The document is a demolition plan for Dixon Landing Park in Milpitas, California, specifically detailing the removal of scoreboards from three fields (Dixon Field 1, 2, and 3). The City of Milpitas is seeking a qualified contractor to remove existing scoreboards, including electrical disconnects, supporting structures, and footings for all three fields. The project involves complete removal of scoreboard infrastructure, with void areas to be filled with engineered slurry fill to match existing grade levels. This demolition plan is part of a broader Scoreboard Replacement Project that includes installing 7 new scoreboards across 3 city locations.
The contract allows for up to 50% of work to be subcontracted, with the prime contractor required to perform at least 50% of the work directly. The City will provide all 7 scoreboards with top and bottom ID panels and necessary building permits. Contractors are expected to evaluate site access, verify site conditions, and incorporate observations from a mandatory pre-bid conference into their bid response. The procurement method is an Invitation for Bid (IFB), indicating a competitive bidding process where the city seeks comprehensive demolition and installation services for the scoreboard replacement project.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIXON LANDING PARK
DEMOLITION PLAN
Dixon Field 2 Scoreboard Remove scoreboard, remove electrical disconnect, remove existing scoreboard supporting structure and remove footings full and complete depth.
Dixon Field 3 Scoreboard Remove scoreboard, remove electrical disconnect, remove existing scoreboard supporting structure and remove footings full and complete depth.
Note: Void left from removal of existing footings to be filled with engineered slurry fill to level of existing grade.
Dixon Field 1 Scoreboard Remove scoreboard, remove electrical disconnect, remove existing scoreboard supporting structure and remove footings full and complete depth.