BRIDGE INSPECTION REPORT
BROAD BRANCH BRIDGE
BROAD BRANCH ROAD OVER BROAD BRANCH
ROCK CREEK PARK
LN
STRUCTURE NO. 3450-029P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 6/10/13
Report prepared by: EU
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 http://www.efl.fhwa.dot.gov/FLHBO/BIP http://www.efl.fhwa.dot.gov/FLHBO/BIP
STRUCTURE SUMMARY STRUCTURE NO. 3450-029P
BROAD BRANCH BRIDGE INSPECTION DATE: 6/10/13
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... FRAME NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 35.5 FT (10.8 M)
DECK TYPE: ......................... CONCRETE CAST-IN-PLACE MAX. SPAN LENGTH: .......... 12.3 FT (3.7 M) WEARING SURFACE: .......... BITUMINOUS DECK WIDTH: ...................... 55.0 FT (16.8 M)
ABUT. FOUNDATIONS: ........ OTHER CURB TO CURB WIDTH: ..... 44.0 FT (13.4 M)
PIER FOUNDATION(S): ........ OTHER YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 25C1 / NONE SKEW ANGLE: ..................... 19 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ N/A
STRUCTURE HISTORY: ...... 1984-JOINT REPAIR.
LOCATION
ROCK CREEK PARK MILE POINT: ..................... 1.69 (KM PT 2.72)
STATE: ................................. DISTRICT OF COLUMBIA LOCATION: 0.1 MILES FROM BEACH DRIVE
FACILITY CARRIED: ............ BROAD BRANCH ROAD
FEATURE INTERSECTED: .. BROAD BRANCH
STRUCTURE EVALUATION SUMMARY
This concrete frame bridge is in fair structural condition. Problems include deterioration of the slab and pier concrete and undermining and settlement of the downstream apron. The apron should be reconstructed, and the areas of spalled and deteriorated concrete in the substructure and slab underside should be repaired.
Additional problems include deterioration of the masonry mortar joints in the wingwalls and retaining walls, vegetation growth on the wingwalls, debris in the channel, and widespread deterioration of the wearing surface.
The roadway on the north side of the crosswalk, including the north approach, has been repaved since the previous inspection.
Repairs should be made as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: R. VENKATAREDDY, B. CARPER (GANNETT FLEMING)
CONDITION ASSESSMENT:
RAMESH VENKATAREDDY, PE, FIELD TEAM LEADER
REPORT REVIEW :
MARCUS MILLER, P.E., SENIOR INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 10/31/13
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 3450-029P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
C226 PRIORITY OF IMPROVEMENT
ITEM
NO.
MAINTENANCE RECOMMENDATIONS
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT COST
UNIT
ESTIMATE
COST
PRELIM.
PRELIM. MAINTENANCE TOTAL : $35,000
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS) QTY. UNIT UNIT
COST ESTIMATES
PRELIM. COST
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL:
PRELIM. REHABILITATION TOTAL:
PRELIM. RECONSTRUCTION TOTAL:
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
FIELD INSPECTION REPORT STRUCTURE NO. 3450-029P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N N F N N N N N G
N G
G N N N F G G G F G N N
F N N N G G N
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
(FLOOR)
(FLOOR)
58.1, 59.3 MINOR TO MODERATE DELAMINATION AND SPALLING OF SLAB
UNDERSIDE IN SOME LOCATIONS WITH EXPOSED REBAR.
MODERATE CRACKING OF SLAB UNDERSIDE WITH
EFFLORESCENCE IN SEVERAL LOCATIONS. MINOR CRACKING OF
SLAB UNDERSIDE WITH EFFLORESCENCE AT CONSTRUCTION
JOINTS. MAP CRACKING WITH EFFLORESCENCE ON UNDERSIDE
OF WEST OVERHANG, CENTER SPAN. MINOR SPALL ON
UNDERSIDE OF EAST OVERHANG, CENTER SPAN.
58.3 WIDESPREAD MINOR TO MODERATE CRACKING OF ASPHALT
WEARING SURFACE, PRIMARILY OVER ABUTMENTS. MINOR
POTHOLES IN WEARING SURFACE AT SPOT LOCATIONS.
ROADWAY ON NORTH SIDE OF CROSSWALK HAS BEEN REPAVED,
AND CROSSWALK RESTRIPED, SINCE PREVIOUS INSPECTION.
PAVEMENT STRIPING, EXCEPT CROSSWALK STRIPING, IS FADED.
58.5 MINOR CRACKING, SCALING AND SPALLING OF CURBS, SIDEWALKS,
AND MEDIAN.
58.6 MINOR FLAKING OF PAINT ON RAILINGS. BASE OF RAIL POSTS NOT
FLUSH WITH SIDEWALK IN SOME LOCATIONS; MINOR TO
MODERATE DETERIORATION OF GROUT PADS. SEVERAL ANCHOR
BOLTS AND NUTS ARE LOOSE IN WEST RAILING. MINOR VEHICLE
SCRAPES ON ENDS OF RAILINGS. END CAP MISSING TO TOP RAIL
OF EAST RAILING AT SOUTH END.
58.7 BIKE PATH TRANSITION ON EAST SIDE OF SOUTH APPROACH
INHIBITS PROPER DRAINAGE ALONG EAST SIDE OF ROADWAY.
58.8 EXPOSED UNDERGROUND UTILITY CONDUIT IN NORTH APPROACH
SHOULDER ON EAST SIDE.
60.1 MINOR TO MODERATE VERTICAL AND RANDOM CRACKING OF
ABUTMENT BREASTWALLS WITH EFFLORESCENCE.
60.5 MODERATE SCALING OF CONCRETE FLOOR; SOUTHEAST END
EXPOSED. SEE ALSO 60.9,10.
F G F F F N
N
N
G
F
FIELD INSPECTION REPORT STRUCTURE NO. 3450-029P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION3.
EROSION AND/OR SCOUR2.
ALIGNMENT1.
61. CHANNEL 6
F G G F N
LOW
SUFF
10 FT.
SILT, SAND, ROCK
222. APPROACHES 6
OTHER 9.
ALIGNMENT 8.
SIGNS7.
SETTLEMENT 6.
EROSION5.
SURFACING4.
APPROACH GUARDRAIL 3.
2. RELIEF JOINTS
APPROACH SLABS1. N
N N F F F N G N
223. RETAINING WALL 7
OTHER 6.
SETTLEMENT OR DEFLECTION5.
EROSION AND/OR SCOUR4.
FOUNDATION3.
WEEP HOLES2.
1. WALL G
G N G G N
36. TRAFFIC AND SAFETY FEATURES
APPROACH GUARDRAIL ENDSD.
APPROACH GUARDRAILSC.
TRANSITIONSB.
BRIDGE RAILINGSA. 0
N N N
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
60.6 MINOR CRACKING AND DETERIORATION OF MORTAR JOINTS WITH
EFFLORESCENCE; MINOR VEGETATION GROWTH IN JOINTS. ONE
STONE DISLODGED AT BASE OF SOUTHWEST WINGWALL.
60.8 MINOR DETERIORATION OF JOINT FILLER AT SOUTHEAST VERTICAL
JOINT; FILLER MATERIAL IS MISSING AT NORTHEAST, NORTHWEST,
AND SOUTHWEST VERTICAL JOINTS.
60.9,10 MODERATE UNDERMINING OF DOWNSTREAM APRON; APRON HAS
SETTLED WITH SEVERE CRACKING; WATER RUNS INTO CRACKS,
BELOW APRON, AND OUT BELOW CUT-OFF WALL. TWO SMALL
HOLES IN SURFACE OF APRON ON NORTH SIDE.
MODERATE EROSION ALONG AND AT END OF NORTHEAST
WINGWALL.
60.13 MINOR TO MODERATE CRACKING OF PIER WALLS WITH
EFFLORESCENCE. MODERATE SCALING AT WATERLINE WITH
EXPOSED REBAR. MINOR SPALL WITH EXPOSED REBAR ON SOUTH
FACE OF NORTH PIER WALL, EAST END AND ON SOUTH FACE OF
NORTH PIER WALL NEAR CENTER.
61.1 CHANNEL CURVES TO RIGHT IMMEDIATELY UPSTREAM OF
STRUCTURE. FLOW IS DIRECTLY INTO SOUTHEAST WINGWALL.
61.2 MINOR SCOUR UP TO 8"D OF SOUTHEAST WINGWALL; SLAB FLOOR
EXPOSED AT THIS LOCATION.
61.4 MODERATE DEBRIS ACCUMULATION ALONG UPSTREAM SIDE OF
STRUCTURE.
222.4 WIDESPREAD MINOR TO MODERATE CRACKING OF SOUTH
APPROACH PAVEMENT. NORTH APPROACH HAS BEEN REPAVED
SINCE PREVIOUS INSPECTION.
222.5,6 APPROACH CURBS SETTLED UP TO 5" ON EAST SIDE AT BOTH
APPROACHES. UP TO 6" HEIGHT DIFFERENTIAL AT ENDS OF
SIDEWALKS DUE TO SETTLEMENT OF APPROACH SHOULDERS; NO
SETTLEMENT AT SOUTHWEST CORNER.
222.7 NO OBJECT MARKERS PRESENT.
223.1 MODERATE DETERIORATION OF MORTAR JOINTS AND EXPANSION
JOINT MATERIAL IN RETAINING WALLS AT NORTHWEST AND
SOUTHEAST CORNERS OF STRUCTURE. TOP COURSE OF STONE
SEPARATED UP TO 1" (PREVIOUS 3/4") AT NORTHWEST RETAINING
WALL DUE TO TREE GROWTH ABOVE. MINOR VEGETATION
GROWTH ALONG RETAINING WALLS.
36.A RAILING HEIGHT OF 3'-1" DOES NOT MEET AASHTO MINIMUM
HEIGHT SPECIFICATION OF 3'-6" FOR PEDESTRIAN/BICYCLE
BARRIERS.
STRUCTURE LOAD RATING STRUCTURE NO. 3450-029P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 20 18 33 30
HS 36 33 60 54
TYPE 3 37 34 61 55
TYPE 3S2 58 53 97 88
TYPE 3-3 71 64 119 108
DESIGN LOADING: H20 (M18)
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: RATING IS BASED ON DESIGN LOAD OF STRUCTURE.
A
A
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3450-029P
BROAD BRANCH BRIDGE INSPECTION DATE: 6/10/13
STRUCTURE IDENTIFICATION
(201) PARK: ROCK CREEK PARK (1) STATE: ....................................... 113 - DISTRICT OF COLUMBI
(202) STRUCTURE NAME: .......... BROAD BRANCH BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............ 1 - BRIDGE (3) COUNTY CODE: ........................ 001 - DISTRICT OF COLUMBI
(204) STRUCTURE NUMBER: ..... 3450-029P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 2 - NATIONAL CAPITAL (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 19 (6) FEATURES INTERSECTED:....... BROAD BRANCH
(207) ROAD SECTION NO: .......... 029P (7) FACILITY CARRIED: .................. BROAD BRANCH ROAD
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 3450029P0000000
(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 0.1 MILES FROM BEACH DRIV
(210) OPERATING UNIT: ............. PARK (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................ 25C1 (11) MILE POINT: ............................. 1.69 (KM PT 2.72)
(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
07 - FRAME
12.3 FT (3.7 M)
35.5 FT (10.8 M)
5 - OTHER
5 - OTHER
5 - OTHER
6 - N/A
1 - CONCRETE CAST-IN-PLACE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 4 - H20 (M18) (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 36.0 TONS (33.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 60.0 TONS (54.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/13 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
o
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 3450-029P
BROAD BRANCH BRIDGE INSPECTION DATE: 6/10/13
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 38°56'40.20"
(17) LONGITUDE: ......................... 77°03'00.20"
(19) DETOUR LENGTH: ............... 2 MI (3 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 5 - HIGHWAY-PEDESTRIAN
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH: ........... 44.0 FT (13.4 M)
(52) DECK WIDTH: ............................ 55.0 FT (16.8 M)
(32) APPR. ROADWAY WIDTH: ........ 44.0 FT (13.4 M)
(213) APPR. PAVEMENT WIDTH: ..... 44.0 FT (13.4 M)
LEFT SHOULDER: .................. 0.0 FT (0.0 M)
RIGHT SHOULDER: ................ 0.0 FT (0.0 M)
(33) BRIDGE MEDIAN: ....................... 2 - CLOSED MEDIAN (no barrier
(34) SKEW ANGLE: ............................ 19 °
(35) DECK FLARE?: ........................... NO
(47) TOTAL HORIZ. CLEARANCE: .... 44.0 FT (13.4 M)
(50) SIDEWALKS:
LEFT : ...................................... 4.0 FT (1.2 M)
RIGHT : ................................... 4.0 FT (1.2 M)
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION: ......... 1 - FULL HEIGHT (NO PARAPE
MATERIAL: .............................. 6 - ALUMINUM
DESIGN TYPE: ........................ 1 - CONTINUOUS RAIL
(215) BRIDGE RAIL HEIGHT: ............ 3.10 FT (0.94 M)
(53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)
(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK:
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ........................... N
(222) APPROACHES:
(223) RETAINING WALL:
(36) TRAFFIC SAFETY FEAT: ... 0NNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
8 - Stable; scour above top of fo
2 - REHAB/RECONSTRUCTION
C - MODERATE
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
1984-JOINT REPAIR.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
http:77�03'00.20 http:38�56'40.20
APPENDIX STRUCTURE NO. 3450-029P
PHOTOGRAPHS STRUCTURE NO. 3450-029P
PHOTO #1 - LOOKING SOUTH TOWARD BEACH DRIVE
FLOW
PHOTO #2 - WEST (DOWNSTREAM) SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW
LOOKING SOUTH
PHOTO #4 - TYPICAL DETERIORATION OF
WEARING SURFACE; CENTERLINE OF
STRUCTURE IN NORTH SPAN SHOWN; NOTE
PREVIOUSLY EXPOSED REBAR PATCHED
WITH ASPHALT
PHOTO #5 - TYPICAL SPALLING OF SIDEWALKS; EAST SIDEWALK AT
NORTH END SHOWN
PHOTO #6 - TYPICAL BASE OF RAIL POSTS NOT FLUSH WITH
SIDEWALK; WEST RAILING AT SOUTH END SHOWN
PHOTO #7 - TYPICAL LOOSE ANCHOR BOLT NUTS IN WEST RAILING;
SOUTH END SHOWN
PHOTO #8 - TYPICAL PEELING OF PAINT ON RAILINGS; EAST RAILING
AT NORTH END SHOWN
PHOTO #9 - TYPICAL CRACKING OF APPROACH PAVEMENT; SOUTH
APPROACH SHOWN
PHOTO #10 - BIKE PATH TRANSITION ON EAST SIDE OF SOUTH
APPROACH INHIBITS PROPER DRAINAGE
PHOTO #11 - TYPICAL HEIGHT DIFFERENTIAL AT ENDS OF SIDEWALKS
DUE TO SETTLEMENT OF APPROACH SHOULDERS; EAST SIDE OF
NORTH APPROACH SHOWN; ALSO NOTE SETTLED APPROACH CURB
PHOTO #12 - EXPOSED UTILITY CONDUIT IN NORTH APPROACH
SHOULDER ON EAST SIDE
PHOTO #13 - GENERAL UNDERSIDE VIEW LOOKING WEST, NORTH
SPAN; NOTE TYPICAL TRANSVERSE CRACKING OF SLAB UNDERSIDE
WITH EFFLORESCENCE
PHOTO #14 - TYPICAL TRANSVERSE CRACKING OF SLAB UNDERSIDE
WITH EFFLORESCENCE; NORTH SPAN AT EAST END SHOWN
PHOTO #15 - TYPICAL SPALLING OF SLAB
UNDERSIDE, NORTH SPAN AT EAST END
SHOWN
PHOTO #16 - TYPICAL CRACKING AND
SPALLING OF SLAB UNDERSIDE WITH
EFFLORESCENCE AND EXPOSED REBAR
ALONG CONSTRUCTION JOINTS; CENTER
SPAN SHOWN
PHOTO #17 - CRACKING WITH
EFFLORESCENCE ON UNDERSIDE OF WEST
OVERHANG IN CENTER SPAN
PHOTO #18 - SPALL IN UNDERSIDE OF EAST
OVERHANG IN CENTER SPAN
PHOTO #19 - GENERAL VIEW OF NORTH ABUTMENT
PHOTO #20 - TYPICAL CRACKING OF ABUTMENT BREASTWALLS;
SOUTH ABUTMENT AT WEST END SHOWN
PHOTO #21 - TYPICAL DETERIORATION OF WINGWALL MASONRY
MORTAR JOINTS; SOUTHWEST WINGWALL SHOWN; NOTE MASONRY
STONE DISLODGED
PHOTO #22 - SCOUR ALONG SOUTHEAST WINGWALL; NOTE SLAB
FLOOR EXPOSED
PHOTO #23 - TYPICAL SCALING OF SLAB FLOOR; CENTER SPAN AT
WEST END SHOWN
PHOTO #24 - GENERAL VIEW OF NORTH PIER, NORTH SIDE
PHOTO #25 - TYPICAL CRACKING OF PIER
WALLS; NORTH FACE OF NORTH PIER AT
EAST END SHOWN
PHOTO #26 - SPALL ON SOUTH FACE OF
NORTH PIER WALL AT EAST END WITH
EXPOSED REBAR
PHOTO #27 - DEBRIS ACCUMULATION ALONG UPSTREAM SIDE OF
STRUCTURE
PHOTO #28 - HOLE IN APRON ON NORTH SIDE AT DOWNSTREAM END
PHOTO #29 - CRACKING AND SETTLEMENT OF APRON AT
DOWNSTREAM END
PHOTO #30 - PREVIOUSLY NOTED UNDERMINING AND SETTLEMENT
OF DOWNSTREAM APRON NOT VISIBLE DURING 2013 INSPECTION DUE
TO HIGH FLOW
PHOTO #31 - LOOKING UPSTREAM THROUGH STRUCTURE; CENTER
SPAN
PHOTO #32 - VEGETATION GROWTH ALONG NORTHEAST RETAINING
WALL
PHOTO #33 - LOOKING DOWNSTREAM THROUGH STRUCTURE,
CENTER SPAN
File details come from the government source that posted it. Updated .