About this file

This document contains a specification section and a notice of federal contract opportunity. The specification section provides requirements for roof and deck insulation for a project to correct various mechanical system deficiencies at a VA medical center in Lexington, KY. It specifies insulation materials and accessories, vapor retarders, substrate boards, and installation methods. The federal contract opportunity is a 100% SDVOSB set-aside to provide general construction services for a project to replace a security camera surveillance system at the Memphis VA Medical Center. The work includes alterations, demolition, and other items described in specifications and drawings. The estimated value is between $1M-$3M. Questions must be submitted in writing by June 12, 2020, and offers are due on that date. The awarded contractor must be verified in CVE and SAM databases and submit a VETS-4212 report.

View the file

Other files

File Type Posted
36C24921R0086 0005.pdf PDF
07 60 00 Flashing and Sheet Metal.pdf PDF
FAN CLARIFICATION.pdf PDF
07 72 00 Roof Accessories.pdf PDF
08 71 00 Door Hardware.pdf PDF
Revised Table Of Contents.pdf PDF
07 52 16.11 Cold Adhesive STY Modified Bituminous Membrane Roofing.pdf PDF
36C24921R0086 0004.pdf PDF
36C24921R0086 0003.pdf PDF
Site Visit Sign-in Log_Correct Various Mech. Def..pdf PDF
36C24921R0086 0002.pdf PDF
Final Asbestos Report - 3 of 6.pdf PDF
19-191 General Addendum 01 to VA.pdf PDF
Questions and Answers 2 of 2 - Pre-bid RFIs.xlsx XLSX spreadsheet
01_005_FLOOR PLAN - FIRST FLOOR - A.PDF PDF
01_007_FLOOR PLAN - SECOND FLOOR - A.PDF PDF
19-191 Electrical Addendum 01 to VA.pdf PDF
Final Asbestos Report - 5 of 6.pdf PDF
01_12_FLOOR PLAN - FOURTH FLOOR - B.PDF PDF
01_15R_FLOOR PLAN - SIXTH FLOOR - A.PDF PDF
01_009_FLOOR PLAN - THIRD FLOOR - A.PDF PDF
01_14_FLOOR PLAN - FIFTH FLOOR - B.PDF PDF
01_002_FLOOR PLAN - GROUND FLOOR - B (1).PDF PDF
01_15_FLOOR PLAN - SIXTH FLOOR - A.PDF PDF
Addendum1.pdf PDF
01_003_FLOOR PLAN - GROUND FLOOR - A.PDF PDF
01_10R_FLOOR PLAN - THIRD FLOOR - B.PDF PDF
Final Asbestos Report - 1 of 6.pdf PDF
01_008R_FLOOR PLAN - SECOND FLOOR - B.PDF PDF
Past Performance Questionnaire.docx DOCX document
01_008_FLOOR PLAN - SECOND FLOOR - B.PDF PDF
Final Asbestos Report - 4 of 6.pdf PDF
Questions and Answers 1 of 2.pdf PDF
01_18_FLOOR PLAN - PENTHOUS - B.PDF PDF
01_13_FLOOR PLAN - FIFTH FLOOR - A.PDF PDF
Final Asbestos Report - 6 of 6.pdf PDF
01_16_FLOOR PLAN - SIXTH FLOOR - B.PDF PDF
01_11R_FLOOR PLAN - FOURTH FLOOR - A.PDF PDF
01_002_FLOOR PLAN - GROUND FLOOR - B.PDF PDF
01_004_FLOOR PLAN - GROUND FLOOR - B.PDF PDF
01_006_FLOOR PLAN - FIRST FLOOR - B.PDF PDF
01_11_FLOOR PLAN - FOURTH FLOOR - A.PDF PDF
Final Asbestos Report - 2 of 6.pdf PDF
01_17_FLOOR PLAN - PENTHOUS - A.PDF PDF
01_026_BUILDING SECTION.PDF PDF
36C24921R0086 0001.pdf PDF
Drawings.pdf PDF
Price Proposal Template.xlsx XLSX spreadsheet
CALCULATION OF SELF PERFORMED WORK.pdf PDF
Contractor EMR Certification Form.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lexington VAMC July 7, 2021 Correct Various Mechanical System Deficiencies Addendum 02 Lexington, KY Project No. 596A4-19-102

07 22 00 - 1

SECTION 07 22 00

ROOF AND DECK INSULATION

PART 1 - GENERAL

1.1 SUMMARY

A. Section Includes:

B. Roof and deck insulation and substrate board on existing concrete and metal deck substrates ready to receive roofing or waterproofing membrane.

C. Repairs and alteration work to existing roof insulation.

1.2 RELATED WORK

A. Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS: Non-Flooring

Adhesives and Sealants VOC Limits.

