Drawings_Part4.pdf

PDF 10 MB Posted

Attached to
Upgrade Doors and Hardware - Iowa City VAMC
Solicitation number
36C26325B0015_1
Issued by

About this file

This document is a Demolition Plan drawing for Building 1, Floor 4 at the Iowa City VA Health Care System, prepared by Fourfront Design, Inc. The architectural plan details specific door modifications and replacements across multiple locations on the floor, including removing/replacing door operators, replacing doors and hardware, welding metal to fill holes, and shimming doors. The drawing includes detailed photographic references for each door modification, a comprehensive wall rating legend, and general notes emphasizing the contractor's responsibility to verify existing conditions, coordinate demolition between trades, and immediately notify the architect/engineer of any conflicts or discrepancies. The project is part of a door and door hardware upgrade construction document set, with the drawing dated 8/28/2024 and created under project number 19.2481.A26, specifically for the Department of Veterans Affairs Office of Construction and Facilities Management.

View the file

Other files

File Type Posted
36C26325B0015 0004.docx DOCX document
636A8-23-102 Upgrade Doors Hardware QA_Revised 9.5.25.docx DOCX document
ICRA DOOR SCHEDULE_20240719.xlsx XLSX spreadsheet
36C26325B0015 0003.docx DOCX document
Wage Determination IA20250068 8.22.25.pdf PDF
Site Visit Sign in Sheet.pdf PDF
Specifications Revised 9.3.25.pdf PDF
636A8-23-102 Upgrade Doors Hardware QA.docx DOCX document
JA Best Access Systems - Cormax_Redacted.pdf PDF
Final SOW_8.18.25.docx DOCX document
JA Honeywell - Lenel Fully_Redacted.pdf PDF
36C26325B0015 0002.docx DOCX document
Specifications Revised 8.18.25.pdf PDF
Updated Door Schedule Dwg No. A6.00.pdf PDF
IFB Attachment - Site Visit Campus Map.pdf PDF
36C26325B0015 0001 (Amendment 0001).pdf PDF
Questions_Answers or Clarifications (Attachment).pdf PDF
Specifications 486 pages.pdf PDF
Safety or Environmental Violations and EMR Information 2 pages.pdf PDF
Drawings_Part2.pdf PDF
Drawings_Part7.pdf PDF
SOW Final 6 pages.pdf PDF
Drawings_Part3.pdf PDF
Drawings_Part5.pdf PDF
Drawings_Part6.pdf PDF
Wage Determination 8-8-2025 7 pages.pdf PDF
Limitations on Subcontracting Certificate of Compliance 2 pages.pdf PDF
VA Handbook 6500.6 Appendix C.pdf PDF
36C26325B0015_1.docx DOCX document
Drawings_Part1.pdf PDF
TMS 20939 VA Privacy Training.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

1. SHEET SIZE FOR PROPER SCALE IS 42X30. CONTRACTOR SHALL NOT

SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS FROM

THE ARCHITECT.

2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VISIT THE

PROJECT AND VERIFY EXISTING CONDITIONS/DIMENSIONS AND

PROPOSED CONDITIONS. COORDINATE DEMOLITION BETWEEN ALL

TRADES. NOTIFY A/E IMMEDIATELY OF ANY CONFLICTS OR

DISCREPANCIES.

3. SEE ENLARGED AREA PLANS FOR KEYNOTES.

4. EXISTING AREAS NOT IN CONTRACT SHOWN SHADED FOR CLARITY.

4CE05

4CS04 4CS03

4S05

4W39

4CW07

4W54

4W52

C

W

C

4CS07A

4CS05A

4CS05

C

S

AD1.12

AD1.12

AD1.12

AD1.12

AD1.12

AD1.12

AD1.12

AD1.12

AD1.12

AD1.12

AD1.12

DOOR 4CE05

SEE DOOR SCHEDULE

DOOR 4CS07A

REPLACE SCREWS. SEE DOOR SCHEDULE.

DOOR 4CS06

REMOVE AND REPLACE OPERATOR AND ARMOR PLATES. SEE

DOOR SCHEDULE.

DOOR 4CS05

REMOVE AND REPLACE OPERATOR. SEE DOOR SCHEDULE.

DOOR 4CS05A

REMOVE AND REPLACE

STANLEY OPERATOR.

DOOR 4CS04

REMOVE OPERATOR, REPLACE DOORS ONLY,

REUSE HARDWARE. SEE DOOR SCHEDULE.

DOOR 4S05

SEE DOOR SCHEDULE.

DOOR 4C10

REMOVE OPERATOR. SEE DOOR SCHEDULE.

DOOR 4CW07

REMOVE OPERATOR. SEE DOOR SCHEDULE.

DOOR 4W39

REMOVE OPERATOR.

SEE DOOR SCHEDULE.

DOOR 4CS03

WELD METAL TO FILL HOLES.

SHIM DOOR TO FILL GAP.

SEE DOOR SCHEDULE

DOOR 4W52

REMOVE EXISTING DOOR, FRAME AND HARDWARE.

SEE DOOR SCHEDULE.

DOOR 4W54

EXISTING FRAME. NEW DOOR AND HARDWARE.

SEE DOOR SCHEDULE.

DOOR 4CW10

REMOVE OPERATOR.

SEE DOOR SCHEDULE.

POINT OF EGRESS

SHEET LEGEND:

NORTH ARROW

PLAN NORTH

TRUE NORTH

1-HOUR FIRE BARRIER

WALL RATING LEGEND:

2-HOUR FIRE BARRIER

SMOKE BARRIER

2-HOUR FIRE SMOKE

BARRIER

FIRE RATING

SMOKE AND FIRE RATING

1-HOUR FIRE SMOKE

BARRIER

SMOKE PARTITION

SMOKE RESISTIVE

CORRIDOR WALL

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

COR / Project Engineer

CONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

Office of Construction and Facilities Management

Department of Veterans Affairs

Phase

STAMP: ARCHITECT/ENGINEER OF RECORD:

4F PROJECT NO: 19.2481.A26 40

/2 /2

:2

:4

P M

8/28/2024

DEMOLITION PLAN - BUILDING 1,

FLOOR 4 PLAN

AD1.05

UPGRADE DOORS/DOOR

HARDWARE AT IOWA CITY VA

HEALTH CARE SYSTEM

JEKP

IOWA CITY, IOWAMATTHEW RUPPENKAMP

CONSTRUCTION

DOCUMENTS

636A8-23-102

CONSTRUCTION DOCUMENTS

GENERAL NOTES:

1/16" = 1'-0"

BUILDING 1, FLOOR 4 DEMO PLAN

Sheets
AD1.05 - DEMOLITION PLAN - BUILDING 1, FLOOR 4 PLAN
AD1.06 - DEMOLITION PLAN - BUILDING 1, FLOOR 5 PLAN
AD1.07 - DEMOLITION PLAN - BUILDING 1, FLOOR 6 PLAN
AD1.08 - DEMOLITION PLAN - BUILDING 1, FLOOR 9
AD1.09 - DEMOLITION PLAN - BUILDING 2, FLOOR 1 PLAN