About this file

This solicitation notice is for general construction services to correct various mechanical system deficiencies at the Lexington Veterans Affairs Medical Center in Troy Bowling Division. The work includes alterations and construction to address issues in accordance with provided specifications and drawings. The project is estimated to cost between $1-3 million and will be awarded using lowest price technically acceptable procedures. The opportunity is open only to verified Service-Disabled Veteran Owned Small Businesses listed on the Center for Verification and Evaluation database. Interested firms must also be registered in the System for Award Management. Questions must be submitted in writing by June 12th, 2020, and proposals are due on the same date with award to follow. The contracting agency is the Department of Veterans Affairs Veterans Health Administration VISN 9.

View the file

Other files

File Type Posted
07 22 00 Roof and Deck Insulation.pdf PDF
36C24921R0086 0005.pdf PDF
07 60 00 Flashing and Sheet Metal.pdf PDF
FAN CLARIFICATION.pdf PDF
07 72 00 Roof Accessories.pdf PDF
08 71 00 Door Hardware.pdf PDF
Revised Table Of Contents.pdf PDF
07 52 16.11 Cold Adhesive STY Modified Bituminous Membrane Roofing.pdf PDF
36C24921R0086 0004.pdf PDF
36C24921R0086 0003.pdf PDF
Site Visit Sign-in Log_Correct Various Mech. Def..pdf PDF
36C24921R0086 0002.pdf PDF
Final Asbestos Report - 3 of 6.pdf PDF
19-191 General Addendum 01 to VA.pdf PDF
Questions and Answers 2 of 2 - Pre-bid RFIs.xlsx XLSX spreadsheet
01_005_FLOOR PLAN - FIRST FLOOR - A.PDF PDF
01_007_FLOOR PLAN - SECOND FLOOR - A.PDF PDF
19-191 Electrical Addendum 01 to VA.pdf PDF
Final Asbestos Report - 5 of 6.pdf PDF
01_12_FLOOR PLAN - FOURTH FLOOR - B.PDF PDF
01_15R_FLOOR PLAN - SIXTH FLOOR - A.PDF PDF
01_009_FLOOR PLAN - THIRD FLOOR - A.PDF PDF
01_14_FLOOR PLAN - FIFTH FLOOR - B.PDF PDF
01_002_FLOOR PLAN - GROUND FLOOR - B (1).PDF PDF
01_15_FLOOR PLAN - SIXTH FLOOR - A.PDF PDF
Addendum1.pdf PDF
01_003_FLOOR PLAN - GROUND FLOOR - A.PDF PDF
01_10R_FLOOR PLAN - THIRD FLOOR - B.PDF PDF
Final Asbestos Report - 1 of 6.pdf PDF
01_008R_FLOOR PLAN - SECOND FLOOR - B.PDF PDF
Past Performance Questionnaire.docx DOCX document
01_008_FLOOR PLAN - SECOND FLOOR - B.PDF PDF
Final Asbestos Report - 4 of 6.pdf PDF
Questions and Answers 1 of 2.pdf PDF
01_18_FLOOR PLAN - PENTHOUS - B.PDF PDF
01_13_FLOOR PLAN - FIFTH FLOOR - A.PDF PDF
Final Asbestos Report - 6 of 6.pdf PDF
01_16_FLOOR PLAN - SIXTH FLOOR - B.PDF PDF
01_11R_FLOOR PLAN - FOURTH FLOOR - A.PDF PDF
01_002_FLOOR PLAN - GROUND FLOOR - B.PDF PDF
01_004_FLOOR PLAN - GROUND FLOOR - B.PDF PDF
01_006_FLOOR PLAN - FIRST FLOOR - B.PDF PDF
01_11_FLOOR PLAN - FOURTH FLOOR - A.PDF PDF
Final Asbestos Report - 2 of 6.pdf PDF
01_17_FLOOR PLAN - PENTHOUS - A.PDF PDF
01_026_BUILDING SECTION.PDF PDF
36C24921R0086 0001.pdf PDF
Drawings.pdf PDF
Price Proposal Template.xlsx XLSX spreadsheet
Contractor EMR Certification Form.pdf PDF
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CALCULATION OF SELF-PERFORMED/SUBCONTRACTED WORK Project 596A4-19-102, Correct Various Mechanical System Deficiencies

Offerors for General Construction (NAICS code 236220) must provide at least 15 percent (25% for specialty trade NAICS codes with 237 and 238 prefix) of the cost of the contract performance incurred for personnel must be performed by the Service Disabled Veteran Owned Small Business (SDVOSB) awardee or those of a verified SDVOSB subcontractor. Provide a breakdown of material and personnel costs, by specification division listed for the project. Home Office overhead, profit/fee and bond costs shall be added after a subtotal of personnel and material/Equipment costs has been calculated. Clearly identify the personnel costs you will be performing, and the personnel costs of other eligible service disabled veteran-owned small business concerns. Below is a suggested format.

Specification Division SDVOB Vendor (Y or N) Personnel Cost Material/Equipment Costs Division 01 $ $ Division 02 $ $ Division 03 $ $ (Add additional lines as necessary for each Division applicable to this project)

Sub Total (Personnel Costs, Material/Equipment Costs)

Profit $ Home Office Overhead $ Bond $ Grand Total $

Calculation of self-performed personnel costs:

1. Total personnel costs * both prime and all subcontractors: $

2. Subtract all subcontractor personnel costs* that are not SDVOSB companies that will perform work on this contract: $

3. Remainder is ‘Total amount of work to be self-performed under the Contract’: $

4. Self-performed work = Line 3/Line 1 x 100 = %

*personnel costs include labors, mechanics, other tradesmen, and office personnel directly charged to the project (includes project manager, job superintendent, administrative, estimators, etc.)

File details come from the government source that posted it. Updated .