Exhibit_B_Dixon_Landing_Park_Demolition_Plan.docx

DOCX document 1 MB Posted

Attached to
Scoreboard Replacement Project
Solicitation number
25-1038
Issued by
Santa Clara County, California

About this file

The document is a demolition plan for Dixon Landing Park in Milpitas, California, specifically detailing the removal of scoreboards from three fields (Dixon Field 1, 2, and 3). The City of Milpitas is seeking a qualified contractor to remove existing scoreboards, including electrical disconnects, supporting structures, and footings for all three fields. The project involves complete removal of scoreboard infrastructure, with void areas to be filled with engineered slurry fill to match existing grade levels. This demolition plan is part of a broader Scoreboard Replacement Project that includes installing 7 new scoreboards across 3 city locations.

The contract allows for up to 50% of work to be subcontracted, with the prime contractor required to perform at least 50% of the work directly. The City will provide all 7 scoreboards with top and bottom ID panels and necessary building permits. Contractors are expected to evaluate site access, verify site conditions, and incorporate observations from a mandatory pre-bid conference into their bid response. The procurement method is an Invitation for Bid (IFB), indicating a competitive bidding process where the city seeks comprehensive demolition and installation services for the scoreboard replacement project.

View the file

Other files

File Type Posted
Scoreboard_Replacement_Project.pdf PDF
Scoreboard_Replacement_Project.pdf PDF
Scope_of_Work_and_Specifications_Final_Draft_05.01.25.docx DOCX document
Scope_of_Work_and_Specifications_Final_Draft_05.01.25.docx DOCX document
Demolition_Plan_by_Location.pdf PDF
Demolition_Plan_by_Location.pdf PDF
Engineering_Drawings_and_Pre-Check_Documents_5.2.25.pdf PDF
Engineering_Drawings_and_Pre-Check_Documents_5.2.25.pdf PDF
Electrical_Plan_by_Location.pdf PDF
Electrical_Plan_by_Location.pdf PDF
Exemplar_Construction_Agreement.pdf PDF
Exemplar_Construction_Agreement.pdf PDF
Milpitas_PO_Terms_and_Conditions.pdf PDF
Milpitas_PO_Terms_and_Conditions.pdf PDF
Milpitas_Sports_Center_SO337360_calcs_SS_2024-04-24.pdf PDF
Milpitas_Sports_Center_SO337360_calcs_SS_2024-04-24.pdf PDF
Exhibit_B_Cardoza_Park_Demolition_Plan.docx DOCX document
Exhibit_B_Milpitas_Sports_Center_Demolition_Plan.docx DOCX document
IFB_Submittal_Forms_to_Complete.pdf PDF
Exhibit_B_Dixon_Landing_Park_Demolition_Plan.docx DOCX document
Exhibit_B_Dixon_Landing_Park_Electrical_Plan.docx DOCX document
Exhibit_B_Milpitas_Sports_Center_Electrical_Plan.docx DOCX document
Exhibit_B_Cardoza_Park_Demolition_Plan.docx DOCX document
Exhibit_B_Cardoza_Park_Electrical_Plan.docx DOCX document
Exhibit_B_Title_Sheet_-_MSC_Scoreboard_Replacement_Project.docx DOCX document
Exhibit_B_Milpitas_Sports_Center_Demolition_Plan.docx DOCX document
Exhibit_B_Title_Sheet_-_MSC_Scoreboard_Replacement_Project.docx DOCX document
Scoreboard_Replacement_Project_Specifications_6-3-24.docx DOCX document
Exhibit_B_Dixon_Landing_Park_Electrical_Plan.docx DOCX document
Exhibit_B_Milpitas_Sports_Center_Electrical_Plan.docx DOCX document
Exhibit_B_Title_Sheet-_Dixon_Landing_Park_Scoreboard_Replacement_Project.docx DOCX document
Scoreboard_Replacement_Project_Specifications_6-3-24.docx DOCX document
Exhibit_B_Cardoza_Park_Electrical_Plan.docx DOCX document
Exhibit_B_Title_Sheet-_Dixon_Landing_Park_Scoreboard_Replacement_Project.docx DOCX document
IFB_Submittal_Forms_to_Complete.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIXON LANDING PARK

DEMOLITION PLAN

Dixon Field 2 Scoreboard Remove scoreboard, remove electrical disconnect, remove existing scoreboard supporting structure and remove footings full and complete depth.

Dixon Field 3 Scoreboard Remove scoreboard, remove electrical disconnect, remove existing scoreboard supporting structure and remove footings full and complete depth.

Note: Void left from removal of existing footings to be filled with engineered slurry fill to level of existing grade.

Dixon Field 1 Scoreboard Remove scoreboard, remove electrical disconnect, remove existing scoreboard supporting structure and remove footings full and complete depth.

image1.png

File details come from the government source that posted it. Updated .