About this file

This document includes a federal contract opportunity notice and related cost estimate report. The notice is for construction services to correct mechanical system deficiencies at the Lexington VA Medical Center in Lexington, Kentucky. The work includes general construction, alterations and removals. The estimate is for asbestos remediation and abatement across multiple buildings. The total estimated cost is $185,536.80. The opportunity is a 100% SDVOSB set-aside with an estimate between $1-3 million. The NAICS code is 236220 and size standard is $39.5 million. The solicitation number is 36C24921R0086 and will be released on June 12, 2020 as a LPTA procurement. Questions must be submitted in writing to the contracting officer by that date.

View the file

Other files

File Type Posted
07 22 00 Roof and Deck Insulation.pdf PDF
36C24921R0086 0005.pdf PDF
07 60 00 Flashing and Sheet Metal.pdf PDF
FAN CLARIFICATION.pdf PDF
07 72 00 Roof Accessories.pdf PDF
08 71 00 Door Hardware.pdf PDF
Revised Table Of Contents.pdf PDF
07 52 16.11 Cold Adhesive STY Modified Bituminous Membrane Roofing.pdf PDF
36C24921R0086 0004.pdf PDF
36C24921R0086 0003.pdf PDF
Site Visit Sign-in Log_Correct Various Mech. Def..pdf PDF
36C24921R0086 0002.pdf PDF
Final Asbestos Report - 3 of 6.pdf PDF
19-191 General Addendum 01 to VA.pdf PDF
Questions and Answers 2 of 2 - Pre-bid RFIs.xlsx XLSX spreadsheet
01_005_FLOOR PLAN - FIRST FLOOR - A.PDF PDF
01_007_FLOOR PLAN - SECOND FLOOR - A.PDF PDF
19-191 Electrical Addendum 01 to VA.pdf PDF
Final Asbestos Report - 5 of 6.pdf PDF
01_12_FLOOR PLAN - FOURTH FLOOR - B.PDF PDF
01_15R_FLOOR PLAN - SIXTH FLOOR - A.PDF PDF
01_009_FLOOR PLAN - THIRD FLOOR - A.PDF PDF
01_14_FLOOR PLAN - FIFTH FLOOR - B.PDF PDF
01_002_FLOOR PLAN - GROUND FLOOR - B (1).PDF PDF
01_15_FLOOR PLAN - SIXTH FLOOR - A.PDF PDF
Addendum1.pdf PDF
01_003_FLOOR PLAN - GROUND FLOOR - A.PDF PDF
01_10R_FLOOR PLAN - THIRD FLOOR - B.PDF PDF
Final Asbestos Report - 1 of 6.pdf PDF
01_008R_FLOOR PLAN - SECOND FLOOR - B.PDF PDF
Past Performance Questionnaire.docx DOCX document
01_008_FLOOR PLAN - SECOND FLOOR - B.PDF PDF
Final Asbestos Report - 4 of 6.pdf PDF
Questions and Answers 1 of 2.pdf PDF
01_18_FLOOR PLAN - PENTHOUS - B.PDF PDF
01_13_FLOOR PLAN - FIFTH FLOOR - A.PDF PDF
01_16_FLOOR PLAN - SIXTH FLOOR - B.PDF PDF
01_11R_FLOOR PLAN - FOURTH FLOOR - A.PDF PDF
01_002_FLOOR PLAN - GROUND FLOOR - B.PDF PDF
01_004_FLOOR PLAN - GROUND FLOOR - B.PDF PDF
01_006_FLOOR PLAN - FIRST FLOOR - B.PDF PDF
01_11_FLOOR PLAN - FOURTH FLOOR - A.PDF PDF
Final Asbestos Report - 2 of 6.pdf PDF
01_17_FLOOR PLAN - PENTHOUS - A.PDF PDF
01_026_BUILDING SECTION.PDF PDF
36C24921R0086 0001.pdf PDF
Drawings.pdf PDF
Price Proposal Template.xlsx XLSX spreadsheet
CALCULATION OF SELF PERFORMED WORK.pdf PDF
Contractor EMR Certification Form.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cooper - -HA 61-63

2250 Leestown Rd Lexington KY 40511

Data Release : Year 2018 Unit Cost Estimate

Quantity

LineNumber

Line Sour ce

Description Crew

Daily Output

Labor Hours

Unit

Material

Equipme nt

Total Ext. Mat. Ext.

