Attachment S - L10 Time and Materials Rate Matrices Rev.pdf

PDF 107 KB Posted

Attached to
Landsat 10 Spacecraft _ DRAFT RFP
Solicitation number
80GSFC26D0015
Issued by

About this file

This is a pricing attachment (Attachment No. S) to Request for Proposals (RFP) 80GSFC26R0015 for the Landsat 10 contract with NASA's Goddard Space Flight Center. The attachment establishes fully-loaded labor rate matrices that contractors and subcontractors must use for pricing task orders under a time and materials contract vehicle.

The document specifies that offerors must propose fully-loaded labor rate categories for contract years 2027 through 2032, with rates that include all indirect expenses and profit. Prime contractors are not to exceed the specified hourly rates for direct labor when pricing all task orders issued under the "Task Ordering Procedure" and "Supplemental Task Ordering Procedures" clauses. A separate matrix establishes maximum fully-loaded rates for subcontractor labor hours, identified as "Name-TBP" (to be provided). Contractors may propose lower rates when pricing individual task orders. The attachment includes blank rate matrices for both prime and subcontractor labor categories and references position qualifications in Section 4 (for prime labor) and Section 3 (for subcontractor labor), both of which are marked as "TBP" (to be provided). Contractors are responsible for providing all personnel, facilities, materials, and other necessary resources for performance of task order requirements under this contract.

View the file

Other files

File Type Posted
Exhibit 6 - L10 Past Performance Questionnaire R.pdf PDF
DRFP L10 80GSFC26R0015 Cover Letter Sgn.pdf PDF
Attachment K - L10 Space Environmental Req Document (LSERD).pdf PDF
Attachment L - L10 Analytical Math Model Definitions (LAMMD) Rev.pdf PDF
Attachment M - L10 Spacecraft Government Furnished Equipment Information List (SC GFEGFI).pdf PDF
Attachment N - L10 World Reference System - 3 Definition Rev.pdf PDF
Attachment Q - LandIS Simplified Mechanical Interface Control Drawing (MICD).pdf PDF
Attachment V - L10 C-SCRM Plan.pdf PDF
Attachment X DRD 3 - CPIC DRD Template for IT Portfolio PPM Data Collection.xlsx XLSX spreadsheet
Attachment X DRD 3 - CPIC DRD.pdf PDF
Enclosure 4 - L10 Geometric Error Budget (GEB).pdf PDF
Exhibit 1 - L10 Pricing Template.xlsx XLSX spreadsheet
Exhibit 4 - L10 Gate Criteria Fill In R.pdf PDF
Attachment A - L10 Statement of Work (SOW).pdf PDF
Attachment D - L10 Spacecraft Interface Requirements Document (SCIRD).pdf PDF
Attachment F - L10 Observatory Environment Req Document (ObsERD)R.pdf PDF
Attachment O - L10 Lexicon.pdf PDF
Attachment P - L10 Acronym List.pdf PDF
Attachment T - L10 Major Payment Events Payment Schedule and Completion Criteria.pdf PDF
Attachment X DRD 4 - CITAR Report Template.xlsx XLSX spreadsheet
Enclosure 1 - L10 Mission Synopsis Rev.pdf PDF
Exhibit 2 - L10 Spacecraft and Observatory Environmental Testing Matrix Fill-in.pdf PDF
Attachment E - L10 Spacecraft to Ground Interface Req Document (SC to GND IRD) Rev.pdf PDF
Attachment G - L10 Spacecraft Simulator Req Document (SC Sim RD).pdf PDF
Attachment H - L10 Spacecraft Deliverable Items List (DIL).pdf PDF
Attachment J - L10 Radiation Environments Description (LRED) Rev.pdf PDF
Attachment R - L10 Spacecraft Contractor Standards.pdf PDF
Attachment U - L10 OCI Plan Rev.pdf PDF
Attachment W - Small Business Subcontracting Plan.pdf PDF
Attachment X - Non-Technical Contract Data Requirements List.pdf PDF
Attachment X DRD 1 - OCI Plan.pdf PDF
Attachment X DRD 2 - Security Requirements for Unclassified IT Resources DRD C-SCRM requirements.pdf PDF
Attachment X DRD 5 - CAIRIA DRD.pdf PDF
Enclosure 2 - L10 Observatory Quality Assurance Surveillance Plan.pdf PDF
Enclosure 3 - L10 Design Reference Case - DRC-18.pdf PDF
Enclosure 3 - L10 Design Reference Case - DRC-18 Definition.pdf PDF
Enclosure 5 - Geometric Budget (GEB) Support Presentation.pdf PDF
DRFP Landsat 10 80GSFC26R0015 Terms and Conditions.pdf PDF
Attachment B - L10 SC CDRL and DID Rev.pdf PDF
Attachment C - L10 Spacecraft Requirements Document (SC SRD).pdf PDF
Attachment I - L10 Payload to Launch Services Interface Description Doc (LS IDD) Rev.pdf PDF
Attachment X DRD 2 - NASA C-SCRM Plan Questionnaire.xlsx XLSX spreadsheet
Attachment X DRD 4 - CITAR DRD updated.pdf PDF
Attachment X DRD 6 - SCV Reporting.pdf PDF
Exhibit 3 - L10 Spacecraft Master Equipment List (MEL) Fill In.pdf PDF
Exhibit 5 - L10 Spacecraft Specifications Fill-in.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment No. S

