Exhibit 4 - L10 Gate Criteria Fill In R.pdf

PDF 60 KB Posted

Attached to
Landsat 10 Spacecraft _ DRAFT RFP
Solicitation number
80GSFC26D0015
Issued by

About this file

This document is a gate criteria template for evaluating comparable spacecraft missions in response to a federal contract opportunity for Earth-observing satellite systems.

The template establishes four mandatory qualification criteria that prospective offerors must demonstrate through historical mission experience: (1) operation of a spacecraft bus for a minimum of three years, (2) accommodation of an Earth-observing instrument payload weighing at least 200 kilograms, (3) orbital operation at altitudes between 500 and 2,000 kilometers, and (4) provision of instrument orbital average power of at least 250 watts. The spacecraft bus must have been produced by the offeror, and all referenced missions must have launched within ten years prior to RFP release. The template includes a data entry table with columns for mission name, brief description, launch date, years in operation, payload mass, operational altitude, and instrument orbital average power. Grayed-out cells are provided for informational purposes only and do not factor into gate criteria evaluation. Offerors may reference a single mission multiple times if it satisfies different criteria requirements. This template serves as the mechanism for offerors to demonstrate relevant past performance and technical capability in spacecraft bus production and Earth-observation mission execution.

View the file

Other files

File Type Posted
Exhibit 6 - L10 Past Performance Questionnaire R.pdf PDF
DRFP L10 80GSFC26R0015 Cover Letter Sgn.pdf PDF
Attachment K - L10 Space Environmental Req Document (LSERD).pdf PDF
Attachment L - L10 Analytical Math Model Definitions (LAMMD) Rev.pdf PDF
Attachment M - L10 Spacecraft Government Furnished Equipment Information List (SC GFEGFI).pdf PDF
Attachment N - L10 World Reference System - 3 Definition Rev.pdf PDF
Attachment Q - LandIS Simplified Mechanical Interface Control Drawing (MICD).pdf PDF
Attachment S - L10 Time and Materials Rate Matrices Rev.pdf PDF
Attachment V - L10 C-SCRM Plan.pdf PDF
Attachment X DRD 3 - CPIC DRD Template for IT Portfolio PPM Data Collection.xlsx XLSX spreadsheet
Attachment X DRD 3 - CPIC DRD.pdf PDF
Enclosure 4 - L10 Geometric Error Budget (GEB).pdf PDF
Exhibit 1 - L10 Pricing Template.xlsx XLSX spreadsheet
Attachment E - L10 Spacecraft to Ground Interface Req Document (SC to GND IRD) Rev.pdf PDF
Attachment G - L10 Spacecraft Simulator Req Document (SC Sim RD).pdf PDF
Attachment H - L10 Spacecraft Deliverable Items List (DIL).pdf PDF
Attachment J - L10 Radiation Environments Description (LRED) Rev.pdf PDF
Attachment R - L10 Spacecraft Contractor Standards.pdf PDF
Attachment U - L10 OCI Plan Rev.pdf PDF
Attachment W - Small Business Subcontracting Plan.pdf PDF
Attachment X - Non-Technical Contract Data Requirements List.pdf PDF
Attachment X DRD 1 - OCI Plan.pdf PDF
Attachment X DRD 2 - Security Requirements for Unclassified IT Resources DRD C-SCRM requirements.pdf PDF
Attachment X DRD 5 - CAIRIA DRD.pdf PDF
Enclosure 2 - L10 Observatory Quality Assurance Surveillance Plan.pdf PDF
Enclosure 3 - L10 Design Reference Case - DRC-18.pdf PDF
Enclosure 3 - L10 Design Reference Case - DRC-18 Definition.pdf PDF
Enclosure 5 - Geometric Budget (GEB) Support Presentation.pdf PDF
Attachment A - L10 Statement of Work (SOW).pdf PDF
Attachment D - L10 Spacecraft Interface Requirements Document (SCIRD).pdf PDF
Attachment F - L10 Observatory Environment Req Document (ObsERD)R.pdf PDF
Attachment O - L10 Lexicon.pdf PDF
Attachment P - L10 Acronym List.pdf PDF
Attachment T - L10 Major Payment Events Payment Schedule and Completion Criteria.pdf PDF
Attachment X DRD 4 - CITAR Report Template.xlsx XLSX spreadsheet
Enclosure 1 - L10 Mission Synopsis Rev.pdf PDF
Exhibit 2 - L10 Spacecraft and Observatory Environmental Testing Matrix Fill-in.pdf PDF
DRFP Landsat 10 80GSFC26R0015 Terms and Conditions.pdf PDF
Attachment B - L10 SC CDRL and DID Rev.pdf PDF
Attachment C - L10 Spacecraft Requirements Document (SC SRD).pdf PDF
Attachment I - L10 Payload to Launch Services Interface Description Doc (LS IDD) Rev.pdf PDF
Attachment X DRD 2 - NASA C-SCRM Plan Questionnaire.xlsx XLSX spreadsheet
Attachment X DRD 4 - CITAR DRD updated.pdf PDF
Attachment X DRD 6 - SCV Reporting.pdf PDF
Exhibit 3 - L10 Spacecraft Master Equipment List (MEL) Fill In.pdf PDF
Exhibit 5 - L10 Spacecraft Specifications Fill-in.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gate Criteria Mission Name Brief Description

(Spacecraft Bus MUST have been produced by Offeror )

Launch Date (MUST be within ten years prior to RFP release )

Years in Operation Payload Mass (kg) Operational Altitude (km) Instrument Orbital Avg. Power (W)

1. Performed Operations for at least three (3) years

2. Accommodated an Earth-observing instrument payload of at least 200kg

3. Operated at an altitude of 500-2000km

4. Operated with an Instrument Orbital Average Power of at least 250W

Notes:

1. Grayed out cells are not required to be filled in. Data provided in these cells will be used for informaiton only and is not considered for meeting gate criteria.

2. If referencing a single mission to meet multiple criteria, list it multiple times in the row for each criteria

Comparable Mission

File details come from the government source that posted it. Updated .