About this file

This presolicitation notice announces a forthcoming solicitation for construction services to correct various mechanical system deficiencies at a Veterans Affairs medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 will seek to award a firm-fixed price contract valued between $1,000,000 and $3,000,000 to provide general construction and alterations to replace a security camera surveillance system at the Memphis VA Medical Center in Memphis, Tennessee. The requirement is reserved exclusively for service-disabled veteran-owned small businesses listed in the Center for Verification and Evaluation database. Questions must be submitted in writing to the contracting officer by June 12, 2020, which is the anticipated release date for the solicitation.

View the file

Other files

File Type Posted
07 22 00 Roof and Deck Insulation.pdf PDF
36C24921R0086 0005.pdf PDF
07 60 00 Flashing and Sheet Metal.pdf PDF
FAN CLARIFICATION.pdf PDF
07 72 00 Roof Accessories.pdf PDF
08 71 00 Door Hardware.pdf PDF
Revised Table Of Contents.pdf PDF
07 52 16.11 Cold Adhesive STY Modified Bituminous Membrane Roofing.pdf PDF
36C24921R0086 0004.pdf PDF
36C24921R0086 0003.pdf PDF
Site Visit Sign-in Log_Correct Various Mech. Def..pdf PDF
36C24921R0086 0002.pdf PDF
Final Asbestos Report - 3 of 6.pdf PDF
19-191 General Addendum 01 to VA.pdf PDF
Questions and Answers 2 of 2 - Pre-bid RFIs.xlsx XLSX spreadsheet
01_005_FLOOR PLAN - FIRST FLOOR - A.PDF PDF
01_007_FLOOR PLAN - SECOND FLOOR - A.PDF PDF
19-191 Electrical Addendum 01 to VA.pdf PDF
Final Asbestos Report - 5 of 6.pdf PDF
01_12_FLOOR PLAN - FOURTH FLOOR - B.PDF PDF
01_15R_FLOOR PLAN - SIXTH FLOOR - A.PDF PDF
01_009_FLOOR PLAN - THIRD FLOOR - A.PDF PDF
01_14_FLOOR PLAN - FIFTH FLOOR - B.PDF PDF
01_002_FLOOR PLAN - GROUND FLOOR - B (1).PDF PDF
01_15_FLOOR PLAN - SIXTH FLOOR - A.PDF PDF
Addendum1.pdf PDF
01_003_FLOOR PLAN - GROUND FLOOR - A.PDF PDF
01_10R_FLOOR PLAN - THIRD FLOOR - B.PDF PDF
Final Asbestos Report - 1 of 6.pdf PDF
01_008R_FLOOR PLAN - SECOND FLOOR - B.PDF PDF
Past Performance Questionnaire.docx DOCX document
01_008_FLOOR PLAN - SECOND FLOOR - B.PDF PDF
Final Asbestos Report - 4 of 6.pdf PDF
Questions and Answers 1 of 2.pdf PDF
01_18_FLOOR PLAN - PENTHOUS - B.PDF PDF
01_13_FLOOR PLAN - FIFTH FLOOR - A.PDF PDF
Final Asbestos Report - 6 of 6.pdf PDF
01_16_FLOOR PLAN - SIXTH FLOOR - B.PDF PDF
01_11R_FLOOR PLAN - FOURTH FLOOR - A.PDF PDF
01_002_FLOOR PLAN - GROUND FLOOR - B.PDF PDF
01_004_FLOOR PLAN - GROUND FLOOR - B.PDF PDF
01_006_FLOOR PLAN - FIRST FLOOR - B.PDF PDF
01_11_FLOOR PLAN - FOURTH FLOOR - A.PDF PDF
Final Asbestos Report - 2 of 6.pdf PDF
01_17_FLOOR PLAN - PENTHOUS - A.PDF PDF
01_026_BUILDING SECTION.PDF PDF
36C24921R0086 0001.pdf PDF
Price Proposal Template.xlsx XLSX spreadsheet
CALCULATION OF SELF PERFORMED WORK.pdf PDF
Contractor EMR Certification Form.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 1