Labor

Ext.

Equip.

Ext.

Total

Mat.

O&P

Labor O&P

Equip.

O&P

Total O&P

Ext. Mat.

O&P

Ext.

Labor O&P

Ext.

Equip. O&P

Ext.

Total O&P

Labor Type

Data Release

CCI Location Notes

1 028213390100 Asbestos remediation, plans and methods, building survey, commercial 0 0 Ea. -$ -$ -$ 1,947.00$ -$ -$ -$ 1,947.00$ -$ -$ -$ 2,124.00$ -$ -$ -$ 2,124.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

100 028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster 2 Asbe 400 0.04 Ea. -$ 1.81$ -$ 1.81$ -$ 181.00$ -$ 181.00$ -$ 2.81$ -$ 2.81$ -$ 281.00$ -$ 281.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

100 028213470100

Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF A9 400 0.16 Ea. 0.82$ 7.23$ -$ 8.05$ 82.00$ 723.00$ -$ 805.00$ 0.90$ 11.24$ -$ 12.14$ 90.00$ 1,124.00$ -$ 1,214.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

40 028213475000

Asbestos waste packaging, handling & disposal, disposal charges, excl. haul, min 0 0 C.Y. -$ -$ -$ 53.99$ -$ -$ -$ 2,159.60$ -$ -$ -$ 59.30$ -$ -$ -$ 2,372.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

1000 028213438300

Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker 2 Asbe 1000 0.02 S.F. 0.08$ 0.72$ -$ 0.80$ 80.00$ 720.00$ -$ 800.00$ 0.09$ 1.12$ -$ 1.21$ 90.00$ 1,120.00$ -$ 1,210.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

4 028213450110 OSHA testing, certified technician, max 0 0 Day -$ -$ -$ 265.50$ -$ -$ -$ 1,062.00$ -$ -$ -$ 292.05$ -$ -$ -$ 1,168.20$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

4 028213450130 OSHA testing, industrial hygienist, max 0 0 Day -$ -$ -$ 354.00$ -$ -$ -$ 1,416.00$ -$ -$ -$ 389.40$ -$ -$ -$ 1,557.60$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

2000 028213420550

Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl.

glue & tape A9 8000 0.01 S.F. 0.04$ 0.36$ -$ 0.40$ 80.00$ 720.00$ -$ 800.00$ 0.04$ 0.56$ -$ 0.60$ 80.00$ 1,120.00$ -$ 1,200.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

2000 028213420100

Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces A9 12000 0.01 S.F. 0.01$ 0.24$ -$ 0.25$ 20.00$ 480.00$ -$ 500.00$ 0.01$ 0.38$ -$ 0.39$ 20.00$ 760.00$ -$ 780.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

Total 2,631.80$ 262.00$ 2,824.00$ -$ 9,670.60$ 2,881.90$ 280.00$ 4,405.00$ -$ 11,906.80$

Unit Detail Report

VA

tim thompson HGS Engineering, Inc.Prepared By:

Lexington, KY, 40511

Cooper - -HA 67

Year 2018

Date: 06/01/2018

Cost Estimate Report

LineNumber Quantity Unit Description Total Incl. O&P Ext. Total Incl. O&P

Existing ConditionsDivision 02

1.00 Ea. $2,124.00 $2,124.00028213390100 Asbestos remediation, plans and methods, building survey, commercial

500.00 S.F. $0.39 $195.00028213420100 Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces

500.00 S.F. $0.60 $300.00028213420550 Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl. glue & tape

250.00 S.F. $1.21 $302.50028213438300 Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker

2.00 Day $292.05 $584.10028213450110 OSHA testing, certified technician, max

2.00 Day $389.40 $778.80028213450130 OSHA testing, industrial hygienist, max

25.00 Ea. $12.14 $303.50028213470100 Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF

25.00 Ea. $2.81 $70.25028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster

10.00 C.Y. $59.30 $593.00028213475000 Asbestos waste packaging, handling & disposal, disposal charges, excl.

haul, min

Division 02 $5,251.15Existing Conditions Subtotal

LineNumber Quantity Unit Description Total Incl. O&P Ext. Total Incl. O&P

20.00% $0.00

Subtotal

General Contractor's Markup on Subs

$5,251.15

$5,251.15Subtotal

General Conditions 0.00% $0.00

$5,251.15Subtotal

General Contractor's Overhead and Profit 0.00%

$5,251.15Grand Total

$0.00

Cooper - -HA 67 ce

Total Ext. Mat. Ext.

