Attachment N - L10 World Reference System - 3 Definition Rev.pdf

PDF 744 KB Posted

Attached to
Landsat 10 Spacecraft _ DRAFT RFP
Solicitation number
80GSFC26D0015
Issued by

About this file

This is a technical specification document defining the Landsat 10 Worldwide Reference System-3 (WRS-3), an indexing scheme for NASA's Landsat 10 spacecraft orbital ground tracks. The document provides the mathematical framework and computational algorithms for the WRS-3 grid system that catalogs and distributes Landsat imagery data.

The WRS-3 grid comprises 265 orbital paths by 248 rows covering Earth's complete surface over an 18-day acquisition cycle. Standard Landsat scenes are extracted around nominal scene-center coordinates with nominal dimensions of 168-km along-track and 164-km across-track, designed to provide approximately 3% overlap between adjacent scenes for continuous coverage. The system uses WGS84 geodetic coordinates and a 653-km orbital altitude specific to Landsat 10. Path numbers are fixed integers (1-265) based on orbital ground tracks, with row numbers potentially including fractional values (0.5 to 248.5) to allow along-track scene window adjustments. The document includes detailed mathematical formulas and computational algorithms for deriving WRS scene center latitude and longitude from input parameters, incorporating the spacecraft's sun-synchronous orbital characteristics and Earth's solar rotation rate. Key orbital parameters include a 97.9835-degree inclination, with Row 60 designated as the descending node at -65.2 degrees longitude (65.2 West). An attached Excel spreadsheet containing the complete scene center table provides lookup coordinates for all WRS-3 grid locations. The document, governed as a Configuration Management-controlled specification (L10-SYS-DESC-0018, Revision B), was released by NASA Goddard Space Flight Center on April 15, 2026.

View the file

Other files

File Type Posted
Exhibit 6 - L10 Past Performance Questionnaire R.pdf PDF
Attachment A - L10 Statement of Work (SOW).pdf PDF
Attachment D - L10 Spacecraft Interface Requirements Document (SCIRD).pdf PDF
Attachment F - L10 Observatory Environment Req Document (ObsERD)R.pdf PDF
Attachment O - L10 Lexicon.pdf PDF
Attachment P - L10 Acronym List.pdf PDF
Attachment T - L10 Major Payment Events Payment Schedule and Completion Criteria.pdf PDF
Attachment X DRD 4 - CITAR Report Template.xlsx XLSX spreadsheet
Enclosure 1 - L10 Mission Synopsis Rev.pdf PDF
Exhibit 2 - L10 Spacecraft and Observatory Environmental Testing Matrix Fill-in.pdf PDF
DRFP L10 80GSFC26R0015 Cover Letter Sgn.pdf PDF
Attachment K - L10 Space Environmental Req Document (LSERD).pdf PDF
Attachment L - L10 Analytical Math Model Definitions (LAMMD) Rev.pdf PDF
Attachment M - L10 Spacecraft Government Furnished Equipment Information List (SC GFEGFI).pdf PDF
Attachment Q - LandIS Simplified Mechanical Interface Control Drawing (MICD).pdf PDF
Attachment S - L10 Time and Materials Rate Matrices Rev.pdf PDF
Attachment V - L10 C-SCRM Plan.pdf PDF
Attachment X DRD 3 - CPIC DRD Template for IT Portfolio PPM Data Collection.xlsx XLSX spreadsheet
Attachment X DRD 3 - CPIC DRD.pdf PDF
Enclosure 4 - L10 Geometric Error Budget (GEB).pdf PDF
Exhibit 1 - L10 Pricing Template.xlsx XLSX spreadsheet
Exhibit 4 - L10 Gate Criteria Fill In R.pdf PDF
Attachment E - L10 Spacecraft to Ground Interface Req Document (SC to GND IRD) Rev.pdf PDF
Attachment G - L10 Spacecraft Simulator Req Document (SC Sim RD).pdf PDF
Attachment H - L10 Spacecraft Deliverable Items List (DIL).pdf PDF
Attachment J - L10 Radiation Environments Description (LRED) Rev.pdf PDF
Attachment R - L10 Spacecraft Contractor Standards.pdf PDF
Attachment U - L10 OCI Plan Rev.pdf PDF
Attachment W - Small Business Subcontracting Plan.pdf PDF
Attachment X - Non-Technical Contract Data Requirements List.pdf PDF
Attachment X DRD 1 - OCI Plan.pdf PDF
Attachment X DRD 2 - Security Requirements for Unclassified IT Resources DRD C-SCRM requirements.pdf PDF
Attachment X DRD 5 - CAIRIA DRD.pdf PDF
Enclosure 2 - L10 Observatory Quality Assurance Surveillance Plan.pdf PDF
Enclosure 3 - L10 Design Reference Case - DRC-18.pdf PDF
Enclosure 3 - L10 Design Reference Case - DRC-18 Definition.pdf PDF
Enclosure 5 - Geometric Budget (GEB) Support Presentation.pdf PDF
DRFP Landsat 10 80GSFC26R0015 Terms and Conditions.pdf PDF
Attachment B - L10 SC CDRL and DID Rev.pdf PDF
Attachment C - L10 Spacecraft Requirements Document (SC SRD).pdf PDF
Attachment I - L10 Payload to Launch Services Interface Description Doc (LS IDD) Rev.pdf PDF
Attachment X DRD 2 - NASA C-SCRM Plan Questionnaire.xlsx XLSX spreadsheet
Attachment X DRD 4 - CITAR DRD updated.pdf PDF
Attachment X DRD 6 - SCV Reporting.pdf PDF
Exhibit 3 - L10 Spacecraft Master Equipment List (MEL) Fill In.pdf PDF
Exhibit 5 - L10 Spacecraft Specifications Fill-in.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment No. N

Landsat 10 World Reference System - 3 Definition

RFP 80GSFC26R0015

National Aeronautics and Space Administration Goddard Space Flight Center

Landsat WRS-3 Definition L10-SYS-DESC-0018 Revision B ii

Landsat 10 Worldwide Reference System-3 (WRS-3) Definition Signature/Approval Page

Prepared by:

Electronic Signature in TDMS Approval Date in TDMS Chris Engebretson Date Acting Landsat 10 Chief Engineer, USGS EROS USGS/EROS Center

Approved by:

Cagatay Aymergen Date Landsat 10 Deputy Project Manager / Acting Observatory Manager

NASA/GSFC, Code 426

Charles Clark Date Landsat 10 Instrument Systems Engineer NASA/GSFC, Code 590

Phillip Driggers Date Landsat 10 Payload Technical Manager NASA/GSFC, Code 592

Ross Henry Date Landsat 10 Project Manager NASA/GSFC, Code 426

Evan Webb Date Landsat 10 Mission System Manager NASA/GSFC, Code 533 iii

CM Foreword This document is a Landsat 10 Project Configuration Management (CM)-controlled document.

Note: Prior to February 2026, the project name was Landsat Next (LNext).

For the purposes of configuration management, the prefixes “LNEXT” and “L10” are completely interchangeable. For example, LNEXT-MGMT-PLAN-0004 is the same as L10-MGMT-PLAN- 0004.

Changes to this document require prior approval of the applicable Configuration Control Board (CCB) Chairperson or designee. Proposed changes shall be submitted to the Landsat 10 CM Office (CMO), along with supportive material justifying the proposed change. Changes to this document will be made by complete revision.

Questions or comments concerning this document should be addressed to:

NASA/Goddard Space Flight Center Landsat 10 Project Office, Code 426 Attention: Configuration Management Office Greenbelt, Maryland 20771 iv

Change History Log v

Table of Contents SIGNATURE/APPROVAL PAGE ................................................................................................ II CM FOREWORD ..........................................................................................................................III CHANGE HISTORY LOG .......................................................................................................... IV

TABLE OF CONTENTS ................................................................................................................ V

LIST OF FIGURES ........................................................................................................................ V

LIST OF TABLES .......................................................................................................................... V

1.0 PURPOSE

1.1 WRS-3 Scene Definition

1.2 WRS-3 Path Definition

1.3 WRS-3 Row Definition

2.0 MATHEMATICAL DEFINITION OF THE WRS-3 GRID

2.1 WRS-3 Nominal Scene Center Computation Algorithm

3.0 REFERENCES

APPENDIX A: SCENE CENTER TABLE

APPENDIX B: ABBREVIATIONS AND ACRONYMS

List of Figures Figure 1.1-1 Image Interval Figure 2.1-1 WRS-3 Scene Center Calculations

List of Tables

Table 1.2-1 WRS-3 Path Time Sequence Table 2-1 WRS-3 Input Parameters

1.0 PURPOSE

The Landsat Worldwide Reference System-3 (WRS-3) provides an indexing scheme for the repeating pattern of orbital ground tracks traversed by the Landsat 10 spacecraft over its 18-day orbital repeat cycle. The previous two WRS grids (WRS-1 and WRS-2) were designed for the Landsat 1-9 missions which flew in a higher orbit. The current WRS-3 was designed for the 653-km orbit used by the later mission.

1.1 WRS-3 SCENE DEFINITION

Although the Landsat Instrument Suite (LandIS) imager collects continuous along-track swaths of data while operating, the data are cataloged and distributed as fixed-size along-track image segments referred to as scenes. Standard Landsat scenes are extracted around nominal scene-center coordinates and are sized to provide along-track overlap between adjacent scenes. Figure 1.1-1 shows how a continuous Landsat interval of data is segmented into overlapping scenes, based on the WRS grid, for cataloging and distribution. Using the WRS-3 orbital parameters listed in Table 2-1 and the LandIS instrument field of view requirement definition, for scenes the nominal along and across track dimensions are 168-km and 164-km respectively.

Figure 1.1-1 Image Interval

A continuous interval of imagery is logically subdivided into overlapping scenes.

1.2 WRS-3 PATH DEFINITION

The WRS indexes orbits (paths) and scene centers (rows) into a global grid system comprising 265 paths by 248 rows. Since adjacent Landsat scenes overlap, indexing the location of an acquisition by latitude/longitude can be ambiguous and, in any event, provides little insight into where the scene falls in the 18-day acquisition cycle. The path/row notation provides a standard designator for every nominal scene center that can be readily related to both the 18-day acquisition cycle and longitude and latitude coordinates. Like the previous Landsat WRS definitions WRS-3 also provides a target data collection pattern ensuring that nominal Earth targets are observed using common viewing geometry, independent of the collecting spacecraft.

The Landsat orbital altitude and repeat cycle dictate that the 18-day acquisition cycle is completed in 265 orbits. The repeating ground tracks corresponding to the 265 orbits that make up a complete acquisition cycle are numbered sequentially with the numbers increasing to the west. The number of unique ground tracks means that adjacent ground tracks are approximately 151-km apart at the equator. The Earth’s rotation during each revolution of the spacecraft in its sun-synchronous orbit causes consecutive orbits to be approximately 2719-km apart at the equator. Thus, each orbit advances 18 paths (2719/151), causing each WRS path to be traversed once per 18-day cycle in an interleaved pattern. Table 1.2-1 shows the time sequence of WRS-3 paths over an 18-day acquisition cycle.

Table 1.2-1 WRS-3 Path Time Sequence

1.3 WRS-3 ROW DEFINITION

Segmenting each Landsat orbit into 248 equally spaced scenes, covering both the day and night sides of the Earth, leads to a set of scene centers separated by just under 162-km along track.

This definition leads to approximately 3% (1.5% at the top and 1.5% at the bottom) of the scene in the along track dimension overlapping between adjacent scenes. This 3% represents a total overlap between adjacent scenes, including the scene acquired prior and after a given scene’s path and row. The WRS row system is indexed so that the scene center at the orbital descending node is row 60, with the row numbers increasing in the along-track direction. Note that unlike the path numbers which, being fixed to the orbital ground tracks, must be integers, fractional row numbers are possible by shifting the scene window along-track relative to the fixed WRS-3 scene centers.

2.0 MATHEMATICAL DEFINITION OF THE WRS-3 GRID

The WRS-3 grid is related to WGS84 geodetic latitude/longitude coordinates using the nominal Landsat orbital parameters listed in Table 2-1. The procedure for computing the WRS scene center is described below. Table 2-1 shows the input parameters used in the subsequent WRS scene center computations.

Table 2-1 WRS-3 Input Parameters

Parameter Value Earth Parameters Semi-Major Axis (WGS84) 6378137.0 m Semi-Minor Axis (WGS84) 6356752.314 m Orbit Parameters Inclination 97.9835 degrees WRS Parameters Number of Paths 265 Number of Rows 248 WRS Repeat Cycle 18 days Descending Node Row 60 Longitude of Path 001, Row 060 -65.2 degrees (65.2 West) Scene Parameters Path Integer 1-265 Row Float 0.5 < R < 248.5

The unknown values to be computed are:

WRS Scene Center Latitude (θd ) WRS Scene Center Longitude (λd)

2.1 WRS-3 NOMINAL SCENE CENTER COMPUTATION ALGORITHM

Figure 2.1-1 WRS-3 Scene Center Calculations

Convert input angles to radians:

ξ = π / 180 * ξ λ001 = π / 180 * λ001 Compute the Earth’s angular rotation rate:

Note: These computations use the solar rotation rate, rather than the sidereal rate as called for in the General Electric Landsat D Program Information Release (PIR) that was first described the Worldwide Reference System-2, in order to account for the orbital precession which is designed to make the orbit sun synchronous. Thus, the apparent Earth angular velocity is the inertial (sidereal) angular velocity plus the mean precession rate which, by design, is equal to the solar angular rate.

Compute the spacecraft’s angular rotation rate:

Compute the central travel angle from the descending node:

Compute the WRS geocentric latitude:

Compute the longitude of Row 60 for this Path:

Compute the WRS longitude:

Make sure the longitude is in the range +/-π:

While ( λd > π ) λd = λd - 2 π

While ( λd < - π ) λd = λd + 2 π Convert the WRS geocentric latitude to geodetic latitude:

Convert angles to degrees:

θd = θd * 180 / π λd = λd * 180 / π Round WRS lat/long off to the nearest whole arc minute:

θd = round( θd*60 ) / 60 λd = round( λd*60 ) / 60 Return the results:

WRS Latitude θd WRS Longitude λd

3.0 REFERENCES

Landsat 8 Science Data Users Handbook, https://www.usgs.gov/landsat-missions/landsat- 8-data-users-handbook. Accessed April 18, 2022.

Landsat 8 Level Zero Reformatted Data Format Control Book.

https://www.usgs.gov/media/files/landsat-8-level-0-reformatted-data-format-control-book. Accessed April 18, 2022.

DMA TR 8350.2-A, DMA Technical Report, Supplement to Department of Defense World Geodetic System 1984 Technical Report, prepared by the Defense Mapping Agency WGS84 Development Committee, dated December 1, 1987.

https://apps.dtic.mil/sti/pdfs/ADA280358.pdf. Accessed April 18, 2022.

Landsat 8-9 Calibration Validation Algorithm Description Document.

https://www.usgs.gov/media/files/landsat-8-9-calibration-validation-algorithm-description-document. Accessed April 18, 2022.

Appendix A: Scene Center Table

The Scene Center Table is attached to this document.

If viewing this document in Word, right click on the Excel Icon and choose "Macro Enabled Worksheet Object" > Open If viewing this document in a PDF, to open the Scene Center table:

1. Ensure the PDF is open in the Adobe app, not in a browser

2. Click the arrow to expand the sidebar, if needed

3. Click the paper clip icon

4. Double-click the attachment. Note: Some users may need to download the attachment in order to open it depending on security settings.

Appendix B: Abbreviations and Acronyms Acronym/Abbreviation Definition in Inch km Kilometer LandIS Landsat Instrument Suite m Meter PIR Program Information Release TR Technical Report WGS84 World Geodetic System 1984, as defined by NIMA TR8350.2 WRS Worldwide Reference System WRS-1 Worldwide Reference System-1 WRS-2 Worldwide Reference System-2 WRS-3 Worldwide Reference System-3 This Acronyms List was generated from the Landsat 10 Common Acronyms List (L10-MGMT-DESC-0006) Draft Rev E.

File details come from the government source that posted it. Updated .