B. Section 06 10 00, ROUGH CARPENTRY: Wood Cants, Blocking, and Edge

Strips.

1.3 APPLICABLE PUBLICATIONS

A. Comply with references to extent specified in this section.

B. American Society of Civil Engineers

ASCE 7-16...............Minimum Design Loads and Associated Criteria for Buildings and Other Structures

C. American Society of Heating, Refrigeration and Air Conditioning

(ASHRAE):

Standard 90.1-13........Energy Standard for Buildings Except Low-Rise

Residential Buildings.

D. ASTM International (ASTM):

C208-12(2017)e2.........Cellulosic Fiber Insulating Board.

C552-17e1...............Cellular Glass Thermal Insulation.

C726-17.................Mineral Fiber Roof Insulation Board.

C728-17a................Perlite Thermal Insulation Board.

C1177/C1177M-17.........Glass Mat Gypsum Substrate for Use as

Sheathing.

C1278/C1278M-17.........Fiber-Reinforced Gypsum Panel.

C1289-19................Faced Rigid Cellular Polyisocyanurate Thermal

Insulation Board.

C1396/C1396M-17.........Gypsum Board.

D41/D41M-11 (2016)......Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing.

D312/D312M-16a..........Asphalt Used in Roofing.

07 22 00 - 2

D1970/D1970M-20.........Self-Adhering Polymer Modified Bituminous Sheet

Materials Used as Steep Roofing Underlayment for Ice Dam Protection.

D2178/D2178M-15a........Asphalt Glass Felt Used in Roofing and

Waterproofing.

D2822/D2822M-05(2011)e1.Asphalt Roof Cement, Asbestos Containing.

D4586/D4586M-07(2018)...Asphalt Roof Cement, Asbestos-Free.

E84-20..................Surface Burning Characteristics of Building

Materials.

F1667-18a...............Driven Fasteners: Nails, Spikes, and Staples.

E. National Roofing Contractors Association (NRCA):

Manual-15...............The NRCA Roofing Manual: Membrane Roof Systems-

2019.

F. UL LLC (UL):

Listed Online Certifications Directory.

G. U.S. Department of Agriculture (USDA):

USDA BioPreferred Program Catalog.

H. U.S. Department of Commerce National Institute of Standards and

Technology (NIST):

DOC PS 1-19.............Structural Plywood.

DOC PS 2-18.............Performance Standard for Wood-Based

Structural-Use Panels.

1.4 SUBMITTALS

A. Submittal Procedures: Section 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES.

B. Submittal Drawings:

1. Show size, configuration, and installation details.

a. Nailers, cants, and terminations.

b. Layout of insulation showing slopes, tapers, penetrations, and edge conditions.

C. Manufacturer's Literature and Data:

1. Description of each product.

D. Samples:

1. Roof insulation, each type.

2. Fasteners, each type.

E. Sustainable Construction Submittals:

07 22 00 - 3

1. Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight.

2. Biobased Content:

a. Show type and quantity for each product.

3. Low Pollutant-Emitting Materials:

a. Show volatile organic compound types and quantities.

b. Certify each composite wood product contain no added urea formaldehyde.

F. Qualifications: Substantiate qualifications meet specifications.

1. Installer.

1.5 QUALITY ASSURANCE

A. Installer Qualifications: Same installer as Division 07 roofing section installer.

1.6 DELIVERY

A. Comply with recommendations of NRCA Manual.

B. Deliver products in manufacturer's original sealed packaging.

C. Mark packaging, legibly. Indicate manufacturer's name or brand, type, and manufacture date.

D. Before installation, return or dispose of products within distorted, damaged, or opened packaging.

1.7 STORAGE AND HANDLING

A. Comply with recommendations of NRCA Manual.

B. Store products indoors in dry, weathertight facility.

C. Protect products from damage during handling and construction operations.

1.8 FIELD CONDITIONS

A. Environment: Install products when existing and forecasted weather permit installation according to manufacturer's instructions.

1.9 WARRANTY

A. Construction Warranty: FAR clause 52.246-21, "Warranty of

Construction."

B. Manufacturer's Warranty: Warrant substrate board, vapor retarder, insulation, and cover board against material and manufacturing defects as part of Division 07 roofing system warranty.

07 22 00 - 4

PART 2 - PRODUCTS

2.1 SYSTEM PERFORMANCE

A. SPEC WRITER NOTE: On existing roofs confirm available insulation thickness and modify as required

B. Insulation Thermal Performance:

1. Overall Average R-Value: RSI-57 (R-33), minimum.

2. Any Location R-Value: RSI-17 (R-10), minimum.

C. Fire and Wind Uplift Resistance: Provide roof insulation complying with requirements specified in Division 07 roofing section.

D. Insulation on Metal Decking: UL labeled indicating compliance with one of the following:

1. UL Listed.

2. Insulation Surface Burning Characteristics: When tested according to

ASTM E84.

a. Flame Spread Rating: 75 maximum.

b. Smoke Developed Rating: 150 maximum.

2.2 PRODUCTS - GENERAL

A. Provide each product from one manufacturer.

B. Sustainable Construction Requirements:

1. Insulation Recycled Content:

a. Mineral Fiber: 75 percent total recycled content, minimum.

b. Fiberglass: 20 percent total recycled content, minimum.

c. Cellulose: 75 percent post-consumer recycled content, minimum.

d. Perlite Composite Board: 23 percent post-consumer recycled content, minimum.

e. Rigid Foam: 9 percent total recycled content, minimum.

f. Glass Fiber Reinforced Rigid Foam: 6 percent total recycled content, minimum.

2. Low Pollutant-Emitting Materials: Comply with VOC limits specified in Section 01 81 13, SUSTAINABLE CONSTRUCTION REQUIREMENTS for the following products:

a. Non-flooring adhesives and sealants.

b. Composite wood and agrifiber.

3. Bio-Based Materials: Where applicable, provide products designated by USDA and meeting or exceeding USDA recommendations for bio-based content, and products meeting Rapidly Renewable Materials and

07 22 00 - 5 certified sustainable wood content definitions; refer to www.biopreferred.gov.

2.3 ADHESIVES

A. Primer: ASTM D41/D41M.

B. Asphalt: ASTM D312, Type III or IV for vapor retarders and insulation.

C. Modified Asphaltic Insulation Adhesive: Insulation manufacturer's recommended modified asphaltic, asbestos-free, cold-applied adhesive formulated to adhere roof insulation to substrate or to another insulation layer.

D. Bead-Applied Urethane Insulation Adhesive: Insulation manufacturer's recommended bead-applied, low-rise, one- or multicomponent urethane adhesive formulated to adhere roof insulation to substrate or to another insulation layer.

E. Roof Cement: Asbestos free, ASTM D2822/D2822M, Type I or Type II; or, ASTM D4586/D4586M, Type I or Type II.

2.4 ROOF AND DECK INSULATION

A. Roof and Deck Insulation, General: Preformed roof insulation boards approved by roofing manufacturer.

B. Polyisocyanurate Board Insulation: ASTM C1289, Type II, Class 1, Grade

2, faced with glass fiber reinforced cellulosic felt facers on both major surfaces of the core foam.

C. Tapered Roof Insulation System:

1. Fabricate of mineral fiberboard, polyisocyanurate, perlite board, or cellular glass. Use only one insulation material for tapered sections. Use only factory-tapered insulation.

2. Cut to provide high and low points with crickets and slopes as shown.

3. Minimum thickness of tapered sections; 38 mm (1-1/2 inch).

4. Minimum slope 1/48 (1/4 inch per 12 inches).

D. Composite Nail Base Insulated Roof Sheathing:

1. Oriented-Strand-Board-Surfaced, Polyisocyanurate-Foam Sheathing:

Polyisocyanurate thermal insulation ASTM C1289, Type V, insulation thickness as shown, with oriented strand board laminated to top surface.

2. Oriented Strand Board: NIST DOC PS 1, Exposure 1, 16 mm (5/8 inch) thick.

3. Bottom surface faced with felt facers.

07 22 00 - 6

2.5 INSULATION ACCESSORIES

A. Glass (Felt): ASTM D2178/D2178M, Type VI, heavy duty ply sheet.

B. Cants and Tapered Edge Strips:

1. Wood Cant Strips: Refer to Section 06 10 00, ROUGH CARPENTRY.

2. Insulation Cant Strips: ASTM C208, Type II, Grade 1, cellulosic-fiber insulation board.

3. Tapered Edge Strips: 1/12 (1 inch per 12 inches), from 0 mm

(0 inches), 300 mm to 450 mm (12 inches to 18 inches) wide.

a. Cellulosic Fiberboard: ASTM C208.

b. Mineral Fiberboard: ASTM C726.

c. Perlite Board: ASTM C728.

C. Vapor Retarder:

1. Glass-Fiber Felts: ASTM D2178/D2178M, Type IV, asphalt impregnated.

2. Self-Adhering Sheet Vapor Retarder: ASTM D1970/D1970M, minimum

1.0 mm (40 mils) thick membrane of HDPE film fully coated with asphalt adhesive, or 0.76 to 1.0 mm (30 to 40 mils) thick membrane of butyl rubber based adhesive backed by a layer of high density cross-laminated polyethylene; maximum permeance rating of

6 ng/Pa/s/sq. m (0.1 perms).

D. Substrate Board:

1. Glass-Mat, Water-Resistant Gypsum Roof Board: ASTM C1177/C1177M, 16 mm (5/8 inch) thick, factory primed.

2.6 ACCESSORIES

A. Fasteners: Corrosion-resistant carbon steel fasteners and galvalume-coated steel or plastic round plates for fastening substrate board and insulation to roof deck.

B. Nails: ASTM F1667; type to suit application.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Comply with requirements of Division 07 roofing section.

3.2 PREPARATION

A. Examine and verify substrate suitability for product installation.

B. Protect existing construction and completed work from damage.

3.3 INSTALLATION - GENERAL

A. Install products according to manufacturer's instructions.

07 22 00 - 7

1. When manufacturer's instructions deviate from specifications, submit proposed resolution for Contracting Officer's Representative consideration.

B. Comply with requirements of UL for insulated steel roof deck.

C. Attach substrate board and other products to meet requirements of

Division 07 roofing section.

3.4 SUBSTRATE BOARD INSTALLATION

A. Fasten substrate board to top flanges of steel decking to resist uplift pressures according requirements for specified roofing system.

1. Locate the long dimension edge joints solidly bearing on top of decking ribs.

3.5 VAPOR RETARDER INSTALLATION

A. Vapor Retarder Installation, General:

1. Install continuous vapor retarder on roof decks where indicated.

2. At vertical surfaces, turn up vapor retarder to top of insulation or base flashing.

3. Seal penetrations through vapor retarder with roof cement to prevent moisture entry from below.

B. Cast in Place Concrete Decks, Except Insulating Concrete:

1. Prime deck as specified.

2. Apply two plies of asphalt saturated felt mopped down to deck.

C. Precast Concrete Unit Decks Without Concrete Topping:

1. Prime deck as specified.

2. Apply two plies of asphalt saturated felt.

3. Mop to deck, keeping bitumen 100 mm (4 inches) away from joints of precast units. Bridge joints with felt. Mop between plies as specified.

3.6 INSULATION INSTALLATION

1. Cant Strips: Install preformed insulation cant strips at junctures of roofing system with vertical construction.

2. Use same insulation as existing for roof repair and alterations unless specified otherwise.

B. Insulation Thickness:

1. Thickness of roof insulation to match existing conditions. Provide thickness required to comply with existing thermal performance.

07 22 00 - 8

2. Insulation on Metal Decks: Provide insulation in minimum thickness recommended by insulation manufacturer to span deck flutes. Support edges of insulation on metal deck ribs.

3. Coordinate alignment and location of roof drains, flashing, gravel stops, fascias and similar items.

4. Where tapered insulation is used, maintain insulation thickness at high points and roof edges to match existing.

a. Low Point Thickness: Minimum 38 mm (1-1/2 inches).

5. Use minimum two layers of insulation when required thickness is

68 mm (2.7 inch) or greater.

C. Lay insulating units with close joints, in regular courses and with end joints staggered.

1. Stagger joints between layers minimum 150 mm (6 inches).

D. Lay units with long dimension perpendicular to the rolled

(longitudinal) direction of the roofing felt.

E. Seal cut edges at penetrations and at edges against blocking with bitumen or roof cement.

F. Cut to fit tightly against blocking or penetrations.

G. Cover all insulation installed on the same day; comply with temporary protection requirements of Division 07 roofing section.

H. Installation Method:

1. Adhered Insulation:

a. Prime substrate as required.

b. Set each layer of insulation firmly in solid mopping of hot asphalt.

c. Set each layer of insulation firmly in ribbons of bead-applied insulation adhesive.

d. Set each layer of insulation firmly in uniform application of full-spread insulation adhesive.

2. Mechanically Fastened Insulation:

a. Fasten insulation according to requirements in Division 07 roofing section.

b. Fasten insulation to resist uplift pressures specified in

Division 07 roofing section and ASCE-7.

3. Mechanically Fastened and Adhered Insulation:

a. Fasten first layer of insulation according to "Mechanically

Fastened Insulation" requirements.

07 22 00 - 9

b. Fasten each subsequent layer of insulation according to "Adhered

Insulation" requirements.

3.7 COVER BOARD INSTALLATION

A. Install cover boards over insulation with long joints in continuous straight lines with staggered end joints.

B. Offset cover board joints from insulation joints 150 mm (6 inches), minimum.

C. Secure cover boards according to "Mechanically Fastened

Insulation" requirements.

- - E N D - -

07 22 00 - 10

---INTENTIONALLY BLANK---