Amendment_0003_-_PRA-ROCR_10(5).pdf

PDF 44 MB Posted

Attached to
Rock Creek Parkway 10(5) Federal contract opportunity
Solicitation number
DTFH71-16-R-00001
Issued by
Department of Transportation Federal Highway Administration

About this file

Only Offerors who submitted proposals to the RFP are allowed to respond to this notice.

View the file

Other files for this federal contract opportunity

Other files attached to Rock Creek Parkway 10(5), newest first.
File Type Posted
Amendment_0006_-_PRA-ROCR_10(5).pdf PDF
Amendment_0005_-_PRA-ROCR_10(5).pdf PDF
Amendment_0004_-_PRA-ROCR_10(5).pdf PDF
Plans_Amendment_1.pdf PDF
Amendment_0001_-_PRA-ROCR_10(5)_(Plans_Seperate).pdf PDF
Report_NEPA_Sch_B_FONSI.pdf PDF
VETS-100A-Form.pdf PDF
Appendix_DC_Water_Preliminary_Plans.pdf PDF
Report_NEPA_Sch_AB_CE.pdf PDF
BIP_Report_3450-009P_Blagden_Bridge.pdf PDF
Permit_USACE.pdf PDF
BIP_Report_3450-017P_Zoo_Tunnel.pdf PDF
BIP_Report_3450-011P_Piney_Branch_Bridge.pdf PDF
Permit_DCRA.pdf PDF
FP03_Eng_.pdf PDF
Report_Certification_Program_for_Bridge_Temporary_Works.pdf PDF
Permit_ESC_ _SWM.pdf PDF
BIP_Report_3450-030P_Pinehurst_Branch_Bridge.pdf PDF
Appendix_DDOT_TS-1138_sheets.pdf PDF
Report_Geotech.pdf PDF
Appendix_CCTV_Camera_and_Associated_Equipment_Specifications.pdf PDF
Permit_NPDES_NOI.pdf PDF
RFP_Solicitation_-_PRA-ROCR_10(5).pdf PDF
Report_Test_Pit_Information.pdf PDF
Permit_DC_DOE.pdf PDF
ADV_Subcontracting_Plan.doc DOC document
BIP_Report_3450-029P_broad_branch_road_culvert.pdf PDF
_Plans_Adv.pdf PDF
Appendix_Special_Sign_Dimensioning_Guide.pdf PDF
FP03_Errata.pdf PDF
BIP_Report_3450-018P_Zoo_Tunnel_Bridge.pdf PDF
ADV_Offeror's_Qualifications_Form.doc DOC document
Appendix_IP_Communications_Equipment_to_be_Supplied_with_Traffic_Controllers.pdf PDF
Report_Traffic_Management_Plan.pdf PDF
BIP_Report_3450-027P_Joyce_Road_box_culvert.pdf PDF
Appendix_Bolt_On_UPS_Cabinet_Assembly_with_Inverter_Charger_and_Battery_Bank.pdf PDF
BIP_Report_3450-008P_Boulder_Bridge.pdf PDF
BIP_Report_3450-016P_Milkhouse_Ford_Bridge.pdf PDF
Synopsis_PRA-ROCR_10(5).doc DOC document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7116R00001

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

PRA-ROCR 10(5)03/02/20160003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/02/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment is to:

1. Revise the B pages as follows:

a)Replace Amendment No. 0002 Cost Proposal Bid Schedules with Amendment No. 0003 Cost

Proposal Bid Schedules to add a pay item and update quantities for various bid items.

b)See B Pages Changes_Amendment 3 for details.

2. Revise the Special Contract Requirements (J Pages) as follows:

a)Section 104 to increase the 2 axle single unit truck load restriction to 65,000 pounds.

b)Section 156 to revise hauling restrictions, define business hours, and add staging area locations. Hauling is now allowed on Beach Drive prior to its reconstruction and on

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Shirley A. Anderson

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 128

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

DTFH7116R00001/0003

Tilden Road (Bridge over Rock Creek) during non-rush hours.

c)Section 604 to clarify that sump for inlets is only needed at the most downstream inlet with an oil/grit separator.

d)Sections 635 and 636 to add requirements for the temporary traffic control signal systems to be installed during Stage 1 and 2.

3. Revise the plans as follows to remove the sump from all inlets with the exception of the most downstream inlet with an oil/grit separator, combine the detours for Stages 1 and 2, add new soil boring locations, and revise quantities:

a)Replace Plan Sheets C11, C12, C39, C40, J01, K01 through K05, K08 through K37, N02, and N07 through N09, with Amendment No. 0003 Plan Sheets

C11, C12, C39, C40, J01, K01 through K05, K08 through K37, N02, and N07 through N09.

b)Replace Amendment No. 0001 Plan Sheets C02, C18 through C21, C23 through C26, D01, D02, D08, K01A, K06, K07, M02, and N01 with Amendment No.

0003 Plan Sheets C02, C18 through C21, C23 through C26, D01, D02, D08, K01A, K06, K07, M02, and N01.

c)Replace Amendment No. 0002 Plan Sheets D20, D24, D27, D28, D32, and D40 with Amendment No.

0003 Plan Sheets D20, D24, D27, D28, D32, and D40.

d)Delete Plan Sheets N03 and N10 through N13.

e)See Plans_Amendment 3 for details.

4. Replace the DC Water Preliminary Plans with an updated version of the plans.

5. Provide Subsurface Exploration Data for additional soil boring information at selected inlet locations along Beach Drive. EFLHD drilled

7 additional soil borings along beach drive near proposed structures. Soil borings were drilled to a total depth of 10 to 12 feet. No groundwater or bedrock was encountered in the soil borings.

6. Reschedule the Proposal due date to March 23, 2016 at 2:00 P.M.

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

Amendment No. 0003

Info Page 1 of 2

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Project PRA-ROCR 10(5)

Rock Creek Park Solicitation: DTFH71-16-R-00001

The purpose of this Amendment is to:

1) Revise the B pages as follows:

a) Replace Amendment No. 0002 Cost Proposal Bid Schedules with Amendment No.

0003 Cost Proposal Bid Schedules to add a pay item and update quantities for various bid items.

b) See B Pages Changes_Amendment 3 for details.

2) Revise the Special Contract Requirements (J Pages) as follows:

a) Section 104 to increase the 2 axle single unit truck load restriction to 65,000 pounds.

b) Section 156 to revise hauling restrictions, define business hours, and add staging area locations. Hauling is now allowed on Beach Drive prior to its reconstruction and on Tilden Road (Bridge over Rock Creek) during non-rush hours.

c) Section 604 to clarify that sump for inlets is only needed at the most downstream inlet with an oil/grit separator.

d) Sections 635 and 636 to add requirements for the temporary traffic control signal systems to be installed during Stage 1 and 2.

3) Revise the plans as follows to remove the sump from all inlets with the exception of the most downstream inlet with an oil/grit separator, combine the detours for Stages 1 and 2, add new soil boring locations, and revise quantities:

a) Replace Plan Sheets C11, C12, C39, C40, J01, K01 through K05, K08 through K37, N02, and N07 through N09, with Amendment No. 0003 Plan Sheets C11, C12, C39, C40, J01, K01 through K05, K08 through K37, N02, and N07 through N09.

b) Replace Amendment No. 0001 Plan Sheets C02, C18 through C21, C23 through C26, D01, D02, D08, K01A, K06, K07, M02, and N01 with Amendment No. 0003 Plan Sheets C02, C18 through C21, C23 through C26, D01, D02, D08, K01A, K06, K07, M02, and N01.

c) Replace Amendment No. 0002 Plan Sheets D20, D24, D27, D28, D32, and D40 with Amendment No. 0003 Plan Sheets D20, D24, D27, D28, D32, and D40.

d) Delete Plan Sheets N03 and N10 through N13.

e) See Plans_Amendment 3 for details.

4) Replace the DC Water Preliminary Plans with an updated version of the plans.

Info Page 2 of 2

5) Provide Subsurface Exploration Data for additional soil boring information at selected inlet locations along Beach Drive. EFLHD drilled 7 additional soil borings along beach drive near proposed structures. Soil borings were drilled to a total depth of 10 to 12 feet. No groundwater or bedrock was encountered in the soil borings.

6) Reschedule the Proposal due date to March 23, 2016 at 2:00 P.M.

B Pages Changes Summary Page 1 of 1

B Pages changes

1. Delete Amendment No. 0002 Cost Proposal Bid Schedules, pages B-1 through B-11, and substitute the Amendment No. 0003 Cost Proposal Bid Schedules, pages B-1 through B-11.

a) Added the following pay item for Schedule A:

1. Pay item 63502-3100 Temporary Traffic Control, Traffic Signal System (Stage 1 & 2)

b) Revised the following pay item quantities for Schedule A:

1. Pay item 60421-0000 Oil/Grit Separator

2. Pay item 60902-0900 Curb and Gutter, Concrete, 11-inch depth (mountable)

3. Pay item 60902-1300 Curb and Gutter, Concrete, 15-inch depth (non-mountable)

4. Pay item 60905-1000 Gutter, Concrete (Valley)

5. Pay item 63504-1000 Temporary Traffic Control, Construction Sign

c) Revised the following pay item description for Schedule A:

1. Pay item 60910-0000 Reset Curb (Granite)

B I D S C H E D U L E Schedule A: Base Contract B-1

Project No: DC PRA-ROCR 10(5)

Project Name: Beach Drive from Rock Creek Parkway to Maryland State Line

Item No. Quantity Unit Unit Price Amount

15101-0000 Line A0100 ALL LPSM $

15201-0000 Line A0150 ALL LPSM $

15401-0000 Line A0200 ALL LPSM $

15501-0000 Line A0250 ALL LPSM $

15705-1700 Line A0300 11,600 LNFT $ $

15706-1000 Line A0350 430 EACH $ $

15706-1100 Line A0400 50 EACH $ $

15706-1600 Line A0450 18 EACH $ $

15720-0000 Line A0500 ALL LPSM $

20217-0000 Line A0550 20,000 LNFT $ $

20220-1000 Line A0600 26 EACH $ $

20301-1200 Line A0650 20 EACH $ $

20301-1400 Line A0700 190 EACH $ $

20301-1500 Line A0750 11 EACH $ $

20301-2000 Line A0800 30 EACH $ $

20301-3800 Line A0850 20 EACH $ $

20302-0150 Line A0900 1,115 LNFT $ $

20302-0300 Line A0950 78,000 LNFT $ $

20302-0700 Line A1000 170 LNFT $ $

20302-1400 Line A1050 575 LNFT $ $

20302-2100 Line A1100 4,500 LNFT $ $

20303-0300 Line A1150 660 SQYD $ $

20303-1000 Line A1200 950 SQYD $ $

MOBILIZATION

CONSTRUCTION SURVEY AND STAKING

CONTRACTOR TESTING

CONSTRUCTION SCHEDULE

SOIL EROSION CONTROL, FILTER BERM

SOIL EROSION CONTROL, INLET PROTECTION (COMBINATION INLET)

REMOVAL OF INLET

REMOVAL OF LIGHT POLE

REMOVAL OF PIPE END SECTION

REMOVAL OF ELECTRICAL JUNCTION BOX

REMOVAL OF BRIDGE RAILING

REMOVAL OF CURB AND GUTTER, CONCRETE

SOIL EROSION CONTROL, INLET PROTECTION TYPE A

SOIL EROSION CONTROL, STABILIZED CONSTRUCTION ENTRANCE

STORM WATER POLLUTION PREVENTION PLAN

TREE ROOT PRUNING

REMOVAL, INDIVIDUAL TREE

REMOVAL OF HEADWALL

REMOVAL OF FENCE (WOOD SPLIT RAIL)

REMOVAL OF GUARDRAIL, TIMBER

REMOVAL OF PIPE CULVERT

REMOVAL OF CONCRETE (BRIDGE SIDEWALK)

REMOVAL OF MEDIAN, CONCRETE

Amendment

Schedule A: Base Contract B-2

Project No: DC PRA-ROCR 10(5)

Project Name: Beach Drive from Rock Creek Parkway to Maryland State Line

Item No. Quantity Unit Unit Price Amount

20303-1100 Line A1250 250 SQYD $ $

20303-1600 Line A1300 79,000 SQYD $ $

20303-3000 Line A1350 800 SQYD $ $

20303-3200 Line A1400 160 SQYD $ $

20303-3300 Line A1450 50 SQYD $ $

20304-1000 Line A1500 ALL LPSM $

20310-1000 Line A1550 40 EACH $ $

20401-0000 Line A1600 8,000 CUYD $ $

20402-0000 Line A1650 3,900 CUYD $ $

20701-0800 Line A1700 40,000 SQYD $ $

20820-0000 Line A1750 ALL LPSM $

20820-0000 Line A1800 ALL LPSM $

21101-1000 Line A1850 150 SQYD $ $

25102-1000 Line A1900 200 TON $ $

25102-4000 Line A1950 1,300 TON $ $

30101-4000 Line A2000 16,000 TON $ $

30302-1000 Line A2050 1,000 LNFT $ $

30303-3000 Line A2100 52,000 SQYD $ $

40101-0200 Line A2150 7,600 TON $ $

40101-1000 Line A2200 17,400 TON $ $

40101-1400 Line A2250 6,200 TON $ $

41301-0400 Line A2300 8,000 SQYD $ $

50102-0600 Line A2350 90 SQYD $ $

REMOVAL OF PAVEMENT, ASPHALT

REMOVAL OF SIDEWALK, ASPHALT

REMOVAL OF SIDEWALK, CONCRETE

REMOVAL OF SIDEWALK, STONE

REMOVAL OF STRUCTURES AND OBSTRUCTIONS (ROCKER BEARINGS)

PLUG, EXISTING PIPE

REMOVAL OF MEDIAN, STONE (GRANITE COBBLE)

PLACED RIPRAP, CLASS 1

PLACED RIPRAP, CLASS 4

AGGREGATE BASE GRADING C OR D

DITCH RECONDITIONING

ROADWAY RECONDITIONING

SUPERPAVE PAVEMENT, 3/8-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO<3 MILLION ESAL

ROADWAY EXCAVATION

SUBEXCAVATION

EARTHWORK GEOTEXTILE, TYPE II-B

DEWATERING (PINEHURST BRANCH BRIDGE)

DEWATERING (JOYCE ROAD BOX CULVERT)

ROADWAY OBLITERATION, METHOD 1

SUPERPAVE PAVEMENT, 3/4-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO<3 MILLION ESAL

SUPERPAVE PAVEMENT, 1-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO<3 MILLION ESAL

ASPHALT PAVEMENT MILLING, 1 1/2-INCH DEPTH

PLAIN RIGID PAVEMENT, 7-INCH DEPTH, TYPE C SMOOTHNESS/ROUGHNESS (HORSE TRAIL CROSSING)

Amendment

Schedule A: Base Contract B-3

Project No: DC PRA-ROCR 10(5)

Project Name: Beach Drive from Rock Creek Parkway to Maryland State Line

Item No. Quantity Unit Unit Price Amount

55201-0200 Line A2400 10 CUYD $ $

55201-0200 Line A2450 425 CUYD $ $

55205-0000 Line A2500 5 SQYD $ $

55205-0000 Line A2550 35 SQYD $ $

55205-0000 Line A2600 36 SQYD $ $

55205-0000 Line A2650 120 SQYD $ $

55211-0000 Line A2700 780 LNFT $ $

55211-0000 Line A2750 100 LNFT $ $

55211-0000 Line A2800 150 LNFT $ $

55503-0000 Line A2850 66 LNFT $ $

55503-0000 Line A2900 225 LNFT $ $

55601-1200 Line A2950 1,115 LNFT $ $

55602-1000 Line A3000 50 LNFT $ $

55901-0000 Line A3050 220 SQYD $ $

56101-0000 Line A3100 5 LNFT $ $

56202-0000 Line A3150 ALL LPSM $

56301-2000 Line A3200 ALL LPSM $

56301-2000 Line A3250 ALL LPSM $

56301-2000 Line A3300 ALL LPSM $

56401-1000 Line A3350 9 EACH $ $

57901-0000 Line A3400 910 SQYD $ $

60103-4000 Line A3450 12 EACH $ $

60201-0300 Line A3500 170 LNFT $ $

REPAIR CONCRETE (2-INCH DEPTH)

REPAIR CONCRETE (4-INCH DEPTH)

REPAIR CONCRETE (6-INCH DEPTH)

REPAIR CONCRETE (DECK REPAIR)

CLEAN AND RESEAL JOINTS (TUNNEL CONSTRUCTION JOINT)

CLEAN AND RESEAL JOINTS (BACKER ROD AND DOW 890)

STRUCTURAL CONCRETE, CLASS A (AE) (HES)

STRUCTURAL CONCRETE, CLASS A (AE)

STRUCTURAL CONCRETE BONDING

TEMPORARY SUPPORT STRUCTURE

PAINTING, STEEL STRUCTURE (BEARINGS)

PAINTING, STEEL STRUCTURE (BRIDGE RAIL)

PAINTING, STEEL STRUCTURE (CLEAN, REPAIR, AND PAINT)

BEARING DEVICE, ELASTOMERIC

CLEAN AND RESEAL JOINTS (VERTICAL MASONRY WALL)

BRIDGE EXPANSION JOINTS (FIXED JOINT)

BRIDGE EXPANSION JOINTS (STRIP SEAL)

BRIDGE RAILING, STEEL, THREE RAIL

REMOVE AND RESET BRIDGE RAILING

MEMBRANE WATERPROOFING

LATEX MODIFIED CONCRETE OVERLAY

CONCRETE, FOUNDATION, LIGHT POLE

8-INCH PIPE CULVERT (DIP)

Schedule A: Base Contract B-4

Project No: DC PRA-ROCR 10(5)

Project Name: Beach Drive from Rock Creek Parkway to Maryland State Line

Item No. Quantity Unit Unit Price Amount

60201-0350 Line A3550 70 LNFT $ $

60201-0400 Line A3600 900 LNFT $ $

60201-0500 Line A3650 17,000 LNFT $ $

60201-0600 Line A3700 3,500 LNFT $ $

60201-0800 Line A3750 1,300 LNFT $ $

60201-0900 Line A3800 300 LNFT $ $

60201-1000 Line A3850 100 LNFT $ $

60210-0400 Line A3900 4 EACH $ $

60210-0500 Line A3950 25 EACH $ $

60210-0600 Line A4000 4 EACH $ $

60210-0800 Line A4050 5 EACH $ $

60210-0900 Line A4100 2 EACH $ $

60210-1000 Line A4150 1 EACH $ $

60210-1200 Line A4200 2 EACH $ $

60401-0000 Line A4250 38 EACH $ $

60403-1700 Line A4300 402 EACH $ $

60403-1700 Line A4350 3 EACH $ $

60404-1000 Line A4400 23 EACH $ $

60405-0000 Line A4450 47 EACH $ $

60421-0000 Line A4500 92 EACH $ $

60501-0000 Line A4550 70,000 LNFT $ $

60703-0000 Line A4600 1,000 LNFT $ $

60705-0000 Line A4650 16 EACH $ $

18-INCH PIPE CULVERT

24-INCH PIPE CULVERT

30-INCH PIPE CULVERT

36-INCH PIPE CULVERT

END SECTION FOR 12-INCH PIPE CULVERT

END SECTION FOR 15-INCH PIPE CULVERT

10-INCH PIPE CULVERT (DIP)

12-INCH PIPE CULVERT

15-INCH PIPE CULVERT

INLET, TYPE 6A (DOUBLE)

INLET, TYPE 6A

CATCH BASIN, TYPE 1 (FIELD INLET)

MANHOLE ADJUSTMENT

OIL/GRIT SEPARATOR

STANDARD UNDERDRAIN SYSTEM

END SECTION FOR 18-INCH PIPE CULVERT

END SECTION FOR 24-INCH PIPE CULVERT

END SECTION FOR 30-INCH PIPE CULVERT

END SECTION FOR 36-INCH PIPE CULVERT

END SECTION FOR 48-INCH PIPE CULVERT

MANHOLE

CLEANING CULVERTS IN PLACE

RECONDITIONING DRAINAGE STRUCTURE

Amendment

Schedule A: Base Contract B-5

Project No: DC PRA-ROCR 10(5)

Project Name: Beach Drive from Rock Creek Parkway to Maryland State Line

Item No. Quantity Unit Unit Price Amount

60901-1200 Line A4700 340 LNFT $ $

60902-0900 Line A4750 55,800 LNFT $ $

60902-1300 Line A4800 18,600 LNFT $ $

60905-1000 Line A4850 1,900 LNFT $ $

60910-0000 Line A4900 405 LNFT $ $

61501-0100 Line A4950 270 SQYD $ $

61501-0900 Line A5000 70 SQYD $ $

61501-1100 Line A5050 830 SQYD $ $

61503-1000 Line A5100 190 SQYD $ $

61504-1000 Line A5150 230 SQYD $ $

61506-2000 Line A5200 690 SQYD $ $

61701-4000 Line A5250 1,050 LNFT $ $

61702-0100 Line A5300 1 EACH $ $

61702-0510 Line A5350 2 EACH $ $

61702-1400 Line A5400 2 EACH $ $

61707-2000 Line A5450 30 LNFT $ $

61901-0000 Line A5500 420 LNFT $ $

62001-0000 Line A5550 15 CUYD $ $

62011-0100 Line A5600 2 EACH $ $

62011-0200 Line A5650 16 EACH $ $

62011-0300 Line A5700 8 EACH $ $

62011-0500 Line A5750 3 EACH $ $

62011-0600 Line A5800 3 EACH $ $

RESET CURB (GRANITE)

SIDEWALK, CONCRETE

SIDEWALK, STONE

SIDEWALK, ASPHALT

MEDIAN, CONCRETE

ACCESSIBILITY RAMP, CONCRETE

CURB, CONCRETE, 14-INCH DEPTH (BLAGDEN MEDIAN)

CURB AND GUTTER, CONCRETE, 11-INCH DEPTH (MOUNTABLE)

CURB AND GUTTER, CONCRETE, 15-INCH DEPTH (NON-MOUNTABLE)

GUTTER, CONCRETE (VALLEY)

FENCE (WOOD POST AND RAIL)

STONE MASONRY

STONE MASONRY HEADWALL FOR 12-INCH PIPE CULVERT

STONE MASONRY HEADWALL FOR 15-INCH PIPE CULVERT

STONE MASONRY HEADWALL FOR 18-INCH PIPE CULVERT

STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT

PAVING, COBBLESTONE (MEDIAN ISLANDS)

GUARDRAIL SYSTEM SBTB

TERMINAL SECTION, TYPE SBT-BAT

TERMINAL SECTION, TYPE SBT-FAT

TERMINAL SECTION, TYPE SBT TANGENT

STRUCTURE TRANSITION RAILING, SBT SYSTEM (TL-2 CONNECTION TO STONE MASONRY GUARDWALL)

STONE MASONRY HEADWALL FOR 30-INCH PIPE CULVERT

Amendment

Schedule A: Base Contract B-6

Project No: DC PRA-ROCR 10(5)

Project Name: Beach Drive from Rock Creek Parkway to Maryland State Line

Item No. Quantity Unit Unit Price Amount

62026-1000 Line A5850 8 SQYD $ $

62030-0000 Line A5900 205 LNFT $ $

62401-0300 Line A5950 25,000 SQYD $ $

62502-0000 Line A6000 25,000 SQYD $ $

62601-0150 Line A6050 36 EACH $ $

62601-0500 Line A6100 40 EACH $ $

62603-0200 Line A6150 40 EACH $ $

62603-0750 Line A6200 40 EACH $ $

62612-0350 Line A6250 36 EACH $ $

62614-0200 Line A6300 36 EACH $ $

62616-0550 Line A6350 36 EACH $ $

62617-1110 Line A6400 36 EACH $ $

62903-0000 Line A6450 320 SQYD $ $

63304-0900 Line A6500 2,300 SQFT $ $

63313-0000 Line A6550 720 LNFT $ $

63401-0700 Line A6600 85,500 LNFT $ $

63403-0400 Line A6650 920 SQFT $ $

63406-0400 Line A6700 740 EACH $ $

63406-0500 Line A6750 80 EACH $ $

63501-0000 Line A6800 ALL LPSM $

63502-2000 Line A6850 8 EACH $ $

63502-3100 Line A6900 2 EACH $ $

63503-0300 Line A6950 200 LNFT $ $

RAISED PAVEMENT MARKER TYPE D

RAISED PAVEMENT MARKER TYPE E

TEMPORARY TRAFFIC CONTROL (CONSTRUCTION STAGE 1)

TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

TEMPORARY TRAFFIC CONTROL, TRAFFIC SIGNAL SYSTEM (STAGE 1 & 2)

TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

QUERCUS RUBRUM, RED OAK, 2-INCH TO 2 1/2-INCH CALIPER, BALLED AND BURLAPPED

CELLULAR CONFINEMENT SYSTEM (RING AND GRID)

SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING

RUMBLE STRIP (CENTERLINE)

PAVEMENT MARKINGS, TYPE D, SOLID

PAVEMENT MARKINGS, TYPE D

AMELANCHIER CANADENSIS, SERVICEBERRY, 6 FEET TO 8 FEET HEIGHT, BALLED AND BURLAPPED

CERCIS CANADENSIS, EASTERN REDBUD, 2-INCH TO 2 1/2-INCH CALIPER, BALLED AND BURLAPPED

CORNUS FLORIDA, WHITE FLOWERING DOGWOOD, 6 FEET TO 8 FEET HEIGHT, BALLED AND BURLAPPED

LIROIDENDREN TULIPFERA, TULIP TREE, 2-INCH TO 2 1/2-INCH CALIPER, BALLED AND BURLAPPED

NYSSA SYLVATICA, BLACK GUM, 2-INCH TO 2 1/2-INCH CALIPER, BALLED AND BURLAPPED

PLATANUS OCCIDENTALIS, SYCAMORE, 6 FEET TO 8 FEET HEIGHT, BALLED AND BURLAPPED

REMOVE AND RESET STONE MASONRY

REPOINT STONE MASONRY

FURNISHING AND PLACING TOPSOIL, 4-INCH DEPTH

TURF ESTABLISHMENT

ACER RUBRUM, RED MAPLE, 2-INCH TO 2 1/2-INCH CALIPER, BALLED AND BURLAPPED

Amendment

Schedule A: Base Contract B-7

Project No: DC PRA-ROCR 10(5)

Project Name: Beach Drive from Rock Creek Parkway to Maryland State Line

Item No. Quantity Unit Unit Price Amount

63504-1000 Line A7000 1,600 SQFT $ $

63601-1000 Line A7050 ALL LPSM $

63601-6000 Line A7100 ALL LPSM $

63610-2200 Line A7150 350 LNFT $ $

63610-2800 Line A7200 660 LNFT $ $

63610-3010 Line A7250 1,250 LNFT $ $

63611-0300 Line A7300 1,650 LNFT $ $

63611-0300 Line A7350 760 LNFT $ $

63611-1000 Line A7400 1,700 LNFT $ $

63611-1100 Line A7450 2,950 LNFT $ $

63612-0100 Line A7500 12 EACH $ $

63620-0100 Line A7550 12 EACH $ $

63621-3000 Line A7600 13 EACH $ $

63701-0000 Line A7650 1 EACH $ $

64501-0000 Line A7700 ALL LPSM $

64502-0000 Line A7750 50 EACH $ $

64701-2000 Line A7800 ALL LPSM $

64701-2000 Line A7850 ALL LPSM $

64701-2000 Line A7900 ALL LPSM $

64701-2000 Line A7950 ALL LPSM $

64701-2000 Line A8000 ALL LPSM $

64701-2000 Line A8050 ALL LPSM $

64701-2000 Line A8100 ALL LPSM $

WIRE, ELECTRICAL CONDUCTORS, 10 AWG

WIRE, ELECTRICAL CONDUCTORS, 10 AWG (GROUND WIRE)

WIRE, ELECTRICAL CONDUCTORS, 0 AWG

WIRE, ELECTRICAL CONDUCTORS, 00 AWG

LUMINAIRE, TYPE A

POLE, TYPE A

TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

SYSTEM INSTALLATION, TRAFFIC SIGNAL

SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM (NPS TRAFFIC COUNT STATION)

CONDUIT, 3-INCH, PVC

CONDUIT, 4-INCH, PVC

CONDUIT, 4-INCH, HDPE (DIRECTIONAL BORING)

MITIGATION, STORMWATER MANAGEMENT, BIORETENTION CELL B-1-3

MITIGATION, STORMWATER MANAGEMENT, BIORETENTION CELL B-1-4

MITIGATION, STORMWATER MANAGEMENT, BIORETENTION CELL B-1-5

MITIGATION, STORMWATER MANAGEMENT, BIORETENTION CELL B-1-6

MITIGATION, STORMWATER MANAGEMENT, BIORETENTION CELL B-1-7

UTILITY BOX, JUNCTION BOX

FIELD OFFICE

LOCATE UTILITIES

LOCATE UTILITIES (TEST PITS)

MITIGATION, STORMWATER MANAGEMENT, BIORETENTION CELL B-1-1

MITIGATION, STORMWATER MANAGEMENT, BIORETENTION CELL B-1-2

Amendment

Schedule A: Base Contract B-8

Project No: DC PRA-ROCR 10(5)

Project Name: Beach Drive from Rock Creek Parkway to Maryland State Line

Item No. Quantity Unit Unit Price Amount

64701-2000 Line A8150 ALL LPSM $

64701-2000 Line A8200 ALL LPSM $

Schedule Total: _____________________

MITIGATION, STORMWATER MANAGEMENT, BIORETENTION CELL B-1-8

MITIGATION, STORMWATER MANAGEMENT, BIORETENTION CELL B-1-9

Submitted by: ______________________

Amendment

Schedule B: Government Option 1 B-9

Project No: DC PRA-ROCR 10(5)

Project Name: Beach Drive from Rock Creek Parkway to Maryland State Line

Item No. Quantity Unit Unit Price Amount

15101-0000 Line B0100 ALL LPSM $

15201-0000 Line B0150 ALL LPSM $

15401-0000 Line B0200 ALL LPSM $

15702-2000 Line B0250 ALL LPSM $

15705-1700 Line B0300 300 LNFT $ $

15705-2000 Line B0350 300 LNFT $ $

20220-1000 Line B0400 20 EACH $ $

20302-0500 Line B0450 820 LNFT $ $

20302-0900 Line B0500 250 LNFT $ $

20303-0900 Line B0550 90 SQYD $ $

20303-2300 Line B0600 270 SQYD $ $

20303-3000 Line B0650 5,600 SQYD $ $

20303-3200 Line B0700 200 SQYD $ $

20401-0000 Line B0750 1,000 CUYD $ $

20701-0200 Line B0800 1,100 SQYD $ $

25102-3000 Line B0850 700 TON $ $

25102-6000 Line B0900 350 TON $ $

40101-0200 Line B0950 30 TON $ $

41301-0400 Line B1000 320 SQYD $ $

50201-0000 Line B1050 2,400 SQFT $ $

55601-1000 Line B1100 815 LNFT $ $

60901-0000 Line B1150 820 LNFT $ $

61501-0100 Line B1200 420 SQYD $ $

ASPHALT PAVEMENT MILLING, 1 1/2-INCH DEPTH

RIGID PAVEMENT PATCH

BRIDGE RAILING, STEEL, ONE RAIL

CURB, CONCRETE(TUNNEL)

SIDEWALK, CONCRETE

PLACED RIPRAP, CLASS 3

PLACED RIPRAP, CLASS 6

SUPERPAVE PAVEMENT, 3/8-INCH NOMINAL MAXIMUM SIZE AGGREGATE, 0.3 TO<3 MILLION ESAL

REMOVAL, INDIVIDUAL TREE

REMOVAL OF CURB, CONCRETE(TUNNEL)

REMOVAL OF FENCE, CHAIN LINK

REMOVAL OF MEDIAN, BRICK(TUNNEL CENTERLINE)

REMOVAL OF PAVEMENT, CONCRETE

REMOVAL OF SIDEWALK, ASPHALT

MOBILIZATION

CONSTRUCTION SURVEY AND STAKING

CONTRACTOR TESTING

SOIL EROSION CONTROL, TURBIDITY MONITORING(VEGETATED RIPRAP EMBANKMENT)

SOIL EROSION CONTROL, FILTER BERM

SOIL EROSION CONTROL, TURBIDITY BARRIER

REMOVAL OF SIDEWALK, CONCRETE(ZOO TUNNEL)

ROADWAY EXCAVATION

EARTHWORK GEOTEXTILE, TYPE I-B

Schedule B: Government Option 1 B-10

Project No: DC PRA-ROCR 10(5)

Project Name: Beach Drive from Rock Creek Parkway to Maryland State Line

Item No. Quantity Unit Unit Price Amount

61501-1100 Line B1250 7,400 SQYD $ $

61501-1200 Line B1300 950 SQYD $ $

61503-1000 Line B1350 15 SQYD $ $

61504-1000 Line B1400 90 SQYD $ $

61506-1000 Line B1450 90 SQYD $ $

61901-0000 Line B1500 240 LNFT $ $

61901-1300 Line B1550 250 LNFT $ $

62013-2000 Line B1600 170 SQYD $ $

62401-0700 Line B1650 350 SQYD $ $

62630-0300 Line B1700 250 EACH $ $

62635-3000 Line B1750 900 EACH $ $

62901-1100 Line B1800 1,000 SQYD $ $

63304-0900 Line B1850 100 SQFT $ $

63401-0100 Line B1900 250 LNFT $ $

63405-0300 Line B1950 4 EACH $ $

63501-0000 Line B2000 ALL LPSM $

64701-2000 Line B2050 ALL LPSM $

64701-2000 Line B2100 ALL LPSM $

64701-2000 Line B2150 ALL LPSM $

64701-2000 Line B2200 ALL LPSM $

64701-2000 Line B2250 ALL LPSM $

MITIGATION, STORMWATER MANAGEMENT, BIORETENTION CELLB-1-14160L

MITIGATION, STORMWATER MANAGEMENT, BIORETENTION CELLB-1-20000L

Submitted by: ______________________ Schedule Total: _____________________

PAVEMENT MARKINGS, TYPE A, SOLID(STOP BARS)

PAVEMENT MARKINGS, TYPE A, "STOP" WORD MESSAGE(24-INCH HEIGHT)

TEMPORARY TRAFFIC CONTROL(SHOREHAM DRIVE MEDIAN INSTALLATION)

MITIGATION, STORMWATER MANAGEMENT, BIORETENTION CELLB-1-10170R

MITIGATION, STORMWATER MANAGEMENT, BIORETENTION CELL B-1-10260R

MITIGATION, STORMWATER MANAGEMENT, BIORETENTION CELLB-1-10800R

STONE MASONRY WALL

FURNISHING AND PLACING TOPSOIL, 12-INCH DEPTH(VEGETATED RIRPAP)

PLANTINGS, SEEDLINGS, CONTAINER GROWN(18-INCH TO 24-INCH SHRUBS)

CUTTINGS, WILLOW POLE(VEGETATED RIRPAP)

ROLLED EROSION CONTROL PRODUCT, TYPE 4(WOVEN COIR)

SIGNS, ALUMINUM PANELS, TYPE 3 SHEETING

SIDEWALK, POROUS ASPHALT

MEDIAN, CONCRETE(SHOREHAM DRIVE)

ACCESSIBILITY RAMP, CONCRETE

PAVING, BRICK(TUNNEL CENTERLINE)

FENCE(WOOD POST AND RAIL)

FENCE, CHAIN LINK

SIDEWALK, ASPHALT

Amendment

Schedule C: Government Option 2 B-11

Project No: DC PRA-ROCR 10(5)

Project Name: Beach Drive from Rock Creek Parkway to Maryland State Line

Item No. Quantity Unit Unit Price Amount

15401-0000 Line C0100 ALL LPSM $

CONTRACTOR TESTING(INTELLIGENT COMPACTION AND COORDINATION)

Submitted by: ______________________ Schedule Total: _____________________

SCR changes 1 of 3

Special Contract Requirement (J Pages) changes

1. Delete the first paragraph of Subsection 104.05 of the Special Contract Requirements (SCR), page J-6, and substitute the following:

When hauling on National Park Service roads, do not exceed the load restrictions shown in Table 104-1:

Table 104-1

Load Restrictions

Single Units Gross Vehicle Weight, pounds

2 axles 65,000 3 axles 48,000 4 or more axles 52,000

Combination Units Gross Vehicle Weight, pounds

3 axles 57,000 4 axles 62,000 5 or more axles 66,000

2. Delete the hauling restrictions added under Amendment No. 0002 Subsection 156.03 of the

SCR and substitute with the following revised hauling restrictions:

Hauling is not permitted on the following roads:

Rock Creek Parkway;

Beach Drive (for extended traveling) after reconstruction;

Sherril Drive (exiting Beach Drive to 16th Street NW);

Morrow Drive (from 16th Street NW to Joyce Street);

Tilden Road (Bridge over Rock Creek) during rush hours; and Joyce Road (between Missouri Ave. NW and 16th Street NW).

3. Add the following to Section 156 of the SCR, page J-34.

156.03. Add the following:

Business hours are defined as Monday thru Friday from 6:30 a.m. to 6:45 p.m..

156.06(d). Delete the first sentence and substitute the following:

Locate staging areas within the construction limits and at the following locations:

Cathedral Avenue at the Connecticut Avenue Bridge;

Paved surfaces within parking areas #2, #3, #4, #6, #7, #8, #9, and #10 along Beach

Drive; and

SCR changes 2 of 3

During Stages 3, 4, and 5, the flat open area (0.50 acres) adjacent to the Victor Garden near the H3 Stables, as approved by the CO. When using this staging area, provide access to the Western Ridge Trail and do not disturb the existing water valve.

4. Add the following to the second paragraph of Subsection 604.03 of the SCR, page J-94:

Construct sump on the most downstream inlet with an oil/grit separator. Size the sump according to the oil/grit separator product specifications.

5. Add the following to Section 635 of the SCR, page J-109:

635.20. Delete the first paragraph and substitute the following:

Design, furnish, and install a portable temporary signal system according to Section 636, MUTCD Parts 4 and 6, and the plans.

635.20. Add the following:

Operate, maintain, and repair the temporary signal system. If the temporary signal system or any of its components malfunctions, or becomes inoperable during use, repair or replace, as necessary, the malfunctioning system or any of its components to bring the system back to normal signal operation. Begin repairs within one hour of notification of the damaged or malfunctioning system during business hours as defined in Subsection 156.03, or within two hours during non-business hours. Provide for temporary flagging operations until the system is returned to normal signal operation. No payment will be made for the use of flaggers in place of a malfunctioning or inoperable temporary signal system.

6. Add the following to Subsection 636.04 of the SCR, page J-110:

Design and place the temporary signal system according to MUTCD, Part 4.

Provide a signal timing sequence and cycle for review and approval by the CO at least 7 days prior to the planned installation of the temporary traffic signal system. Test the timing cycle approved by the CO to determine acceptability with prevailing traffic conditions. Revise the timing cycle as needed, or as directed by the CO, in order to pass traffic through the signalized traffic control zone according to Subsection 156.06(i).

Provide the means to allow DDOT to establish communication with the temporary signal system and adjust signal timings remotely.

Furnish a power source to operate the signal system. Furnish an automatic backup battery power source capable of running the signal for at least 36 hours.

Design the system to be fail-safe. Ensure the system monitors the following conditions: lack of green, yellow, or red signal indication voltage; total loss of indication on any approach; presence of multiple signal indications on any approach; conflicting green/yellow signal indications; and

SCR changes 3 of 3 low power condition. In the event any of these conditions are detected, immediately begin flashing operation of red indications in all directions.

Install and maintain temporary signal system by a qualified operator with documented experience of no less than 5 years (immediately preceding this project) working in the operation and maintenance of traffic signals. Submit a resume for each individual working as a signal system operator describing their knowledge and experience for approval to the CO at least 14 days before the temporary signal system installation begins. Ensure the traffic signal operator is available 24 hours/day to respond within the timeframes specified in Subsection 635.20 to make corrections/adjustments/repairs to the temporary signal system.

Plan Sheet changes 1 of 2

Plan Sheet changes

1. Delete the Plan Sheets C11, C12, C39, C40, J01, K01 through K05, K08 through K37, N02, and N07 through N09, and substitute the Amendment No. 0003 Plan Sheets C11, C12, C39, C40, J01, K01 through K05, K08 through K37, N02, and N07 through N09.

a) Sheet C11 updated to add the missing valley curb quantity from 313+75 to 314+90 and to add the missing transition from mountable to non-mountable curb from 424+50 to 429+10.

b) Sheet C12 updated to revise the rounded quantities for mountable, non-mountable, and valley curb.

c) Sheets C39 and C40 updated to revise the quantities for construction signs because the detours for Stages 1 and 2 were combined.

d) Sheet J01 updated to remove sump from the schematics and table. Note 3 added to indicate the construction of sumps only on the most downstream inlet that has an oil/grit separator.

The sump will need to be sized according to the oil/grit separator product specifications.

See the revised storm drain profile sheets (K01A through K37) for more information.

e) Sheets K01 through K05 and K08 through K37 updated to remove sump from all inlets except for the most downstream inlets that have oil/grit separators. See Drainage Schedules (C18 through C26) for oil/grit separator quantities.

f) Sheets N02 and N07 through N09 updated to combine the detours for Stages 1 and 2. Two temporary traffic signals added for “Detour Stage 1 & 2”. See N08 for the temporary traffic signal locations.

2. Delete the Amendment No. 0001 Plan Sheets C02, C18 through C21, C23 through C26, D01, D02, D08, K01A, K06, K07, M02, and N01, and substitute the Amendment No. 0003 Plan Sheets C02, C18 through C21, C23 through C26, D01, D02, D08, K01A, K06, K07, M02, and N01.

a) Sheet C02 updated to revise pay item quantities and add the new pay item 63502-3100 Temporary Traffic Control, Traffic Signal System (Stage 1 & 2).

b) Sheets C18 through C21 and C23 through C26 updated to remove oil/grit separator from several proposed drainage structures.

c) Sheets D01 and D02 updated to adjust curb callouts to construct non-mountable curb and gutter from 103+50LT to 109+34LT.

d) Sheet D08 updated to add new boring hole #7 location. See Subsurface Exploration Data Appendix for soil boring information.

e) Sheet K01A, K06, and K07 updated to remove sump from all inlets except for the most downstream inlet with an oil/grit separator. Added Note 1 indicating to construct the sump

Plan Sheet changes 2 of 2 on the most downstream inlet with an oil/grit separator and to size the sump at these inlets according to the oil/grit separator product specifications.

f) Sheet M02 updated to add a note indicating the inspection control schedule for DDOE inspections of BMPs requirements.

g) Sheet N01 updated to combine the detours for Stages 1 and 2.

3. Delete the Amendment No. 0002 Plan Sheets D20, D24, D27, D28, D32, and D40, and substitute the Amendment No. 0003 Plan Sheets D20, D24, D27, D28, D32, and D40.

a) Sheet D20, D24, D27, D28, D32, and D40 updated to add new boring hole locations. See Subsurface Exploration Data Appendix for soil boring information.

4. Delete the Plan Sheets N03 and N10 through N13.

a) Sheets N03 and N10 through N13 deleted because the detours for Stages 1 and 2 were combined.

DISTRICT OF COLUMBIA

WATER AND SEWER AUTHORITY

5000 Overlook Avenue, SW, Washington, DC 20032 Phone: 202.787.2251, Fax: 202.787.2297

5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, Washington, DC 20032

5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, 5000 Overlook Avenue, SW, Page 1 of 3 Pages

Form FHWA-201 (Rev. 11-67)

Use this form in lieu of transmittal slips within Dept. of Trans. When message comment is to be retained as file material. Do not prepare carbons. Not to be used in lieu of Form FHWA- 121 for informal correspondence.

cc: TS Reading, w/ attachment

M:\Projects\rocr\10(5)\Techserv\Geotech\Reports\Preliminary Memo\Geotechnical Data_Jan-2016\ROCR10(5)_Geotech Memorandum_02-01-16.docx

SUBJECT: Project ROCR 10(5): Subsurface Exploration Data

TO MESSAGE/COMMENT FROM/DATE

K. Dowden Project Management Branch Chief

1. Introduction

This memorandum presents the findings of our subsurface exploration along Beach Drive for Project ROCR 10(5). The project is located in the Rock Creek Park in The District of Columbia. The main purpose of the study was to evaluate the presence/absence of bed rock at selected inlet locations.

2. Procedures and Results EFLHD Subsurface Exploration Team performed the drilling operations between January 5th and 8th, 2016. The crew drilled seven (7) soil borings along Beach Drive. The boring locations were chosen by EFLHD geotechnical engineer based on the accessibility of the drilling rig and proximity of the borings to the existing utilities and structures. Boring elevations were determined from plan topography. The borings were advanced to their termination depths with hollow stem augers using CME 750 ATV-mounted drill rig. Table 1 provides information regarding boring locations, ground surface elevations, and total depths.

Table 1 – Field Data Boring

No.

Station Offset

(ft) Ground Surface

Elevation (ft)

Total Depth

(ft)

B-1 338+63.87 16.96 Lt. 158.89 10 B-2 286+44.01 14.46 Lt. 137.68 10 B-3 265+44.97 16.53 Lt. 104.27 12 B-4 255.91.24 14.39 Lt. 93.64 12 B-5 240+31.28 22.01 Lt. 86.04 10 B-6 214+06.29 20.05 Rt. 70.65 10 B-7 142+33.35 25.88 Lt. 67.07 10

Borings were advanced using 3¾ -in. (inside diameter) hollow stem augers (HSA). Standard Penetration Tests (SPT) were performed using a 2¼ -in.

(outside diameter) split-spoon sampler in general accordance with ASTM D 1586, Standard Method of Penetration Test and Split Barrel Sampling of Soils.

The soil sampling was performed by driving the split-spoon sampler a distance of 24 inches into the undisturbed soil under the impact of a 140 lb. automatic

M. Elias Senior Geotechnical Engineer

Through:

M.

Abouzakhm Division Geotechnical Engineer

02/01/2016

Page 2 of 3 Pages hammer free-falling 30 inches. The total number of blows recorded for the middle twelve inches of the 24-inch sample range is designated as the “Standard Penetration Resistance” or N-value. The number of blows required to advance the sampler through each 6-inch interval was recorded on field boring logs.

Upon completion of the Standard Penetration Testing, the sampler was removed from the ground and sample recovery measurements were made and recorded for each sampling event. A field description by color, texture, and moisture was made for each recovered sample. Representative portions of split-spoon samples were preserved in glass jars.

The results of field tests and measurements were recorded on the driller’s logs and appropriate data sheets in the field. These data sheets and logs contain information concerning the boring methods, samples attempted and recovered, indications of the presence of various material such as gravel, pebbles, organic matter, etc. and observations of groundwater. They also contain interpretations by the exploration foreman of the subsurface conditions based on the performance of the equipment and cuttings brought to the surface by the drilling tools.

Groundwater level readings were made in the boreholes at the times and under the conditions stated on the boring logs. Fluctuations in groundwater levels could occur seasonally and might also be influenced by changes in grading, surface runoff and infiltration rates, and other influencing factors. Soil and groundwater conditions between borings could vary from conditions at the particular boring locations.

3. Findings

Boring logs describing the subsurface conditions encountered in each boring are provided in Attachment 1. The stratification lines designating the interfaces between soil types on the boring logs represent approximate boundaries. The transition between materials may be gradual. It should be noted that one or more of the units may be absent at specific locations.

It should be noted that soil description listed in the boring logs was based on visual classification only. No laboratory testing was done in this study.

No groundwater or bedrock was encountered in the soil borings. However, different amounts of cobbles and rock fragments were encountered in the fill materials. It is anticipated that excavations can be achieved using earth removing equipment such as back hoes or excavators. A jack hammer may be needed to break the cobbles/rock fragments.

Page 3 of 3 Pages

4. Disclaimer and Limitations Clause

The subsurface explorations described in this memorandum have been conducted in accordance with standard practices and procedures (except as specifically noted). The results of these exploration and test represent conditions at the specific locations and dates indicated. Subsurface conditions between these locations may vary. The subsurface conditions summarized and data provided include interpretations developed by the Government in the process of preparing this memorandum. These interpretations are not intended as a substitute for the personal investigation, independent interpretation, and judgment of the Contractor.

Attachments:

Attachment 1 – Boring Logs.

J-1

J-2

J-3

J-4

0.4

3.0

5.0

10.0

1.3

2.0

2.0

TOPSOIL (0.4')

Tan, micaceous Sandy SILT (moist)

-FILL-

Medium dense, gray and tan, micaceous Sandy SILT (moist)

-FILL-

Loose to medium dense, tan to reddish tan, micaceous Sandy SILT (moist)

Boring was terminated @ 10 ft

11-13-7-7

3-6-2-8

4-8-8-10

Standard Penetration Test Data

Boring Began:

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Inspector:

MATERIAL DESCRIPTION

Boring No.:

Groundwater Depth:

At Completion:

Completed:

Hole Diameter:

Boring Method:

Rock Core Diam:

Vane Shear

30 in.

140 lbs/AutomaticHammer Wt. & Type:

Clear/29 F

Encountered at:

After

Northing: 474570.7886 Easting: 1299382.0548

Caved at:

Hammer Drop:

Project Name:

N o.

Rock Creek Park Project Datum:

(Blows / ft)

158.9 ft

Undisturbed (UD)

1/5/16

R ec ft)

Water Content %

Project Location: Boring Location:

La ye r D ep th

(f t)

Ty pe

Weather:

SAMPLE

S P

T B lo w s pe r 6 in

. Plastic Limit

Boring was backfilled with auger cuttings No groundwater was encountered during our drilling operation Hand auger top 3 ft.

Soil description was based on visiual classification

Liquid Limit

SPT

U. S. DEPARTMENT OF TRANSPORTATION

Penetrometer (PP in tsf) Rock Core (RQD in %)

Surface Elevation:

Sample Types:

BORING LOG

1/5/16 M. Elias

D. HutchinsOperator:

Beach Drive,Sta. 338+63.87/Offset 16.96' Lt.

hrs

Remarks:

Auger Cuttings

G ra ph ic

L og

ROCR 10(5)

Density, Color, Plasticity, Size, Proportions, Moisture

D ep th S ca le

(f t)

E le va tio n (fe et

HSA

B-1

P P

3 3/4"

B O

R

IN

G L

O G

1/

/1

:4

- M

:\P R

O

JE

C

TS

\R O

C R

\1 0(

5) \T

E C

H S

E R

V \G

E O

TE

C

H \S

U B

S U

R

FA

C E

IN

V

E S

TI

G

A

TI

O N

\B O

R

IN

G L

O G

S \D

R

IL

LI

N

G _B

E A

C H

D R

\B E

A C

H D

R M

A .G

P J

158.5

155.9

153.9

148.9

Sheet: 1 of 1

J-3

J-4

5.0

8.0

10.0

0.7

0.4

Very loose to loose, light brown and gray , Sandy GRAVEL, trace silt (moist)

-FILL-

Loose, light brown , micaceous Sandy SILT , trace gravel (moist)

-FILL-

Medium dense, brown to reddish brown, Sandy

GRAVEL

(moist) Hard augering

-FILL-

Boring was terminated @ 10 ft

4-4-2-2

1-2-1-4

1-2-3-8

16-20-9-17

Standard Penetration Test Data

Boring Began:

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Inspector:

MATERIAL DESCRIPTION

Boring No.:

Groundwater Depth:

At Completion:

Completed:

Hole Diameter:

Boring Method:

Rock Core Diam:

Vane Shear

30 in.

140 lbs/AutomaticHammer Wt. & Type:

Clear/29 F

Encountered at:

After

Northing: 470517.713 Easting: 1300674.215

Caved at:

Hammer Drop:

Project Name:

N o.

Rock Creek Park Project Datum:

(Blows / ft)

137.7 ft

Undisturbed (UD)

1/5/16

R ec ft)

Water Content %

Project Location: Boring Location:

La ye r D ep th

(f t)

Ty pe

Weather:

SAMPLE

S P

T B lo w s pe r 6 in

. Plastic Limit

Boring was backfilled with auger cuttings No groundwater was encountered during our drilling operation Soil description was based on visual classification

Liquid Limit

SPT

U. S. DEPARTMENT OF TRANSPORTATION

Penetrometer (PP in tsf) Rock Core (RQD in %)

Surface Elevation:

Sample Types:

BORING LOG

1/5/16 M. Elias

D. HutchinsOperator:

Beach Drive,Sta. 286+44.01/Offset 14.46' Lt.

hrs

Remarks:

Auger Cuttings

G ra ph ic

L og

ROCR 10(5)

Density, Color, Plasticity, Size, Proportions, Moisture

D ep th S ca le

(f t)

E le va tio n (fe et

HSA

B-2

P P

3 3/4"

B O

R

IN

G L

O G

1/

/1

:4

- M

:\P R

O

JE

C

TS

\R O

C R

\1 0(

5) \T

E C

H S

E R

V \G

E O

TE

C

H \S

U B

S U

R

FA

C E

IN

V

E S

TI

G

A

TI

O N

\B O

R

IN

G L

O G

S \D

R

IL

LI

N

G _B

E A

C H

D R

\B E

A C

H D

R M

A .G

P J

132.7

129.7

127.7

J-3

J-4

J-5

0.6

8.0

12.0

1.5

1.1

0.6

1.3

1.3

SAND and GRAVEL

Very loose to loose, brown, micaceous Sandy SILT, trace organics (moist)

-FILL-

Medium dense, light brown , micaceous Silty SAND , some gravel and rock fragments (moist)

-FILL-

Boring was terminated @ 12 ft

13-6-4-3

2-2-2-1

1-2-5-11

4-4-7-10

3-7-10-7

Standard Penetration Test Data

Boring Began:

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Inspector:

MATERIAL DESCRIPTION

Boring No.:

Groundwater Depth:

At Completion:

Completed:

Hole Diameter:

Boring Method:

Rock Core Diam:

Vane Shear

30 in.

140 lbs/AutomaticHammer Wt. & Type:

Clear/32 F

Encountered at:

After

Northing: 468671.1773 Easting: 1300092.9578

Caved at:

Hammer Drop:

Project Name:

N o.

Rock Creek Park Project Datum:

(Blows / ft)

104.3 ft

Undisturbed (UD)

1/6/16

R ec ft)

Water Content %

Project Location: Boring Location:

La ye r D ep th

(f t)

Ty pe

Weather:

SAMPLE

S P

T B lo w s pe r 6 in

. Plastic Limit

Boring was backfilled with auger cuttings No groundwater was encountered during our drilling operation Soil description was based on visual classification

Liquid Limit

SPT

U. S. DEPARTMENT OF TRANSPORTATION

Penetrometer (PP in tsf) Rock Core (RQD in %)

Surface Elevation:

Sample Types:

BORING LOG

1/6/16 M. Elias MastersOperator:

Beach Drive,Sta. 265+44.97/Offset 16.53'Lt.

hrs

Remarks:

Auger Cuttings

G ra ph ic

L og

ROCR 10(5)

Density, Color, Plasticity, Size, Proportions, Moisture

D ep th S ca le

(f t)

E le va tio n (fe et

HSA

B-3

P P

3 3/4"

B O

R

IN

G L

O G

1/

/1

:3

- M

:\P R

O

JE

C

TS

\R O

C R

\1 0(

5) \T

E C

H S

E R

V \G

E O

TE

C

H \S

U B

S U

R

FA

C E

IN

V

E S

TI

G

A

TI

O N

\B O

R

IN

G L

O G

S \D

R

IL

LI

N

G _B

E A

C H

D R

\B E

A C

H D

R M

A .G

P J

103.7

96.3

92.3

J-3

J-4

J-5

2.0

9.0

12.0

0.6

1.2

1.3

0.1

1.5

Medium dense, light brown, micaceous Sandy GRAVEL , trace silt (moist)

-FILL-

Very loose to loose, brown, micaceous Silty SAND , trace organics (moist)

-FILL-

Possible Gravel seam, hard augering

Dense, light brown , Sandy GRAVEL (moist)

- FILL-

Boring was terminated @ at 12 ft

7-8-3-4

1-2-3-1

1-1-2-3

50/3"

12-15-25-37

Standard Penetration Test Data

Boring Began:

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Inspector:

MATERIAL DESCRIPTION

Boring No.:

Groundwater Depth:

At Completion:

Completed:

Hole Diameter:

Boring Method:

Rock Core Diam:

Vane Shear

30 in.

140 lbs/AutomaticHammer Wt. & Type:

Clear/33 F

Encountered at:

After

Northing: 467868.456 Easting: 1299610.87

Caved at:

Hammer Drop:

Project Name:

N o.

Rock Creek Park Project Datum:

(Blows / ft)

93.6 ft

Undisturbed (UD)

1/6/16

R ec ft)

Water Content %

Project Location: Boring Location:

La ye r D ep th

(f t)

Ty pe

Weather:

SAMPLE

S P

T B lo w s pe r 6 in

. Plastic Limit

Boring was backfilled with auger cuttings No groundwater was encountered during our drilling operation Soil description was based on visual classification

Liquid Limit

SPT

U. S. DEPARTMENT OF TRANSPORTATION

Penetrometer (PP in tsf) Rock Core (RQD in %)

Surface Elevation:

Sample Types:

BORING LOG

1/6/16 M. Elias EnglandOperator:

Beach Drive, Sta. 255+91.24 /Offset 14.39' Lt.

hrs

Remarks:

Auger Cuttings

G ra ph ic

L og

ROCR 10(5)

Density, Color, Plasticity, Size, Proportions, Moisture

D ep th S ca le

(f t)

E le va tio n (fe et

HSA

B-4

P P

3 3/4"

B O

R

IN

G L

O G

1/

/1

:3

- M

:\P R

O

JE

C

TS

\R O

C R

\1 0(

5) \T

E C

H S

E R

V \G

E O

TE

C

H \S

U B

S U

R

FA

C E

IN

V

E S

TI

G

A

TI

O N

\B O

R

IN

G L

O G

S \D

R

IL

LI

N

G _B

E A

C H

D R

\B E

A C

H D

R M

A .G

P J

91.6

84.6

81.6

3"

J-3

J-4

0.4

3.0

5.0

10.0

2.0

1.7

1.6

1.6

TOPSOIL

Tan, micaceous Sandy GRAVEL, trace silt (moist)

-FILL-

Very soft, tan, micaceous Sandy SILT (moist)

-FILL-

Loose to medium dense, tan, micaceous Silty SAND (moist)

-FILL-

Trace gravel

Boring was terminated @ 10 ft

WOH-1-1-1

1-3-3-4

4-7-12-11

Standard Penetration Test Data

Boring Began:

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Inspector:

MATERIAL DESCRIPTION

Boring No.:

Groundwater Depth:

At Completion:

Completed:

Hole Diameter:

Boring Method:

Rock Core Diam:

Vane Shear

30 in.

140 lbs/AutomaticHammer Wt. & Type:

P. Cloudy/ 38 F

Encountered at:

After

Northing: 466681.788 Easting: 1299358.325

Caved at:

Hammer Drop:

Project Name:

N o.

Rock Creek Park Project Datum:

(Blows / ft)

86.0 ft

Undisturbed (UD)

1/7/16

R ec ft)

Water Content %

Project Location: Boring Location:

La ye r D ep th

(f t)

Ty pe

Weather:

SAMPLE

S P

T B lo w s pe r 6 in

. Plastic Limit

Boring was backfilled with auger cuttings No groundwater was encountered during our drilling operation Hand auger top 3 ft Soil description was based on visual classification

Liquid Limit

SPT

U. S. DEPARTMENT OF TRANSPORTATION

Penetrometer (PP in tsf) Rock Core (RQD in %)

Surface Elevation:

Sample Types:

BORING LOG

1/7/16 M. Elias MastersOperator:

Beach Drive, Sta. 240+31.28/Offset 22.01' Lt.

hrs

Remarks:

Auger Cuttings

G ra ph ic

L og

ROCR 10(5)

Density, Color, Plasticity, Size, Proportions, Moisture

D ep th S ca le

(f t)

E le va tio n (fe et

HSA

B-5

P P

3 3/4"

B O

R

IN

G L

O G

1/

/1

:3

- M

:\P R

O

JE

C

TS

\R O

C R

\1 0(

5) \T

E C

H S

E R

V \G

E O

TE

C

H \S

U B

S U

R

FA

C E

IN

V

E S

TI

G

A

TI

O N

\B O

R

IN

G L

O G

S \D

R

IL

LI

N

G _B

E A

C H

D R

\B E

A C

H D

R M

A .G

P J

85.6

83.0

81.0

76.0

J-3

J-4

0.3

5.0

10.0

1.4

1.3

1.4

1.9

TOPSOIL

Loose, tan, micaceous Silty SAND, trace gravel (moist)

-FILL-

Very soft, tan and gray, micaceous Sandy SILT (moist)

-FILL-

Wet sample

Boring was terminated @ 10 ft

1-2-3-2

2-3-3-4

1-1-1-2

1-1-1-1

Standard Penetration Test Data

Boring Began:

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Inspector:

MATERIAL DESCRIPTION

Boring No.:

Groundwater Depth:

At Completion:

Completed:

Hole Diameter:

Boring Method:

Rock Core Diam:

Vane Shear

30 in.

140 lbs/AutomaticHammer Wt. & Type:

P. Cloudy/ 45 F

Encountered at:

After

Northing: 465322.528 Easting: 1298299.488

Caved at:

Hammer Drop:

Project Name:

N o.

Rock Creek Park Project Datum:

(Blows / ft)

70.7 ft

Undisturbed (UD)

1/7/16

R ec ft)

Water Content %

Project Location: Boring Location:

La ye r D ep th

(f t)

Ty pe

Weather:

SAMPLE

S P

T B lo w s pe r 6 in

. Plastic Limit

Boring was backfilled with auger cuttings upon completion of drilling operation No groundwater or bedrock was encountered during our drilling operation.

Description and identification of soils was based on visual and manual procedures.

Liquid Limit

SPT

U. S. DEPARTMENT OF TRANSPORTATION

Penetrometer (PP in tsf) Rock Core (RQD in %)

Surface Elevation:

Sample Types:

BORING LOG

1/7/16 M. Elias…