This document is a Deliverable Items List (DIL) for the Landsat 10 Spacecraft, issued by NASA's Goddard Space Flight Center under RFP 80GSFC26R0015. The DIL, designated L10-SC-LIST-0008 Revision C, was released on March 5, 2026, and has been reviewed and determined not to be subject to export control.

The document specifies hardware deliverables required from the spacecraft contractor, organized in a structured table format. Key deliverable items include: one Observatory unit with associated acceptance documentation to be delivered after On-Orbit Acceptance Review; two Observatory Operational Simulators (OOpS) due three months before Spacecraft Comprehensive Performance Test; five Command and Telemetry Spacecraft Simulators (CTSS) with three units for ground stations, one for the Mission Operations Center, and one for maintenance and repair testing, due three months after Spacecraft Critical Design Review and site acceptance; three Spacecraft Software Simulators (SoftSim) due six months before CPT; one RF Suitcase Simulator for RF compatibility testing; one Launch Vehicle Interface Simulator positioned at the spacecraft contractor facility; and one set of Operational Development Tools including telemetry monitoring tools. All documentation, data, and models per the Contract Data Requirements List and Statement of Work will be delivered to GSFC in Greenbelt, Maryland. The deliverables are referenced to specific sections of the Statement of Work (SOW 4.2 through SOW 4.7.1) for detailed requirements and specifications.

View the file

Other files

File Type Posted
Exhibit 6 - L10 Past Performance Questionnaire R.pdf PDF
DRFP L10 80GSFC26R0015 Cover Letter Sgn.pdf PDF
Attachment K - L10 Space Environmental Req Document (LSERD).pdf PDF
Attachment L - L10 Analytical Math Model Definitions (LAMMD) Rev.pdf PDF
Attachment M - L10 Spacecraft Government Furnished Equipment Information List (SC GFEGFI).pdf PDF
Attachment N - L10 World Reference System - 3 Definition Rev.pdf PDF
Attachment Q - LandIS Simplified Mechanical Interface Control Drawing (MICD).pdf PDF
Attachment S - L10 Time and Materials Rate Matrices Rev.pdf PDF
Attachment V - L10 C-SCRM Plan.pdf PDF
Attachment X DRD 3 - CPIC DRD Template for IT Portfolio PPM Data Collection.xlsx XLSX spreadsheet
Attachment X DRD 3 - CPIC DRD.pdf PDF
Enclosure 4 - L10 Geometric Error Budget (GEB).pdf PDF
Exhibit 1 - L10 Pricing Template.xlsx XLSX spreadsheet
Exhibit 4 - L10 Gate Criteria Fill In R.pdf PDF
Attachment A - L10 Statement of Work (SOW).pdf PDF
Attachment D - L10 Spacecraft Interface Requirements Document (SCIRD).pdf PDF
Attachment F - L10 Observatory Environment Req Document (ObsERD)R.pdf PDF
Attachment O - L10 Lexicon.pdf PDF
Attachment P - L10 Acronym List.pdf PDF
Attachment T - L10 Major Payment Events Payment Schedule and Completion Criteria.pdf PDF
Attachment X DRD 4 - CITAR Report Template.xlsx XLSX spreadsheet
Enclosure 1 - L10 Mission Synopsis Rev.pdf PDF
Exhibit 2 - L10 Spacecraft and Observatory Environmental Testing Matrix Fill-in.pdf PDF
Attachment E - L10 Spacecraft to Ground Interface Req Document (SC to GND IRD) Rev.pdf PDF
Attachment G - L10 Spacecraft Simulator Req Document (SC Sim RD).pdf PDF
Attachment J - L10 Radiation Environments Description (LRED) Rev.pdf PDF
Attachment R - L10 Spacecraft Contractor Standards.pdf PDF
Attachment U - L10 OCI Plan Rev.pdf PDF
Attachment W - Small Business Subcontracting Plan.pdf PDF
Attachment X - Non-Technical Contract Data Requirements List.pdf PDF
Attachment X DRD 1 - OCI Plan.pdf PDF
Attachment X DRD 2 - Security Requirements for Unclassified IT Resources DRD C-SCRM requirements.pdf PDF
Attachment X DRD 5 - CAIRIA DRD.pdf PDF
Enclosure 2 - L10 Observatory Quality Assurance Surveillance Plan.pdf PDF
Enclosure 3 - L10 Design Reference Case - DRC-18.pdf PDF
Enclosure 3 - L10 Design Reference Case - DRC-18 Definition.pdf PDF
Enclosure 5 - Geometric Budget (GEB) Support Presentation.pdf PDF
DRFP Landsat 10 80GSFC26R0015 Terms and Conditions.pdf PDF
Attachment B - L10 SC CDRL and DID Rev.pdf PDF
Attachment C - L10 Spacecraft Requirements Document (SC SRD).pdf PDF
Attachment I - L10 Payload to Launch Services Interface Description Doc (LS IDD) Rev.pdf PDF
Attachment X DRD 2 - NASA C-SCRM Plan Questionnaire.xlsx XLSX spreadsheet
Attachment X DRD 4 - CITAR DRD updated.pdf PDF
Attachment X DRD 6 - SCV Reporting.pdf PDF
Exhibit 3 - L10 Spacecraft Master Equipment List (MEL) Fill In.pdf PDF
Exhibit 5 - L10 Spacecraft Specifications Fill-in.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment No. H

Landsat 10 Spacecraft Deliverable Items List (DIL)

RFP 80GSFC26R0015

National Aeronautics and Space Administration Goddard Space Flight Center

Landsat 10 SC DIL L10-SC-LIST-0008 Revision C ii Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

Landsat 10 Spacecraft Deliverable Items List (SC DIL) Signature/Approval Page

Prepared by:

Electronic Signature in TDMS Approval Date in TDMS Charles Bacon Date Landsat 10 Observatory Manager NASA/GSFC, Code 429

Approved by:

Cagatay Aymergen Date Acting CCB Chair / Landsat 10 Deputy Project Manager

NASA/GSFC, Code 426

Charles Bacon Date Landsat 10 Observatory Manager NASA/GSFC, Code 429

Evan Webb Date Landsat 10 Mission System Manager NASA/GSFC, Code 599 iii Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

CM Foreword This document is a Landsat 10 Project Configuration Management (CM)-controlled document.

Note: Prior to February 2026, the project name was Landsat Next (LNext).

For the purposes of configuration management, the prefixes “LNEXT” and “L10” are completely interchangeable. For example, LNEXT-MGMT-PLAN-0004 is the same as L10-MGMT-PLAN- 0004.

Changes to this document require prior approval of the applicable Configuration Control Board (CCB) Chairperson or designee. Proposed changes shall be submitted to the Landsat 10 CM Office (CMO), along with supportive material justifying the proposed change. Changes to this document will be made by complete revision.

Questions or comments concerning this document should be addressed to:

NASA/Goddard Space Flight Center Landsat 10 Project Office, Code 426 Attention: Configuration Management Office Greenbelt, Maryland 20771 iv Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

Change History Log v Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

Table of Contents SIGNATURE/APPROVAL PAGE ................................................................................................ II CM FOREWORD ..........................................................................................................................III CHANGE HISTORY LOG .......................................................................................................... IV

TABLE OF CONTENTS ................................................................................................................ V

LIST OF FIGURES ........................................................................................................................ V

LIST OF TABLES .......................................................................................................................... V

List of Figures No table of contents entries found.

List of Tables No table of contents entries found.

Use or disclosure of data contained on this page is subject to the restriction(s) on the title page of this document.

A. Hardware

Item No. Description Qty Delivery Date Place of Acceptance

Reference

A-1 Observatory (with associated acceptance documentation)

1 After On-Orbit Acceptance Review

On-Orbit Statement of Work (SOW)

4.2 A-2 Observatory

Operational Simulator (OOpS)

2 SC CPT - 3 months Landsat 10 Mission

Operations Center (MOC)

SOW 4.4

A-3 Command and Telemetry Spacecraft Simulator (CTSS)

5 SC CDR + 3 Months After Site Acceptance

Test and Review

3 GND Station

1 MOC

1 MR Testing

SOW 4.4

A-4 Spacecraft Software Simulator (SoftSim)

3 SC CPT - 6 months Landsat 10 Mission

Operations Center

SOW 4.4

A-5 RF Suitcase Simulator 1 RF Compat Test + 3 months

After Site Acceptance Test and Review

EROS/LGS SOW 4.4.5

A-6 Launch Vehicle Interface Simulator

(LVIS)

1 Launch Vehicle Simulator Test – 3 months After Acceptance Test and Review

In-place at Spacecraft Contractor

SOW 4.4.4

A-7 Operational Development Tools (including Telemetry Monitoring Tools)

1 FSW Release supporting first SC

Comprehensive Performance Test (CPT) + 3 months

Landsat 10 Mission

Operations Center

SOW 4.7.1

A-8 Reserved A-9 Documentation, data, models, etc. per the Contract Data Requirements List (CDRLs), and SOW

Various As Specified in Documentation

GSFC

Greenbelt, MD

File details come from the government source that posted it. Updated .