BUILDING 1

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

FULLY SPRINKLERED

/2

/2

:4

:3

P

M

G-001

COVER

1 14TJS ANP

CORRECT VARIOUS

MECHANICAL SYSTEM

DEFICIENCIES

1101 VETERANS DRIVE

LEXINGTON, KY 40502-2236

MARCH 29, 2021

596A4-19-10219-191-Q27

CORRECT VARIOUS MECHANICAL

SYSTEM DEFICIENCIES

1101 VETERANS DRIVE

LEXINGTON, KY 40502-2236

VA PROJECT #: 596A4-19-102

BID DOCUMENTS

DRAWING LIST

MP100 THIRD FLOOR WEST MECHANICAL PIPING PLAN - PHASE 1 40 55

MP101 THIRD FLOOR NORTH/SOUTH MECHANICAL PIPING PLAN - PHASE 1 41 55

MP102 FOURTH FLOOR WEST MECHANICAL PIPING PLAN - PHASE 1 42 55

MP103 FOURTH FLOOR NORTH/SOUTH MECHANICAL PIPING PLAN - PHASE 1 43 55

MP104 FIFTH FLOOR WEST MECHANICAL PIPING PLAN - PHASE 1 44 55

MP105 THIRD FLOOR WEST MECHANICAL PIPING PLAN - PHASE 2 45 55

MP106 THIRD FLOOR NORTH/SOUTH MECHANICAL PIPING PLAN - PHASE 2 46 55

MP107 FOURTH FLOOR WEST MECHANICAL PIPING PLAN - PHASE 2 47 55

MP108 FOURTH FLOOR NORTH/SOUTH MECHANICAL PIPING PLAN - PHASE 2 48 55

MP109 FIFTH FLOOR WEST MECHANICAL PIPING PLAN - PHASE 2 49 55

M-501 MECHANICAL DETAILS 50 55

M-502 AIR HANDLING UNIT DETAILS 51 55

M-503 MECHANICAL CONTROLS 52 55

M-504 MECHANICAL CONTROLS 53 55

M-601 MECHANICAL SCHEDULES 54 55

M-602 MECHANICAL SCHEDULES 55 55

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 16

E-101 THIRD FLOOR OVERALL PLAN 2 16

E-102 FOURTH FLOOR OVERALL PLAN 3 16

E-103 FIFTH FLOOR OVERALL PLAN 4 16

EP101 THIRD FLOOR WEST POWER PLAN 5 16

EP102 THIRD FLOOR NORTH/SOUTH POWER PLAN 6 16

EP103 FOURTH FLOOR WEST POWER PLAN 7 16

EP104 FOURTH FLOOR NORTH/SOUTH PLAN 8 16

EP105 FIFTH FLOOR WEST POWER PLAN 9 16

EP106 ROOF POWER PLAN 10 16

E-400 ENLARGED GROUND FLOOR POWER PLANS 11 16

E-401 ENLARGED FIRST FLOOR POWER PLAN 12 16

E-402 ENLARGED SECOND FLOOR POWER PLAN 13 16

E-403 ENLARGED FIFTH FLOOR POWER PLAN 14 16

E-404 ENLARGED SIXTH FLOOR POWER PLAN 15 16

E-501 ELECTRICAL DETAILS 16 16

DRAWING LIST

GENERAL

G-001 COVER 1 14

GI101 ICRA DETAILS 2 14

GI102 GROUND & FIRST FLOOR INFECTION CONTROL PLAN - PHASE 2 3 14

GI103 THIRD FLOOR WEST INFECTION CONTROL PLAN - PHASE 1 AND 3 4 14

GI104 THIRD FLOOR WEST INFECTION CONTROL PLAN - PHASE 2 5 14

GI105 THIRD FLOOR NORTH/SOUTH INFECTION CONTROL PLAN - PHASE 1 AND 3 6 14

GI106 THIRD FLOOR NORTH/SOUTH INFECTION CONTROL PLAN - PHASE 1 AND 3 7 14

GI107 THIRD FLOOR NORTH/SOUTH INFECTION CONTROL PLAN - PHASE 2 8 14

GI108 FOURTH FLOOR WEST INFECTION CONTROL PLAN - PHASE 1 AND 3 9 14

GI109 FOURTH FLOOR WEST INFECTION CONTROL PLAN - PHASE 2 10 14

GI110 FOURTH FLOOR NORTH/SOUTH INFECTION CONTROL PLAN - PHASE 1 AND 3 11 14

GI111 FOURTH FLOOR NORTH/SOUTH INFECTION CONTROL PLAN - PHASE 2 12 14

GI112 FIFTH FLOOR WEST ICRA PLAN - PHASE 1 AND 3 13 14

GI113 FIFTH FLOOR WEST INFECTION CONTROL PLAN - PHASE 2 14 14

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 9

A-101 GROUND & FIRST FLOOR PHASING PLAN - PHASE 2 2 9

A-102 THIRD FLOOR WEST PLAN - PHASE 1, 2, AND 3 3 9

A-103 THIRD FLOOR NORTH/SOUTH PLAN - PHASE 1 AND 3 4 9

A-104 THIRD FLOOR NORTH/SOUTH PLAN - PHASE 2 5 9

A-105 FOURTH FLOOR WEST PLAN - PHASE 1, 2, AND 3 6 9

A-106 FOURTH FLOOR NORTH/SOUTH PLAN - PHASE 1 AND 3 7 9

A-107 FOURTH FLOOR NORTH/SOUTH PLAN - PHASE 2 8 9

A-108 FIFTH FLOOR WEST FLOOR PLAN - PHASE 1, 2, AND 3 9 9

MECHANICAL

M-001 MECHANICAL SYMBOLS AND ABBREVIATIONS 1 55

MD100 THIRD FLOOR WEST HVAC DEMOLITION PLAN - PHASE 2 2 55

MD101 THIRD FLOOR NORTH/SOUTH HVAC DEMOLITION PLAN - PHASE 2 3 55

MD102 FOURTH FLOOR WEST HVAC DEMOLITION PLAN - PHASE 2 4 55

MD103 FOURTH FLOOR NORTH/SOUTH HVAC DEMOLITION PLAN - PHASE 2 5 55

MD104 FIFTH FLOOR WEST HVAC DEMOLITION PLAN - PHASE 2 6 55

MD105 ROOF MECHANICAL DEMOLITION PLAN - PHASE 2 7 55

MD106 THIRD FLOOR WEST MECHANICAL PIPING DEMOLITION PLAN - PHASE 2 8 55

MD107 THIRD FLOOR NORTH/SOUTH MECHANICAL PIPING DEMOLITION PLAN - PHASE 2 9 55

MD108 FOURTH FLOOR WEST MECHANICAL PIPING DEMOLITION PLAN - PHASE 2 10 55

MD109 FOURTH FLOOR NORTH/SOUTH MECHANICAL PIPING DEMOLITION PLAN - PHASE 2 11 55

MD110 FIFTH FLOOR WEST MECHANICAL PIPING DEMOLITION PLAN - PHASE 2 12 55

MD111 THIRD FLOOR WEST MECHANICAL PIPING DEMOLITION PLAN - PHASE 3 13 55

MD112 THIRD FLOOR NORTH/SOUTH MECHANICAL PIPING DEMOLITION PLAN - PHASE 3 14 55

MD113 FOURTH FLOOR WEST MECHANICAL PIPING DEMOLITION PLAN - PHASE 3 15 55

MD114 FOURTH FLOOR NORTH/SOUTH MECHANICAL PIPING DEMOLITION PLAN - PHASE 3 16 55

MD115 FIFTH FLOOR WEST MECHANICAL PIPING DEMOLITION PLAN - PHASE 3 17 55

MD301 AIR HANDLING UNIT SECTIONS DEMOLITION 18 55

MD400 ENLARGED GROUND FLOOR HVAC DEMOLITION PLANS 19 55

MD401 ENLARGED FIRST FLOOR HVAC DEMOLITION PLANS 20 55

MD402 ENLARGED SECOND FLOOR HVAC DEMOLITION PLANS 21 55

MD403 ENLARGED THIRD FLOOR HVAC DEMOLITION PLANS 22 55

MD404 ENLARGED FOURTH FLOOR HVAC DEMOLITION PLANS 23 55

MD405 ENLARGED FIFTH FLOOR HVAC DEMOLITION PLANS 24 55

MD406 ENLARGED SIXTH FLOOR HVAC DEMOLITION PLANS 25 55

MH100 THIRD FLOOR WEST HVAC PLAN - PHASE 2 26 55

MH101 THIRD FLOOR NORTH/SOUTH HVAC PLAN - PHASE 2 27 55

MH102 FOURTH FLOOR WEST HVAC PLAN - PHASE 2 28 55

MH103 FOURTH FLOOR NORTH/SOUTH HVAC PLAN - PHASE 2 29 55

MH104 FIFTH FLOOR WEST HVAC PLAN - PHASE 2 30 55

MH105 ROOF MECHANICAL PLAN - PHASE 2 31 55

MH301 AIR HANDLING UNIT SECTIONS 32 55

MH400 ENLARGED GROUND FLOOR HVAC PLANS 33 55

MH401 ENLARGED FIRST FLOOR HVAC PLANS 34 55

MH402 ENLARGED SECOND FLOOR HVAC PLANS 35 55

MH403 ENLARGED THIRD FLOOR HVAC PLANS 36 55

MH404 ENLARGED FOURTH FLOOR HVAC PLANS 37 55

MH405 ENLARGED FIFTH FLOOR HVAC PLANS 38 55

MH406 ENLARGED SIXTH FLOOR HVAC PLANS 39 55

DocuSign Envelope ID: EE5AEEF2-9D98-4577-93F2-090BB049D8AE

3/25/2021

ICRA, ILSM, FIRE WATCH AND

MISC. FORMS

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT FOR THE

CORRECTION OF VARIOUS MECHANICAL SYSTEM

DEFICIENCIES

• THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA

• PLEASE USE ALTERNATE EXITS AS MARKED

FORMS CONTAINER

TO BE CLEAR

PLASTIC

1'-5"

HEATED DETECTOR CUT-OFF

BASIS OF DESIGN: HEPA

NEGATIVE AIR UNIT INTEGRAL

WITH EDGEGUARD BARRIER

SYSTEM.

FIRE RATED PLYWOOD (TEMP.

REMOVE GLASS PANEL)

EXISTING WINDOW FRAME

ICRA BARRIER ICRA BARRIER,

SEE PLANS FOR

TYPES AND

LOCATIONS.

EXISTING CEILING

EXISTING CONCRETE SLAB FLOORING

FINISHED FLOORING TO BE

KEPT CLEAN. FLOORS NOT

BEING REPLACED MUST BE

PROTECTED. COVER WITH

ROSIN PAPER/ FIRE RATED

PLYWOOD.

VERIFY ROUTING OUTSIDE OF

ICRA BARRIERS WITH COR

PRIOR TO INSTALLATION

ABOVE CEILING INFECTION

CONTROL ISOLATION FLEX BARRIER

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L E

H E

IG

H

T

HEPA NEGATIVE

AIR UNIT

EXISTING WALL

EXISTING CEILING

FLEX DUCT

3 5/8" INSULATED WALL WITH

16 GAUGE METAL STUDS @

16" O.C. WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

5"

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

/2

5"

3 5/8" 16 GAUGE METAL

STUDS @ 16" O.C. WALL TO

EXTEND TO UNDERSIDE OF

DECK

R N

3 5/8" INSULATED WALL WITH

16 GAUGE METAL STUDS @

16" O.C. (2) LAYERS 5/8"

GYPSUM BOARD EACH SIDE.

WALL TO EXTEND TO

UNDERSIDE OF DECK

5/8" FIRE RESISTANT GYPSUM

BOARD - BOTH SIDES

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

6 1/4"

T

FIRE RESISTANT SEALANT,

BOTH SIDES

FIRE RESISTANT SEALANT,

BOTH SIDES

FIRE RESISTANT SEALANT,

BOTH SIDES

1-HR RATED AND SMOKE RATED

U.L. DESIGN NO. U404

SMOKE RATED 2-HR RATED AND

SMOKE RATED

U.L. DESIGN NO. U404 P

PLASTIC SHEET BARRIER

NON RATED

PLASTIC SHEET

BARRIER

EXISTING WALL

ASSEMBLY

EXISTING CEILING

BOTTOM SEALING

RUNNER

TOP SEALING

RUNNER

SUPPORT POLES,

QUANTITY PER

MANUF.

RECOMMENDATIONS

REQU.

AS

OUTSIDE OF BUILDING

WEEKLY CHANGED HEPA

FILTER

HEPA NEGATIVE

AIR UNIT

WEEKLY CHANGED (OR MORE AS

NEEDED) PRE FILTER

FIRE RATED PLYWOOD

F L E

X D

U C

T

SUPPLY DUCTS EITHER KEEP

RUNNING OR COVER WHEN

RUNNING TO KEEP DUST OUT.

TAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION

A

O

V

FIRE EXTINGUISHER ON PORTABLE

FLOOR BRACKET (ILSM MAY REQUIRE

MORE THAN ONE)

TYPE P PLASTIC ZIPPER

WALL CURTAIN BARRIER

6 MIL PLASTIC, SEE PLANS

FOR LOCATION

INDICATOR SHALL BE AT -0.01 OR

GREATER (VERIFY DAILY). IF NOT,

VERIFY ALL OPENINGS SUCH AS

DOORS ARE CLOSED AND/OR CHANGE

OUT NEGATIVE AIR PRE-FILTER

PROVIDE STICKY MAT, DRY MAT, WET MAT

(CHANGED END OF SHIFT

OR MORE IF NECESSARY

TO MAINTAIN CLEANLINESS)

PROVIDE WIPES AND SPRAY FOR WET MAT

POST ICRA ILSM FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

COVER ALL RETURNS AT THE

GRATE/DIFFUSERS

OPTIONAL EXHAUST DUCTS

(COVER THE GRATES AND THE DIFFUSERS)

A

E

A

DOOR OPENING

VENT TO OUTSIDE

ROUTE TO BE

APPROVED BY OWNER

TYPE R, N, OR T HARD WALL

ICRA BARRIER WITH SCWD

ACCESS. SEE PLANS FOR

TYPE AND LOCATIONS

A. THE CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT PRIOR

APPROVAL OF THE COR AND THE MEDICAL CENTER.

B. ACTIVITY HAZARD RISK CLASSIFICATIONS OF CLASS

I OR CLASS II SHALL REQUIRE APPROVAL BY THE

FACILITY SAFETY MANAGER AND CONTRACTING

OFFICER REPRESENTATIVE BEFORE BEGINNING

ANY CONSTRUCTION WORK. HAZARD RISK

CLASSIFICATIONS OF CLASS III OR IV SHALL

REQUIRE A PERMIT BEFORE BEGINNING ANY

CONSTRUCTION WORK. INFECTION CONTROL

PERMITS WILL BE ISSUED BY THE FACILITY SAFETY

MANAGER AND CONTRACTING OFFICER

REPRESENTATIVE.

C. INFECTION CONTROL PERMITS SHALL BE POSTED

OUTSIDE THE APPROPRIATE CONSTRUCTION AREA.

MORE THAN ONE PERMIT MAY BE ISSUED, AS WORK

IS LOCATED IN MULTIPLE AREAS.

D. THE REQUIRED INFECTION CONTROL PRECAUTIONS

ARE AS FOLLOWS:

CLASS 1:

• NOTIFY THE COR.

• EXECUTE WORK USING METHODS TO MINIMIZE

RAISING DUST FROM CONSTRUCTION OPERATIONS.

• CEILING TILES: IMMEDIATELY REPLACE ANY CEILING

TILES DISPLACED FOR VISUAL INSPECTION.

• UPON COMPLETION: CLEAN WORK AREA, AND

NOTIFY COR.

CLASS 2:

• NOTIFY THE COR.

• PROVIDE ACTIVE MEANS TO PREVENT AIRBORNE

DUST FROM DISPERSING INTO ATMOSPHERE SUCH

AS WET METHODS OR TOOL MOUNTED DUST

COLLECTORS.

• WATER MIST WORK SURFACES TO CONTROL DUST

WHILE CUTTING.

• SEAL UNUSED DOORS WITH PAINTERS TAPE.

• BLOCK OFF AND SEAL AIR VENTS.

• REMOVE OR ISOLATE HVAC SYSTEM IN AREAS

WHERE WORK IS BEING PERFORMED.

• UPON COMPLETION: WIPE WORK SURFACES WITH

CLEANER/ DISINFECTANT. CONTAIN CONSTRUCTION

WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS.

CLASS 3:

DURING CONSTRUCTION WORK:

• OBTAIN PERMIT FROM THE COR.

• REMOVE OR ISOLATE HVAC SYSTEM IN AREA

WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA

FROM NON-WORK AREA OR IMPLEMENT CONTROL

CUBE METHOD (CART WITH PLASTIC COVERING AND

SEALED CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS. INSTALL CONSTRUCTION

BARRIERS AND CEILING PROTECTION CAREFULLY,

OUTSIDE OF NORMAL WORK HOURS.

• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF

WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS AND

CONTINUOUSLY MONITORED WITH A DIGITAL

DISPLAY, RECORDING AND ALARM INSTRUMENT,

WHICH MUST BE CALIBRATED ON INSTALLATION,

MAINTAINED WITH PERIODIC CALIBRATION AND

MONITORED BY THE CONTRACTOR.

• CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS.

• COVER TRANSPORT RECEPTACLES OR CARTS.

TAPE COVERING UNLESS SOLID LID.

UPON COMPLETION:

• DO NOT REMOVE BARRIERS FROM WORK AREA

UNTIL COMPLETED PROJECT THOROUGHLY

CLEANED, AND IS INSPECTED BY THE CONTRACTING

OFFICER REPRESENTATIVE AND BY THE VA

ENVIRONMENTAL SERVICES DEPARTMENT.

• REMOVE CONSTRUCTION BARRIERS AND CEILING

PROTECTION CAREFULLY TO MINIMIZE SPREADING

OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION, OUTSIDE OF NORMAL WORK

HOURS.

• VACUUM WORK AREA WITH HEPA FILTERED

VACUUMS.

• WET MOP AREA WITH CLEANER/DISINFECTANT.

• UPON COMPLETION, RESTORE HVAC SYSTEM

WHERE WORK WAS PERFORMED.

• RETURN PERMIT TO THE COR.

CLASS 4:

DURING CONSTRUCTION WORK:

• OBTAIN PERMIT FROM THE COR.

• ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS

BEING DONE TO PREVENT CONTAMINATION OF

DUCT SYSTEM.

• COMPLETE ALL CRITICAL BARRIERS TO SEAL AREA

FROM NON-WORK AREA OR IMPLEMENT CONTROL

CUBE METHOD (CART WITH PLASTIC COVERING AND

SEALED CONNECTION TO WORK SITE WITH HEPA

VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE

CONSTRUCTION BEGINS. INSTALL CONSTRUCTION

BARRIERS AND CEILING PROTECTION CAREFULLY,

OUTSIDE OF NORMAL WORK HOURS.

• MAINTAIN NEGATIVE AIR PRESSURE, 0.01 INCHES OF

WATER GAUGE, WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS AND

CONTINUOUSLY MONITORED WITH A DIGITAL

DISPLAY, RECORDING AND ALARM INSTRUMENT,

WHICH MUST BE CALIBRATED ON INSTALLATION,

MAINTAINED WITH PERIODIC CALIBRATION AND

MONITORED BY THE CONTRACTOR.

• SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.

• CONSTRUCT ANTEROOM AND REQUIRE ALL

PERSONNEL TO PASS THROUGH THIS ROOM SO

THEY CAN BE VACUUMED USING A HEPA VACUUM

CLEANER BEFORE LEAVING WORK SITE OR THEY

CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE

REMOVED EACH TIME THEY LEAVE WORK SITE.

• ALL PERSONNEL ENTERING WORK SITE ARE

REQUIRED TO WEAR SHOE COVERS. SHOE COVERS

MUST BE CHANGED EACH TIME THE WORKER EXITS

THE WORK AREA.

UPON COMPLETION:

• DO NOT REMOVE BARRIERS FROM WORK AREA

UNTIL COMPLETED PROJECT IS THOROUGHLY

CLEANED, AND IS INSPECTED BY THE CONTRACTING

OFFICER REPRESENTATIVE AND BY THE VA

ENVIRONMENTAL SERVICES DEPARTMENT.

• REMOVE CONSTRUCTION BARRIERS AND CEILING

PROTECTION CAREFULLY TO MINIMIZE SPREADING

OF DIRT AND DEBRIS ASSOCIATED WITH

CONSTRUCTION, OUTSIDE OF NORMAL WORK

HOURS.

• CONTAIN CONSTRUCTION WASTE BEFORE

TRANSPORT IN TIGHTLY COVERED CONTAINERS.

• COVER TRANSPORT RECEPTACLES OR CARTS.

TAPE COVERING UNLESS SOLID LID.

• VACUUM WORK AREA WITH HEPA FILTERED

VACUUMS.

• WET MOP AREA WITH CLEANER/DISINFECTANT.

• UPON COMPLETION, RESTORE HVAC SYSTEM

WHERE WORK WAS PERFORMED.

• RETURN PERMIT TO THE COR.

TYPE "F" DOOR -

WHERE INDICATED ON PLANS, IN ALL TYPE "R" INFECTION CONTROL

BARRIERS, USE A FLUSH 3'-0"x7'-0" SOLID CORE WOOD DOOR WITH 45 MINUTE

RATING. DOORS TO BE IN HOLLOW METAL DOOR FRAME AND USE DOOR

HARDWARE SET HW-4A. SEE SPECIFICATIONS FOR DOOR HARDWARE.

TYPE "N" DOOR -

WHERE INDICATED ON PLANS, IN ALL TYPE "N" INFECTION CONTROL

BARRIERS, USE A FLUSH 3'-0"x7'-0" SOLID CORE WOOD DOOR . DOORS TO BE

IN HOLLOW METAL DOOR FRAME AND USE DOOR HARDWARE SET HW-4. SEE

SPECIFICATIONS FOR DOOR HARDWARE.

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

/2

/2

:4

:3

P

M

GI101

ICRA DETAILS

2 14TJS ANP

CORRECT VARIOUS

MECHANICAL SYSTEM

DEFICIENCIES

1101 VETERANS DRIVE

LEXINGTON, KY 40502-2236

MARCH 29, 2021

596A4-19-10219-191-Q27

BID DOCUMENTS

Scale: 6" = 1'-0"

ILSM SIGNAGE

Scale: 1/2" = 1'-0"

CROSS SECTION A

Scale: 1/2" = 1'-0"

ICRA MOBILE CONTAINMENT CART

Scale: 3/4" = 1'-0"

ICRA BARRIER WALL TYPES

Scale: 1/2" = 1'-0"

TYPICAL ICRA CONSTRUCTION PLAN LAYOUT

ICRA DOOR TYPES

A. HOSPITAL "STANDARD HOURS OF OPERATION"

ARE 7AM THROUGH 7PM MONDAY THROUGH

FRIDAY. UNLESS NOTED OTHERWISE ON

DOCUMENTS, ALL WORK TO BE PERFORMED OFF

PEAK HOURS.

B. WHEN STARTING NEW PHASES OF WORK,

COMMUNICATE WITH COR SO WORK MAY BE

COORDINATED WITH AFFECTED DEPARTMENTS.

C. WORK TO BE PERFORMED IN PHASES TO

MINIMIZE IMPACT TO HOSPITAL OPERATIONS.

MAINTAIN PATHS OF EGRESS REQUIRED

THROUGHOUT HOSPITAL DURING

CONSTRUCTION.

D. WHERE INDICATED, INFECTION CONTROL

BARRIERS ARE TO BE INSTALLED AT THE

BEGINNING OF WORK SHIFT AND REMOVED

PRIOR TO START OF STANDARD OPERATING

HOURS.

E. INFECTION CONTROL BARRIERS ARE TO BE TYPE

"A" HARD WALL CONSTRUCTION WITH TYPE "D"

BARRIERS USED TO CREATE ANTECHAMBERS.

WORK SHIFT DEPENDENT BARRIERS THAT ARE

TO BE INSTALLED FOR ONLY A FEW HOURS AT A

TIME ARE TO BE TYPE "B" BARRIERS SEALED TO

THE FLOOR AND CEILING ASSEMBLY.

F. WHERE INDICATED, ALL WORK TO BE DONE IN

SINGLE PHASE.

G. GC TO TEMPORARILY REMOVE AND SAVE ALL

CEILING TILE AND GRID FOR REINSTALLATION AT

COMPLETION OF WORK PER PHASE OR WORK

SHIFT. ALL CEILING MOUNTED SYSTEM

COMPONENTS, INCLUDING BUT NOT LIMITED TO

LIGHTS, FIRE ALARM, IT, AND DIFFUSERS TO BE

MOVED, SAVED, PROTECTED AND REINSTALLED

AT THE COMPLETION OF WORK PER PHASE OR

WORK SHIFT. ANY CEILING TILE OR GRID

COMPONENTS DAMAGED AS A RESULT OF

REMOVAL TO BE REPLACED TO THE

SATISFACTION OF THE COR.

H. WHEN WORKING ON OIT, IT, COMM, OR DATA

ROOMS, GC AND ALL SUBS TO HAVE MEMBER OF

OIT PRESENT AT ALL TIMES. COORDINATE WITH

COR.

TYPE "R" INFECTION

CONTROL BARRIER

TYPE "N" INFECTION CONTROL

BARRIER

PLAN LEGEND

TYPE "P" INFECTION CONTROL

BARRIER

ACCESS DOOR THROUGH ICRA

BARRIER W/ STICKY MAT

PLASTIC SHEET BARRIER

ZIPPER ACCESS

HATCHED AREA INDICATES

AREA OF WORK SEPARATED

WITH ICRA BARRIER

STICKY MAT LOCATED AT

ACCESS POINTS

COMM EQUIP

RM

D007D

CORRIDOR

DH003

ELEVATOR

S7

CORRIDOR

AH004

ELEVATOR

LOBBY

A000

ELEV

P3

IT CLOSET

A002C

LOUNGE

A002

CORRIDOR

AH101

IT

A104

ELEC

A0104

ELEVATOR

P3

4'-0"

MECH

B128

STAIR

BS103

ELEC

BU103

ELEC

BU102

4'-0"

WAITING

CH120

IT

C121

WELCOME

DESK

CH101C

EXAM

C132D

PASSAGE

CH132A

CLEAN

UTILITY

C137

PASSAGE

CH140

PASSAGE

CH126

PASSAGE

CH125B

CLEAN

UTILTY

CH125H

E CYL

C125I

NOUR

PREP

C125J 7

5'-0"

PROCEDURE

D115

CORRIDOR

DH107

CLEAN

STORAGE

D139

SUPPLY RM

D137

IT EQUIP RM

D164

ELEVATOR

S7

CORRIDOR

EH104

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

/2

/2

:4

:4

P

M

GI102

GROUND & FIRST FLOOR INFECTION

CONTROL PLAN - PHASE 2

3 14TJS ANP

CORRECT VARIOUS

MECHANICAL SYSTEM

DEFICIENCIES

1101 VETERANS DRIVE

LEXINGTON, KY 40502-2236

MARCH 29, 2021

596A4-19-10219-191-Q27

BID DOCUMENTS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T H

0 4 8 16

1 TYPE "R" INFECTION CONTROL BARRIER

2 TYPE "N" INFECTION CONTROL BARRIER

3 TYPE "R" CONSTRUCTION ACCESS DOOR W/

WALK OFF STICKY MATS

4 TYPE "P" INFECTION CONTROL BARRIER W/

ZIPPER ACCESS AND STICKY MAT

5 TYPE "R" CONSTRUCTION ACCESS DOOR,

USE FOR LONG PIPE RUNS ONLY, LOCKED

AND SEALED FOR REMAINDER OF

SUBPHASE

6 THIS SIDE OF DOOR TO BE DEACTIVATED

AND HELD OPEN DURING THIS SUB PHASE.

7 THIS DOOR TO REMAIN CLOSED AND

SEALED THROUGHOUT SUBPHASE

8 WALK OFF STICKY MATS

9 THIS AREA TO BE OPEN TO STAFF AND

PATIENTS WHEN CONSTRUCTION ISN'T

TAKING PLACE. INSTALL AND REMOVE TYPE

"N" BARRIERS FOR ACCESS AND ISOLATION

10 THIS DOOR TO BE CLOSED AND SEALED

DURING OFF HOUR CONSTRUCTION

ACTIVITY AND OPEN WHEN CONSTRUCTION

ISN'T OCCURRING

Scale: 1/4" = 1'-0"

GROUND FLOOR - D007D COMM EQUIP RM - PHASE 2

Scale: 1/4" = 1'-0"

GROUND FLOOR - A002C IT CLOSET - PHASE 2

N

O R

T H

0 4 8 16

Scale: 1/4" = 1'-0"

FIRST FLOOR - A104 IT - PHASE 2

Scale: 1/4" = 1'-0"

FIRST FLOOR - BU103 ELECTRICAL - PHASE 2

Scale: 1/4" = 1'-0"

FIRST FLOOR - C121 IT - PHASE 2

Scale: 1/4" = 1'-0"

FIRST FLOOR - C137 CLEAN UTILITY - PHASE 2

Scale: 1/4" = 1'-0"

FIRST FLOOR - CH125H CLEAN UTILITY - PHASE 2

Scale: 1/4" = 1'-0"

FIRST FLOOR - D137 SUPPLY RM - PHASE 2

Scale: 1/4" = 1'-0"

FIRST FLOOR - D164 IT EQUIP RM

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16 N O

R T H

0 4 8 16

N O

R T H

0 4 8 16N O

R T H

0 4 8 16

TYPE "R" INFECTION

CONTROL BARRIER

TYPE "N" INFECTION CONTROL

BARRIER

PLAN LEGEND

TYPE "P" INFECTION CONTROL

BARRIER

ACCESS DOOR THROUGH ICRA

BARRIER W/ STICKY MAT

PLASTIC SHEET BARRIER

ZIPPER ACCESS

HATCHED AREA INDICATES

AREA OF WORK SEPARATED

WITH ICRA BARRIER

STICKY MAT LOCATED AT

ACCESS POINTS

A. HOSPITAL "STANDARD HOURS OF OPERATION"

ARE 7AM THROUGH 7PM MONDAY THROUGH

FRIDAY. UNLESS NOTED OTHERWISE ON

DOCUMENTS, ALL WORK TO BE PERFORMED OFF

PEAK HOURS.

B. WHEN STARTING NEW PHASES OF WORK,

COMMUNICATE WITH COR SO WORK MAY BE

COORDINATED WITH AFFECTED DEPARTMENTS.

C. WORK TO BE PERFORMED IN PHASES TO

MINIMIZE IMPACT TO HOSPITAL OPERATIONS.

MAINTAIN PATHS OF EGRESS REQUIRED

THROUGHOUT HOSPITAL DURING

CONSTRUCTION.

D. WHERE INDICATED, INFECTION CONTROL

BARRIERS ARE TO BE INSTALLED AT THE

BEGINNING OF WORK SHIFT AND REMOVED

PRIOR TO START OF STANDARD OPERATING

HOURS.

E. INFECTION CONTROL BARRIERS ARE TO BE TYPE

"A" HARD WALL CONSTRUCTION WITH TYPE "D"

BARRIERS USED TO CREATE ANTECHAMBERS.

WORK SHIFT DEPENDENT BARRIERS THAT ARE

TO BE INSTALLED FOR ONLY A FEW HOURS AT A

TIME ARE TO BE TYPE "B" BARRIERS SEALED TO

THE FLOOR AND CEILING ASSEMBLY.

F. WHERE INDICATED, ALL WORK TO BE DONE IN

SINGLE PHASE.

G. GC TO TEMPORARILY REMOVE AND SAVE ALL

CEILING TILE AND GRID FOR REINSTALLATION AT

COMPLETION OF WORK PER PHASE OR WORK

SHIFT. ALL CEILING MOUNTED SYSTEM

COMPONENTS, INCLUDING BUT NOT LIMITED TO

LIGHTS, FIRE ALARM, IT, AND DIFFUSERS TO BE

MOVED, SAVED, PROTECTED AND REINSTALLED

AT THE COMPLETION OF WORK PER PHASE OR

WORK SHIFT. ANY CEILING TILE OR GRID

COMPONENTS DAMAGED AS A RESULT OF

REMOVAL TO BE REPLACED TO THE

SATISFACTION OF THE COR.

H. WHEN WORKING ON OIT, IT, COMM, OR DATA

ROOMS, GC AND ALL SUBS TO HAVE MEMBER OF

OIT PRESENT AT ALL TIMES. COORDINATE WITH

COR.

CORRIDOR

BH302

CODING

B315

RESPIRATORY

B310

EQUIP

ROOM

B318

CLEANUP/

REPAIR

TESTING

B319A

STAIR

AS303

ELEC

BU303

ELEC

BU302

CPAC

CLINIC

B319B

CORRIDOR

BH303

CORRIDOR

BH301

TOILET

TOILET

B306

SLEEP

LAB

B304

EEG

TESTING

B321

EEG

TESTING

B324

SLEEP

ROOM

B322

SLEEP

ROOM

B301

EC

BU301

READING

ROOM

B323

EMG

TESTING

B325

SLEEP

DISORDER

RECEPTION

A306

CLEAN

A304

CORRIDOR

AH302

HOSPICE

CARE

OFFICE

A307

SOILED

A305

MECH

SHAFT

A304A

CORRIDOR

AH301

LOBBY

A301

4'-0"

3'-10"

4'-0"

3'-10"

4'-0"

SECY

RESP

THERAPY

B314

CARDIOLOGY

PROVIDER

OFFICE

B312H

RESPIRATORY

B312F

PROVIDER

OFFICE

B312D

CORRIDOR

BH302

NEGATIVE

PRESSURE

PENTAMIDINE

TREATMENT

B316

CODING

B317

CODING

B315

RESPIRATORY

B310

CPAC CLINIC

B319B

CORRIDOR

BH303

CORRIDOR

BH301

TOILET

TOILET

B306

SLEEP

LAB

B304

EEG

TESTING

B321

EEG

TESTING

B324

EC

BU301

READING

ROOM

B323

EMG

TESTING

B325

SLEEP

DISORDER

RECEPTION

A306

CLEAN

A304

CORRIDOR

AH302

HOSPICE

CARE

OFFICE

A307

SOILED

A305

MECH

SHAFT

A304A

CORRIDOR

AH301

LOBBY

A301

3'-9"

3'-9"

CONTROL

B324A

EEG

TESTING

B324

SLEEP

ROOM

B322

READING

ROOM

B323

EMG

TESTING

B325

CONTROL

B325A

SLEEP

DISORDER

RECEPTION

A306

CLEAN

A304

CORRIDOR

AH302 HOSPICE

CARE

OFFICE

A307SOILED

A305

4'-2"

CORRIDOR

AH301

NEUROLOGY

ADMIN

OFFICE

A303

NEUROLOGY

ADMIN

OFFICE

A302C

RESEARCH

B303

CONFERENCE

ROOM

A302B

4'-0"

CODING

B319

EQUIP

ROOM

B318

CLEANUP/

REPAIR

TESTING

B319A

CPAC

CLINIC

B319B

EEG

TESTING

B320

CORRIDOR

BH303

SLEEP

LAB

B304

EEG

TESTING

B321

CONTROL

B321A

CONTROL

B324A

EEG

TESTING

B324

SLEEP

ROOM

B322

4'-1"

B312E

RESPIRATORY

B313

SECY

RESP

THERAPY

B314

CARDIOLOGY

PROVIDER

OFFICE

B312H

CORRIDOR

BH302

NEGATIVE

PRESSURE

PENTAMIDINE

TREATMENT

B316

CODING

B317

CHIEF RESP

THERAPY

B314A

5'-0"

2 1

RESPIRATORY

B313

SECY

RESP

THERAPY

B314

PROVIDER

OFFICE

B312D

CARDIOLOGY

OFFICE

B312

PULM

ADMIN

OFFICE

B311

CORRIDOR

BH302

NEGATIVE

PRESSURE

PENTAMIDINE

TREATMENT

B316

CODING

B317

RESPIRATORY

B310

WORK

ROOM

B309

CODING

B319

CORRIDOR

BH302

4'-0" 4'-0"

PULM

ADMIN

OFFICE

B311

RESPIRATORY

B310

WORK

ROOM

B309

ELEC

BU303

ELEC

BU302

RESPIRATORY

B308

CORRIDOR

BH301

TOILET

B307

RESPIRATORY

B308A

RESEARCH

B305

PULM ADMIN

OFFICE/

PROVIDER

OFFICE

B311A

4'-0"

PROVIDER

OFFICE

B312B

PROVIDER

OFFICE

B312C

B312G

B312E

RESPIRATORY

B313

CARDIOLOGY

PROVIDER

OFFICE

B312HRESPIRATORY

B312F

PROVIDER

OFFICE

B312D

CARDIOLOGY

OFFICE

B312

PULM

ADMIN

OFFICE

B311 CORRIDOR

BH302

8 8

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

/2

/2

:4

:0

P

M

GI103

THIRD FLOOR WEST INFECTION

CONTROL PLAN - PHASE 1 AND 3

4 14TJS ANP

CORRECT VARIOUS

MECHANICAL SYSTEM

DEFICIENCIES

1101 VETERANS DRIVE

LEXINGTON, KY 40502-2236

MARCH 29, 2021

596A4-19-10219-191-Q27

BID DOCUMENTS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T H

0 4 8 16

1 TYPE "R" INFECTION CONTROL BARRIER

2 TYPE "N" INFECTION CONTROL BARRIER

3 TYPE "R" CONSTRUCTION ACCESS DOOR W/

WALK OFF STICKY MATS

4 TYPE "P" INFECTION CONTROL BARRIER W/

ZIPPER ACCESS AND STICKY MAT

5 TYPE "R" CONSTRUCTION ACCESS DOOR,

USE FOR LONG PIPE RUNS ONLY, LOCKED

AND SEALED FOR REMAINDER OF

SUBPHASE

6 THIS SIDE OF DOOR TO BE DEACTIVATED

AND HELD OPEN DURING THIS SUB PHASE.

7 THIS DOOR TO REMAIN CLOSED AND

SEALED THROUGHOUT SUBPHASE

8 WALK OFF STICKY MATS

9 THIS AREA TO BE OPEN TO STAFF AND

PATIENTS WHEN CONSTRUCTION ISN'T

TAKING PLACE. INSTALL AND REMOVE TYPE

"N" BARRIERS FOR ACCESS AND ISOLATION

10 THIS DOOR TO BE CLOSED AND SEALED

DURING OFF HOUR CONSTRUCTION

ACTIVITY AND OPEN WHEN CONSTRUCTION

ISN'T OCCURRING

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE A,

PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE B,

PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE C,

PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE D,

PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE E,

PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE F,

PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE G,

PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE H,

PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE I,

PHASE 1 AND 3

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

TYPE "N" INFECTION CONTROL

BARRIER

PLAN LEGEND

TYPE "P" INFECTION CONTROL

BARRIER

ACCESS DOOR THROUGH ICRA

BARRIER W/ STICKY MAT

PLASTIC SHEET BARRIER

ZIPPER ACCESS

HATCHED AREA INDICATES

AREA OF WORK SEPARATED

WITH ICRA BARRIER

STICKY MAT LOCATED AT

ACCESS POINTS

A. HOSPITAL "STANDARD HOURS OF OPERATION"

ARE 7AM THROUGH 7PM MONDAY THROUGH

FRIDAY. UNLESS NOTED OTHERWISE ON

DOCUMENTS, ALL WORK TO BE PERFORMED OFF

PEAK HOURS.

B. WHEN STARTING NEW PHASES OF WORK,

COMMUNICATE WITH COR SO WORK MAY BE

COORDINATED WITH AFFECTED DEPARTMENTS.

C. WORK TO BE PERFORMED IN PHASES TO

MINIMIZE IMPACT TO HOSPITAL OPERATIONS.

MAINTAIN PATHS OF EGRESS REQUIRED

THROUGHOUT HOSPITAL DURING

CONSTRUCTION.

D. WHERE INDICATED, INFECTION CONTROL

BARRIERS ARE TO BE INSTALLED AT THE

BEGINNING OF WORK SHIFT AND REMOVED

PRIOR TO START OF STANDARD OPERATING

HOURS.

E. INFECTION CONTROL BARRIERS ARE TO BE TYPE

"A" HARD WALL CONSTRUCTION WITH TYPE "D"

BARRIERS USED TO CREATE ANTECHAMBERS.

WORK SHIFT DEPENDENT BARRIERS THAT ARE

TO BE INSTALLED FOR ONLY A FEW HOURS AT A

TIME ARE TO BE TYPE "B" BARRIERS SEALED TO

THE FLOOR AND CEILING ASSEMBLY.

F. WHERE INDICATED, ALL WORK TO BE DONE IN

SINGLE PHASE.

G. GC TO TEMPORARILY REMOVE AND SAVE ALL

CEILING TILE AND GRID FOR REINSTALLATION AT

COMPLETION OF WORK PER PHASE OR WORK

SHIFT. ALL CEILING MOUNTED SYSTEM

COMPONENTS, INCLUDING BUT NOT LIMITED TO

LIGHTS, FIRE ALARM, IT, AND DIFFUSERS TO BE

MOVED, SAVED, PROTECTED AND REINSTALLED

AT THE COMPLETION OF WORK PER PHASE OR

WORK SHIFT. ANY CEILING TILE OR GRID

COMPONENTS DAMAGED AS A RESULT OF

REMOVAL TO BE REPLACED TO THE

SATISFACTION OF THE COR.

H. WHEN WORKING ON OIT, IT, COMM, OR DATA

ROOMS, GC AND ALL SUBS TO HAVE MEMBER OF

OIT PRESENT AT ALL TIMES. COORDINATE WITH

COR.

PROVIDER

OFFICE

B312B

PROVIDER

OFFICE

B312C B312G

B312E

RESPIRATORY

B313

SECY

RESP

THERAPY

B314

CARDIOLOGY

PROVIDER

OFFICE

B312HRESPIRATORY

B312F

PROVIDER

OFFICE

B312D

CARDIOLOGY

OFFICE

B312

PULM

ADMIN

OFFICE

B311

NEGATIVE

PRESSURE

PENTAMIDINE

TREATMENT

B316

CHIEF RESP

THERAPY

B314A

CORRIDOR

BH302

3'-10"

1 1

PROVIDER

OFFICE

B312C B312G

B312E

RESPIRATORY

B313

SECY

RESP

THERAPY

B314

CARDIOLOGY

PROVIDER

OFFICE

B312HRESPIRATORY

B312F

PROVIDER

OFFICE

B312D

CORRIDOR

BH302

NEGATIVE

PRESSURE

PENTAMIDINE

TREATMENT

B316

CODING

B317

CODING

B315

RESPIRATORY

B310

CODING

B319

CHIEF RESP

THERAPY

B314A

4'-0"

CARDIOLOGY

OFFICE

B312

PLUM

ADMIN

OFFICE

B311B

PULM

ADMIN

OFFICE

B311

WORK

ROOM

B309

RESPIRATORY

B308

CORRIDOR

BH301

RESPIRATORY

B308A

RESEARCH

B305

PULM ADMIN

OFFICE/

PROVIDER

OFFICE

B311A

5'-0"

4'-0"

4'-0"

CODING

B319

EQUIP

ROOM

B318

CLEANUP/

REPAIR

TESTING

B319A

CPAC

CLINIC

B319B

EEG

TESTING

B320

CORRIDOR

BH303

SLEEP

LAB

B304

EEG

TESTING

B321

CONTROL

B321A

4'-0"

CPAC

CLINIC

B319B

CORRIDOR

BH303

SLEEP

LAB

B304

EEG

TESTING

B321

EEG

TESTING

B324

SLEEP

ROOM

B322

4'-3"

CONTROL

B324A

EEG

TESTING

B324

EMG

TESTING

B325

CONTROL

B325A

SLEEP

DISORDER

RECEPTION

A306

CORRIDOR

AH302

HOSPICE

CARE

OFFICE

A307

84'-0"

4'-0"

READING

ROOM

B323

CLEAN

A304

CORRIDOR

AH302

SOILED

A305

5'-3"

EC

BU301

READING

ROOM

B323

CLEAN

A304

SOILED

A305

MECH

SHAFT

A304A

CORRIDOR

AH301

NEUROLOGY

ADMIN

OFFICE

A303

NEUROLOGY

ADMIN

OFFICE

A302C

3'-9"

5'-0"

CORRIDOR

AH301

NEUROLOGY

ADMIN

OFFICE

A303

NEUROLOGY

ADMIN

OFFICE

A302C

RESEARCH

B303

CHIEFS

OFFICE

A303A

CONFERENCE

ROOM

A302B

3'-9"

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

/2

/2

:4

:3

P

M

GI104

THIRD FLOOR WEST INFECTION

CONTROL PLAN - PHASE 2

5 14TJS ANP

CORRECT VARIOUS

MECHANICAL SYSTEM

DEFICIENCIES

1101 VETERANS DRIVE

LEXINGTON, KY 40502-2236

MARCH 29, 2021

596A4-19-10219-191-Q27

BID DOCUMENTS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T H

0 4 8 16

1 TYPE "R" INFECTION CONTROL BARRIER

2 TYPE "N" INFECTION CONTROL BARRIER

3 TYPE "R" CONSTRUCTION ACCESS DOOR W/

WALK OFF STICKY MATS

4 TYPE "P" INFECTION CONTROL BARRIER W/

ZIPPER ACCESS AND STICKY MAT

5 TYPE "R" CONSTRUCTION ACCESS DOOR,

USE FOR LONG PIPE RUNS ONLY, LOCKED

AND SEALED FOR REMAINDER OF

SUBPHASE

6 THIS SIDE OF DOOR TO BE DEACTIVATED

AND HELD OPEN DURING THIS SUB PHASE.

7 THIS DOOR TO REMAIN CLOSED AND

SEALED THROUGHOUT SUBPHASE

8 WALK OFF STICKY MATS

9 THIS AREA TO BE OPEN TO STAFF AND

PATIENTS WHEN CONSTRUCTION ISN'T

TAKING PLACE. INSTALL AND REMOVE TYPE

"N" BARRIERS FOR ACCESS AND ISOLATION

10 THIS DOOR TO BE CLOSED AND SEALED

DURING OFF HOUR CONSTRUCTION

ACTIVITY AND OPEN WHEN CONSTRUCTION

ISN'T OCCURRING

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE A,

PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE B,

PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE C,

PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE D,

PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE E,

PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE F,

PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE G,

PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE H,

PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR WEST ICRA

PLAN - SUBPHASE I,

PHASE 2

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

L S

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

TYPE "R" INFECTION

CONTROL BARRIER

TYPE "N" INFECTION CONTROL

BARRIER

PLAN LEGEND

TYPE "P" INFECTION CONTROL

BARRIER

ACCESS DOOR THROUGH ICRA

BARRIER W/ STICKY MAT

PLASTIC SHEET BARRIER

ZIPPER ACCESS

HATCHED AREA INDICATES

AREA OF WORK SEPARATED

WITH ICRA BARRIER

STICKY MAT LOCATED AT

ACCESS POINTS

A. HOSPITAL "STANDARD HOURS OF OPERATION"

ARE 7AM THROUGH 7PM MONDAY THROUGH

FRIDAY. UNLESS NOTED OTHERWISE ON

DOCUMENTS, ALL WORK TO BE PERFORMED OFF

PEAK HOURS.

B. WHEN STARTING NEW PHASES OF WORK,

COMMUNICATE WITH COR SO WORK MAY BE

COORDINATED WITH AFFECTED DEPARTMENTS.

C. WORK TO BE PERFORMED IN PHASES TO

MINIMIZE IMPACT TO HOSPITAL OPERATIONS.

MAINTAIN PATHS OF EGRESS REQUIRED

THROUGHOUT HOSPITAL DURING

CONSTRUCTION.

D. WHERE INDICATED, INFECTION CONTROL

BARRIERS ARE TO BE INSTALLED AT THE

BEGINNING OF WORK SHIFT AND REMOVED

PRIOR TO START OF STANDARD OPERATING

HOURS.

E. INFECTION CONTROL BARRIERS ARE TO BE TYPE

"A" HARD WALL CONSTRUCTION WITH TYPE "D"

BARRIERS USED TO CREATE ANTECHAMBERS.

WORK SHIFT DEPENDENT BARRIERS THAT ARE

TO BE INSTALLED FOR ONLY A FEW HOURS AT A

TIME ARE TO BE TYPE "B" BARRIERS SEALED TO

THE FLOOR AND CEILING ASSEMBLY.

F. WHERE INDICATED, ALL WORK TO BE DONE IN

SINGLE PHASE.

G. GC TO TEMPORARILY REMOVE AND SAVE ALL

CEILING TILE AND GRID FOR REINSTALLATION AT

COMPLETION OF WORK PER PHASE OR WORK

SHIFT. ALL CEILING MOUNTED SYSTEM

COMPONENTS, INCLUDING BUT NOT LIMITED TO

LIGHTS, FIRE ALARM, IT, AND DIFFUSERS TO BE

MOVED, SAVED, PROTECTED AND REINSTALLED

AT THE COMPLETION OF WORK PER PHASE OR

WORK SHIFT. ANY CEILING TILE OR GRID

COMPONENTS DAMAGED AS A RESULT OF

REMOVAL TO BE REPLACED TO THE

SATISFACTION OF THE COR.

H. WHEN WORKING ON OIT, IT, COMM, OR DATA

ROOMS, GC AND ALL SUBS TO HAVE MEMBER OF

OIT PRESENT AT ALL TIMES. COORDINATE WITH

COR.

1 1

1 1

11111

2 2

1 1

EC

AU305

EMS

A372

PATIENT

A369A

CORRIDOR

AH309

PATIENT

TOILET

A367A

LINEN

SUPPLY

A366

PATIENT

TOILET

A363A

STAFF

WORK

ROOM

A358A

CORRIDOR

AH308 SOILED

UTILITY

A358

PATIENT

TOILET

A362A

NOURISHMENT

A359

CORRIDOR

AH306

TOILET

A357

PATIENT

TOILET

A356A

A354A

MANAGER

A355A

NURSE

STATION

A352

CLEAN

SUPPLY

A368

STAIR

AS302

AU308 AU307 AU306

CORRIDOR

AH307

BEREAVEMENT

ROOM

A371

NEUROLOGY

TEAM

OFFICE

A350

CORRIDOR

AH306

TOILET

A349A

TOILET

A346A

OFFICE

APU

A348

IT

A345

TOILET

A342A

STORAGE

A344

CORRIDOR

AH306

TOILET

A338A

LOBBY

A300

ELEVATOR

AE303

ELEVATOR

AE302

ELEVATOR

AE301

DOCTOR

A341

SECY

A339

DOCTOR

A310

SURGY

TEAM

ROOM

A311

PANTRY

A313

CORRIDOR

AH304

NURSES

STATION

A314

MED

ROOM

A317

A335

EXAM

A333

TOILET

A336A

TOILET

A332A

STORAGE

A330

TOILET

A327A

CORRIDOR

AH305

TOILET

A323A

SMALL

EQUIP

ROOM

A325A

PATIENT

SHOWER

A325

SPD

A331

STAIR

AS301

ELEC

AU301

ELEC

AU302

ELEC

AU303

TOILET

A320

EMS

A319

TOILET

A318A

TOILETEC

AU304

PHYSICIANS

OFFICE

A373

9 96 CORRIDOR

AH303

3'-8"

9 9

27 10 10 1010

4'-0"

2 2 2

2 2

1 1 1

LOBBY

A301

ELEVATOR

S5

ELEVATOR

S4

MED

REVIEW

ROOM

B302

EC

AU305EMS

A372

WAITING

ROOM

A369

PATIENT

A369A

CORRIDOR

AH309

A367

PATIENT

TOILET

A367A

LOBBY

A300

EMS

A319

4 BED

ROOM

A318

TOILET

A318A

2 BED

ROOM

A316

2 BED

ROOM

A315

TOILET

WAITING

AREA

A312

HAS

A308

EMS

A309

EC

AU304

CORRIDOR

AH303

10 7

4 43

77 7

LOBBY

A301

ELEVATOR

S5

ELEVATOR

S4

MED

REVIEW

ROOM

B302

EC

AU305

EMS

A372LINEN

SUPPLY

A366

PATIENT

ROOM

A365

PATIENT

TOILET

A365A

PATIENT

TOILET

A364A

PATIENT

ROOM

A364

PATIENT

ROOM

A363

PATIENT

TOILET

A363A

STAFF

WORK

ROOM

A358A

CORRIDOR

AH308

SOILED

UTILITY

A358

PATIENT

TOILET

A362A

PATIENT

ROOM

A362

CORRIDOR

AH306

TOILET

A357

CORRIDOR

AH307

BEREAVEMENT

ROOM

A371

NEUROLOGY

TEAM

OFFICE

A350

CORRIDOR

AH306

OFFICE

APU

A348

IT

A345

STORAGE

A344

CORRIDOR

AH306

LOBBY

A300

ELEVATOR

AE303

ELEVATOR

AE302

ELEVATOR

AE301

DOCTOR

A341

SECY

A339

DOCTOR

A310

SURGY

TEAM

ROOM

A311

PANTRY

A313

CORRIDOR

AH304

WORK

ROOM

A326

TOILET

A326A

4 BED

ROOM

A324

TOILET

A324A

CORRIDOR

AH305

TOILET

A323A

SMALL

EQUIP

ROOM

A325A

PATIENT

SHOWER

A325

SPD

A331

4 BED

ROOM

A323

TOILET

A322A

1 BED

ROOM

A321

TOILET

A321A

TOILET

A320

EMS

A319

2 BED

ROOM

A315

WAITING

AREA

A312

HAS

A308

EMS

A309

EC

AU304

PHYSICIANS

OFFICE

A373

1 BED

ROOM

A322

CORRIDOR

AH303

8 8

4 4

4'-0"

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

/2

/2

:4

:4

P

M

GI105

THIRD FLOOR NORTH/SOUTH

INFECTION CONTROL PLAN - PHASE 1

AND 3

6 14TJS ANP

CORRECT VARIOUS

MECHANICAL SYSTEM

DEFICIENCIES

1101 VETERANS DRIVE

LEXINGTON, KY 40502-2236

MARCH 29, 2021

596A4-19-10219-191-Q27

BID DOCUMENTS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T H

0 4 8 16

1 TYPE "R" INFECTION CONTROL BARRIER

2 TYPE "N" INFECTION CONTROL BARRIER

3 TYPE "R" CONSTRUCTION ACCESS DOOR W/

WALK OFF STICKY MATS

4 TYPE "P" INFECTION CONTROL BARRIER W/

ZIPPER ACCESS AND STICKY MAT

5 TYPE "R" CONSTRUCTION ACCESS DOOR,

USE FOR LONG PIPE RUNS ONLY, LOCKED

AND SEALED FOR REMAINDER OF

SUBPHASE

6 THIS SIDE OF DOOR TO BE DEACTIVATED

AND HELD OPEN DURING THIS SUB PHASE.

7 THIS DOOR TO REMAIN CLOSED AND

SEALED THROUGHOUT SUBPHASE

8 WALK OFF STICKY MATS

9 THIS AREA TO BE OPEN TO STAFF AND

PATIENTS WHEN CONSTRUCTION ISN'T

TAKING PLACE. INSTALL AND REMOVE TYPE

"N" BARRIERS FOR ACCESS AND ISOLATION

10 THIS DOOR TO BE CLOSED AND SEALED

DURING OFF HOUR CONSTRUCTION

ACTIVITY AND OPEN WHEN CONSTRUCTION

ISN'T OCCURRING

Scale: 1/8" = 1'-0"

THIRD FLOOR NORTH/SOUTH ICRA PLAN - SUBPHASE A, PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR NORTH/SOUTH ICRA PLAN - SUBPHASE B, PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR NORTH/SOUTH ICRA PLAN - SUBPHASE C, PHASE 1 AND 3

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

LOCKER

L S

L S

LS

L S

LS

L S

TYPE "R" INFECTION

CONTROL BARRIER

TYPE "N" INFECTION CONTROL

BARRIER

PLAN LEGEND

TYPE "P" INFECTION CONTROL

BARRIER

ACCESS DOOR THROUGH ICRA

BARRIER W/ STICKY MAT

PLASTIC SHEET BARRIER

ZIPPER ACCESS

HATCHED AREA INDICATES

AREA OF WORK SEPARATED

WITH ICRA BARRIER

STICKY MAT LOCATED AT

ACCESS POINTS

A. HOSPITAL "STANDARD HOURS OF OPERATION"

ARE 7AM THROUGH 7PM MONDAY THROUGH

FRIDAY. UNLESS NOTED OTHERWISE ON

DOCUMENTS, ALL WORK TO BE PERFORMED OFF

PEAK HOURS.

B. WHEN STARTING NEW PHASES OF WORK,

COMMUNICATE WITH COR SO WORK MAY BE

COORDINATED WITH AFFECTED DEPARTMENTS.

C. WORK TO BE PERFORMED IN PHASES TO

MINIMIZE IMPACT TO HOSPITAL OPERATIONS.

MAINTAIN PATHS OF EGRESS REQUIRED

THROUGHOUT HOSPITAL DURING

CONSTRUCTION.

D. WHERE INDICATED, INFECTION CONTROL

BARRIERS ARE TO BE INSTALLED AT THE

BEGINNING OF WORK SHIFT AND REMOVED

PRIOR TO START OF STANDARD OPERATING

HOURS.

E. INFECTION CONTROL BARRIERS ARE TO BE TYPE

"A" HARD WALL CONSTRUCTION WITH TYPE "D"

BARRIERS USED TO CREATE ANTECHAMBERS.

WORK SHIFT DEPENDENT BARRIERS THAT ARE

TO BE INSTALLED FOR ONLY A FEW HOURS AT A

TIME ARE TO BE TYPE "B" BARRIERS SEALED TO

THE FLOOR AND CEILING ASSEMBLY.

F. WHERE INDICATED, ALL WORK TO BE DONE IN

SINGLE PHASE.

G. GC TO TEMPORARILY REMOVE AND SAVE ALL

CEILING TILE AND GRID FOR REINSTALLATION AT

COMPLETION OF WORK PER PHASE OR WORK

SHIFT. ALL CEILING MOUNTED SYSTEM

COMPONENTS, INCLUDING BUT NOT LIMITED TO

LIGHTS, FIRE ALARM, IT, AND DIFFUSERS TO BE

MOVED, SAVED, PROTECTED AND REINSTALLED

AT THE COMPLETION OF WORK PER PHASE OR

WORK SHIFT. ANY CEILING TILE OR GRID

COMPONENTS DAMAGED AS A RESULT OF

REMOVAL TO BE REPLACED TO THE

SATISFACTION OF THE COR.

H. WHEN WORKING ON OIT, IT, COMM, OR DATA

ROOMS, GC AND ALL SUBS TO HAVE MEMBER OF

OIT PRESENT AT ALL TIMES. COORDINATE WITH

COR.

PATIENT

ROOM

A363

PATIENT

TOILET

A363A

CORRIDOR

AH308

PATIENT

TOILET

A362A

PATIENT

ROOM

A362

PATIENT

ROOM

A361

TOILET

A327A

WORK

ROOM

A326

TOILET

A326A

4 BED

ROOM

A324

TOILET

A324A

CORRIDOR

AH305

TOILET

A323A

4 BED

ROOM

A327

4'-1"

4'-0"

CORRIDOR

AH308

SOILED

UTILITY

A358

PATIENT

TOILET

A362A

PATIENT

ROOM

A362

PATIENT

ROOM

A361

PATIENT

TOILET

A361A

PATIENT

TOILET

A360A

NURSES

A360

NOURISHMENT

A359

CORRIDOR

AH306

TOILET

A357

CORRIDOR

AH306

TOILET

A329A

STORAGE

A330

1 BED

ROOM

A329

TOILET

A328A

1 BED

ROOM

A328

TOILET

A327A

WORK

ROOM

A326

TOILET

A326A

CORRIDOR

AH305

PATIENT

SHOWER

A325

4 BED

ROOM

A327

4 4

2 2

CORRIDOR

AH307

NEUROLOGY

TEAM

OFFICE

A350

CORRIDOR

AH306

TOILET

A351A

STAFF

NURSING

A351

TOILET

A349A

A349

OFFICE

APU

A347

TOILET

A346A

OFFICE

APU

A346

OFFICE

APU

A348

IT

A345

TOILET

A342A

1 BED

ROOM

A343

1 BED

ROOM

A342

STORAGE

A344

CORRIDOR

AH306

1 BED

ROOM

A340

SECURITY

ROOM

A338

TOILET

A338A

DOCTOR

A341

SECY

A339

PANTRY

A313

CORRIDOR

AH304

A335

EXAM

A333

2 BED

ROOM

A337

2 BED

ROOM

A336

4 BED

ROOM

A332

TOILET

A336A

7 777

6 13

OFFICE

APU

A346

IT

A345

TOILET

A342A

1 BED

ROOM

A343

1 BED

ROOM

A342

STORAGE

A344

CORRIDOR

AH306

1 BED

ROOM

A340

SECURITY

ROOM

A338

TOILET

A338A

DOCTOR

A341

SECY

A339

PANTRY

A313

CORRIDOR

AH309

CORRIDOR

AH306

MANAGER

A355A

NURSE

STATION

A352

CLEAN

SUPPLY

A368STAIR

AS302

AU307 AU306

CORRIDOR

AH307

BEREAVEMENT

ROOM

A371

NEUROLOGY

TEAM

OFFICE

A350

CORRIDOR

AH306

SURGY

TEAM

ROOM

A311

PANTRY

A313

CORRIDOR

AH304

NURSES

STATION

A314

MED

ROOM

A317

CORRIDOR

AH303

DOCTOR

A335

4'-5"

5'-6"

NURSES

A360

NOURISHMENT

A359

CORRIDOR

AH306

PATIENT

TOILET

A356A

PATIENT

ROOM

A356

A354A

SOCIAL

WORK

A354

TOILET

A351A

STAFF

NURSING

A351

TOILET

A349A

A349

2 BED

ROOM

A336

4 BED

ROOM

A332

TOILET

A332A

TOILET

A329A

STORAGE

A330

1 BED

ROOM

A329

TOILET

A328A

1 BED

ROOM

A328

CORRIDOR

AH306

7 7

5'-0"

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

/2

/2

:5

:1

P

M

GI106

THIRD FLOOR NORTH/SOUTH

INFECTION CONTROL PLAN - PHASE 1

AND 3

7 14TJS ANP

CORRECT VARIOUS

MECHANICAL SYSTEM

DEFICIENCIES

1101 VETERANS DRIVE

LEXINGTON, KY 40502-2236

MARCH 29, 2021

596A4-19-10219-191-Q27

BID DOCUMENTS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T H

0 4 8 16

1 TYPE "R" INFECTION CONTROL BARRIER

2 TYPE "N" INFECTION CONTROL BARRIER

3 TYPE "R" CONSTRUCTION ACCESS DOOR W/

WALK OFF STICKY MATS

4 TYPE "P" INFECTION CONTROL BARRIER W/

ZIPPER ACCESS AND STICKY MAT

5 TYPE "R" CONSTRUCTION ACCESS DOOR,

USE FOR LONG PIPE RUNS ONLY, LOCKED

AND SEALED FOR REMAINDER OF

SUBPHASE

6 THIS SIDE OF DOOR TO BE DEACTIVATED

AND HELD OPEN DURING THIS SUB PHASE.

7 THIS DOOR TO REMAIN CLOSED AND

SEALED THROUGHOUT SUBPHASE

8 WALK OFF STICKY MATS

9 THIS AREA TO BE OPEN TO STAFF AND

PATIENTS WHEN CONSTRUCTION ISN'T

TAKING PLACE. INSTALL AND REMOVE TYPE

"N" BARRIERS FOR ACCESS AND ISOLATION

10 THIS DOOR TO BE CLOSED AND SEALED

DURING OFF HOUR CONSTRUCTION

ACTIVITY AND OPEN WHEN CONSTRUCTION

ISN'T OCCURRING

Scale: 1/8" = 1'-0"

THIRD FLOOR NORTH/SOUTH ICRA PLAN - SUBPHASE D,

PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR NORTH/SOUTH ICRA PLAN - SUBPHASE E,

PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR NORTH/SOUTH ICRA PLAN - SUBPHASE G,

PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR NORTH/SOUTH ICRA PLAN - SUBPHASE H,

PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR NORTH/SOUTH ICRA PLAN - SUBPHASE I,

PHASE 1 AND 3

Scale: 1/8" = 1'-0"

THIRD FLOOR NORTH/SOUTH ICRA PLAN - SUBPHASE F,

PHASE 1 AND 3

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

LOCKER

LOCKER

LOCKER

LOCKER

L S

L S

LS

LS

L S

LS

L S

TYPE "R" INFECTION

CONTROL BARRIER

TYPE "N" INFECTION CONTROL

BARRIER

PLAN LEGEND

TYPE "P" INFECTION CONTROL

BARRIER

ACCESS DOOR THROUGH ICRA

BARRIER W/ STICKY MAT

PLASTIC SHEET BARRIER

ZIPPER ACCESS

HATCHED AREA INDICATES

AREA OF WORK SEPARATED

WITH ICRA BARRIER

STICKY MAT LOCATED AT

ACCESS POINTS

A. HOSPITAL "STANDARD HOURS OF OPERATION"

ARE 7AM THROUGH 7PM MONDAY THROUGH

FRIDAY. UNLESS NOTED OTHERWISE ON

DOCUMENTS, ALL WORK TO BE PERFORMED OFF

PEAK HOURS.

B. WHEN STARTING NEW PHASES OF WORK,

COMMUNICATE WITH COR SO WORK MAY BE

COORDINATED WITH AFFECTED DEPARTMENTS.

C. WORK TO BE PERFORMED IN PHASES TO

MINIMIZE IMPACT TO HOSPITAL OPERATIONS.

MAINTAIN PATHS OF EGRESS REQUIRED

THROUGHOUT HOSPITAL DURING

CONSTRUCTION.

D. WHERE INDICATED, INFECTION CONTROL

BARRIERS ARE TO BE INSTALLED AT THE

BEGINNING OF WORK SHIFT AND REMOVED

PRIOR TO START OF STANDARD OPERATING

HOURS.

E. INFECTION CONTROL BARRIERS ARE TO BE TYPE

"A" HARD WALL CONSTRUCTION WITH TYPE "D"

BARRIERS USED TO CREATE ANTECHAMBERS.

WORK SHIFT DEPENDENT BARRIERS THAT ARE

TO BE INSTALLED FOR ONLY A FEW HOURS AT A

TIME ARE TO BE TYPE "B" BARRIERS SEALED TO

THE FLOOR AND CEILING ASSEMBLY.

F. WHERE INDICATED, ALL WORK TO BE DONE IN

SINGLE PHASE.

G. GC TO TEMPORARILY REMOVE AND SAVE ALL

CEILING TILE AND GRID FOR REINSTALLATION AT

COMPLETION OF WORK PER PHASE OR WORK

SHIFT. ALL CEILING MOUNTED SYSTEM

COMPONENTS, INCLUDING BUT NOT LIMITED TO

LIGHTS, FIRE ALARM, IT, AND DIFFUSERS TO BE

MOVED, SAVED, PROTECTED AND REINSTALLED

AT THE COMPLETION OF WORK PER PHASE OR

WORK SHIFT. ANY CEILING TILE OR GRID

COMPONENTS DAMAGED AS A RESULT OF

REMOVAL TO BE REPLACED TO THE

SATISFACTION OF THE COR.

H. WHEN WORKING ON OIT, IT, COMM, OR DATA

ROOMS, GC AND ALL SUBS TO HAVE MEMBER OF

OIT PRESENT AT ALL TIMES. COORDINATE WITH

COR.

2 2 2 22

LOBBY

A301

ELEVATOR

S5

ELEVATOR

S4

MED

REVIEW

ROOM

B302

EC

AU305

EMS

A372

WAITING

ROOM

A369

PATIENT

A369A

CORRIDOR

AH309

A367

PATIENT

TOILET

A367A

LOBBY

A300

1 BED

ROOM

A321

TOILET

A321A

TOILET

A320

EMS

A319

4 BED

ROOM

A318

TOILET

A318A

2 BED

ROOM

A316

2 BED

ROOM

A315

TOILET

WAITING

AREA

A312

EMS

A309

EC

AU304

CORRIDOR

AH303

"44

"4

LINEN

SUPPLY

A366

PATIENT

ROOM

A365

PATIENT

TOILET

A365A

PATIENT

TOILET

A364A

PATIENT

ROOM

A364

PATIENT

ROOM

A363

PATIENT

TOILET

A363A

STAFF

WORK

ROOM

A358A

CORRIDOR

AH308

DOCTOR

A310

SURGY

TEAM

ROOM

A311

CORRIDOR

AH304

NURSES

STATION

A314

MED

ROOM

A317

4 BED

ROOM

A324

TOILET

A324A

CORRIDOR

AH305

TOILET

A323A

SMALL

EQUIP

ROOM

A325A

4 BED

ROOM

A323

TOILET

A322A

1 BED

ROOM

A321

2 BED

ROOM

A316

2 BED

ROOM

A315

TOILET

WAITING

AREA

A312

HAS

A308

EMS

A309

EC

AU304

1 BED

ROOM

A322

CORRIDOR

AH303

CORRIDOR

AH303

CORRIDOR

AH309

4'-6"

4'-6"

CORRIDOR

AH308

SOILED

UTILITY

A358

PATIENT

TOILET

A362A

PATIENT

ROOM

A362

PATIENT

ROOM

A361

PATIENT

TOILET

A361A

PATIENT

TOILET

A360A

NURSES

A360

NOURISHMENT

A359

CORRIDOR

AH306

TOILET

A357

TOILET

A329A

STORAGE

A330

1 BED

ROOM

A329

TOILET

A328A

1 BED

ROOM

A328

TOILET

A327A

WORK

ROOM

A326

TOILET

A326A

CORRIDOR

AH305PATIENT

SHOWER

A325

4 BED

ROOM

A327

4 4

4'-0"4

4'-0"

2 2 2

CORRIDOR

AH306

TOILET

A357

PATIENT

TOILET

A356A

PATIENT

ROOM

A356

A354A

SOCIAL

WORK

A354

MANAGER

A355A

CORRIDOR

AH307 NEUROLOGY

TEAM

OFFICE

A350

TOILET

A351A

STAFF

NURSING

A351

TOILET

A349A

A349

CORRIDOR

AH306

A335

EXAM

A333

2 BED

ROOM

A337

2 BED

ROOM

A336

4 BED

ROOM

A332

TOILET

A336A

TOILET

A332A

SPD

A331

4 4

7 7 77 7

TOILET

A342A

1 BED

ROOM

A342

STORAGE

A344

CORRIDOR

AH306

1 BED

ROOM

A340

SECURITY

ROOM

A338

TOILET

A338A

DOCTOR

A341

SECY

A339

PANTRY

A313

CORRIDOR

AH304

2 BED

ROOM

A337

2 2

CORRIDOR

AH306

A349

OFFICE

APU

A347

TOILET

A346A

OFFICE

APU

A346

OFFICE

APU

A348

IT

A345

1 BED

ROOM

A343

STORAGE

A344

2 2

PATIENT

TOILET

A356A

PATIENT

ROOM

A356

A354A

SOCIAL

WORK

A354

MANAGER

A355A

NURSE

STATION

A352

CORRIDOR

AH307

NEUROLOGY

TEAM

OFFICE

A350

CORRIDOR

AH306

TOILET

A351A

STAFF

NURSING

A351

TOILET

A349A

A349

OFFICE

APU

A347

OFFICE

APU

A348

4 4

LOBBY

A301

ELEVATOR

S5

MED

REVIEW

ROOM

B302

EC

AU305

EMS

A372

WAITING

ROOM

A369

CORRIDOR

AH309

CORRIDOR

AH307

BEREAVEMENT

ROOM

A371

LOBBY

A300

ELEVATOR

AE303

PHYSICIANS

OFFICE

A373

Engineers Architects

## KEY NOTES:

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420

NC License #: C-1848 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

FULLY SPRINKLERED

/2

/2

:5

:4

P

M

GI107

THIRD FLOOR NORTH/SOUTH

INFECTION CONTROL PLAN - PHASE 2

8 14TJS ANP

CORRECT VARIOUS

MECHANICAL SYSTEM

DEFICIENCIES

1101 VETERANS DRIVE

LEXINGTON, KY 40502-2236

MARCH 29, 2021

596A4-19-10219-191-Q27

BID DOCUMENTS

N

AREA OF WORK

KEY PLAN

SCALE: NO SCALE

N O

R T H

0 4 8 16

1 TYPE "R" INFECTION CONTROL BARRIER

2 TYPE "N" INFECTION CONTROL BARRIER

3 TYPE "R" CONSTRUCTION ACCESS DOOR W/

WALK OFF STICKY MATS

4 TYPE "P" INFECTION CONTROL BARRIER W/

ZIPPER ACCESS AND STICKY MAT

5 TYPE "R" CONSTRUCTION ACCESS DOOR,

USE FOR LONG PIPE RUNS ONLY, LOCKED

AND SEALED FOR REMAINDER OF

SUBPHASE

6 THIS SIDE OF DOOR TO BE DEACTIVATED

AND HELD OPEN DURING THIS SUB PHASE.

7 THIS DOOR TO REMAIN CLOSED AND

SEALED THROUGHOUT SUBPHASE

8 WALK OFF STICKY MATS

9 THIS AREA TO BE OPEN TO STAFF AND

PATIENTS WHEN CONSTRUCTION ISN'T

TAKING PLACE. INSTALL AND REMOVE TYPE

"N" BARRIERS FOR ACCESS AND ISOLATION

10 THIS DOOR TO BE CLOSED AND SEALED

DURING OFF HOUR CONSTRUCTION

ACTIVITY AND OPEN WHEN CONSTRUCTION

ISN'T OCCURRING

Scale: 1/8" = 1'-0"

THIRD FLOOR NORTH/SOUTH ICRA PLAN - SUBPHASE A, PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR NORTH/SOUTH ICRA PLAN - SUBPHASE B, PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR NORTH/SOUTH ICRA PLAN - SUBPHASE C, PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR NORTH/SOUTH ICRA PLAN - SUBPHASE D, PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR

NORTH/SOUTH ICRA PLAN -

SUBPHASE E, PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR

NORTH/SOUTH ICRA PLAN -

SUBPHASE F, PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR

NORTH/SOUTH ICRA PLAN -

SUBPHASE G, PHASE 2

Scale: 1/8" = 1'-0"

THIRD FLOOR

NORTH/SOUTH ICRA PLAN -

SUBPHASE H, PHASE 2

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

N O

R T H

0 4 8 16

FF:VCT

CONTROL BARRIER

TYPE "N" INFECTION CONTROL

BARRIER

PLAN LEGEND

TYPE "P" INFECTION CONTROL

BARRIER

ACCESS DOOR THROUGH ICRA

BARRIER W/ STICKY MAT

PLASTIC SHEET BARRIER

ZIPPER ACCESS

HATCHED AREA INDICATES

AREA OF WORK SEPARATED

WITH ICRA BARRIER

STICKY MAT LOCATED AT

ACCESS POINTS

A. HOSPITAL "STANDARD HOURS OF OPERATION"

ARE 7AM THROUGH 7PM MONDAY THROUGH

FRIDAY. UNLESS NOTED OTHERWISE ON

DOCUMENTS, ALL WORK TO BE PERFORMED OFF

PEAK HOURS.

B. WHEN STARTING NEW PHASES OF WORK,

COMMUNICATE WITH COR SO WORK MAY BE

COORDINATED WITH AFFECTED DEPARTMENTS.

C. WORK TO BE PERFORMED IN PHASES TO

MINIMIZE IMPACT TO HOSPITAL OPERATIONS.

MAINTAIN PATHS OF EGRESS REQUIRED

THROUGHOUT HOSPITAL DURING

CONSTRUCTION.

D. WHERE INDICATED, INFECTION CONTROL

BARRIERS ARE TO BE INSTALLED AT THE

BEGINNING OF WORK SHIFT AND REMOVED

PRIOR TO START OF STANDARD OPERATING

HOURS.

E. INFECTION CONTROL BARRIERS ARE TO BE TYPE

"A" HARD WALL CONSTRUCTION WITH TYPE "D"

BARRIERS USED TO CREATE ANTECHAMBERS.

WORK SHIFT DEPENDENT BARRIERS THAT ARE

TO BE INSTALLED FOR ONLY A FEW HOURS AT A

TIME ARE TO BE TYPE "B" BARRIERS SEALED TO

THE FLOOR AND CEILING ASSEMBLY.

F. WHERE INDICATED, ALL WORK TO BE DONE IN

SINGLE PHASE.

G. GC TO TEMPORARILY REMOVE AND SAVE ALL

CEILING TILE AND GRID FOR REINSTALLATION AT

COMPLETION OF WORK PER PHASE OR WORK

SHIFT. ALL CEILING MOUNTED SYSTEM

COMPONENTS, INCLUDING BUT NOT LIMITED TO

LIGHTS, FIRE ALARM, IT, AND DIFFUSERS TO BE

MOVED, SAVED, PROTECTED AND REINSTALLED

AT THE COMPLETION OF WORK PER PHASE OR

WORK SHIFT. ANY CEILING TILE OR GRID

COMPONENTS DAMAGED AS A RESULT OF

REMOVAL TO BE REPLACED TO THE

SATISFACTION OF THE COR.

H. WHEN WORKING ON OIT, IT, COMM, OR DATA

ROOMS, GC AND ALL SUBS TO HAVE MEMBER OF

OIT PRESENT AT ALL TIMES. COORDINATE WITH

COR.

HAC

B421

STOR

B417

STOR

B417A

CORRIDOR

BH402

B414

PHYSICIAN

OFFICE

B412A

OFFICE

B410

TOILET

B411

STAIR

BS403

ELEC

BU403

ELEC

BU402

OFFICE

B409

OFFICE

B408

OFFICE

B406

CORRIDOR

BH401

WATER

TREATMENT

B423

TOILET

B424E

HEMODIALYSIS

UNIT

B424

SUPPLY

B423A

PATIENT

CARE

NURSE

OFFICE

B404

B424A

ISOLATION

B424A

EXAM

B403

ELEC

BU401

TOI…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .