Drawings_Part1.pdf

PDF 8 MB Posted

Attached to
Upgrade Doors and Hardware - Iowa City VAMC
Solicitation number
36C26325B0015_1
Issued by

About this file

This document is a set of construction documents for the Upgrade Doors and Door Hardware project at the Iowa City VA Health Care System. The project, located at 601 US-6 West in Iowa City, Iowa, has the project number 636A8-23-102 and is being managed by the U.S. Department of Veterans Affairs Veteran's Health Administration. The documents include detailed demolition and construction plans for upgrading doors and hardware across multiple buildings (Building 1, Building 2, Building 7, and Building 50), with specific focus on removing existing doors, frames, and hardware and replacing them with new components. The project requires careful coordination with infection control measures, as outlined in the comprehensive Infection Control Risk Assessment (ICRA) decision matrix, which provides guidelines for managing construction activities in a healthcare environment to minimize infection risks. The construction documents include detailed floor plans, door schedules, demolition plans, and electrical equipment plans, with specific instructions for each door's removal, replacement, or modification.

View the file

Other files

File Type Posted
636A8-23-102 Upgrade Doors Hardware QA_Revised 9.5.25.docx DOCX document
ICRA DOOR SCHEDULE_20240719.xlsx XLSX spreadsheet
36C26325B0015 0004.docx DOCX document
Site Visit Sign in Sheet.pdf PDF
Specifications Revised 9.3.25.pdf PDF
636A8-23-102 Upgrade Doors Hardware QA.docx DOCX document
Wage Determination IA20250068 8.22.25.pdf PDF
36C26325B0015 0003.docx DOCX document
36C26325B0015 0002.docx DOCX document
Specifications Revised 8.18.25.pdf PDF
Updated Door Schedule Dwg No. A6.00.pdf PDF
Final SOW_8.18.25.docx DOCX document
JA Honeywell - Lenel Fully_Redacted.pdf PDF
JA Best Access Systems - Cormax_Redacted.pdf PDF
36C26325B0015 0001 (Amendment 0001).pdf PDF
Questions_Answers or Clarifications (Attachment).pdf PDF
IFB Attachment - Site Visit Campus Map.pdf PDF
SOW Final 6 pages.pdf PDF
Drawings_Part3.pdf PDF
Drawings_Part5.pdf PDF
Drawings_Part6.pdf PDF
Wage Determination 8-8-2025 7 pages.pdf PDF
Limitations on Subcontracting Certificate of Compliance 2 pages.pdf PDF
VA Handbook 6500.6 Appendix C.pdf PDF
36C26325B0015_1.docx DOCX document
Drawings_Part4.pdf PDF
TMS 20939 VA Privacy Training.pdf PDF
Drawings_Part2.pdf PDF
Drawings_Part7.pdf PDF
Specifications 486 pages.pdf PDF
Safety or Environmental Violations and EMR Information 2 pages.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

COR / Project Engineer

CONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

Office of Construction and Facilities Management

Department of

Veterans Affairs

Phase

STAMP: ARCHITECT/ENGINEER OF RECORD:

4F PROJECT NO: 19.2481.A26 40

/2 /2

:0

:4

P M

8/28/2024

COVER SHEET

G0.00

UPGRADE DOORS/DOOR

HARDWARE AT IOWA CITY VA

HEALTH CARE SYSTEM

KZKP

IOWA CITY, IOWAMATTHEW RUPPENKAMP

CONSTRUCTION

DOCUMENTS

636A8-23-102

CONSTRUCTION DOCUMENTS

SHEET INDEX

ELECTRICAL

E0.00 ELECTRICAL LEGENDS AND ABBREVIATIONS

E0.01 ELECTRICAL DETAILS

E1.00 BUILDING 1 BASEMENT - DOOR EQUIPMENT PLAN

E1.01 BUILDING 1 LEVEL 1 - DOOR EQUIPMENT

E1.02 BUILDING 1 LEVEL 2 - DOOR EQUIPMENT

E1.03 BUILDING 1 LEVEL 3 - DOOR EQUIPMENT

E1.04 BUILDING 1 LEVEL 4 - DOOR EQUIPMENT

E1.05 BUILDING 1 LEVEL 5 - DOOR EQUIPMENT

E1.06 BUILDING 1 LEVEL 6 - DOOR EQUIPMENT

E1.07 BUILDING 2 LEVEL 1 AND BUILDING 7 LEVEL 1 - DOOR EQUIPMENT

E1.08 ENLARGED NEW DOOR HARDWARE PLANS

E1.09 ENLARGED NEW DOOR HARDWARE PLANS

E1.10 ENLARGED NEW DOOR HARDWARE PLANS

SHEET INDEX

GENERAL

G0.00 COVER SHEET

G0.01 CAMPUS MAP

G1.00 INFECTION CONTROL RISK ASSESSMENT

ARCHITECTURAL

AD1.01 DEMOLITION PLAN - BUILDING 1 - BASEMENT PLAN

AD1.02 DEMOLITION PLAN - BUILDINGS 1 AND 50, FLOOR 1 PLAN

AD1.03 DEMOLITION PLAN - BUILDINGS 1 AND 50, FLOOR 2 PLAN

AD1.05 DEMOLITION PLAN - BUILDING 1, FLOOR 4 PLAN

AD1.06 DEMOLITION PLAN - BUILDING 1, FLOOR 5 PLAN

AD1.07 DEMOLITION PLAN - BUILDING 1, FLOOR 6 PLAN

AD1.08 DEMOLITION PLAN - BUILDING 1, FLOOR 9

AD1.09 DEMOLITION PLAN - BUILDING 2, FLOOR 1 PLAN

AD1.10 DEMOLITION PLAN - BUILDING 7 FLOOR PLANS

AD1.11 DEMOLITION PLANS - ENLARGED

AD1.12 DEMOLITION PLANS - ENLARGED

A1.01 BUILDING 1 - BASEMENT PLAN

A1.02 BUILDINGS 1 AND 50, FLOOR 1 PLAN

A1.03 BUILDINGS 1 AND 50, FLOOR 2 PLAN

A1.05 BUILDING 1, FLOOR 4 PLAN

A1.06 BUILDING 1, FLOOR 5 PLAN

A1.07 BUILDING 1, FLOOR 6 PLAN

A1.08 BUILDING 1, FLOOR 9 PLAN

A1.09 BUILDING 2, FLOOR 1 PLAN

A1.10 BUILDING 7 FLOOR PLANS

A1.11 NEW CONSTRUCTION PLANS - ENLARGED

A1.12 NEW CONSTRUCTION PLANS - ENLARGED

A6.00 DOOR SCHEDULES

A6.01 DOOR ELEVATIONS AND DETAILS

UPGRADE DOORS AND DOOR HARDWARE

AT IOWA CITY VA HEALTH CARE SYSTEM

601 US-6 WEST

IOWA CITY, IOWA 52246

PROJECT NO. 636A8-23-102

VA

U.S DEPARTMENT OF VETERAN'S AFFAIRS

VETERAN'S HEALTH ADMINISTRATION

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

STRUCTURE

STRUCTURE

STRUCTURE

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

BUILDING

STRUCTURE

BUILDING

11BUILDING

STRUCTURE

BUILDING

32 BUILDING

BUILDING

LOT A

LOTJ

LOT K

LOADING

DOCK

LOT N

LOT O

LOT M

PARKING

RAMP

STRUCTURE 49

LOT I

LOT H

LOT G

LOT F

LOT D

LOT E

U.S HIGHWAY 6

W O

O L

F A

V E

N U

E

N E W

T O

N R

O A D

NEWTON ROAD

U N

D E R

C O

N S T R

U C

T

IO

N

B

B

B

B

B

B

B

O

S

S

S

S

S

S

S

O

B

B

B

B

B

B

B

B

B

B

B

B

B

B

B

NO. B/S/O ASSET SCHEDULE

MAIN HOSPITAL BUILDING

ADMIN. OFFICE BUILDING & WAREHOUSE

CHILLER PLANT BUILDING

STORAGE BUILDING

ALTERNATE SOURCE GENERATOR

TRANSFORMER

VA HOSPITAL SIGN

BOILER PLANT

TRANSFORMER

TANKS OXYGEN

STORAGE BUILDING

MISCELLANEOUS SERVICE BUILDING

GENERATOR PUMP HOUSE

STORAGE BUILDING

WHEEL CHAIR SHELTER

TRANSFORMER

FLAG POLES

STORAGE BUILDING

SHELTER

RESEARCH LABORATORY

RESEARCH LABORATORY

RESEARCH LABORATORY

SWITCHGEAR

SWITCHGEAR

EMERGENCY GENERATOR

STORAGE BUILDING

EMERGENCY GENERATOR

TANKS FUEL

PARKING RAMP

SPECIALTY CLINICS

ADMIN. OFFICE BUILDING - MODULAR

B = BUILDINGS S = STRUCTURE O = OTHER

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

COR / Project Engineer

CONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

Office of Construction and Facilities Management

Department of Veterans Affairs

Phase

STAMP: ARCHITECT/ENGINEER OF RECORD:

4F PROJECT NO: 19.2481.A26 40

/2 /2

:2

:1

P M

8/28/2024

CAMPUS MAP

G0.01

UPGRADE DOORS/DOOR

HARDWARE AT IOWA CITY VA

HEALTH CARE SYSTEM

JEKP

IOWA CITY, IOWAMATTHEW RUPPENKAMP

CONSTRUCTION

DOCUMENTS

636A8-23-102

CONSTRUCTION DOCUMENTS

1" = 40'-0"

CAMPUS MAP

1. SHEET SIZE FOR PROPER SCALE IS 42X30. CONTRACTOR SHALL NOT

SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS FROM

THE ARCHITECT.

2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VISIT THE

PROJECT AND VERIFY EXISTING CONDITIONS/DIMENSIONS AND

PROPOSED CONDITIONS. COORDINATE DEMOLITION BETWEEN ALL

TRADES. NOTIFY A/E IMMEDIATELY OF ANY CONFLICTS OR

DISCREPANCIES.

3. SEE ENLARGED AREA PLANS FOR KEYNOTES.

4. EXISTING AREAS NOT IN CONTRACT SHOWN SHADED FOR CLARITY.Infection Control Risk Assessment (ICRA) Decision Matrix

Introductory Information and Instructions

Use this template as a baseline for performing facility Infection Control Risk Assessments (ICRAs) for construction, renovation, and maintenance work (referred to as the “activity” in this document). The template provides minimum requirements for categorizing activity types and patient risk to determine the level of precautions needed to prevent infection risks. Facilities may customize this template to incorporate site-specific information and/or to add more stringent criteria.

NOTE: This VHA ICRA template pertains specifically to infection prevention. It must be used in conjunction with the required Pre-Construction Risk Assessment (PCRA) for the activity which addresses other activity-related safety concerns (e.g., vibration, noise) outside the scope of the ICRA.

To complete the template:

1. Use Table 1 to identify the category of the construction, renovation and/or maintenance activity.

2. Use Table 2 to identify the areas affected by the activity.

3. Use Table 3 to identify the overall patient risk category that will be affected by the activity.

4. Use Table 4 to determine the level of infection prevention and control precautions needed for the activity.

Once all 4 steps above are completed: Refer to Table 5 for the minimum required control measures for the level of infection prevention and control precautions needed for the activity. Refer to Table 6 for the minimum infection prevention and control measures required on completion of the activity.

Table 1 - Construction, Renovation, and/or Maintenance Activity Category

NOTE: If any of the bulleted criteria in a higher activity category pertains to the work that will be done (even if the other criteria are in a lower category), use the higher activity category for the VHA ICRA.

CATEGORY A

MAINTENANCE

Inspection and/or facility upkeep generally defined as follows:

• Work can be completed in a single shift, not to exceed 10 hours.

• Patients and/or employees may be in the area depending on the activity.

• Work that does not create dust or debris.

• Removal of ceiling tile or access to mechanical or electrical chase for visual inspection limited to 4 tile per 50 square feet with limited exposure time (not to exceed an hour for each tile) within the shift.

• Minor interior updates (e.g., replacing floor or ceiling tiles, carpentry work to include hanging signage, and painting without sanding) that do not create dust or debris.

• Limited building system maintenance such as plumbing on potable systems limited to faucet replacement etc. and electrical work such as replacement of bulbs, receptacles, or switches.

General maintenance and repair work generally defined as follows:

• Prolonged inspection and work that may take longer than a single shift but not exceeding a week.

• Patients and employees are not to be in the area until activity is completed.

• Work that creates minimal dust and debris.

• Interior finish or surface repairs, updates, or modifications such as repair of firewalls and barriers, and new flooring that produces minimal dust and debris. Controlled sanding activities (e.g., wet or dry sanding) that produce minimal dust and debris.

• Plumbing work such as installation or replacement of a single fixture or piping for a single fixture. Any work on sanitary plumbing including snaking of drains.

• Electrical work such as installation of cabling/wiring/conduit for a single device, installation of new device such as a light fixture that produces minimal dust and debris.

• Air Handler and/or fan shutdown/startup and HVAC work such as replacement of a single diffuser, single terminal unit or a single device that produces minimal dust and debris.

CATEGORY B

MAINTENANCE

Small-scale construction, renovation, or maintenance generally defined as follows:

• Work requiring longer than a single week to complete but not exceeding 6 months.

• Patients and employees are not to be in the area until activity is completed.

• Demolition/removal of preexisting floor covering, casework, lay-in ceiling, or other architectural elements.

• Demolition/removal of more than 32 ft2 of drywall/framing, hard ceilings, and doors/framing and minimal infrastructure such as electrical circuits and branch piping.

• Installation of new walls, ceilings and doors including framing, drywall/plaster and associated work.

• Plumbing work such as the installation of new sinks, showers and toilets and associated plumbing.

• Shut down of sections of potable water systems.

• Electrical work such as installation of conduit and wire for lighting, receptacles and switches for an area, the installation of conduit and wire for new devices such as terminal units, fans etc.

• Modification of existing fire alarm and suppression systems.

• Mechanical work such as the installation of ductwork, diffusers, and terminal units for an area.

CATEGORY C

MAINTENANCE

Large-scale construction, renovation, or maintenance generally defined as follows:

• Work exceeding 6 months in duration.

• Patients and employees are not to be in the area until activity is completed.

• Large-scale demolition of building components and infrastructure including removal of multiple doors, walls, framing, ceilings, flooring, piping, electrical and HVAC.

• The installation building components such as new walls, ceilings and doors including framing, drywall and associated plaster work.

• Plumbing work such as the installation of:

• new medical gas systems,

• steam/heating hot water, condensate systems,

• multiple sinks, showers and toilets including associated plumbing.

• Shutdown of potable water, steam/heating hot water, condensate, and medical gas systems.

• Electrical work such as installation of electrical feeders, distribution panels, conduit and wire for lighting, receptacles and switches for an area, the installation of conduit and wire for new devices such as terminal units, fans etc.

• Installation of fire alarm and suppression systems.

• Electrical shutdown of multiple panels.

• Mechanical work such as the installation of air handling equipment, associated ductwork, diffusers, heat exchangers, terminal units and controls.

CATEGORY D

MAINTENANCE

Table 2 - Affected Area Assessment

Identify the areas and associated patients that will be affected by the construction/renovation/maintenance activity (see the Figure for a visual representation of adjacent affected areas).

Copy from PCRA Form

Figure: Isometric drawing of affected area assessment

AREA Service(s)/Type(s) of Area(s) (e.g., OR, Unit/Ward, Sterile

Processing, Administrative, etc.)*

Point of Contact (POC) POC Contact Information

Activity Area**

Area Above

Area Below

Adjacent Area 1

Adjacent Area 2

Adjacent Area 3

Adjacent Area 4

* There may be more than one Service/type of area for each row. List all.

** List the area(s) in which the construction/renovation/maintenance activity will occur. NOTE: When the Activity Category is B, C, or D, the control measures are determined by the Patient Risk in the adjacent affected areas.

Table 3 - Patient Risk Category

Using Table 3, identify the patient risk category for each area listed in Table 2. Of the patient risk categories identified, select the one with the greatest risk as the overall Patient Risk Category for the activity.

Table 4 - Level of Infection Prevention and Control Precautions

Match the Overall Patient Risk Category (Low, Medium, High, Highest) determined from Table 3 with the planned Construction/Renovation/Maintenance Activity Category (A, B, C, D) from Table 1 to determine the minimum Level of Infection Prevention and Control Precautions (I, II, III, or IV) using Table 4 below.

Table 5 - Required Infection Prevention and Control Measures, by Level of Precautions

Controls defined below for the Level of Precautions identified for the activity must be in place before the activity begins and maintained until work is completed and the area is activated. Control measures for each Precaution Level must also include the control measures in the preceding Level(s).

As the activity progresses, a full re-evaluation of remaining activity type and patient risk is required prior to downgrading the Level of Precautions.

Level I

1. Perform work activity in a manner that does not create dust.

2. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.

3. Any materials and equipment being brought into the facility must be free of contaminants and loose material.

All control measures in Level I and the following:

1. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system).

2. Ensure worker clothing is clean and free of visible dust before leaving the work area.

3. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation.

4. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system.

5. Seal doors to prevent dust migration.

6. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.

7. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.

8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.

All control measures in Levels I and II and the following:

1. Ensure availability of equipment for cleaning hands. (Hand wipes)

2. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

3. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.

4. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

5. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors (unless a work specific waiver is approved by VHA’s Office of Healthcare Engineering); this must be maintained continuously 24/7 for the duration of the project. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows is not required to be HEPA-filtered. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited.

6. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

All control measures in Levels I, II and III and the following:

1. Barriers must be hard barriers unless temporary to install final barrier.

2. Containment must include an anteroom to ensure pressure control. Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.

3. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable.

4. Workers must wear shoe covers or have a method to clean shoes in anteroom.

Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.

Level of Precautions determined from Table 5 I II III IV

Level of

Precautions

Control Measures

Level II

Level III

Level IV

Table 6 - Minimum Infection Prevention and Control Measures Required Upon Completion of the Activity (at the end of the project or project phase)

Controls defined below shall be completed upon completion of the activity and inspected prior to terminating measures defined in Table 5.

Level I - II

Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

HVAC Systems:

1. Remove isolation of HVAC system in areas where work is being performed. Verify that HVAC systems are clean and operational.

2. Verify the HVAC systems meet original airflow and air exchange design specifications.

Water systems:

Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA Directive 1061.

Construction areas must be inspected by an infection preventionist and engineering representative (and others as determined by the facility) for final activity/project close out and removal of infection prevention and control measures.

Work Area Cleaning:

1. Clean work areas including all environmental surfaces, high horizontal surfaces and flooring materials.

2. Check all supply and return air registers for dust accumulation on upper surfaces as well as air diffuser surfaces.

Removal of Critical Barriers:

1. Critical barriers must remain in place during all work involving drywall removal, creation of dust and activities beyond simple touch-up work. The barrier may NOT be removed until a work area cleaning has been performed. Additional cleaning may be needed after removal of barrier.

2. All (plastic or hard) barrier removal activities must be completed in a manner that prevents dust release. Use the following precautions when removing hard barriers:

i. Carefully remove screws and painter tape.

ii. If dust will be generated during screw removal, use hand-held HEPA vacuum.

iii. Drywall cutting is prohibited during removal process.

iv. Clean all stud tracks with HEPA vacuum before removing outer hard barrier.

v. Use a plastic barrier to enclose area if dust could be generated.

Negative Air Requirements:

1. The use of negative air must be designed to remove contaminants from the work area.

2. Negative air devices (fans, filters, monitoring and documentation equipment) must remain operational at all times and in place for a period after completion of dust creating activities to remove contaminants from the work area and before removal of critical barriers.

HVAC systems:

1. Upon removal of critical barriers, remove isolation of HVAC system in areas where work is being performed.

2. Verify that HVAC systems are clean and operational.

3. Verify and document through a TAB the HVAC systems meets original airflow and air exchange design specifications.

Water systems:

Until the potable water system is activated and in use, flushing shall continue at least twice per week in accordance with VHA Directive 1061.

Level of

Precautions

Measures

Level III - IV

Low Risk Medium Risk High Risk Highest Risk

Non-patient care areas such as:

Patient care support areas such as:

Patient care areas such as:

Procedural, invasive, sterile support and highly compromised patient care areas such as:

• Public hallways and gathering areas not in clinical areas

• Office areas not in clinical areas

• Breakrooms not in clinical areas

• Bathrooms or locker rooms not in clinical areas

• Mechanical/electrical rooms not in clinical areas

• Waiting areas

• Clinical engineering

(biomedical)

• Materials management

• Sterile processing department – dirty side

• Kitchen, cafeteria, gift shop, coffee shop, and food kiosks

• Patient care rooms and areas, including spinal cord injury units

• All acute care units, including mental health

• All outpatient units and clinics

• Emergency department

• Community Living Centers, domiciliaries, and transitional residences

• Employee health

• Pharmacy – general work zone

• Medication rooms and clean utility rooms

• Imaging suites – diagnostic imaging

• Laboratory

• All transplant units

• All intensive care units

• All oncology units and chemotherapy/infusi on centers

• OR theaters and restricted areas

• Hemodialysis units

• Procedural rooms*

• Pharmacy compounding area

• Sterile processing department – clean side

• Transfusion services

• Imaging suites – interventional imaging

• Dedicated isolation wards/units for infectious diseases

* Procedural Rooms are designated for the performance of patient care activities that may require high-level disinfected or sterile instruments and some environmental controls but is not required to be performed with the environmental controls of an operating room (OR). The room is intended for procedures that are performed in an aseptic surgical field and penetrates the protective surfaces of a patient’s body (e.g., subcutaneous tissue, mucous membranes, cornea) or entry into or opening of a sterile body cavity. Examples of these spaces include Cardiac Catheterization Suites, Electrophysiology Suites, Endovascular/GI Suites, Angio Suites and other spaces which may have high risk patient populations.

Low Risk I II II III

Patient Risk

Category

Medium Risk

High Risk

Highest Risk

I

I

II

II

II

III

III

IV

IV

IV

IV

IV

A B C D

Activity Category

An infection prevention and control permit is required for Level III and Level IV. Consult with Infection Prevention and Control for Level I and Level II.

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

COR / Project Engineer

CONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

Office of Construction and Facilities Management

Department of Veterans Affairs

Phase

STAMP: ARCHITECT/ENGINEER OF RECORD:

4F PROJECT NO: 19.2481.A26 40

/2 /2

:2

:1

P M

8/28/2024

INFECTION CONTROL RISK

ASSESSMENT

G1.00

UPGRADE DOORS/DOOR

HARDWARE AT IOWA CITY VA

HEALTH CARE SYSTEM

JEKP

IOWA CITY, IOWAMATTHEW RUPPENKAMP

CONSTRUCTION

DOCUMENTS

636A8-23-102

CONSTRUCTION DOCUMENTS

NOTE: GENERAL CONTRACTOR SHALL COORDINATE WITH IOWA CITY VA COR

TO OBTAIN AN ICRA/PCRA FORM FILLED OUT BY LOCAL IOWA CITY VA STAFF

WITH REQUIREMENT BASED UPON AREA OF WORK AND ADJACENCIES.

GENERAL NOTES:

1/4" = 1'-0"

INFECTION CONTROL RISK ASSESSMENT

ICRA PERMIT- DOORS LEVEL 2 001 ICRA PERMIT - DOORS LEVEL 3 001

ICRA PERMIT - DOORS LEVEL 4 001

BE24

B C

BW110C

BW107

BCS03B

BW114 BW115

BS04

B W

B C

W

B W

A

B E

B E

AD1.11

AD1.11

AD1.11

AD1.11

AD1.11

AD1.11

AD1.11

AD1.11

AD1.11

AD1.11

AD1.11

AD1.11

AD1.11

DOOR BE24

REMOVE EXISTING DOOR,

FRAME AND HARDWARE.

SEE DOOR SCHEDULE.

DOOR BE00

REMOVE EXISTING DOOR,

FRAME AND HARDWARE. MAY

REQUIRE SAW CUTTING TO

REMOVE EXISTING FRAME

SET IN CONCRETE.

DOOR BW12A

REMOVE EXISTING DOOR,

FRAME AND HARDWARE.

SEE DOOR SCHEDULE.

DOOR BC07

REMOVE EXISTING ALUMINUM

DOOR, FRAME AND HARDWARE.

SEE DOOR SCHEDULE

DOOR BW107

PAINT HM DOOR AND FRAME.

SEE DOOR SCHEDULE.

DOOR BW110C

REMOVE EXISTING DOOR,

FRAME AND HARDWARE.

SEE DOOR SCHEDULE.

DOOR BW114

REMOVE EXISTING DOOR,

FRAME AND HARDWARE.

SEE DOOR SCHEDULE.

DOOR BW115

REMOVE EXISTING DOOR,

FRAME AND HARDWARE.

SEE DOOR SCHEDULE.

DOOR BS04

REMOVE EXISTING DOOR,

FRAME AND HARDWARE. SEE

DOOR SCHEDULE.

DOOR BW101

KEEP DOORS AND FRAMES

NOT RATED. SEE DOOR SCHEDULE.

DOOR BCS03B

SEE DOOR SCHEDULE.

DOOR BCW02

REPLACE DOOR & FRAME 7'-4" x 7'-2"

REPLACE DOOR 11 P.M. FRIDAY TO

NOON SUNDAY. SEE DOOR SCHEDULE.

DOOR BE01

REMOVE EXISTING DOOR,

FRAME AND HARDWARE. MAY

REQUIRE SAW CUTTING TO

REMOVE EXISTING FRAME

SET IN CONCRETE.

1. SHEET SIZE FOR PROPER SCALE IS 42X30. CONTRACTOR SHALL NOT

SCALE DRAWINGS BUT SHALL REQUEST THE DESIRED DIMENSIONS FROM

THE ARCHITECT.

2. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VISIT THE

PROJECT AND VERIFY EXISTING CONDITIONS/DIMENSIONS AND

PROPOSED CONDITIONS. COORDINATE DEMOLITION BETWEEN ALL

TRADES. NOTIFY A/E IMMEDIATELY OF ANY CONFLICTS OR

DISCREPANCIES.

3. SEE ENLARGED AREA PLANS FOR KEYNOTES.

4. EXISTING AREAS NOT IN CONTRACT SHOWN SHADED FOR CLARITY.

POINT OF EGRESS

SHEET LEGEND:

NORTH ARROW

PLAN NORTH

TRUE NORTH

1-HOUR FIRE BARRIER

WALL RATING LEGEND:

2-HOUR FIRE BARRIER

SMOKE BARRIER

2-HOUR FIRE SMOKE

BARRIER

FIRE RATING

SMOKE AND FIRE RATING

1-HOUR FIRE SMOKE

BARRIER

SMOKE PARTITION

SMOKE RESISTIVE

CORRIDOR WALL

FOURFRONT DESIGN, INC.

517 7TH STREET

RAPID CITY, SOUTH DAKOTA 57701

PH: (605) 342-9470

FAX: (605) 342-2377

WWW.FOURFRONTDESIGN.COM

FOUR FRONT

D E S I G N I N C.

Project Number

Building Number

Drawing Number

Dwg.

DrawnCheckedDate

Location

Project TitleDrawing Title

COR / Project Engineer

CONSULTANTS:

DateRevisions:

VA FORM 08-6231

o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9

F

E

D

C

B

A

1 2 3 4 5 6 7 8 9 of

Office of Construction and Facilities Management

Department of Veterans Affairs

Phase

STAMP: ARCHITECT/ENGINEER OF RECORD:

4F PROJECT NO: 19.2481.A26 40

/2 /2

:2

:2

P M

8/28/2024

DEMOLITION PLAN - BUILDING 1 -

BASEMENT PLAN

AD1.01

UPGRADE DOORS/DOOR

HARDWARE AT IOWA CITY VA

HEALTH CARE SYSTEM

JEKP

IOWA CITY, IOWAMATTHEW RUPPENKAMP

CONSTRUCTION

DOCUMENTS

636A8-23-102

CONSTRUCTION DOCUMENTS

1/16" = 1'-0"

BUILDING 1, BASEMENT DEMO PLAN

GENERAL NOTES:

Sheets
G0.01 - CAMPUS MAP
G1.00 - INFECTION CONTROL RISK ASSESSMENT
AD1.01 - DEMOLITION PLAN - BUILDING 1 - BASEMENT PLAN
AD1.02 - DEMOLITION PLAN - BUILDINGS 1 AND 50, FLOOR 1 PLAN

File details come from the government source that posted it. Updated .