Landsat 10 Time & Materials Rate Matrices

TBP

RFP 80GSFC26R0015

CONTRACT TBD

National Aeronautics and Space Administration

Goddard Space Flight Center

FULLY-LOADED LABOR RATE MATRIX

Task Plan proposals for CLIN 002 must utilize the not-to-exceed rates and factors delineated below for pricing all task orders contemplated or issued in accordance with the “Task Ordering Procedure” and “Supplemental Task Ordering Procedures” clauses of the contract.

1. FULLY-LOADED LABOR RATE MATRIX:

The Contractor shall not exceed the fully-loaded labor rates as specified below (loaded through Profit) for pricing all task orders:

**Labor Categories

*CY 2027

^HR Rate

CY 2028

HR Rate

CY 2029

HR Rate

CY 2030

HR Rate

CY 2031

HR Rate

CY 2032

HR Rate

**Labor Categories - The Offeror shall provide fully-loaded labor categories, in accordance with the Position Qualifications in Section 4 of this attachment.

*CY = Contract Year

^HR = Hourly Rate: The above fully burdened labor rates include application of all indirect expenses and profit. These are not-to-exceed rates to be used for task order pricing purposes only for the Contractor labor hours. The Contractor may propose lower rates when pricing task orders.

Offeror's shall propose all direct labor categories and levels within each category anticipated to perform all non-standard services order requirements.

The Contractor shall provide all personnel, facilities, materials, and other necessary resources for the performance of special study task order requirements under this contract.

2. SUBCONTRACTOR (Name-TBP) FULLY-LOADED LABOR RATES (For All Task Orders):

The Prime Contractor shall not exceed the fully-loaded labor rates as specified below (loaded through Profit) for pricing the subcontractor labor hours on all task orders:

++Labor Categories

CY 2027

^HR Rate

CY 2028

HR Rate

CY 2029

HR Rate

CY 2030

HR Rate

CY 2031

HR Rate

CY 2032

HR Rate

++Labor Categories - The Offeror shall provide fully-loaded Subcontractor labor categories, in accordance with the Position Qualifications in Section 3 of this attachment.

^HR = Hourly Rate: The above fully burdened labor rates include application of all indirect expenses and profit. These are not-to-exceed fully-loaded rates to be used for task order pricing purposes only for the Subcontractor labor hours. The Contractor may propose lower subcontractor rates when pricing task orders.

3. POSITION QUALIFICATIONS (For All Prime and Subcontractor Labor Categories):

TBP

File details come from the government source that posted it. Updated .