Exhibit_B_Dixon_Landing_Park_Electrical_Plan.docx
DOCX document 1 MB Posted
- Attached to
- Scoreboard Replacement Project
- Solicitation number
- 25-1038
- Issued by
- Santa Clara County, California
About this file
The document is an electrical plan for the Dixon Landing Park Scoreboard Replacement Project, issued by the City of Milpitas, California. The project involves installing new scoreboards at three Dixon Fields, specifically replacing existing scoreboards with BA-2014 and BA-624 models. The electrical plan provides detailed technical specifications for the installation, including requirements for electrical disconnects, conduits, conductors, and ground rods. Each field's scoreboard installation involves specific electrical work, such as installing new disconnects, replacing existing conduits, and implementing appropriate grounding measures.
The project is part of a broader City of Milpitas initiative to upgrade sports field infrastructure, with the city purchasing and providing seven new scoreboards and necessary building permits. The contractor is required to perform demolition and installation services, with the ability to subcontract up to 50% of the work while maintaining direct responsibility for at least half of the project. The electrical plan emphasizes compliance with electrical codes, specifically referencing the California Electrical Code (CEC) and ASCE 7-16 standards for load determinations and environmental considerations. Electrical specifications include using NEMA 3R outdoor-rated disconnects, wet-service listed conductors, and proper sizing of electrical components based on established engineering standards.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DIXON LANDING PARK
ELECTRICAL PLAN
.Notes:
1. New scoreboards electrical loads are equal to or less than those of the existing boards being removed.
2. Over current protection, conduits and conductors from the panel to the new disconnects are existing to be re-used.
3. New disconnect shall be NEMA 3R (outdoor/rainproof) and shall be sized no smaller than the electrical load of the scoreboard.
4. Conductors shall be sized per CEC Table 310.16 and shall be listed for wet service.
5. Conduits shall be sized per CEC Chapter 9 Tables 4 & 5.
6. The load determination shall also consider Case B and Case C from ASCE 7-16 Figure 29.3-1. Case B required for all scoreboards, and Case C required for the 20’-0” W x 8’-6” H scoreboard (BA-2014).
Electrical panel located in utility closet behind snack shack
Dixon Field 1 Scoreboard Install new BA-2014 scoreboard, install new electrical disconnect, replace existing conduit and liquid tight from disconnect to score board, install (1) new ground rod.
Install Dak Score/MX-1 interface box into existing equipment cage and connect to existing power Dixon Field 2 Scoreboard Install new BA-624 scoreboard, install new electrical disconnect, replace existing conduit and liquid tight from disconnect to score board, install (1) new ground rod.
Dixon Field 3 Scoreboard Install new BA-624 scoreboard, install new electrical disconnect, install new conduit and liquid tight from disconnect to score board, install (1) new ground rod.
image1.png
File details come from the government source that posted it. Updated .