Attachment 1 FY22CC IDIQ SOW - RFP - 26 May 2021.docx
DOCX document 1 MB Posted
- Solicitation number
- N61340-21-R-0032
About this file
This is a solicitation for a single-award Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide Ready Relevant Learning (RRL) Fiscal Year 2022 (FY22) Content Conversion services for the Sailor 2025 project. The Naval Air Warfare Center Training Systems Division (NAWCTSD) seeks proposals due no later than July 19, 2021 to be submitted via the DoD SAFE website. The work includes designing, developing, testing, and delivering training products in support of converting content for various Navy ratings into interactive multimedia instruction, mobile technologies, performance support, and structured on-the-job training. The North American Industry Classification System (NAICS) code is 541330 with a size standard of $41.5 million.
View the file
Other files
Show all 38
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
SAILOR 20205 (S2025) Fiscal Year (FY) 22 READY RELEVANT LEARNING (RRL)
CONTENT CONVERSION (CC)
Prepared For:
Commander, United States Fleet Forces Command (CFFC) Norfolk, VA 23551-2487 Prepared By:
Naval Air Warfare Center Training Systems Division (NAWCTSD) 12211 Science Drive Orlando, FL 32826
DISTRIBUTION A. Approved for public release. Distribution is unlimited.
This page intentionally left blank.
| REVIEWED BY: | DATE: _____________ |
| Diane Richie | |
| RRL TSPM Lead Systems Engineer | |
| NAVAIR – 5.7.7. |
| REVIEWED BY: | DATE: _____________ | |
| Vince Flango | ||
| FY22 Content Conversion (CC) Technical Point of Contact | ||
| NAVAIR – 5.3.6 |
| APPROVED BY: | DATE: _______________ | |
| LCDR Maura Betts | ||
| Program Management Office | ||
| NAVAIR – |
Change Log
| Date |
| Section Number |
| Section Title |
| Change |
Table of CONTENTS
| 1. Scope | 11 |
| 1.1 Rating Requirements | 11 |
| 1.2 Course, Module and Lesson Structure | 12 |
| 1.3 Content Delivery Modes and Media Types | 12 |
| 1.4 Content Conversion Process Flows | 14 |
| 1.4.1 Performance Support (PS) and Structured On The Job Training (SOJT) Development Process | 14 |
| 1.4.1.1 PS Hosted in Training Delivery Environments | 14 |
| 1.4.1.2 PS Hosted in Operational Environments | 15 |
| 1.4.2 Complex Media Development Process | 15 |
| 1.4.3 Coordination with Third-Parties | 16 |
| 1.5 List of SOW Appendices | 16 |
| 1.6 Terms and Definitions | 17 |
| 1.7 Government-Furnished Information (GFI) | 17 |
| 1.8 Government-Furnished Software, Tools and Equipment | 17 |
| 1.9 Government-Furnished Subject Matter Experts (SMEs) | 18 |
| 2. Applicable Documents | 18 |
| 2.1 Government Documents | 18 |
| 2.2 Department of Defense (DOD) Documents | 19 |
| 2.3 Department of the Navy (DON) Documents | 20 |
| 2.4 Authoring Instructional Materials (AIM) Documents | 21 |
| 2.5 Industry Standards | 21 |
| 2.6 Other Documents | 22 |
| 3. Requirements | 25 |
| 3.1 General Requirements | 26 |
| 3.1.1 RRL Content Conversion Planning | 26 |
| 3.1.1.1 Life-Cycle Model Management | 26 |
| 3.1.1.2 Infrastructure Management | 26 |
| 3.1.1.3 Program Assessment and Control | 26 |
| 3.1.1.4 Program Decision Management | 27 |
| 3.1.2 Contract Data Requirements Lists (CDRLs) | 27 |
| 3.1.3 Online Management System (OMS) | 27 |
| 3.1.3.1 OMS Basic Requirements | 28 |
| 3.1.3.1.1 OMS Required Functionality for IMI, Supporting Material and Complex Media Reviews | 28 |
| The OMS shall: | 28 |
| 3.1.3.1.2 OMS Comment Submission Capability for IMI, Supporting Material and Complex Media Reviews | 28 |
| The OMS shall have the following lesson comment submission capabilities: | 28 |
| 3.1.3.1.3 OMS Comment Review and Administration Capability for IMI, Supporting Material and Complex Media Reviews | 29 |
| The OMS shall have the following lesson comment review and administration capabilities: | 29 |
| 3.1.4 Configuration Management (CM) | 30 |
| 3.1.5 Contractor SMEs | 30 |
| 3.1.6 Copyrights | 30 |
| 3.1.7 Quality Assurance and Management Plan (QAMP) | 31 |
| 3.1.7.1 Control of GFI | 31 |
| 3.1.8 Communications Plan | 31 |
| 3.2 Security | 31 |
| 3.2.1 Classified Processing and Access to Classified Systems | 32 |
| 3.2.2 Operations Security (OPSEC) | 32 |
| 3.2.3 Unclassified Contractor-Owned Network Security – Safeguarding of Unclassified Controlled Technical Information | 33 |
| 3.2.4 Cyber Incident and Compromise Reporting | 33 |
| 3.2.5 Access to DOD Installations, Government Information and Information Technology (IT) Systems – Personnel Security Background Checks | 34 |
| 3.2.6 Personnel Security – Background Checks | 34 |
| 3.2.7 International Traffic and Arms Regulation | 35 |
| 3.2.8 Personnel Security – Reporting of Adverse or Derogatory Information Related to Contractors | 35 |
| 3.2.9 Government-Issued Personal Identification Credentials | 35 |
| 3.2.10 Contractor “Out-Processing” Policy | 36 |
| 3.2.11 Supply Chain Risk Management (SCRM) For National Security Systems | 36 |
| 3.2.12 Protection of Critical Program Information (CPI) | 36 |
| 3.2.13 Transmission of Controlled Unclassified Information (CUI) Via Email | 36 |
| 3.2.14 Transmission of CUI Via DoD Safe Access File Exchange (DoD SAFE) | 37 |
| 3.3 Cybersecurity | 37 |
| 3.3.1 Critical Program Information (CPI) | 37 |
| 3.3.2 Cybersecurity Training & Certification | 38 |
| 3.3.3 Software Integrity Testing and Certification | 38 |
| 3.4 Management Requirements | 39 |
| 3.4.1 Integrated Product Team (IPT) | 39 |
| 3.4.2 Integrated Management Plan (IMP) | 39 |
| 3.4.3 Work Planning and Scheduling | 39 |
| 3.4.4 Development of the Contract Work Breakdown Structure (CWBS) | 40 |
| 3.4.5 Subcontractor Management and Reporting | 40 |
| 3.4.6 Risk Management | 40 |
| 3.4.6.1 Schedule Risk Assessment (SRA) | 41 |
| 3.4.7 Program Progress, Tracking, and Reporting | 41 |
| 3.4.8 Conferences, Meetings, and Reviews | 41 |
| 3.4.8.1 Post Award Conference (PAC) | 42 |
| 3.4.8.2 In-Process Review (IPR) Meetings | 43 |
| 3.4.8.3 Weekly or Biweekly IPT Meetings | 44 |
| 3.4.8.4 Data-Gathering Trips | 44 |
| 3.5 RRL Content Conversion Requirements | 44 |
| 3.5.1 Instructional Media Design Package (IMDP) Development | 45 |
| 3.5.1.1 Design for Training Product Delivery Environments | 45 |
| 3.5.1.1.1 Design Implementations to Reduce TRANET VDI Bandwidth Usage | 46 |
| 3.5.1.1.2 Design for Experience Application Program Interface (xAPI) Requirements | 47 |
| 3.5.1.1.3 Design for Mobile Requirements | 48 |
| 3.5.2 IMI, Mobile Ready, Mobile Optimized, and Responsive Design Mobile Website Media Types | 48 |
| 3.5.2.1 Instructional Media Design Package (IMDP) Development (Updated Style Guide) and Model Products (i.e., Prototypes) | 48 |
| 3.5.2.2 Instructional Media Package (IMP) (Script Storyboards) | 49 |
| 3.5.2.3 Instructional Media Package (IMP) (On-screen Lessons [OSLs]) | 49 |
| 3.5.2.4 Courseware Reviews | 49 |
| 3.5.2.5 Test Package Development (Assessments) | 49 |
| 3.5.2.6 Course Testing Plan (Administration) | 50 |
| 3.5.2.7 Training Conduct Support Document (TCSD) | 50 |
| 3.5.2.8 Training Program Structure Documents (TPSD) | 51 |
| 3.5.2.9 Training Systems Support Document (TSSD) | 51 |
| 3.5.2.10 IMI Test & Evaluation (T&E) Program Components (IMI Product Acceptance) for Hosting in NeL Training Environment | 51 |
| 3.5.2.10.1 NeL Contractor Testing (NeL DT-D1) | 52 |
| 3.5.2.10.2 NeL Content Test Readiness Review (TRR) ETIM | 52 |
| 3.5.2.10.3 NeL Government Testing (NeL DT-D2) | 52 |
| 3.5.2.10.4 NeL DT-D2 Corrections | 53 |
| 3.5.2.10.5 Government Content Acceptance Testing (GCAT) | 53 |
| 3.5.2.10.6 Instructional Media Package (Media Source Files) | 53 |
| 3.5.2.10.7 Instructional Media Package (Final Curriculum Delivery) | 53 |
| 3.5.2.10.8 IMI Hosted in NeL Environment T3 and Course Pilot Preparation | 53 |
| 3.5.2.11 IMI T&E Program Components (IMI Product Acceptance Testing) for Hosting in Non-NeL Training Environments | 54 |
| 3.5.2.11.1 NeL Contractor Testing (NeL DT-D1) | 54 |
| 3.5.2.11.2 NeL Content TRR ETIM | 54 |
| 3.5.2.11.3 NeL Government Testing (NeL DT-D2) | 54 |
| 3.5.2.11.4 Non-NeL Environments Contractor Internal Testing (Non-NeL DT-D1) | 54 |
| 3.5.2.11.5 Non-NeL Environments TRR ETIM | 55 |
| 3.5.2.11.6 Non-NeL Environments Integrated Testing (Non-NeL IT-D1) | 55 |
| 3.5.2.11.6.1 Non-NeL IT-D1 Entry Criteria | 56 |
| 3.5.2.11.7 Instructional Media Package (Media Source Files) | 56 |
| 3.5.2.11.8 Instructional Media Package (Final Curriculum Delivery) | 56 |
| 3.5.2.11.9 IMI Hosted in Non-NeL Environment T3 and Course Pilot Preparation | 56 |
| 3.5.3 Performance Support (PS) and Structured On-The-job Training (SOJT) Media Types | 57 |
| 3.5.3.1 PS and SOJT Model Products (i.e. Prototypes) | 57 |
| 3.5.3.2 PS and SOJT Design | 57 |
| 3.5.3.3 PS and SOJT Instructional Media Package (IMP) (Script Storyboards) | 58 |
| 3.5.3.4 PS and SOJT Instructional Media Package (IMP) (On-screen Lessons (OSLs)) | 58 |
| 3.5.3.5 PS and SOJT Training Conduct Support Document | 58 |
| 3.5.3.6 PS and SOJT Acceptance Testing | 58 |
| 3.5.3.7 PS and SOJT Instructional Media Package (Media Source Files) | 58 |
| 3.5.3.8 PS and SOJT Instructional Media Package-IMP (Final Curriculum Delivery | 59 |
| 3.5.4 Complex Media Types (e.g. PC Simulation, Augmented/Mixed/Virtual Reality, and Immersive Virtual Environment) | 59 |
| 3.5.4.1 Systems Engineering Processes | 59 |
| 3.5.4.1.1 System Requirements Definition | 59 |
| 3.5.4.1.2 System Requirements Analysis | 59 |
| 3.5.4.1.3 Traceability | 60 |
| 3.5.4.1.4 System Architectural Design | 60 |
| 3.5.4.1.5 System Implementation | 60 |
| 3.5.4.1.6 System Integration | 61 |
| 3.5.4.1.7 System Verification | 61 |
| 3.5.4.1.8 System Transition | 61 |
| 3.5.4.2 Engineering Technical Interface Meetings (ETIMs) | 61 |
| 3.5.4.2.1 Systems Requirements Review-II/System Functional Review (SRR-II/SFR) ETIM | 61 |
| 3.5.4.2.1.1 SRR-II/SFR ETIM Entry Criteria | 62 |
| 3.5.4.2.1.2 SRR-II/SFR ETIM Exit Criteria | 63 |
| 3.5.4.2.2 Preliminary Design Review (PDR) ETIM | 63 |
| 3.5.4.2.2.1 PDR ETIM Entry Criteria | 65 |
| 3.5.4.2.2.2 PDR ETIM Exit Criteria | 65 |
| 3.5.4.2.3 Critical Design Review (CDR) | 66 |
| 3.5.4.2.3.1 CDR ETIM Entry Criteria | 67 |
| 3.5.4.2.3.2 CDR ETIM Exit Criteria | 68 |
| 3.5.4.2.4 Test Readiness Review | 68 |
| 3.5.4.3 Software Engineering Processes | 69 |
| 3.5.4.3.1 Software Requirements Analysis | 69 |
| 3.5.4.3.2 Software Architectural Design | 69 |
| 3.5.4.3.3 Software Product Design | 69 |
| 3.5.4.3.4 Software Implementation | 70 |
| 3.5.4.3.4.1 Software Unit Construction and Testing | 70 |
| 3.5.4.3.5 Software Integration | 70 |
| 3.5.4.3.6 Cold Start Process | 70 |
| 3.5.4.3.6.1 Software Product Execution | 71 |
| 3.5.4.3.6.2 Media and Storage Devices | 71 |
| 3.5.4.4 Test and Evaluation (T&E) Processes | 72 |
| 3.5.4.4.1 Test Planning and Procedures | 72 |
| 3.5.4.4.2 Responsibility for Tests | 72 |
| 3.5.4.4.3 Test Authority | 72 |
| 3.5.4.4.4 Test Resources and Facilities | 72 |
| 3.5.4.4.5 Test Methods | 73 |
| 3.5.4.4.6 Verification Criteria | 73 |
| 3.5.4.4.7 Configuration | 73 |
| 3.5.4.4.8 Verification Log | 74 |
| 3.5.4.4.9 Changes During Testing | 74 |
| 3.5.4.4.10 Software Changes During Government Testing | 74 |
| 3.5.4.4.11 Changes After Testing | 74 |
| 3.5.4.4.12 T&E Non-Conformance Reporting System | 74 |
| 3.5.4.4.13 Deficiency Review Board (DRB) | 75 |
| 3.5.4.4.14 Deficiency and Discrepancy Adjudication | 75 |
| 3.5.4.5 Detailed Tasks for Complex Media (e.g. PC Simulation, Augmented/Mixed/Virtual Reality, and Immersive Virtual Environment Blended Approach) Courseware | 76 |
| 3.5.4.5.1 Logic Tables | 76 |
| 3.5.4.5.2 Test Package (Assessments) | 76 |
| 3.5.4.5.3 Navy Preliminary Evaluation | 76 |
| 3.5.4.5.4 Training Support Products | 76 |
| 3.5.4.5.5 Complex Media (e.g. PC Simulation, AR/MR/VR, and IVE Blended Approach) T&E Program Components | 77 |
| 3.5.4.5.5.1 Baseline Configuration Audit | 77 |
| 3.5.4.5.5.2 Navy Preliminary Evaluation (per increment – lessons delivered in increments) | 78 |
| 3.5.4.5.5.3 Pre-Modification Inspection (PMI) | 79 |
| 3.5.4.5.5.4 Contractor Internal Testing (Simulation DT-D1) | 79 |
| 3.5.4.5.5.5 Test Readiness Review | 80 |
| 3.5.4.5.5.6 Integrated Testing (Simulation IT-D1) | 82 |
| 3.5.4.5.5.7 Complex Media T3 and Course Pilot Preparation | 83 |
| 3.5.5 Human Factors Engineering (HFE) | 83 |
| 3.5.6 Gap Implementation | 83 |
| 3.5.7 Train the Trainer (T3) | 83 |
| 3.5.7.1 T3 Entry Criteria | 84 |
| 3.5.7.2 T3 Exit Criteria | 84 |
| 3.5.8 Course Pilot | 85 |
| 3.5.8.1 Course Pilot Entry Criteria | 86 |
| 3.5.8.2 Course Pilot Exit Criteria | 86 |
| 3.5.8.3 Regression Testing Following T3 and Course Pilot Events | 86 |
LIST OF TABLES
| Table 1. Rating and Classification Requirements | 13 |
| Table 2. Content delivery modes and Media Types | 15 |
| Table 3. Government Documents | 20 |
| Table 4. DOD Documents | 21 |
| Table 5. DON Documents | 22 |
| Table 6. AIM Documents | 23 |
| Table 7. Industry Standards | 23 |
| Table 8. Other Documents | 25 |
LIST OF FIGURES
| Figure 1. IMI Levels 1 – 3 (and Mobile Ready, Mobile Optimized and Responsive Design Mobile Website) Content Conversion Process | 16 |
| Figure 2. Training Environment and Devices | 17 |
| Figure 3. Complex Media Content Conversion Process | 18 |
This page intentionally left blank.
Statement of Work for the RRL FY22 Content Conversion 29 June 2020 xi
STATEMENT OF WORK (SOW)
FOR
SAILOR 2025 (S2025) FY22 READY RELEVANT LEARNING (RRL)
CONTENT CONVERSION (CC)
Scope This Statement of Work (SOW) defines the basic requirements to be performed under this Ready Relevant Learning Fiscal Year 2022 Content Conversion (RRL FY22 CC) Indefinite Delivery/Indefinite Quantity (ID/IQ) contract. The detailed requirements will be defined in this ID/IQ SOW and each specific Delivery Order (DO). This ID/IQ documents the contractor tasks for the design, development, testing, and delivery of products in support of the RRL FY22 CC effort (see especially Appendices C, G, I, J, K, L, M). The contractor shall employ innovative instructional systems design (see Appendices H, L, and M), systems engineering, and training assessment approaches in conjunction with new and modernized technologies (see Appendix G) to support specified ratings accession training while simultaneously supporting the broader Sailor 2025 (S2025) overarching goal of improving Sailors’ transfer of training to the operational work environment. The following represents examples of the broader S2025 goals:
· Converting and/or improving designated courses so they are compatible with the waterfront or shipboard environment and contribute to the acquisition of actionable knowledge (i.e., practical knowledge that will be activated by and recognized as relevant to operational work contexts and events).
· Employing modernized media, instructional, and motivational strategies that are engaging (see Appendices G and I).
· Scheduling the converted and/or improved content closer in time to when the training will be put into practice in the work environment.
Rating Requirements The contractor shall perform tasks for the design, development, testing, and delivery of products for the ratings listed in Table 1 (highest classification is SECRET NOFORN unless otherwise noted). The contractor shall also prepare for and conduct Train-the-Trainer (T3) events and Course Pilot events as part of this effort.
Table 1. Rating and Classification Requirements
| Rating |
| Highest Information Classification |
| Facilities Access Classification |
| When Classification Required |
| Fire Controlman (FC) |
| Unclassified |
| Unclassified |
| At Contract Award |
| Fire Controlman (AEGIS) (FCA) |
| SECRET NOFORN |
| SECRET NOFORN |
| At Contract Award |
| Gunner’s Mate (GM) |
| Unclassified |
| Unclassified |
| At Contract Award |
| Interior Communications Electrician (IC) |
| Unclassified |
| Unclassified |
| At Contract Award |
| Machinist's Mate - Submarine Auxiliary (MMA) |
| UNCLASS/ NOFORN |
| UNCLASS/ NOFORN |
| At Contract Award |
| Torpedoman's Mate (TM) |
| Unclassified |
| Unclassified |
| At Contract Award |
| Construction Mechanic (CM) |
| Unclassified |
| Unclassified |
| At Contract Award |
| Aviation Ordnanceman (AO) |
| Unclassified |
| Unclassified |
| At Contract Award |
| Aviation Support Equipment Technician (AS) |
| Unclassified |
| Unclassified |
| At Contract Award |
Course, Module and Lesson Structure Using the Government provided Supporting Data Workbook (SDW) as corresponding SOW Appendix A, Knowledge Capture Reports (KCRs), and complex media fidelity data as a basis, the contractor shall determine the course, module, and lesson structure for each course for each rating and shall design, develop, test, and deliver products meeting the specified requirements. A given course may be reused as-is across paths within a rating and across ratings. In such case, the government will order the course once and the contractor shall design, develop, test, and deliver for such as-is reuse as described in a DO. Similarly, a given course may be repackaged in a different sequence for use across paths within a rating and across ratings. In such case, the government will order the course once and the contractor shall design, develop, test, repackage, and deliver for such use as described in a DO.
Content Delivery Modes and Media Types Training products are grouped under four content delivery modes: Instructor-Facilitated Interactive Training (IFIT), Self-Directed Interactive Training (SDIT), Structured On-The-Job Training (SOJT), and Performance Support (PS) (see Appendices C, G, and J). Table 2 shows the four overarching content delivery modes and a high-level view of associated media types to support the RRL effort, as identified in the SDW and complex media fidelity data.
NOTE: there is no traditional Instructor-Led Training Computer-Assisted Instruction (ILT-CAI) media type or instructional strategy in the RRL Content Conversion effort; rather, the contractor shall design and develop interactive multimedia instruction (IMI) for use as IFIT that meets the requirements for being hosted in Navy eLearning (NeL). In context for Ready Relevant Learning, “IMI” is the preferred term and shall be interpreted generically as electronic media, replacing both Interactive Courseware (“ICW”) and “ILT-CAI” as terms regardless of whether the product is instructor-led or student-led, and including considerations for software management tools (e.g. Learning Management System, Learning Record Store).
Table 2. Content Delivery Modes and Media Types
| Media |
| Delivery Method |
| IFIT |
| SDIT |
| PS |
| SOJT |
| Actual Equipment |
| X |
| X |
| X |
| Actual Equipment Trainer |
| X |
X
| Augmented Reality (AR) |
| X |
| Checklist |
| X |
| X |
| X |
| X |
| Decision Tables |
| X |
| X |
| X |
| X |
| Demonstration Animation |
| X |
| X |
| X |
| X |
| Demonstration Video |
| X |
| X |
| X |
| X |
Electronic Performance Support System (EPSS)
| X |
| X |
| Hybrid Mobile App |
| X |
| X |
| X |
| X |
| Immersive Virtual Environment (IVE) |
| X |
| X |
Intelligent Tutoring System
| X |
| X |
| X |
Job Aid (JA)
| X |
| X |
| Level 1 IMI |
| X |
| X |
| Level 2 IMI |
| X |
| X |
| Level 3 IMI |
| X |
| X |
| Mixed Reality (MR) |
| X |
| Mobile Friendly/Mobile Ready Website |
| X |
| X |
| X |
| Mobile Optimized Website |
| X |
| X |
| X |
| Mobile Web App |
| X |
| X |
| X |
| X |
| Native App |
| X |
| X |
| X |
| X |
| Paper/Paper-based |
| X |
| X |
| X |
| X |
| PC Simulation |
| X |
| X |
| Picture/Diagram |
| X |
| X |
| X |
| X |
| Responsive Design Website |
| X |
| X |
| X |
| Training Aid |
| X |
| X |
| X |
| X |
| Training Support Material |
| X |
| X |
| X |
| X |
| Virtual Reality (VR) |
| X |
Content Conversion Process Flows Depending on the specific content delivery method and media type, the contractor shall follow slightly different development process flows with different CDRL deliverables, some following traditional ISD processes, some following systems engineering processes, and some blending the two. The blended content conversion process is represented in Appendix N.
The contractor shall follow a systematic approach for converting content into IMI, Mobile Ready, Mobile Optimized, and Responsive Design Mobile Website media types detailed within the SOW (see SOW Appendices C and G). Figure 1 identifies such a high-level process.
Figure 1. IMI Levels 1 – 3 (and Mobile Ready, Mobile Optimized and Responsive Design Mobile Website) Content Conversion Process Performance Support (PS) and Structured On The Job Training (SOJT) Development Process The contractor shall follow a systematic approach for converting content into Performance Support (PS) and Structured On-the-job Training (SOJT) media types detailed within the SOW (see SOW Appendices C and G). SOJT products shall be designed, developed and tested to be hosted in MyNavy Portal. The contractor shall design, develop, and test PS products to be used in both (1) a training setting and hosted in a training environment, such as NeL, and (2) an on-the-job operation setting and hosted in an operation environment, such as MyNavy Portal. Each host environment may have specific requirements that affect media development and test.
PS Hosted in Training Delivery Environments The contractor shall create and convert PS products to be used in a training setting (i.e. training aids, training support materials, supplemental training materials), following the same general process in Figure 1, to be hosted within specific training environments (e.g. NeL). Figure 2 identifies some of the training environments and devices capable of presenting training content within the current Naval training enterprise.
Figure 2. Training Environment and Devices PS Hosted in Operational Environments The contractor shall create and convert on-the-job PS products to be hosted within specific workplace (operation) environments and devices capable of presenting PS content within the current Naval training enterprise (e.g. MyNavy Portal).
Complex Media Development Process The contractor shall follow a systematic approach for converting content into complex media types (e.g. PC simulation, Augmented/Mixed/Virtual Reality, and Immersive Virtual Environment (IVE)) detailed within the SOW (see SOW Appendices C and G).
Figure 3 identifies such a high-level process that blends the traditional IMI development process with the Systems Engineering Process specifically for these types of media products.
NOTE: Any reference in an SDW (Appendix A), KCR, complex media fidelity data, and supporting data workbook to “VSIM” or “ICW 4” or a variant of that term shall be interpreted as complex media (either, or a blend of, PC simulation, Augmented/ Mixed/Virtual Reality, or Immersive Virtual Environment (see SOW Appendix C)).
Figure 3. Complex Media Content Conversion Process Coordination with Third-Parties As required, the contractor shall coordinate with the Government and any third-party contractor responsible for developing complex media (e.g. PC simulation, Augmented/Mixed/Virtual Reality, or Immersive Virtual Environment system development (e.g. Government labs, Multipurpose Reconfigurable Training System (MRTS) 3D, PORTS, etc.)). In such cases contractor shall be required to design and develop training support materials that work together with the third-party developed system.
List of SOW Appendices To complete this effort, the contractor shall follow the guidance and requirements in the following Content Conversion appendices to this SOW:
· Appendix A (per rating): rating requirements covered by this SOW.
· Appendix B: acronyms used within this SOW.
· Appendix C: terms and definitions used within and outside this SOW regarding RRL Content Conversion.
· Appendix D: list of the Contract Data Requirements Lists (CDRLs) identified within this SOW.
· Appendix E: Risk Assessment Example Format.
· Appendix F: descriptions of the four RRL content delivery modes.
· Appendix G: operational definitions of engaging instructional strategies to be used in content development under this SOW.
· Appendix H: list of Bloom’s taxonomy action verbs.
· Appendix I: description of media type characteristics.
· Appendix J: mobile learning roadmap.
· Appendix K: guidance on Naval Educational Training Center (NETC) RRL Single User Gaming and Simulation. Appendix L: guidance on NETC RRL Video Streaming.
· Appendix M: RRL Content Conversion Blended Process.
Terms and Definitions Appendix C provides the terms definitions that are critical to this SOW. These terms and definitions supersede any similar terms and definitions that may be found in other sources.
Government-Furnished Information (GFI) The Government will provide the following on an as-is basis:
1. Supporting Data Workbook (Appendix A) for each rating, at DO award.
1. Complex media fidelity data for each rating, as available.
1. Knowledge Capture (KC) data for each rating, if available, at DO award.
1. Existing Trainee Guides, Lesson Plans, Training Course Control Document (TCCD), Training Project Plan (TPP), Curriculum Outline of Instruction (COI) ) for each rating, as available, at DO award. Updates, if available, NLT 30 days after DO award.
1. Access to existing data for each rating in Content Planning Module/Learning Object Module (CPM/LOM), if available, such as existing Trainee Guides, Lesson Plans, TCCD, TPP, COI, NLT 30 days after DO award.
1. Examples of existing courseware for each rating, if available, at DO award. (For RRL the Government does not intend to provide all existing IMI or source files as GFI to discourage the contractor from simply copying and pasting content into a different format. The contractor shall plan as though no existing courseware materials are available.)
1. Applicable Style Guides, if available, at DO award. Updates, if available, NLT 30 days after DO award.
1. Technical Publications (e.g. technical manuals) for each rating, if available, at DO award. Updates, if available, NLT 30 days after DO award.
Any other GFI not listed here is ancillary and its absence does not prevent the contract from being executed.
Government-Furnished Software, Tools and Equipment The Government will not furnish software (Microsoft [MS] Office, Adobe Acrobat, etc.) or tools. The Government will not furnish equipment, hardware, software personnel, personnel, or materials for the Contractor’s use during this effort. The Government will provide access to a test bed at NAWCTSD for TRANET-U VDI content for the Contractor to test training materials. The Contractor shall provide the necessary hardware, software, tools, personnel, materials, and facilities, not otherwise furnished by the Government, to perform the tasks specified by this SOW.
Government-Furnished Subject Matter Experts (SMEs) Government SME access will be provided on a not-to-interfere basis. The Government is sensitive to overburdening SMEs. NAWCTSD will serve as the liaison between the fleet, Type Commander (TYCOM), Learning Centers (LCs) and/or Schoolhouses and the Contractor to coordinate access to SMEs in support of SOW activities and requirements. Location for SME support will be provided by the Government. The Government’s SMEs will be available face-to-face for key data collection activities (interviews, workshops, and reviews) and will be available for providing follow up information via phone, video-teleconference (VTC), or by Defense Collaboration Services (DCS), whenever practical.
Applicable Documents The following represent a list of applicable guidance documents for this effort. In the event of a conflict between the SOW and the references cited herein, the contents of this SOW take precedence. Nothing in this SOW, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained. These documents will be provided to the Contractor as GFI, if they are not readily available to the Contractor via the Internet. For all documents listed below, the latest versions apply.
Government Documents Table 3. Government Documents
| Document Number |
| Document Title and/or Description |
National Security Agency (NSA) Configuration Guide
| NAVAIRINST 4355.19E |
| System Engineering Technical Review Process |
| National Institute of Standards and Technology (NIST) Special Publication (SP) 800-44 |
| Guidelines on Securing Public Web Servers |
United States (U.S.) Office of Personnel Management (OPM) Final Credentialing Standards for Issuing Personal Identity Verification
| Institute of Electrical and Electronics Engineers (IEEE) Std. 15288-2015 |
| Systems and Software Engineering- Systems Life Cycle Processes |
· Copies of Defense Intelligence Security Agency (DISA) Configuration Guide can be obtained from http://disa.mil/.
· Copies of NSA Configuration Guides can be obtained from http://www.nsa.gov/ia/mitigation_guidance/security_configuration_guides/index.shtml.
· Copies of National Institute of Standards and Technology (NIST) documents can be obtained from http://csrc.nist.gov/publications/PubsSPs.html. Copies of OSHA standards can be obtained from http://www.osha.gov.
· Copies of OPM document can be obtained from http://www.opm.gov/investigate/resources/index.aspx.
· Copies of IEEE Std 15288-2015 can be obtained from http://www.ieee.org/.
Department of Defense (DOD) Documents Table 4. DOD Documents
| DOD Document Number |
| Document Title and/or Description |
| Department of Defense Instruction (DODI) 1322.26 |
| Distributed Learning (DL) dated 05 October 2017 |
(https://adlnet.gov/dodi/dodi-xapi)
| DODI 5000.02 |
| Operation of the Defense Acquisition System |
| DODI 5200.39 |
| Critical Program Information (CPI) Identification and Protection Within Research, Development, Test, and Evaluation (RDT&E) dated October 15, 2018 |
| DODI 5200.48 |
| Controlled Unclassified Information (CUI) dated March 6, 2020 |
| DODI 8500.01 |
| Department of Defense Instruction 8500.01 Cyber Security dated 14 Mar 2014 |
| DODI 8510.01 |
| Risk Management Framework (RMF) for DoD Information Technology (IT), Change 1, dated 24 May 2016 |
| DODI 5220.22-M |
| National Industrial Security Program Operating Manual, dated 28 Feb 2006 |
| DOD 8570.01-M |
| Information Assurance (IA) Workforce Improvement Program, dated 19 Dec 2005 w/Change 4, 11/10/2015 |
DOD Implementation Plan for Advanced Distributed Learning (ADL) dated 19 May 2000
| Military Handbook (MIL-HDBK)-881D |
| Work Breakdown Structures for Defense Materiel Items |
| MIL-HDBK-29612-1A |
| Department of Defense Handbook for Guidance for Acquisition of Training Data Products and Services (Part 1 of 5) |
| MIL-HDBK-29612-2A |
| Department of Defense Handbook for Instructional Systems Development/Systems Approach to Training and Education (Part 2 of 5) |
| MIL-HDBK-29612-3A |
| Development of Interactive Multimedia Instruction (Part 3 of 5) |
| MIL-HDBK-29612-4A |
| Department of Defense Handbook Glossary for Training (Part 4 of 5) |
| MIL-HDBK-29612-5A |
| Department of Defense Handbook for Advanced Distributed Learning (ADL) Products and Systems (Part 5 of 5) |
| MIL-PRF-29612B |
| Performance Specification Training Data Products |
| MIL-HDBK-217F, Notice 2 |
| Reliability Prediction of Electronic Equipment |
| MIL-HDBK-472, Notice 1 |
| Maintainability Prediction |
· Copies of DOD Directives and Instructions can be obtained from the DOD Issuances Website (http://www.dtic.mil/whs/directives/).
· DOD Implementation Plan for ADL can be obtained from http://prhome.defense.gov/Portals/52/Documents/RFM/Readiness/docs/adl_implementplan.pdf.
· Copies of the DOD Specifications and Handbooks can be obtained online from the DOD Single Stock Point or from the Acquisition Streamlining and Standardization Information System (ASSIST) website (http://everyspec.com/DoD/DoD-HDBK/)
Department of the Navy (DON) Documents Table 5. DON Documents
| DON Documents |
| Document Title and/or Description |
DON Department of Defense Information Assurance Certification and Accreditation Process (DIACAP) Handbook Version 1, dated 15 July 2008
| NETCINST 5510.1 |
| Content Segmentation and Classification Guide |
| NETCNOTE 1500.6 |
| Metadata Instruction |
| NMCI.10011.01.UA3.E |
| Core Build Contents Version 2.3, 02 Aug 07 |
Copies of the Navy Marine Corps Intranet (NMCI) Core Build Standard can be obtained from http://www.nmci-eds.com/downloads/core-build
| OPNAVINST 1500.76C |
| Naval Training System Requirements, Acquisition, and Management |
| Secretary of the Navy Instruction (SECNAVINST) 5000.36A |
| Department of the Navy Information Technology Application and Data Management |
| SECNAVINST 5870.4A |
| Copyright, dated 16 Aug 2005 |
| Secretary of the Navy (SECNAV) M-5239.1 |
| Department of the Navy Information Assurance Program, Information Assurance Manual, dated Nov 2005 |
| SECNAV M-5510.36 |
| Department of the Navy, Information Security Program, dated Jun 2006 |
· Copies of the CON DIACAP Handbook can be obtained from https://www.doncio.navy.mil/tagResults.aspx?ID=96
· Copies of the DON documents can be obtained online from the Navy’s Integrate Learning Environment website: https://www.secnav.navy.mil/doni/Directives/Forms/AllItems.aspx
Authoring Instructional Materials (AIM) Documents Table 6. AIM Documents
| Document Number |
| Document Title and/or Description |
AIM Content Planning Module (CPM) User’s Manual
AIM Learning Object Module (LOM) User’s Manual
· Copies of the AIM documentation can be obtained from https://www.public.navy.mil/netc/ntt/pdfs/End_to_End_Process_SOP_(7-11-14)_Final.pdf
Industry Standards Table 7. Industry Standards
| Document Owner |
| Document Title and/or Description |
| ADL Co-Laboratories |
| Shareable Content Object Reference Model (SCORM) 2004—SCORM is a collection of standards and specifications adapted from multiple sources to provide a comprehensive suite of e-learning capabilities that enable interoperability, accessibility and reusability of Web-based learning content. SCORM documents and important information about SCORM can be obtained from: http://www.adlnet.gov/policy. |
| ADL Co-Laboratories |
| SCORM 2004 Conformance Testing Tool—This is a self-testing tool downloaded from http://www.adlnet.org to verify SCORM compliant courseware. |
| ADL Co-Laboratories |
| The Advanced Distributed Learning Registry (ADL-R): Best Practices for Updating Registered Content https://www.atsc.army.mil/tadlp/implementation/scorm/conformance/tools_scorm.asp |
| Experience API SCORM Profile |
| Guidelines for representing SCORM data and events as xAPI Statements. Provides a representation of the SCORM® data model as well as limited SCORM®-specific features, but uses xAPI for run time communications and tracking. The SCORM® profile was created as a compatibility approach to xAPI. It can be used to: |
· create content that can track to both a Learning Management System (LMS) and learning record store (LRS)
· convert existing SCORM® data to xAPI Statements that can be stored in an LRS
· track experiences from a learning record provider in a manner consistent with how they would've been tracked in SCORM® (http://adlnet.github.io/xAPI-SCORM-Profile/)
| xAPI LRS Conformance Requirements |
| The Experience API (xAPI)Conformance Requirements for Learning Record Stores |
(https://adl.gitbooks.io/xapi-lrs-conformance-requirements/content/)
| cmi5 (Case Mix Index) Profile Specification |
| A profile specification for xAPI that describes packaging, launch, and important data capture concepts for traditional LMSs that include an LRS. |
(https://github.com/AICC/CMI-5_Spec_Current) Aviation Industry CBT Committee (AICC)
| ANSI/ASQ Q9000-2000 |
| Quality Management Systems - Fundamentals and Vocabulary |
| ANSI/ASQ Q9001-2000 |
| Quality Management Systems - Requirements |
| ANSI/ASQ Q9004-2000 |
| Quality Management Systems - Guidelines for Performance Improvements |
| ANSI Z535.1-2006 (R 2011) |
| Safety Colors |
| ANSI Z535.2-2011 |
| Environmental and Facility Safety Signs |
| ANSI Z535.3-2011 |
| Criteria for Safety Symbols |
| ANSI Z535.4-2011 |
| Product Safety Signs and Labels |
| ANSI Z535.5-2011 |
| Safety Tags and Barricade Tapes (for Temporary Hazards) |
| IEEE Std. 12207-2017201712207-2017 |
| Systems and Software Engineering – Software Life Cycle Processes |
| Integrated Master Schedule (IMS) Global Learning Consortium |
| Question & Test Interoperability (QTI) Specification |
| Joint ADL Co-Lab |
| Best Practices Guide for Design and Development of SCORM Assessments (https://adlnet.gov/research/scorm/scorm-2004-4th-edition/scorm-2004-4th-edition-conformance-test-suite/) |
· Copies of the industry standard documents can be found by visiting the web addresses indicated.
· Copies of the following Industry Standards can be obtained from the American National Standards Institute (ANSI)/American Society for Quality Control (ASQC) (http://www.ansi.org).
· (Copies of the ANSI/Institute of Electrical and Electronics Engineers (IEEE) documents are available from http://standards.ieee.org/ or IEEE Service Center, 445 Hoes Lane, Piscataway, NJ 08854-1331.)
Other Documents Table 8. Other Documents
| Document Number |
| Document Title and/or Description |
| CJCSI 6510.01F |
| IA and Computer Network Defense (CND) |
| Executive Order 13465 |
| Economy and Efficiency in Government Procurement Through Compliance with Certain Immigration and Nationality Act Provisions and Use of an Electronic Employment Eligibility Verification System, dated 6 June 2008 (Amendment to Executive Order 12989 of 13 February 1996) |
| NMCI.10011.01.UF0.E |
| Core Build Contents Version 7, 22 May 2012 |
| NAVAIRINST 5000.21B |
| Naval Systems Command (SYSCOM) Risk Management Policy dated 24 Jan 2008 |
| Unnumbered Document |
| Joint ADL Co-Lab, ADL Acquisition Guidance, dated 9 Aug 2006 |
| NAVPERS 18068F |
| Volume I Navy Enlisted Occupational Standards |
| Unnumbered Document |
| NeL Content Hosting Frequently Asked Questions (FAQ) |
| Unnumbered Document |
| Navy Education and Training Center (NETC) Course Hosting Process |
| Unnumbered Document |
| Content Hosting and Report Management Service (CHaRMS) Developer User Guide V2 |
| Unnumbered Document |
| Virtual Desktop Infrastructure (VDI) Specifications Brief |
| Unnumbered Document |
| VDI Risk Management Framework package |
| Unnumbered Document |
| Mobile Learning & Technology Roadmap |
| Unnumbered Document |
| NETC Common Reference Profile (https://netc.usalearning.net/xapi-library/resources/pdf/NETC-Common-Reference-Profile.pdf) |
| Unnumbered Document |
| NETC E-learning Profile (https://netc.usalearning.net/xapi-library/resources/pdf/NETC-E-learning-Profile.pdf) |
| Unnumbered Document |
| NETC Performance Support Profile (https://netc.usalearning.net/xapi-library/resources/pdf/NETC-Performance-Support-Profile.pdf) |
| Unnumbered Document |
| NETC Simulation Base Profile (https://netc.usalearning.net/xapi-library/resources/pdf/NETC-Simulation-Profile.pdf) |
| Unnumbered Document |
| NETC xAPI Glossary |
(https://netc.usalearning.net/xapi-library/resources/pdf/NETC-xAPI-Glossary.pdf)
| Unnumbered Document |
| NETC xAPI Implementation Guidelines (https://netc.usalearning.net/xapi-library/resources/pdf/NETC-xAPI-Implementation-Guidelines.pdf) |
· Copies of the CJCSI document can be obtained from http://www.dtic.mil/dtic/
· Copies of the Presidential document can be obtained from the Federal Register at http://edocket.access.gpo.gov/2008/pdf/08-1348.pdf
· Copies of the NMCI document can be obtained from the Navy’s Integrate Learning Environment website (https://www.public.navy.mil/netc/ile/Default.aspx).
· Copies of the SCORM documents can be obtained from http://www.adlnet.gov/capabilities/scorm/scorm-2004-4th#tab-resources.
· Copies of the Joint ADL Co-Lab document can be obtained from https://adlnet.gov/collaboration/dadlac.
· Copies of NAVAIRINST 5000.21B can be obtained from https://directives.navair.navy.mil/.
| OPNAVINST 11010.20H |
| Facilities Project Instruction |
· Copies of these instructions are available at http;//doni.daps.dla.mil
| MIL-STD_130N |
| Department of Defense (DoD) Standard Practices – Identification Markings of U.S. Military Property |
· Copies of this standard is available online at: http://quicksearch.dla.mil/qsSearch.aspx
| DOD 5010-12M |
| Procedures for Acquisition Management of Technical Data |
· The publication shown above is available at http://www.dtic.mil/whs/directives/corres/pdf/501012m.pdf
| Defense Federal Acquisition Regulation Supplement (DFARS) 252.211-7003 |
| Item Identification and Valuation (August 2008) |
| DFARS 252.239-7001 |
| Information Assurance Contractor Training and Certification (January 2008) |
· DFARS clauses are downloadable from http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
| DFAR 2.101 |
| Definitions |
| DFAR 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| DFAR 52.222-54 |
| Employment Eligibility Verification |
| DFAR 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting |
· DFAR clauses are downloadable from http://farsite.hill.af.mil/vffara.htm
| DODD 8140.01 |
| Cyberspace Workforce management, dated 11 August 2015 |
| DODI 8520.02 |
| Public Key Infrastructure (PKI) and Public Key (PK) Enabling, dated 24 May 2011 |
| NIST SP 800-53r4 |
| National Institute of Standards and technology (NIST) – Security and Privacy Controls for Federal Information Systems and Organizations, dated 22 January 2015 |
| CNSSI 1253 |
| Committee on National Security Systems Instruction (CNSSI) – Security Categorization and Control Selection for National Security Systems, dated 27 March 2014 |
| SECNAV M-5239.2 |
| Department of the Navy Cyberspace Information Technology and Cybersecurity Workforce management and Qualification manual, dated June 2016 |
(The above documents are available from the following sources:
· DOD Instructions, Directives, and Manuals are available at http://www.esd.whs.mil/DD/DoD-Issuances/
· NIST Special Publications are available at https://csrc.nist.gov/Publications
· CNSSI Instructions are available at https://www.cnss.gov
· SECNAV Manuals are available at https://doni.documentservices.dla.mil/manuals-secnav.aspx)
DoN NAVEDTRA Documents
| NAVEDTRA 130B (series) |
| Task Based Curriculum Development Manual, (Volumes 1-3) |
| NAVEDTRA 131B (series) |
| Personnel Performance Profile Based Curriculum Development Manual, Volumes (1 – 3) |
| NAVEDTRA 132 (series) |
| Navy School Testing Program Management Manual |
| NAVEDTRA 136 |
| Naval Education and Training Command Integrated Learning Environment Course Development and Life Cycle Maintenance |
· Copies of the NAVEDTRA documents are available for download from https://www.public.navy.mil/netc/ntt/pdfs/
Naval Air Systems Command Instructions (NAVAIRINST)
| NAVAIRINST 4355.19E |
| Systems Engineering Technical Reviews, dated 6 February 2015 |
· Copies of the NAVAIRINSTs are available for download from https://directives.navair.navy.mil
NAWCTSD Documents
| NAVAIR Training Systems Domain Guide |
| Naval Air Systems Command Training Systems Domain Guide, version 1.0, dated October 2016 |
| Security Assessment Procedures Document |
| NAWCTSD Assessment Procedures for the Omnibus Standalone-Unclassified Training Systems, dated 22 September 2016 |
· Copies of these NAWCTSD documents will be provided as part of the contract or Government Furnished Information (GFI)
Non-Government Documents
Industry Standards
ANSI = American National Standards Institute ISO = International Organization for Standardization
| ANSI/ASQ/ISO 9001-2015 |
| Quality Management Systems - Requirements |
· Copies of the ANSI/ISO document is available from http://www.ansi.org
Electronic Industries Alliance (EIA)/SAE International
| SAE/EIA-649-B |
| Configuration Management Standard |
| SAE/EIA-649-1 2014 |
| Configuration Management Requirements for Defense Contracts |
| SAE/EIA 748-C |
| Earned Value Management Systems |
| GEIA-HB-649-A |
| Configuration Management Standard Implementation Guide, Revision A of February 2016 |
· Copies of the EIA/SAE documents are available from http://ansi.org
Institute of Electrical and Electronics Engineers (IEEE)/ISO/International Electrotechnical Commission (IEC)
| IEEE/ISO/IEC |
| Systems and Software Engineering – Software Life Cycle Processes |
· Copies of the IEEE/ISO/IEC documents are available from http://www.ieee.org
Requirements The Contractor shall organize, coordinate, and control RRL content conversion activities to ensure compliance with contract requirements and timely delivery of products specified herein.
General Requirements The Contractor shall provide the necessary hardware, software, personnel, supervision, management, materials, services, equipment, facilities, technical, logistics, and clerical support to perform the tasks specified in this SOW. The requirements defined herein form the basis for work performed for the Government during the entire contract. The Contractor shall meet the requirements of the SOW in accordance with (IAW) the guidance documents provided and the contents of this document.
