Amendment_0004_-_PRA-ROCR_10(5).pdf

PDF 100 KB Posted

Attached to
Rock Creek Parkway 10(5) Federal contract opportunity
Solicitation number
DTFH71-16-R-00001
Issued by
Department of Transportation Federal Highway Administration

About this file

The Proposal due date of March 23 2016 at 2 00 P.M. EST will remain the same.

View the file

Other files for this federal contract opportunity

Other files attached to Rock Creek Parkway 10(5), newest first.
File Type Posted
Amendment_0006_-_PRA-ROCR_10(5).pdf PDF
Amendment_0005_-_PRA-ROCR_10(5).pdf PDF
Amendment_0003_-_PRA-ROCR_10(5).pdf PDF
Plans_Amendment_1.pdf PDF
Amendment_0001_-_PRA-ROCR_10(5)_(Plans_Seperate).pdf PDF
Report_NEPA_Sch_B_FONSI.pdf PDF
VETS-100A-Form.pdf PDF
Appendix_DC_Water_Preliminary_Plans.pdf PDF
Report_NEPA_Sch_AB_CE.pdf PDF
BIP_Report_3450-009P_Blagden_Bridge.pdf PDF
Permit_USACE.pdf PDF
BIP_Report_3450-017P_Zoo_Tunnel.pdf PDF
BIP_Report_3450-011P_Piney_Branch_Bridge.pdf PDF
Permit_DCRA.pdf PDF
FP03_Eng_.pdf PDF
Report_Certification_Program_for_Bridge_Temporary_Works.pdf PDF
Permit_ESC_ _SWM.pdf PDF
BIP_Report_3450-030P_Pinehurst_Branch_Bridge.pdf PDF
Appendix_DDOT_TS-1138_sheets.pdf PDF
Report_Geotech.pdf PDF
FP03_Errata.pdf PDF
BIP_Report_3450-018P_Zoo_Tunnel_Bridge.pdf PDF
ADV_Offeror's_Qualifications_Form.doc DOC document
Appendix_IP_Communications_Equipment_to_be_Supplied_with_Traffic_Controllers.pdf PDF
Report_Traffic_Management_Plan.pdf PDF
BIP_Report_3450-027P_Joyce_Road_box_culvert.pdf PDF
Appendix_Bolt_On_UPS_Cabinet_Assembly_with_Inverter_Charger_and_Battery_Bank.pdf PDF
BIP_Report_3450-008P_Boulder_Bridge.pdf PDF
BIP_Report_3450-016P_Milkhouse_Ford_Bridge.pdf PDF
Appendix_CCTV_Camera_and_Associated_Equipment_Specifications.pdf PDF
Permit_NPDES_NOI.pdf PDF
RFP_Solicitation_-_PRA-ROCR_10(5).pdf PDF
Report_Test_Pit_Information.pdf PDF
Permit_DC_DOE.pdf PDF
ADV_Subcontracting_Plan.doc DOC document
BIP_Report_3450-029P_broad_branch_road_culvert.pdf PDF
_Plans_Adv.pdf PDF
Appendix_Special_Sign_Dimensioning_Guide.pdf PDF
Synopsis_PRA-ROCR_10(5).doc DOC document
Show all 39

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

DTFH7116R00001

x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT

THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Sterling VA 20166-6511

EFLHD-CO

21400 Ridgetop Circle Construction Office Eastern Federal Lands Highway Div.

Federal Highway Administration

Sterling VA 20166-6511

EFLHD-AC

21400 Ridgetop Circle Acquisitions Office Eastern Federal Lands Highway Div.

Federal Highway Administration

PRA-ROCR 10(5)03/16/20160004

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

10/02/2015

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project: PRA-ROCR 10(5)

The purpose of this Amendment is to:

1) Revise Section 104 of the Special Contract Requirements (J Pages) to reduce the load restriction of 2-axle single unit trucks to 43,000 pounds and increase the load restriction to 65,000 pounds for single unit trucks with 3 or more axels.

The Proposal due date of March 23, 2016, at 2:00 P.M. EST will remain the same.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

NSN 7540-01-152-8070

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0004

Info Page 1 of 1

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0004 Project PRA-ROCR 10(5)

Rock Creek Park Solicitation: DTFH71-16-R-00001

The purpose of this Amendment is to:

1) Revise Section 104 of the Special Contract Requirements (J Pages) to reduce the load restriction of 2-axle single unit trucks to 43,000 pounds and increase the load restriction to 65,000 pounds for single unit trucks with 3 or more axels.

The Proposal due date of March 23, 2016, at 2:00 P.M. will remain the same.

Special Contract Requirement (J Pages) changes

1. Delete the changes made under Amendment No. 0003 to the first paragraph of Subsection

104.05 of the Special Contract Requirements (SCR) and substitute the following:

When hauling on National Park Service roads, do not exceed the load restrictions shown in Table 104-1:

Table 104-1

Load Restrictions

Single Units Gross Vehicle Weight, pounds

2 axles 43,000 3 or more axles 65,000

Combination Units Gross Vehicle Weight, pounds

3 axles 57,000 4 axles 62,000 5 or more axles 66,000

Amendment 4 info.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0004
Project PRA-ROCR 10(5)
Solicitation: DTFH71-16-R-00001

File details come from the government source that posted it. Updated .