements
The Experience API (xAPI)Conformance Requirements for Learning Record Stores

(https://adl.gitbooks.io/xapi-lrs-conformance-requirements/content/)

cmi5 (Case Mix Index) Profile Specification
A profile specification for xAPI that describes packaging, launch, and important data capture concepts for traditional LMSs that include an LRS.

(https://github.com/AICC/CMI-5_Spec_Current) Aviation Industry CBT Committee (AICC)

ANSI/ASQ Q9000-2000
Quality Management Systems - Fundamentals and Vocabulary
ANSI/ASQ Q9001-2000
Quality Management Systems - Requirements
ANSI/ASQ Q9004-2000
Quality Management Systems - Guidelines for Performance Improvements
ANSI Z535.1-2006 (R 2011)
Safety Colors
ANSI Z535.2-2011
Environmental and Facility Safety Signs
ANSI Z535.3-2011
Criteria for Safety Symbols
ANSI Z535.4-2011
Product Safety Signs and Labels
ANSI Z535.5-2011
Safety Tags and Barricade Tapes (for Temporary Hazards)
IEEE Std. 12207-2017201712207-2017
Systems and Software Engineering – Software Life Cycle Processes
Integrated Master Schedule (IMS) Global Learning Consortium
Question & Test Interoperability (QTI) Specification
Joint ADL Co-Lab
Best Practices Guide for Design and Development of SCORM Assessments (https://adlnet.gov/research/scorm/scorm-2004-4th-edition/scorm-2004-4th-edition-conformance-test-suite/)

· Copies of the industry standard documents can be found by visiting the web addresses indicated.

· Copies of the following Industry Standards can be obtained from the American National Standards Institute (ANSI)/American Society for Quality Control (ASQC) (http://www.ansi.org).

· (Copies of the ANSI/Institute of Electrical and Electronics Engineers (IEEE) documents are available from http://standards.ieee.org/ or IEEE Service Center, 445 Hoes Lane, Piscataway, NJ 08854-1331.)

Other Documents Table 8. Other Documents

Document Number
Document Title and/or Description
CJCSI 6510.01F
IA and Computer Network Defense (CND)
Executive Order 13465
Economy and Efficiency in Government Procurement Through Compliance with Certain Immigration and Nationality Act Provisions and Use of an Electronic Employment Eligibility Verification System, dated 6 June 2008 (Amendment to Executive Order 12989 of 13 February 1996)
NMCI.10011.01.UF0.E
Core Build Contents Version 7, 22 May 2012
NAVAIRINST 5000.21B
Naval Systems Command (SYSCOM) Risk Management Policy dated 24 Jan 2008
Unnumbered Document
Joint ADL Co-Lab, ADL Acquisition Guidance, dated 9 Aug 2006
NAVPERS 18068F
Volume I Navy Enlisted Occupational Standards
Unnumbered Document
NeL Content Hosting Frequently Asked Questions (FAQ)
Unnumbered Document
Navy Education and Training Center (NETC) Course Hosting Process
Unnumbered Document
Content Hosting and Report Management Service (CHaRMS) Developer User Guide V2
Unnumbered Document
Virtual Desktop Infrastructure (VDI) Specifications Brief
Unnumbered Document
VDI Risk Management Framework package
Unnumbered Document
Mobile Learning & Technology Roadmap
Unnumbered Document
NETC Common Reference Profile (https://netc.usalearning.net/xapi-library/resources/pdf/NETC-Common-Reference-Profile.pdf)
Unnumbered Document
NETC E-learning Profile (https://netc.usalearning.net/xapi-library/resources/pdf/NETC-E-learning-Profile.pdf)
Unnumbered Document
NETC Performance Support Profile (https://netc.usalearning.net/xapi-library/resources/pdf/NETC-Performance-Support-Profile.pdf)
Unnumbered Document
NETC Simulation Base Profile (https://netc.usalearning.net/xapi-library/resources/pdf/NETC-Simulation-Profile.pdf)
Unnumbered Document
NETC xAPI Glossary

(https://netc.usalearning.net/xapi-library/resources/pdf/NETC-xAPI-Glossary.pdf)

Unnumbered Document
NETC xAPI Implementation Guidelines (https://netc.usalearning.net/xapi-library/resources/pdf/NETC-xAPI-Implementation-Guidelines.pdf)

· Copies of the CJCSI document can be obtained from http://www.dtic.mil/dtic/

· Copies of the Presidential document can be obtained from the Federal Register at http://edocket.access.gpo.gov/2008/pdf/08-1348.pdf

· Copies of the NMCI document can be obtained from the Navy’s Integrate Learning Environment website (https://www.public.navy.mil/netc/ile/Default.aspx).

· Copies of the SCORM documents can be obtained from http://www.adlnet.gov/capabilities/scorm/scorm-2004-4th#tab-resources.

· Copies of the Joint ADL Co-Lab document can be obtained from https://adlnet.gov/collaboration/dadlac.

· Copies of NAVAIRINST 5000.21B can be obtained from https://directives.navair.navy.mil/.

OPNAVINST 11010.20H
Facilities Project Instruction

· Copies of these instructions are available at http;//doni.daps.dla.mil

MIL-STD_130N
Department of Defense (DoD) Standard Practices – Identification Markings of U.S. Military Property

· Copies of this standard is available online at: http://quicksearch.dla.mil/qsSearch.aspx

DOD 5010-12M
Procedures for Acquisition Management of Technical Data

· The publication shown above is available at http://www.dtic.mil/whs/directives/corres/pdf/501012m.pdf

Defense Federal Acquisition Regulation Supplement (DFARS) 252.211-7003
Item Identification and Valuation (August 2008)
DFARS 252.239-7001
Information Assurance Contractor Training and Certification (January 2008)

· DFARS clauses are downloadable from http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html

DFAR 2.101
Definitions
DFAR 52.204-9
Personal Identity Verification of Contractor Personnel
DFAR 52.222-54
Employment Eligibility Verification
DFAR 252.204-7012
Safeguarding Covered Defense Information and Cyber Incident Reporting

· DFAR clauses are downloadable from http://farsite.hill.af.mil/vffara.htm

DODD 8140.01
Cyberspace Workforce management, dated 11 August 2015
DODI 8520.02
Public Key Infrastructure (PKI) and Public Key (PK) Enabling, dated 24 May 2011
NIST SP 800-53r4
National Institute of Standards and technology (NIST) – Security and Privacy Controls for Federal Information Systems and Organizations, dated 22 January 2015
CNSSI 1253
Committee on National Security Systems Instruction (CNSSI) – Security Categorization and Control Selection for National Security Systems, dated 27 March 2014
SECNAV M-5239.2
Department of the Navy Cyberspace Information Technology and Cybersecurity Workforce management and Qualification manual, dated June 2016

(The above documents are available from the following sources:

· DOD Instructions, Directives, and Manuals are available at http://www.esd.whs.mil/DD/DoD-Issuances/

· NIST Special Publications are available at https://csrc.nist.gov/Publications

· CNSSI Instructions are available at https://www.cnss.gov

· SECNAV Manuals are available at https://doni.documentservices.dla.mil/manuals-secnav.aspx)

DoN NAVEDTRA Documents

NAVEDTRA 130B (series)
Task Based Curriculum Development Manual, (Volumes 1-3)
NAVEDTRA 131B (series)
Personnel Performance Profile Based Curriculum Development Manual, Volumes (1 – 3)
NAVEDTRA 132 (series)
Navy School Testing Program Management Manual
NAVEDTRA 136
Naval Education and Training Command Integrated Learning Environment Course Development and Life Cycle Maintenance

· Copies of the NAVEDTRA documents are available for download from https://www.public.navy.mil/netc/ntt/pdfs/

Naval Air Systems Command Instructions (NAVAIRINST)

NAVAIRINST 4355.19E
Systems Engineering Technical Reviews, dated 6 February 2015

· Copies of the NAVAIRINSTs are available for download from https://directives.navair.navy.mil

NAWCTSD Documents

NAVAIR Training Systems Domain Guide
Naval Air Systems Command Training Systems Domain Guide, version 1.0, dated October 2016
Security Assessment Procedures Document
NAWCTSD Assessment Procedures for the Omnibus Standalone-Unclassified Training Systems, dated 22 September 2016

· Copies of these NAWCTSD documents will be provided as part of the contract or Government Furnished Information (GFI)

Non-Government Documents

Industry Standards

ANSI = American National Standards Institute ISO = International Organization for Standardization

ANSI/ASQ/ISO 9001-2015
Quality Management Systems - Requirements

· Copies of the ANSI/ISO document is available from http://www.ansi.org

Electronic Industries Alliance (EIA)/SAE International

SAE/EIA-649-B
Configuration Management Standard
SAE/EIA-649-1 2014
Configuration Management Requirements for Defense Contracts
SAE/EIA 748-C
Earned Value Management Systems
GEIA-HB-649-A
Configuration Management Standard Implementation Guide, Revision A of February 2016

· Copies of the EIA/SAE documents are available from http://ansi.org

Institute of Electrical and Electronics Engineers (IEEE)/ISO/International Electrotechnical Commission (IEC)

IEEE/ISO/IEC
Systems and Software Engineering – Software Life Cycle Processes

· Copies of the IEEE/ISO/IEC documents are available from http://www.ieee.org

Requirements The Contractor shall organize, coordinate, and control RRL content conversion activities to ensure compliance with contract requirements and timely delivery of products specified herein.

General Requirements The Contractor shall provide the necessary hardware, software, personnel, supervision, management, materials, services, equipment, facilities, technical, logistics, and clerical support to perform the tasks specified in this SOW. The requirements defined herein form the basis for work performed for the Government during the entire contract. The Contractor shall meet the requirements of the SOW in accordance with (IAW) the guidance documents provided and the contents of this document.

RRL Content Conversion Planning The purpose of the RRL content conversion planning process is to produce and communicate effective and workable plans. The Contractor shall define, document, manage, and apply RRL content conversion planning processes IAW IEEE Std 12207-2017, sections 6.1.2.3.4.5, 6.3.1, and 7.1.1.3.1.

Life-Cycle Model Management The purpose of the life cycle model management process is to define, maintain, and assure availability of policies, life cycle processes, life cycle models, and procedures for use by the government. The Contractor shall define, document, manage, and apply life cycle model management, at the program level, IAW IEEE Std 12207-2017, section 6.2.1. References to the organizational implementation of life cycle model management within IEEE Std 12207-2017, section 6.2.1 shall only apply to the RRL content conversion effort.

Infrastructure Management The purpose of the infrastructure management process is to provide the enabling infrastructure and services to the RRL content conversion effort and its objectives throughout the life cycle of the effort. The Contractor shall define, document, manage, and apply infrastructure management, at the program level, IAW IEEE Std 12207-2017, section 6.2.2. References to the organizational implementation of infrastructure management within IEEE Std 12207-2017, section 6.2.2 shall apply only to the RRL content conversion effort.

Program Assessment and Control The purpose of the program assessment and control process is to determine the status of the RRL content conversion effort and direct its plan execution. The Contractor shall define, document, manage, and apply program assessment and control IAW IEEE Std 12207-2017, section 6.3.2.

Program Decision Management The purpose of the decision management process is to select the most beneficial course of RRL content conversion effort action where alternatives exist. The Contractor shall define, document, manage, and apply a program decision management process IAW IEEE Std 12207-2017, section 6.3.3.

Contract Data Requirements Lists (CDRLs) The Contractor shall update, improve, manage, and deliver acceptable contractually required data. The Contractor shall implement data management procedures and policies to provide control and configuration management (CM) of contractually required data. The Contractor shall:

a.Ensure data items to be delivered to the Government meet the quantity and quality requirements of the CDRL.
b.Establish data management procedures and policies to provide control and CM of contractually required data. To ensure sub-Contractors meet the contract data requirements set forth in the CDRL, the prime Contractor shall maintain control of work completed by sub-Contractors.
c.Establish and maintain data libraries via an online management system consisting of technical manuals, parent system technical description, and software documentation for the work completed for academic training systems and other data pertaining to training systems.

Online Management System (OMS) The Contractor shall establish, implement, and make available an OMS throughout the entire contract completion date. The Contractor shall use the OMS as a tool for communication between the Contractor and the Government. The Contractor shall maintain deliverables (all versions) and corresponding Government comments on the OMS. The Contractor shall include on the OMS supporting materials, agendas, and minutes for conferences (e.g., Post Award Conference [PAC]), meetings (e.g., Integrated Product Team [IPT]), reviews (e.g., In-Progress Report [IPR]) and materials (presentations, agendas, etc.). The Contractor shall make available the OMS to be used at the PAC. The OMS shall serve as a data library consisting of documentation, data, and information used, maintained, updated, and improved for use in this effort. The Contractor shall record and maintain a master listing of contract related documentation, data, and information used, maintained, updated, and improved for use in this effort. File sharing between the Contractor and the Government reviewers shall be provided. An intuitive file structure and naming convention, file directories, and final deliverables shall be provided on the file-sharing website. The latest version of files (text, graphics, animations, videos, etc.) shall be made available by close of business on Fridays for download by the Government.

OMS Basic Requirements The OMS shall allow Government content reviewers and project managers to review, consolidate, and submit deliverable review comments produced by the contractor. Reviewers will submit review comments for documents such as agendas, meeting minutes, reports, and design documents (e.g. Software Product Design, Instructional Media Design Package, etc.) in external files via a comment resolution matrix (CRM) rather than via a browser. Reviewers will submit IMI and supporting materials (i.e. script storyboards, on-screen lessons, lesson plans, trainee guides) and complex media review comments electronically through a web browser rather than capturing comments in external files via CRM.

For IMI and supporting materials, and complex media reviews, the OMS shall provide digital traceability of each comment. The system shall allow reviewers access to the courseware under review and the ability to enter comments from any location. This system shall be hosted at the contractor’s location and be accessible via standard internet browsers supported by NMCI computers. The review system shall control access through login and password protection. The system shall allow managers and reviewers to view all related course documentation during review sessions, such as the course lesson plan (LP), trainee guide (TG), design strategy document (IMDP), course schedules, status reports, and lessons.

OMS Required Functionality for IMI, Supporting Material and Complex Media Reviews The OMS shall:

· Allow reviewers to submit comments directly from the courseware (reviewer does not leave the courseware to add a comment and the courseware is visible on the reviewer’s screen while adding the comment).

· Allow approved users to view, add, approve, and disapprove comments submitted via the content comment submission capability.

· Allow users to submit, review, and perform administrative functions on lesson comments.

· Provide a user interface allowing access to all online content, with indications of review assignment, review completion status, and content waiting for comment approval and submission to the contractor.

OMS Comment Submission Capability for IMI, Supporting Material and Complex Media Reviews The OMS shall have the following lesson comment submission capabilities:

· Require a unique login ID and password combination to gain access to the courseware commenting capability for each individual with access to the OMS

· Comments received from the online lesson comment capability shall be given a unique identifier and shall capture the data provided from the lesson commenting form.

· Register the date, time, and login ID of anyone who edits a comment or changes its status, along with the specific changes made. The information shall be readily accessible for user viewing.

· Allow users to provide comments on each courseware page, and verify each comment by page without the reviewer having to add the page identifier.

· The comment submission form shall be self-populated with the following information:

· The lesson under review.

· The topic of the lesson under review.

· The date and time of the comment.

· The commenter’s name or login identification.

· For each comment, the system shall allow the commenter to provide:

· Whether the change is a global change (applicable to the entire lesson) or a local change (applicable to the lesson page/slide being reviewed).

· The specific comment text, including the ability to copy and paste large sections of text into the comment field.

OMS Comment Review and Administration Capability for IMI, Supporting Material and Complex Media Reviews The OMS shall have the following lesson comment review and administration capabilities:

· Security. The system shall provide for at least three levels of access to the comments:

· Reviewer - who shall have access to view their and others comments.

· Approver - acts as a master reviewer and identifies which of the Reviewer’s comments are to be addressed by the contractor. Receives lesson notifications and assigns lessons to Reviewers with associated due dates.

· Administrators - who shall have access to the entire system and act as a systems administrator by providing password and login information to reviewers. Administrators may be producers or system administrators. Administrators shall be able to add new reviewers and deactivate others. The system shall allow reviewers to view all their comments for a lesson or for all lessons. (Note: The Administrator is the role of the contractor.)

· The system shall contain a reports mechanism that has the ability to see all comments at once, regardless of…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .