This document includes a federal contract opportunity notice and related cost estimate report. The notice is for construction services to correct mechanical system deficiencies at the Lexington VA Medical Center in Lexington, Kentucky. The work includes general construction, alterations and removals. The estimate is for asbestos remediation and abatement across multiple buildings. The total estimated cost is $185,536.80. The opportunity is a 100% SDVOSB set-aside with an estimate between $1-3 million. The NAICS code is 236220 and size standard is $39.5 million. The solicitation number is 36C24921R0086 and will be released on June 12, 2020 as a LPTA procurement. Questions must be submitted in writing to the contracting officer by that date.
View the file
Other files
Show 40 more
Latest 50 of 55 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cooper - -HA 61-63
2250 Leestown Rd Lexington KY 40511
Data Release : Year 2018 Unit Cost Estimate
Quantity
LineNumber
Line Sour ce
Description Crew
Daily Output
Labor Hours
Unit
Material
Equipme nt
Total Ext. Mat. Ext.
Labor
Ext.
Equip.
Ext.
Total
Mat.
O&P
Labor O&P
Equip.
O&P
Total O&P
Ext. Mat.
O&P
Ext.
Labor O&P
Ext.
Equip. O&P
Ext.
Total O&P
Labor Type
Data Release
CCI Location Notes
1 028213390100 Asbestos remediation, plans and methods, building survey, commercial 0 0 Ea. -$ -$ -$ 1,947.00$ -$ -$ -$ 1,947.00$ -$ -$ -$ 2,124.00$ -$ -$ -$ 2,124.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
100 028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster 2 Asbe 400 0.04 Ea. -$ 1.81$ -$ 1.81$ -$ 181.00$ -$ 181.00$ -$ 2.81$ -$ 2.81$ -$ 281.00$ -$ 281.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
100 028213470100
Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF A9 400 0.16 Ea. 0.82$ 7.23$ -$ 8.05$ 82.00$ 723.00$ -$ 805.00$ 0.90$ 11.24$ -$ 12.14$ 90.00$ 1,124.00$ -$ 1,214.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
40 028213475000
Asbestos waste packaging, handling & disposal, disposal charges, excl. haul, min 0 0 C.Y. -$ -$ -$ 53.99$ -$ -$ -$ 2,159.60$ -$ -$ -$ 59.30$ -$ -$ -$ 2,372.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
1000 028213438300
Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker 2 Asbe 1000 0.02 S.F. 0.08$ 0.72$ -$ 0.80$ 80.00$ 720.00$ -$ 800.00$ 0.09$ 1.12$ -$ 1.21$ 90.00$ 1,120.00$ -$ 1,210.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
4 028213450110 OSHA testing, certified technician, max 0 0 Day -$ -$ -$ 265.50$ -$ -$ -$ 1,062.00$ -$ -$ -$ 292.05$ -$ -$ -$ 1,168.20$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
4 028213450130 OSHA testing, industrial hygienist, max 0 0 Day -$ -$ -$ 354.00$ -$ -$ -$ 1,416.00$ -$ -$ -$ 389.40$ -$ -$ -$ 1,557.60$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
2000 028213420550
Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl.
glue & tape A9 8000 0.01 S.F. 0.04$ 0.36$ -$ 0.40$ 80.00$ 720.00$ -$ 800.00$ 0.04$ 0.56$ -$ 0.60$ 80.00$ 1,120.00$ -$ 1,200.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
2000 028213420100
Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces A9 12000 0.01 S.F. 0.01$ 0.24$ -$ 0.25$ 20.00$ 480.00$ -$ 500.00$ 0.01$ 0.38$ -$ 0.39$ 20.00$ 760.00$ -$ 780.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
Total 2,631.80$ 262.00$ 2,824.00$ -$ 9,670.60$ 2,881.90$ 280.00$ 4,405.00$ -$ 11,906.80$
Unit Detail Report
VA
tim thompson HGS Engineering, Inc.Prepared By:
Lexington, KY, 40511
Cooper - -HA 67
Year 2018
Date: 06/01/2018
Cost Estimate Report
LineNumber Quantity Unit Description Total Incl. O&P Ext. Total Incl. O&P
Existing ConditionsDivision 02
1.00 Ea. $2,124.00 $2,124.00028213390100 Asbestos remediation, plans and methods, building survey, commercial
500.00 S.F. $0.39 $195.00028213420100 Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces
500.00 S.F. $0.60 $300.00028213420550 Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl. glue & tape
250.00 S.F. $1.21 $302.50028213438300 Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker
2.00 Day $292.05 $584.10028213450110 OSHA testing, certified technician, max
2.00 Day $389.40 $778.80028213450130 OSHA testing, industrial hygienist, max
25.00 Ea. $12.14 $303.50028213470100 Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF
25.00 Ea. $2.81 $70.25028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster
10.00 C.Y. $59.30 $593.00028213475000 Asbestos waste packaging, handling & disposal, disposal charges, excl.
haul, min
Division 02 $5,251.15Existing Conditions Subtotal
LineNumber Quantity Unit Description Total Incl. O&P Ext. Total Incl. O&P
20.00% $0.00
Subtotal
General Contractor's Markup on Subs
$5,251.15
$5,251.15Subtotal
General Conditions 0.00% $0.00
$5,251.15Subtotal
General Contractor's Overhead and Profit 0.00%
$5,251.15Grand Total
$0.00
Cooper - -HA 67 ce
Total Ext. Mat. Ext.
Labor
Ext.
Equip.
Ext.
Total
Mat.
O&P
Labor O&P
Equip.
O&P
Total O&P
Ext. Mat.
O&P
Ext.
Labor O&P
Ext.
Equip. O&P
Ext.
Total O&P
Labor Type
Data Release
CCI Location Notes
500 028213420100
Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces A9 12000 0.01 S.F. 0.01$ 0.24$ -$ 0.25$ 5.00$ 120.00$ -$ 125.00$ 0.01$ 0.38$ -$ 0.39$ 5.00$ 190.00$ -$ 195.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
1 028213390100 Asbestos remediation, plans and methods, building survey, commercial 0 0 Ea. -$ -$ -$ 1,947.00$ -$ -$ -$ 1,947.00$ -$ -$ -$ 2,124.00$ -$ -$ -$ 2,124.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
25 028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster 2 Asbe 400 0.04 Ea. -$ 1.81$ -$ 1.81$ -$ 45.25$ -$ 45.25$ -$ 2.81$ -$ 2.81$ -$ 70.25$ -$ 70.25$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
25 028213470100
Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF A9 400 0.16 Ea. 0.82$ 7.23$ -$ 8.05$ 20.50$ 180.75$ -$ 201.25$ 0.90$ 11.24$ -$ 12.14$ 22.50$ 281.00$ -$ 303.50$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
10 028213475000
Asbestos waste packaging, handling & disposal, disposal charges, excl. haul, min 0 0 C.Y. -$ -$ -$ 53.99$ -$ -$ -$ 539.90$ -$ -$ -$ 59.30$ -$ -$ -$ 593.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
250 028213438300
Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker 2 Asbe 1000 0.02 S.F. 0.08$ 0.72$ -$ 0.80$ 20.00$ 180.00$ -$ 200.00$ 0.09$ 1.12$ -$ 1.21$ 22.50$ 280.00$ -$ 302.50$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
2 028213450110 OSHA testing, certified technician, max 0 0 Day -$ -$ -$ 265.50$ -$ -$ -$ 531.00$ -$ -$ -$ 292.05$ -$ -$ -$ 584.10$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
2 028213450130 OSHA testing, industrial hygienist, max 0 0 Day -$ -$ -$ 354.00$ -$ -$ -$ 708.00$ -$ -$ -$ 389.40$ -$ -$ -$ 778.80$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
500 028213420550
Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl.
glue & tape A9 8000 0.01 S.F. 0.04$ 0.36$ -$ 0.40$ 20.00$ 180.00$ -$ 200.00$ 0.04$ 0.56$ -$ 0.60$ 20.00$ 280.00$ -$ 300.00$ STD Year 2018
Total 2,631.80$ 65.50$ 706.00$ -$ 4,497.40$ 2,881.90$ 70.00$ 1,101.25$ -$ 5,251.15$
VA
tim thompson HGS Engineering, Inc.Prepared By:
Lexington, KY, 40511
Cooper - -HA 95-96
Year 2018
Date: 06/01/2018
Cost Estimate Report
LineNumber Quantity Unit Description Total Incl. O&P Ext. Total Incl. O&P
Existing ConditionsDivision 02
1.00 Ea. $2,124.00 $2,124.00028213390100 Asbestos remediation, plans and methods, building survey, commercial
300.00 S.F. $0.39 $117.00028213420100 Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces
300.00 S.F. $0.60 $180.00028213420550 Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl. glue & tape
10,000.00 S.F. $1.21 $12,100.00028213438300 Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker
24.00 Day $292.05 $7,009.20028213450110 OSHA testing, certified technician, max
24.00 Day $389.40 $9,345.60028213450130 OSHA testing, industrial hygienist, max
250.00 Ea. $12.14 $3,035.00028213470100 Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF
250.00 Ea. $2.81 $702.50028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster
40.00 C.Y. $59.30 $2,372.00028213475000 Asbestos waste packaging, handling & disposal, disposal charges, excl.
haul, min
Division 02 $36,985.30Existing Conditions Subtotal
Subtotal
General Contractor's Markup on Subs
$36,985.30
$36,985.30Subtotal
General Conditions 0.00% $0.00
$36,985.30Subtotal
General Contractor's Overhead and Profit 0.00%
$36,985.30Grand Total
Cooper - -HA 95-96 ce
Total Ext. Mat. Ext.
Labor
Ext.
Equip.
Ext.
Total
Mat.
O&P
Labor O&P
Equip.
O&P
Total O&P
Ext. Mat.
O&P
Ext.
Labor O&P
Ext.
Equip. O&P
Ext.
Total O&P
Labor Type
Data Release
CCI Location Notes
1 028213390100 Asbestos remediation, plans and methods, building survey, commercial 0 0 Ea. -$ -$ -$ 1,947.00$ -$ -$ -$ 1,947.00$ -$ -$ -$ 2,124.00$ -$ -$ -$ 2,124.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
300 028213420100
Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces A9 12000 0.01 S.F. 0.01$ 0.24$ -$ 0.25$ 3.00$ 72.00$ -$ 75.00$ 0.01$ 0.38$ -$ 0.39$ 3.00$ 114.00$ -$ 117.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
300 028213420550
Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl.
glue & tape A9 8000 0.01 S.F. 0.04$ 0.36$ -$ 0.40$ 12.00$ 108.00$ -$ 120.00$ 0.04$ 0.56$ -$ 0.60$ 12.00$ 168.00$ -$ 180.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
10000 028213438300
Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker 2 Asbe 1000 0.02 S.F. 0.08$ 0.72$ -$ 0.80$ 800.00$ 7,200.00$ -$ 8,000.00$ 0.09$ 1.12$ -$ 1.21$ 900.00$ 11,200.00$ -$ 12,100.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
24 028213450110 OSHA testing, certified technician, max 0 0 Day -$ -$ -$ 265.50$ -$ -$ -$ 6,372.00$ -$ -$ -$ 292.05$ -$ -$ -$ 7,009.20$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
24 028213450130 OSHA testing, industrial hygienist, max 0 0 Day -$ -$ -$ 354.00$ -$ -$ -$ 8,496.00$ -$ -$ -$ 389.40$ -$ -$ -$ 9,345.60$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
250 028213470100
Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF A9 400 0.16 Ea. 0.82$ 7.23$ -$ 8.05$ 205.00$ 1,807.50$ -$ 2,012.50$ 0.90$ 11.24$ -$ 12.14$ 225.00$ 2,810.00$ -$ 3,035.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
250 028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster 2 Asbe 400 0.04 Ea. -$ 1.81$ -$ 1.81$ -$ 452.50$ -$ 452.50$ -$ 2.81$ -$ 2.81$ -$ 702.50$ -$ 702.50$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
40 028213475000
Asbestos waste packaging, handling & disposal, disposal charges, excl. haul, min 0 0 C.Y. -$ -$ -$ 53.99$ -$ -$ -$ 2,159.60$ -$ -$ -$ 59.30$ -$ -$ -$ 2,372.00$ STD Year 2018
Total 2,631.80$ 1,020.00$ 9,640.00$ -$ 29,634.60$ 2,881.90$ 1,140.00$ 14,994.50$ -$ 36,985.30$
VA
tim thompson HGS Engineering, Inc.Prepared By:
Lexington, KY, 40511
Cooper - -HA 98-100
Year 2018
Date: 06/01/2018
Cost Estimate Report
LineNumber Quantity Unit Description Total Incl. O&P Ext. Total Incl. O&P
Existing ConditionsDivision 02
1.00 Ea. $2,124.00 $2,124.00028213390100 Asbestos remediation, plans and methods, building survey, commercial
20,000.00 S.F. $0.39 $7,800.00028213420100 Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces
20,000.00 S.F. $0.60 $12,000.00028213420550 Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl. glue & tape
10,000.00 S.F. $1.21 $12,100.00028213438300 Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker
24.00 Day $292.05 $7,009.20028213450110 OSHA testing, certified technician, max
24.00 Day $389.40 $9,345.60028213450130 OSHA testing, industrial hygienist, max
2,000.00 Ea. $12.14 $24,280.00028213470100 Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF
2,000.00 Ea. $2.81 $5,620.00028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster
300.00 C.Y. $59.30 $17,790.00028213475000 Asbestos waste packaging, handling & disposal, disposal charges, excl.
haul, min
Division 02 $98,068.80Existing Conditions Subtotal
Subtotal
General Contractor's Markup on Subs
$98,068.80
$98,068.80Subtotal
General Conditions 0.00% $0.00
$98,068.80Subtotal
General Contractor's Overhead and Profit 0.00%
$98,068.80Grand Total
Cooper - -HA 98-100
Sourc e
Total Ext. Mat. Ext.
Labor
Ext.
Equip.
Ext. Total Mat. O&P Labor O&P
Equip.
O&P
Total O&P
Ext. Mat.
O&P
Ext.
Labor O&P
Ext.
Equip. O&P
Ext. Total O&P
Labor Type
Data Release
CCI Location Notes
1 028213390100 Asbestos remediation, plans and methods, building survey, commercial 0 0 Ea. -$ -$ -$ 1,947.00$ -$ -$ -$ 1,947.00$ -$ -$ -$ 2,124.00$ -$ -$ -$ 2,124.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
20000 028213420100
Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces A9 12000 0.01 S.F. 0.01$ 0.24$ -$ 0.25$ 200.00$ 4,800.00$ -$ 5,000.00$ 0.01$ 0.38$ -$ 0.39$ 200.00$ 7,600.00$ -$ 7,800.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
20000 028213420550
Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl.
glue & tape A9 8000 0.01 S.F. 0.04$ 0.36$ -$ 0.40$ 800.00$ 7,200.00$ -$ 8,000.00$ 0.04$ 0.56$ -$ 0.60$ 800.00$ 11,200.00$ -$ 12,000.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
10000 028213438300
Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker 2 Asbe 1000 0.02 S.F. 0.08$ 0.72$ -$ 0.80$ 800.00$ 7,200.00$ -$ 8,000.00$ 0.09$ 1.12$ -$ 1.21$ 900.00$ 11,200.00$ -$ 12,100.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
24 028213450110 OSHA testing, certified technician, max 0 0 Day -$ -$ -$ 265.50$ -$ -$ -$ 6,372.00$ -$ -$ -$ 292.05$ -$ -$ -$ 7,009.20$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
24 028213450130 OSHA testing, industrial hygienist, max 0 0 Day -$ -$ -$ 354.00$ -$ -$ -$ 8,496.00$ -$ -$ -$ 389.40$ -$ -$ -$ 9,345.60$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
2000 028213470100
Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF A9 400 0.16 Ea. 0.82$ 7.23$ -$ 8.05$ 1,640.00$ 14,460.00$ -$ 16,100.00$ 0.90$ 11.24$ -$ 12.14$ 1,800.00$ 22,480.00$ -$ 24,280.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
2000 028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster 2 Asbe 400 0.04 Ea. -$ 1.81$ -$ 1.81$ -$ 3,620.00$ -$ 3,620.00$ -$ 2.81$ -$ 2.81$ -$ 5,620.00$ -$ 5,620.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
300 028213475000
Asbestos waste packaging, handling & disposal, disposal charges, excl. haul, min 0 0 C.Y. -$ -$ -$ 53.99$ -$ -$ -$ 16,197.00$ -$ -$ -$ 59.30$ -$ -$ -$ 17,790.00$ STD Year 2018
Total 2,631.80$ 3,440.00$ 37,280.00$ -$ 73,732.00$ 2,881.90$ 3,700.00$ 58,100.00$ -$ 98,068.80$
VA
tim thompson HGS Engineering, Inc.Prepared By:
Lexington, KY, 40511
Cooper - -HA 109
Year 2018
Date: 06/01/2018
Cost Estimate Report
LineNumber Quantity Unit Description Total Incl. O&P Ext. Total Incl. O&P
Existing ConditionsDivision 02
8.00 Ea. $2,124.00 $16,992.00028213390100 Asbestos remediation, plans and methods, building survey, commercial
20,000.00 S.F. $0.39 $7,800.00028213420100 Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces
20,000.00 S.F. $0.60 $12,000.00028213420550 Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl. glue & tape
70,000.00 S.F. $1.21 $84,700.00028213438300 Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker
24.00 Day $292.05 $7,009.20028213450110 OSHA testing, certified technician, max
24.00 Day $389.40 $9,345.60028213450130 OSHA testing, industrial hygienist, max
2,000.00 Ea. $12.14 $24,280.00028213470100 Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF
2,000.00 Ea. $2.81 $5,620.00028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster
300.00 C.Y. $59.30 $17,790.00028213475000 Asbestos waste packaging, handling & disposal, disposal charges, excl.
haul, min
Division 02 $185,536.80Existing Conditions Subtotal
Subtotal
General Contractor's Markup on Subs
$185,536.80
$185,536.80Subtotal
General Conditions 0.00% $0.00
$185,536.80Subtotal
General Contractor's Overhead and Profit 0.00%
$185,536.80Grand Total
Cooper - -HA 109 ce
Total Ext. Mat. Ext.
Labor
Ext.
Equip.
Ext.
Total
Mat.
O&P
Labor O&P
Equip.
O&P
Total O&P
Ext. Mat.
O&P
Ext.
Labor O&P
Ext.
Equip. O&P
Ext.
Total O&P
Labor Type
Data Release
CCI Location Notes
24 028213450110 OSHA testing, certified technician, max 0 0 Day -$ -$ -$ 265.50$ -$ -$ -$ 6,372.00$ -$ -$ -$ 292.05$ -$ -$ -$ 7,009.20$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
24 028213450130 OSHA testing, industrial hygienist, max 0 0 Day -$ -$ -$ 354.00$ -$ -$ -$ 8,496.00$ -$ -$ -$ 389.40$ -$ -$ -$ 9,345.60$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
2000 028213470100
Asbestos waste packaging, handling & disposal, collect and bag bulk material, by hand, 3 CF A9 400 0.16 Ea. 0.82$ 7.23$ -$ 8.05$ 1,640.00$ 14,460.00$ -$ 16,100.00$ 0.90$ 11.24$ -$ 12.14$ 1,800.00$ 22,480.00$ -$ 24,280.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
2000 028213473000 Asbestos waste packaging, handling & disposal, cart bags 50' to dumpster 2 Asbe 400 0.04 Ea. -$ 1.81$ -$ 1.81$ -$ 3,620.00$ -$ 3,620.00$ -$ 2.81$ -$ 2.81$ -$ 5,620.00$ -$ 5,620.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
8 028213390100 Asbestos remediation, plans and methods, building survey, commercial 0 0 Ea. -$ -$ -$ 1,947.00$ -$ -$ -$ 15,576.00$ -$ -$ -$ 2,124.00$ -$ -$ -$ 16,992.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
300 028213475000
Asbestos waste packaging, handling & disposal, disposal charges, excl. haul, min 0 0 C.Y. -$ -$ -$ 53.99$ -$ -$ -$ 16,197.00$ -$ -$ -$ 59.30$ -$ -$ -$ 17,790.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
20000 028213420100
Preparation of asbestos containment area, pre-cleaning, HEPA vacuum and wet wipe, flat surfaces A9 12000 0.01 S.F. 0.01$ 0.24$ -$ 0.25$ 200.00$ 4,800.00$ -$ 5,000.00$ 0.01$ 0.38$ -$ 0.39$ 200.00$ 7,600.00$ -$ 7,800.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
20000 028213420550
Preparation of asbestos containment area, cover surfaces with polyethylene sheeting, floors, each layer, 6 mil, incl.
glue & tape A9 8000 0.01 S.F. 0.04$ 0.36$ -$ 0.40$ 800.00$ 7,200.00$ -$ 8,000.00$ 0.04$ 0.56$ -$ 0.60$ 800.00$ 11,200.00$ -$ 12,000.00$ STD Year 2018
KENTUCKY / LEXINGTON (403-
405)
70000 028213438300
Bulk asbestos removal, asbestos millboard, flat board and VAT contaminated plywood, includes disposable tools & 2 suits & 1 respirator filter/day/worker 2 Asbe 1000 0.02 S.F. 0.08$ 0.72$ -$ 0.80$ 5,600.00$ 50,400.00$ -$ 56,000.00$ 0.09$ 1.12$ -$ 1.21$ 6,300.00$ 78,400.00$ -$ 84,700.00$ STD Year 2018
Total 2,631.80$ 8,240.00$ 80,480.00$ -$ 135,361.00$ 2,881.90$ 9,100.00$ 125,300.00$ -$ 185,536.80$
File details come from the government source that posted it. Updated .