Labor

Ext.

Equip.

Ext.

Total

Mat.

O&P

Labor O&P

Equip.

O&P

Total O&P

Ext. Mat.

O&P

Ext.

Labor O&P

Ext.

Equip. O&P

Ext.

Total O&P

Labor Type

Data Release

CCI Location Notes

500 028213420100

Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces A9 12000 0.01 S.F. 0.01$ 0.24$ -$ 0.25$ 5.00$ 120.00$ -$ 125.00$ 0.01$ 0.38$ -$ 0.39$ 5.00$ 190.00$ -$ 195.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

1 028213390100 Asbestos remediation, plans and methods, building survey, commercial 0 0 Ea. -$ -$ -$ 1,947.00$ -$ -$ -$ 1,947.00$ -$ -$ -$ 2,124.00$ -$ -$ -$ 2,124.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

25 028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster 2 Asbe 400 0.04 Ea. -$ 1.81$ -$ 1.81$ -$ 45.25$ -$ 45.25$ -$ 2.81$ -$ 2.81$ -$ 70.25$ -$ 70.25$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

25 028213470100

Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF A9 400 0.16 Ea. 0.82$ 7.23$ -$ 8.05$ 20.50$ 180.75$ -$ 201.25$ 0.90$ 11.24$ -$ 12.14$ 22.50$ 281.00$ -$ 303.50$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

10 028213475000

Asbestos waste packaging, handling & disposal, disposal charges, excl. haul, min 0 0 C.Y. -$ -$ -$ 53.99$ -$ -$ -$ 539.90$ -$ -$ -$ 59.30$ -$ -$ -$ 593.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

250 028213438300

Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker 2 Asbe 1000 0.02 S.F. 0.08$ 0.72$ -$ 0.80$ 20.00$ 180.00$ -$ 200.00$ 0.09$ 1.12$ -$ 1.21$ 22.50$ 280.00$ -$ 302.50$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

2 028213450110 OSHA testing, certified technician, max 0 0 Day -$ -$ -$ 265.50$ -$ -$ -$ 531.00$ -$ -$ -$ 292.05$ -$ -$ -$ 584.10$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

2 028213450130 OSHA testing, industrial hygienist, max 0 0 Day -$ -$ -$ 354.00$ -$ -$ -$ 708.00$ -$ -$ -$ 389.40$ -$ -$ -$ 778.80$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

500 028213420550

Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl.

glue & tape A9 8000 0.01 S.F. 0.04$ 0.36$ -$ 0.40$ 20.00$ 180.00$ -$ 200.00$ 0.04$ 0.56$ -$ 0.60$ 20.00$ 280.00$ -$ 300.00$ STD Year 2018

Total 2,631.80$ 65.50$ 706.00$ -$ 4,497.40$ 2,881.90$ 70.00$ 1,101.25$ -$ 5,251.15$

VA

tim thompson HGS Engineering, Inc.Prepared By:

Lexington, KY, 40511

Cooper - -HA 95-96

Year 2018

Date: 06/01/2018

Cost Estimate Report

LineNumber Quantity Unit Description Total Incl. O&P Ext. Total Incl. O&P

Existing ConditionsDivision 02

1.00 Ea. $2,124.00 $2,124.00028213390100 Asbestos remediation, plans and methods, building survey, commercial

300.00 S.F. $0.39 $117.00028213420100 Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces

300.00 S.F. $0.60 $180.00028213420550 Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl. glue & tape

10,000.00 S.F. $1.21 $12,100.00028213438300 Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker

24.00 Day $292.05 $7,009.20028213450110 OSHA testing, certified technician, max

24.00 Day $389.40 $9,345.60028213450130 OSHA testing, industrial hygienist, max

250.00 Ea. $12.14 $3,035.00028213470100 Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF

250.00 Ea. $2.81 $702.50028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster

40.00 C.Y. $59.30 $2,372.00028213475000 Asbestos waste packaging, handling & disposal, disposal charges, excl.

haul, min

Division 02 $36,985.30Existing Conditions Subtotal

Subtotal

General Contractor's Markup on Subs

$36,985.30

$36,985.30Subtotal

General Conditions 0.00% $0.00

$36,985.30Subtotal

General Contractor's Overhead and Profit 0.00%

$36,985.30Grand Total

Cooper - -HA 95-96 ce

Total Ext. Mat. Ext.

Labor

Ext.

Equip.

Ext.

Total

Mat.

O&P

Labor O&P

Equip.

O&P

Total O&P

Ext. Mat.

O&P

Ext.

Labor O&P

Ext.

Equip. O&P

Ext.

Total O&P

Labor Type

Data Release

CCI Location Notes

1 028213390100 Asbestos remediation, plans and methods, building survey, commercial 0 0 Ea. -$ -$ -$ 1,947.00$ -$ -$ -$ 1,947.00$ -$ -$ -$ 2,124.00$ -$ -$ -$ 2,124.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

300 028213420100

Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces A9 12000 0.01 S.F. 0.01$ 0.24$ -$ 0.25$ 3.00$ 72.00$ -$ 75.00$ 0.01$ 0.38$ -$ 0.39$ 3.00$ 114.00$ -$ 117.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

300 028213420550

Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl.

glue & tape A9 8000 0.01 S.F. 0.04$ 0.36$ -$ 0.40$ 12.00$ 108.00$ -$ 120.00$ 0.04$ 0.56$ -$ 0.60$ 12.00$ 168.00$ -$ 180.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

10000 028213438300

Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker 2 Asbe 1000 0.02 S.F. 0.08$ 0.72$ -$ 0.80$ 800.00$ 7,200.00$ -$ 8,000.00$ 0.09$ 1.12$ -$ 1.21$ 900.00$ 11,200.00$ -$ 12,100.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

24 028213450110 OSHA testing, certified technician, max 0 0 Day -$ -$ -$ 265.50$ -$ -$ -$ 6,372.00$ -$ -$ -$ 292.05$ -$ -$ -$ 7,009.20$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

24 028213450130 OSHA testing, industrial hygienist, max 0 0 Day -$ -$ -$ 354.00$ -$ -$ -$ 8,496.00$ -$ -$ -$ 389.40$ -$ -$ -$ 9,345.60$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

250 028213470100

Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF A9 400 0.16 Ea. 0.82$ 7.23$ -$ 8.05$ 205.00$ 1,807.50$ -$ 2,012.50$ 0.90$ 11.24$ -$ 12.14$ 225.00$ 2,810.00$ -$ 3,035.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

250 028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster 2 Asbe 400 0.04 Ea. -$ 1.81$ -$ 1.81$ -$ 452.50$ -$ 452.50$ -$ 2.81$ -$ 2.81$ -$ 702.50$ -$ 702.50$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

40 028213475000

Asbestos waste packaging, handling & disposal, disposal charges, excl. haul, min 0 0 C.Y. -$ -$ -$ 53.99$ -$ -$ -$ 2,159.60$ -$ -$ -$ 59.30$ -$ -$ -$ 2,372.00$ STD Year 2018

Total 2,631.80$ 1,020.00$ 9,640.00$ -$ 29,634.60$ 2,881.90$ 1,140.00$ 14,994.50$ -$ 36,985.30$

VA

tim thompson HGS Engineering, Inc.Prepared By:

Lexington, KY, 40511

Cooper - -HA 98-100

Year 2018

Date: 06/01/2018

Cost Estimate Report

LineNumber Quantity Unit Description Total Incl. O&P Ext. Total Incl. O&P

Existing ConditionsDivision 02

1.00 Ea. $2,124.00 $2,124.00028213390100 Asbestos remediation, plans and methods, building survey, commercial

20,000.00 S.F. $0.39 $7,800.00028213420100 Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces

20,000.00 S.F. $0.60 $12,000.00028213420550 Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl. glue & tape

10,000.00 S.F. $1.21 $12,100.00028213438300 Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker

24.00 Day $292.05 $7,009.20028213450110 OSHA testing, certified technician, max

24.00 Day $389.40 $9,345.60028213450130 OSHA testing, industrial hygienist, max

2,000.00 Ea. $12.14 $24,280.00028213470100 Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF

2,000.00 Ea. $2.81 $5,620.00028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster

300.00 C.Y. $59.30 $17,790.00028213475000 Asbestos waste packaging, handling & disposal, disposal charges, excl.

haul, min

Division 02 $98,068.80Existing Conditions Subtotal

Subtotal

General Contractor's Markup on Subs

$98,068.80

$98,068.80Subtotal

General Conditions 0.00% $0.00

$98,068.80Subtotal

General Contractor's Overhead and Profit 0.00%

$98,068.80Grand Total

Cooper - -HA 98-100

Sourc e

Total Ext. Mat. Ext.

Labor

Ext.

Equip.

Ext. Total Mat. O&P Labor O&P

Equip.

O&P

Total O&P

Ext. Mat.

O&P

Ext.

Labor O&P

Ext.

Equip. O&P

Ext. Total O&P

Labor Type

Data Release

CCI Location Notes

1 028213390100 Asbestos remediation, plans and methods, building survey, commercial 0 0 Ea. -$ -$ -$ 1,947.00$ -$ -$ -$ 1,947.00$ -$ -$ -$ 2,124.00$ -$ -$ -$ 2,124.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

20000 028213420100

Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces A9 12000 0.01 S.F. 0.01$ 0.24$ -$ 0.25$ 200.00$ 4,800.00$ -$ 5,000.00$ 0.01$ 0.38$ -$ 0.39$ 200.00$ 7,600.00$ -$ 7,800.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

20000 028213420550

Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl.

glue & tape A9 8000 0.01 S.F. 0.04$ 0.36$ -$ 0.40$ 800.00$ 7,200.00$ -$ 8,000.00$ 0.04$ 0.56$ -$ 0.60$ 800.00$ 11,200.00$ -$ 12,000.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

10000 028213438300

Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker 2 Asbe 1000 0.02 S.F. 0.08$ 0.72$ -$ 0.80$ 800.00$ 7,200.00$ -$ 8,000.00$ 0.09$ 1.12$ -$ 1.21$ 900.00$ 11,200.00$ -$ 12,100.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

24 028213450110 OSHA testing, certified technician, max 0 0 Day -$ -$ -$ 265.50$ -$ -$ -$ 6,372.00$ -$ -$ -$ 292.05$ -$ -$ -$ 7,009.20$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

24 028213450130 OSHA testing, industrial hygienist, max 0 0 Day -$ -$ -$ 354.00$ -$ -$ -$ 8,496.00$ -$ -$ -$ 389.40$ -$ -$ -$ 9,345.60$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

2000 028213470100

Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF A9 400 0.16 Ea. 0.82$ 7.23$ -$ 8.05$ 1,640.00$ 14,460.00$ -$ 16,100.00$ 0.90$ 11.24$ -$ 12.14$ 1,800.00$ 22,480.00$ -$ 24,280.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

2000 028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster 2 Asbe 400 0.04 Ea. -$ 1.81$ -$ 1.81$ -$ 3,620.00$ -$ 3,620.00$ -$ 2.81$ -$ 2.81$ -$ 5,620.00$ -$ 5,620.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

300 028213475000

Asbestos waste packaging, handling & disposal, disposal charges, excl. haul, min 0 0 C.Y. -$ -$ -$ 53.99$ -$ -$ -$ 16,197.00$ -$ -$ -$ 59.30$ -$ -$ -$ 17,790.00$ STD Year 2018

Total 2,631.80$ 3,440.00$ 37,280.00$ -$ 73,732.00$ 2,881.90$ 3,700.00$ 58,100.00$ -$ 98,068.80$

VA

tim thompson HGS Engineering, Inc.Prepared By:

Lexington, KY, 40511

Cooper - -HA 109

Year 2018

Date: 06/01/2018

Cost Estimate Report

LineNumber Quantity Unit Description Total Incl. O&P Ext. Total Incl. O&P

Existing ConditionsDivision 02

8.00 Ea. $2,124.00 $16,992.00028213390100 Asbestos remediation, plans and methods, building survey, commercial

20,000.00 S.F. $0.39 $7,800.00028213420100 Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces

20,000.00 S.F. $0.60 $12,000.00028213420550 Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl. glue & tape

70,000.00 S.F. $1.21 $84,700.00028213438300 Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker

24.00 Day $292.05 $7,009.20028213450110 OSHA testing, certified technician, max

24.00 Day $389.40 $9,345.60028213450130 OSHA testing, industrial hygienist, max

2,000.00 Ea. $12.14 $24,280.00028213470100 Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF

2,000.00 Ea. $2.81 $5,620.00028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster

300.00 C.Y. $59.30 $17,790.00028213475000 Asbestos waste packaging, handling & disposal, disposal charges, excl.

haul, min

Division 02 $185,536.80Existing Conditions Subtotal

Subtotal

General Contractor's Markup on Subs

$185,536.80

$185,536.80Subtotal

General Conditions 0.00% $0.00

$185,536.80Subtotal

General Contractor's Overhead and Profit 0.00%

$185,536.80Grand Total

Cooper - -HA 109 ce

Total Ext. Mat. Ext.

Labor

Ext.

Equip.

Ext.

Total

Mat.

O&P

Labor O&P

Equip.

O&P

Total O&P

Ext. Mat.

O&P

Ext.

Labor O&P

Ext.

Equip. O&P

Ext.

Total O&P

Labor Type

Data Release

CCI Location Notes

24 028213450110 OSHA testing, certified technician, max 0 0 Day -$ -$ -$ 265.50$ -$ -$ -$ 6,372.00$ -$ -$ -$ 292.05$ -$ -$ -$ 7,009.20$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

24 028213450130 OSHA testing, industrial hygienist, max 0 0 Day -$ -$ -$ 354.00$ -$ -$ -$ 8,496.00$ -$ -$ -$ 389.40$ -$ -$ -$ 9,345.60$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

2000 028213470100

Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF A9 400 0.16 Ea. 0.82$ 7.23$ -$ 8.05$ 1,640.00$ 14,460.00$ -$ 16,100.00$ 0.90$ 11.24$ -$ 12.14$ 1,800.00$ 22,480.00$ -$ 24,280.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

2000 028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster 2 Asbe 400 0.04 Ea. -$ 1.81$ -$ 1.81$ -$ 3,620.00$ -$ 3,620.00$ -$ 2.81$ -$ 2.81$ -$ 5,620.00$ -$ 5,620.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

8 028213390100 Asbestos remediation, plans and methods, building survey, commercial 0 0 Ea. -$ -$ -$ 1,947.00$ -$ -$ -$ 15,576.00$ -$ -$ -$ 2,124.00$ -$ -$ -$ 16,992.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

300 028213475000

Asbestos waste packaging, handling & disposal, disposal charges, excl. haul, min 0 0 C.Y. -$ -$ -$ 53.99$ -$ -$ -$ 16,197.00$ -$ -$ -$ 59.30$ -$ -$ -$ 17,790.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

20000 028213420100

Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces A9 12000 0.01 S.F. 0.01$ 0.24$ -$ 0.25$ 200.00$ 4,800.00$ -$ 5,000.00$ 0.01$ 0.38$ -$ 0.39$ 200.00$ 7,600.00$ -$ 7,800.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

20000 028213420550

Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl.

glue & tape A9 8000 0.01 S.F. 0.04$ 0.36$ -$ 0.40$ 800.00$ 7,200.00$ -$ 8,000.00$ 0.04$ 0.56$ -$ 0.60$ 800.00$ 11,200.00$ -$ 12,000.00$ STD Year 2018

KENTUCKY / LEXINGTON (403-

405)

70000 028213438300

Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker 2 Asbe 1000 0.02 S.F. 0.08$ 0.72$ -$ 0.80$ 5,600.00$ 50,400.00$ -$ 56,000.00$ 0.09$ 1.12$ -$ 1.21$ 6,300.00$ 78,400.00$ -$ 84,700.00$ STD Year 2018

Total 2,631.80$ 8,240.00$ 80,480.00$ -$ 135,361.00$ 2,881.90$ 9,100.00$ 125,300.00$ -$ 185,536.80$