Electrical_Plan_by_Location.pdf

PDF 576 KB Posted

Attached to
Scoreboard Replacement Project
Solicitation number
25-1038
Issued by
Santa Clara County, California

About this file

This electrical plan document, prepared for the City of Milpitas, provides detailed specifications for scoreboard replacement and electrical installation work across three municipal park locations: Dixon Landing Park, Milpitas Sports Center, and Cardoza Park. The project encompasses installation of new Daktronics scoreboards (BA-624 and BA-2014 models) at seven total locations, with each installation requiring new electrical disconnects, conduit and liquid-tight connections, and ground rods. Specific work includes installation of Dak Score/MX-1 interface boxes at electrical panels located at each facility and, at Cardoza Park, installation of a new Christy box requiring approximately five feet of trenching. The project timeline extends 75 calendar days from the Notice to Proceed, with a mandatory pre-bid conference scheduled for May 22, 2025, at 10:00 am and electronic bids due by June 17, 2025, at 12:00 pm Pacific Time. The City will provide all seven scoreboards and necessary building permits to the selected contractor.

The electrical specifications require compliance with California Electrical Code (CEC) standards, including conductor sizing per CEC Table 310.16 with wet service listing and conduit sizing per CEC Chapter 9 Tables 4 and 5. All new electrical disconnects must be NEMA 3R rated (outdoor/rainproof) and sized appropriately for scoreboard electrical loads. Load determinations must account for wind load cases B and C from ASCE 7-16 Figure 29.3-1, with Case C specifically required for the larger 20'-0" W x 8'-6" H BA-2014 scoreboards at Milpitas Sports Center and Cardoza Park. The work allows reuse of existing overcurrent protection, conduits, and conductors from panels to new disconnects. Contractors must hold C-45 and C-10 licensing classifications, perform at least 50% of work directly with up to 50% subcontracting permitted, maintain California Secretary of State registration, and comply with prevailing wage requirements. Performance and payment bonds equal to 100% of contract value are required, along with proof of insurance and non-collusion declarations.

View the file

Other files

File Type Posted
Scoreboard_Replacement_Project.pdf PDF
Scoreboard_Replacement_Project.pdf PDF
Scope_of_Work_and_Specifications_Final_Draft_05.01.25.docx DOCX document
Scope_of_Work_and_Specifications_Final_Draft_05.01.25.docx DOCX document
Demolition_Plan_by_Location.pdf PDF
Demolition_Plan_by_Location.pdf PDF
Engineering_Drawings_and_Pre-Check_Documents_5.2.25.pdf PDF
Engineering_Drawings_and_Pre-Check_Documents_5.2.25.pdf PDF
Electrical_Plan_by_Location.pdf PDF
Exemplar_Construction_Agreement.pdf PDF
Exemplar_Construction_Agreement.pdf PDF
Milpitas_PO_Terms_and_Conditions.pdf PDF
Milpitas_PO_Terms_and_Conditions.pdf PDF
Milpitas_Sports_Center_SO337360_calcs_SS_2024-04-24.pdf PDF
Milpitas_Sports_Center_SO337360_calcs_SS_2024-04-24.pdf PDF
Exhibit_B_Cardoza_Park_Demolition_Plan.docx DOCX document
Exhibit_B_Cardoza_Park_Electrical_Plan.docx DOCX document
Exhibit_B_Title_Sheet_-_MSC_Scoreboard_Replacement_Project.docx DOCX document
Exhibit_B_Milpitas_Sports_Center_Demolition_Plan.docx DOCX document
Exhibit_B_Title_Sheet_-_MSC_Scoreboard_Replacement_Project.docx DOCX document
Scoreboard_Replacement_Project_Specifications_6-3-24.docx DOCX document
Exhibit_B_Cardoza_Park_Demolition_Plan.docx DOCX document
Exhibit_B_Dixon_Landing_Park_Demolition_Plan.docx DOCX document
Exhibit_B_Milpitas_Sports_Center_Demolition_Plan.docx DOCX document
IFB_Submittal_Forms_to_Complete.pdf PDF
Exhibit_B_Dixon_Landing_Park_Demolition_Plan.docx DOCX document
Exhibit_B_Dixon_Landing_Park_Electrical_Plan.docx DOCX document
Exhibit_B_Milpitas_Sports_Center_Electrical_Plan.docx DOCX document
Exhibit_B_Dixon_Landing_Park_Electrical_Plan.docx DOCX document
Exhibit_B_Milpitas_Sports_Center_Electrical_Plan.docx DOCX document
Exhibit_B_Title_Sheet-_Dixon_Landing_Park_Scoreboard_Replacement_Project.docx DOCX document
Scoreboard_Replacement_Project_Specifications_6-3-24.docx DOCX document
Exhibit_B_Cardoza_Park_Electrical_Plan.docx DOCX document
Exhibit_B_Title_Sheet-_Dixon_Landing_Park_Scoreboard_Replacement_Project.docx DOCX document
IFB_Submittal_Forms_to_Complete.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Dixon Field 3 Scoreboard

Install new BA-624 scoreboard, install new electrical disconnect, install new conduit and liquid tight from disconnect to score board, install (1) new ground rod.

Dixon Field 2 Scoreboard

Install new BA-624 scoreboard, install new electrical disconnect, replace existing conduit and liquid tight from disconnect to score board, install (1) new ground rod.

Dixon Field 1 Scoreboard

Install new BA-2014 scoreboard, install new electrical disconnect, replace existing conduit and liquid tight from disconnect to score board, install (1) new ground rod.

Electrical panel located in utility closet behind snack shack

Install Dak Score/MX-1 interface box into existing equipment cage and connect to existing power

Notes:

1. New scoreboards electrical loads are equal to or less than those of the existing boards being removed.

2. Over current protection, conduits and conductors from the panel to the new disconnects are existing to be re-used.

3. New disconnect shall be NEMA 3R (outdoor/rainproof) and shall be sized no smaller than the electrical load of the scoreboard.

4. Conductors shall be sized per CEC Table 310.16 and shall be listed for wet service.

5. Conduits shall be sized per CEC Chapter 9 Tables 4 & 5.

6. The load determination shall also consider Case B and Case C from ASCE 7-16 Figure 29.3-1. Case B required for all scoreboards, and Case C required for the 20’-0” W x 8’-6” H scoreboard (BA-2014).

ATTACHMENT F : ELECTRICAL PLAN BY LOCATION

DIXON LANDING PARK

Milmont Dr. & Jurgens Dr.

MILPITAS SPORTS CENTER

1325 E CALAVERAS BLVD

One Major (west side) and One

Minor (east side) Scoreboards

(total of two) Install new

(BA624) scoreboards. Install new electrical disconnects, install new conduits and liquid tight from disconnects to score boards. Install (1) new ground rod.

Senior Scoreboard Install new (BA2014) scoreboard, install new electrical disconnect, install new conduit and liquid tight from disconnect to score board. Install

(1) new ground rod.

Sports Center Field electrical panel located between football field and snack shack.

Dak Score/MX-1 interface box to be installed in existing equipment cage and connect to existing power.

Dak Score/MX-1 interface box to be installed in existing equipment cage and connect to existing power.

Notes:

1. New scoreboards electrical loads are equal to or less than those of the existing boards being removed.

2. Over current protection, conduits and conductors from the panel to the new disconnects are existing to be re-used.

3. New disconnect shall be NEMA 3R (outdoor/rainproof) and shall be sized no smaller than the electrical load of the scoreboard.

4. Conductors shall be sized per CEC Table 310.16 and shall be listed for wet service.

5. Conduits shall be sized per CEC Chapter 9 Tables 4 & 5.

6. The load determination shall also consider Case B and Case C from ASCE 7-16 Figure 29.3-1. Case B required for all scoreboards, and

Case C required for the 20’-0” W x 8’-6” H scoreboard (BA2014).

CARDOZA PARK

1356 Kennedy Dr

Cardoza Scoreboard Install new BA2014 scoreboard. Install new electrical disconnect, install new conduit and liquid tight from disconnect to score board, install (1) new ground rod, install one new Christy box. (Christy box installation will require approx. 5’ long trench from the Christy box to the score board support). Repair exposed cable at the base of the scoreboard.

Cardoza Field electrical panel located behind softball field

Dak Score/MX-1 interface box to be installed in existing equipment cage and connect to existing power.

Notes:

1. New scoreboards electrical loads are equal to or less than those of the existing boards being removed.

2. Over current protection, conduits and conductors from the panel to the new disconnects are existing to be re-used.

3. New disconnect shall be NEMA 3R (outdoor/rainproof) and shall be sized no smaller than the electrical load of the scoreboard.

4. Conductors shall be sized per CEC Table 310.16 and shall be listed for wet service.

5. Conduits shall be sized per CEC Chapter 9 Tables 4 & 5.

6. The load determination shall also consider Case B and Case C from ASCE 7-16 Figure 29.3-1. Case C required for the 20’-0” W x 8’-6” H scoreboard (BA2014).

Exhibit_B_Dixon_Landing_Park_Electrical_Plan
Exhibit_B_Milpitas_Sports_Center_Electrical_Plan
Exhibit_B_Cardoza_Park_Electrical_Plan

File details come from the government source that posted it. Updated .