RRL Content Conversion Planning The purpose of the RRL content conversion planning process is to produce and communicate effective and workable plans. The Contractor shall define, document, manage, and apply RRL content conversion planning processes IAW IEEE Std 12207-2017, sections 6.1.2.3.4.5, 6.3.1, and 7.1.1.3.1.
Life-Cycle Model Management The purpose of the life cycle model management process is to define, maintain, and assure availability of policies, life cycle processes, life cycle models, and procedures for use by the government. The Contractor shall define, document, manage, and apply life cycle model management, at the program level, IAW IEEE Std 12207-2017, section 6.2.1. References to the organizational implementation of life cycle model management within IEEE Std 12207-2017, section 6.2.1 shall only apply to the RRL content conversion effort.
Infrastructure Management The purpose of the infrastructure management process is to provide the enabling infrastructure and services to the RRL content conversion effort and its objectives throughout the life cycle of the effort. The Contractor shall define, document, manage, and apply infrastructure management, at the program level, IAW IEEE Std 12207-2017, section 6.2.2. References to the organizational implementation of infrastructure management within IEEE Std 12207-2017, section 6.2.2 shall apply only to the RRL content conversion effort.
Program Assessment and Control The purpose of the program assessment and control process is to determine the status of the RRL content conversion effort and direct its plan execution. The Contractor shall define, document, manage, and apply program assessment and control IAW IEEE Std 12207-2017, section 6.3.2.
Program Decision Management The purpose of the decision management process is to select the most beneficial course of RRL content conversion effort action where alternatives exist. The Contractor shall define, document, manage, and apply a program decision management process IAW IEEE Std 12207-2017, section 6.3.3.
Contract Data Requirements Lists (CDRLs) The Contractor shall update, improve, manage, and deliver acceptable contractually required data. The Contractor shall implement data management procedures and policies to provide control and configuration management (CM) of contractually required data. The Contractor shall:
| a. | Ensure data items to be delivered to the Government meet the quantity and quality requirements of the CDRL. |
| b. | Establish data management procedures and policies to provide control and CM of contractually required data. To ensure sub-Contractors meet the contract data requirements set forth in the CDRL, the prime Contractor shall maintain control of work completed by sub-Contractors. |
| c. | Establish and maintain data libraries via an online management system consisting of technical manuals, parent system technical description, and software documentation for the work completed for academic training systems and other data pertaining to training systems. |
Online Management System (OMS) The Contractor shall establish, implement, and make available an OMS throughout the entire contract completion date. The Contractor shall use the OMS as a tool for communication between the Contractor and the Government. The Contractor shall maintain deliverables (all versions) and corresponding Government comments on the OMS. The Contractor shall include on the OMS supporting materials, agendas, and minutes for conferences (e.g., Post Award Conference [PAC]), meetings (e.g., Integrated Product Team [IPT]), reviews (e.g., In-Progress Report [IPR]) and materials (presentations, agendas, etc.). The Contractor shall make available the OMS to be used at the PAC. The OMS shall serve as a data library consisting of documentation, data, and information used, maintained, updated, and improved for use in this effort. The Contractor shall record and maintain a master listing of contract related documentation, data, and information used, maintained, updated, and improved for use in this effort. File sharing between the Contractor and the Government reviewers shall be provided. An intuitive file structure and naming convention, file directories, and final deliverables shall be provided on the file-sharing website. The latest version of files (text, graphics, animations, videos, etc.) shall be made available by close of business on Fridays for download by the Government.
OMS Basic Requirements The OMS shall allow Government content reviewers and project managers to review, consolidate, and submit deliverable review comments produced by the contractor. Reviewers will submit review comments for documents such as agendas, meeting minutes, reports, and design documents (e.g. Software Product Design, Instructional Media Design Package, etc.) in external files via a comment resolution matrix (CRM) rather than via a browser. Reviewers will submit IMI and supporting materials (i.e. script storyboards, on-screen lessons, lesson plans, trainee guides) and complex media review comments electronically through a web browser rather than capturing comments in external files via CRM.
For IMI and supporting materials, and complex media reviews, the OMS shall provide digital traceability of each comment. The system shall allow reviewers access to the courseware under review and the ability to enter comments from any location. This system shall be hosted at the contractor’s location and be accessible via standard internet browsers supported by NMCI computers. The review system shall control access through login and password protection. The system shall allow managers and reviewers to view all related course documentation during review sessions, such as the course lesson plan (LP), trainee guide (TG), design strategy document (IMDP), course schedules, status reports, and lessons.
OMS Required Functionality for IMI, Supporting Material and Complex Media Reviews The OMS shall:
· Allow reviewers to submit comments directly from the courseware (reviewer does not leave the courseware to add a comment and the courseware is visible on the reviewer’s screen while adding the comment).
· Allow approved users to view, add, approve, and disapprove comments submitted via the content comment submission capability.
· Allow users to submit, review, and perform administrative functions on lesson comments.
· Provide a user interface allowing access to all online content, with indications of review assignment, review completion status, and content waiting for comment approval and submission to the contractor.
OMS Comment Submission Capability for IMI, Supporting Material and Complex Media Reviews The OMS shall have the following lesson comment submission capabilities:
· Require a unique login ID and password combination to gain access to the courseware commenting capability for each individual with access to the OMS
· Comments received from the online lesson comment capability shall be given a unique identifier and shall capture the data provided from the lesson commenting form.
· Register the date, time, and login ID of anyone who edits a comment or changes its status, along with the specific changes made. The information shall be readily accessible for user viewing.
· Allow users to provide comments on each courseware page, and verify each comment by page without the reviewer having to add the page identifier.
· The comment submission form shall be self-populated with the following information:
· The lesson under review.
· The topic of the lesson under review.
· The date and time of the comment.
· The commenter’s name or login identification.
· For each comment, the system shall allow the commenter to provide:
· Whether the change is a global change (applicable to the entire lesson) or a local change (applicable to the lesson page/slide being reviewed).
· The specific comment text, including the ability to copy and paste large sections of text into the comment field.
OMS Comment Review and Administration Capability for IMI, Supporting Material and Complex Media Reviews The OMS shall have the following lesson comment review and administration capabilities:
· Security. The system shall provide for at least three levels of access to the comments:
· Reviewer - who shall have access to view their and others comments.
· Approver - acts as a master reviewer and identifies which of the Reviewer’s comments are to be addressed by the contractor. Receives lesson notifications and assigns lessons to Reviewers with associated due dates.
· Administrators - who shall have access to the entire system and act as a systems administrator by providing password and login information to reviewers. Administrators may be producers or system administrators. Administrators shall be able to add new reviewers and deactivate others. The system shall allow reviewers to view all their comments for a lesson or for all lessons. (Note: The Administrator is the role of the contractor.)
· The system shall contain a reports mechanism that has the ability to see all comments at once, regardless of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .