The document is an Electrical Plan by Location for the City of Milpitas' Scoreboard Replacement Project, covering three municipal park locations: Dixon Landing Park, Milpitas Sports Center, and Cardoza Park. The project involves installing seven new scoreboards with associated electrical infrastructure, including new electrical disconnects, conduits, ground rods, and Dak Score/MX-1 interface boxes. Each location requires specific installation tasks: Dixon Landing Park needs three scoreboards (BA-624 and BA-2014 models), Milpitas Sports Center requires two major/minor scoreboards and a senior scoreboard, and Cardoza Park needs one scoreboard with additional requirements like a Christy box installation and cable repair.
The project specifications detail precise electrical requirements, including using NEMA 3R (outdoor/rainproof) disconnects sized appropriately for each scoreboard's electrical load, conductors sized per CEC Table 310.16, and conduits sized per CEC Chapter 9 Tables. The electrical load for new scoreboards must be equal to or less than existing boards, and current protection, conduits, and conductors from existing panels can be re-used. The load determination must consider Case B and Case C requirements from ASCE 7-16 Figure 29.3-1, with specific considerations for the 20'-0" W x 8'-6" H scoreboards. The City will provide the scoreboards and building permits, while the contractor is responsible for installation, site evaluation, and performing at least 50% of the work directly.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dixon Field 3 Scoreboard
Install new BA-624 scoreboard, install new electrical disconnect, install new conduit and liquid tight from disconnect to score board, install (1) new ground rod.
Dixon Field 2 Scoreboard
Install new BA-624 scoreboard, install new electrical disconnect, replace existing conduit and liquid tight from disconnect to score board, install (1) new ground rod.
Dixon Field 1 Scoreboard
Install new BA-2014 scoreboard, install new electrical disconnect, replace existing conduit and liquid tight from disconnect to score board, install (1) new ground rod.
Electrical panel located in utility closet behind snack shack
Install Dak Score/MX-1 interface box into existing equipment cage and connect to existing power
Notes:
1. New scoreboards electrical loads are equal to or less than those of the existing boards being removed.
2. Over current protection, conduits and conductors from the panel to the new disconnects are existing to be re-used.
3. New disconnect shall be NEMA 3R (outdoor/rainproof) and shall be sized no smaller than the electrical load of the scoreboard.
4. Conductors shall be sized per CEC Table 310.16 and shall be listed for wet service.
5. Conduits shall be sized per CEC Chapter 9 Tables 4 & 5.
6. The load determination shall also consider Case B and Case C from ASCE 7-16 Figure 29.3-1. Case B required for all scoreboards, and Case C required for the 20’-0” W x 8’-6” H scoreboard (BA-2014).
ATTACHMENT F : ELECTRICAL PLAN BY LOCATION
DIXON LANDING PARK
Milmont Dr. & Jurgens Dr.
MILPITAS SPORTS CENTER
1325 E CALAVERAS BLVD
One Major (west side) and One
Minor (east side) Scoreboards
(total of two) Install new
(BA624) scoreboards. Install new electrical disconnects, install new conduits and liquid tight from disconnects to score boards. Install (1) new ground rod.
Senior Scoreboard Install new (BA2014) scoreboard, install new electrical disconnect, install new conduit and liquid tight from disconnect to score board. Install
(1) new ground rod.
Sports Center Field electrical panel located between football field and snack shack.
Dak Score/MX-1 interface box to be installed in existing equipment cage and connect to existing power.
Dak Score/MX-1 interface box to be installed in existing equipment cage and connect to existing power.
Notes:
1. New scoreboards electrical loads are equal to or less than those of the existing boards being removed.
2. Over current protection, conduits and conductors from the panel to the new disconnects are existing to be re-used.
3. New disconnect shall be NEMA 3R (outdoor/rainproof) and shall be sized no smaller than the electrical load of the scoreboard.
4. Conductors shall be sized per CEC Table 310.16 and shall be listed for wet service.
5. Conduits shall be sized per CEC Chapter 9 Tables 4 & 5.
6. The load determination shall also consider Case B and Case C from ASCE 7-16 Figure 29.3-1. Case B required for all scoreboards, and
Case C required for the 20’-0” W x 8’-6” H scoreboard (BA2014).
CARDOZA PARK
1356 Kennedy Dr
Cardoza Scoreboard Install new BA2014 scoreboard. Install new electrical disconnect, install new conduit and liquid tight from disconnect to score board, install (1) new ground rod, install one new Christy box. (Christy box installation will require approx. 5’ long trench from the Christy box to the score board support). Repair exposed cable at the base of the scoreboard.
Cardoza Field electrical panel located behind softball field
Dak Score/MX-1 interface box to be installed in existing equipment cage and connect to existing power.
Notes:
1. New scoreboards electrical loads are equal to or less than those of the existing boards being removed.
2. Over current protection, conduits and conductors from the panel to the new disconnects are existing to be re-used.
3. New disconnect shall be NEMA 3R (outdoor/rainproof) and shall be sized no smaller than the electrical load of the scoreboard.
4. Conductors shall be sized per CEC Table 310.16 and shall be listed for wet service.
5. Conduits shall be sized per CEC Chapter 9 Tables 4 & 5.
6. The load determination shall also consider Case B and Case C from ASCE 7-16 Figure 29.3-1. Case C required for the 20’-0” W x 8’-6” H scoreboard (BA2014).
| Exhibit_B_Dixon_Landing_Park_Electrical_Plan |
| Exhibit_B_Milpitas_Sports_Center_Electrical_Plan |
| Exhibit_B_Cardoza_Park_Electrical_Plan |
File details come from the government source that posted it. Updated .