Drawing Vol 1-8 Mechanical 614-700-MH-20231011.pdf
PDF 12 MB Posted
- Attached to
- Y1DA--614-22-700 EHRM Infrastructure Upgrades Construction Memphis TN Federal contract opportunity
- Solicitation number
- 36C77624B0013_1
About this file
This document appears to be a set of mechanical drawings related to the federal contract opportunity for the EHRM Infrastructure Upgrades Construction project at the Memphis, TN VA Medical Center.
The associated federal contract opportunity is a solicitation (Solicitation Number 36C77624B0013_1) issued by the Department of Veterans Affairs Technology Acquisition Center Austin for the EHRM Infrastructure Upgrades Construction project at the Memphis, TN VAMC. The opportunity is for construction services to support the EHRM (Electronic Health Record Modernization) program. No additional details about the required products, services, response dates, award dates, pricing terms, set asides, incumbents, or other salient information are provided in this document, as it contains only mechanical drawings and does not address the full solicitation.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H
C
C
1. UNLESS NOTED OTHERWISE, THE SIZE OF EACH BRANCH DUCT TO A TERMINAL AIR BOX
(TAB) SHALL MATCH THE INLET SIZE UNLESS THE BRANCH IS GREATER THAN 6FEET IN
LENGTH, IN WHICH CASE THE BRANCH DUCT SHALL BE SIZED AT A PRESSURE DROP OF
0.07"W.C. PER 100' OF DUCTWORK.
2. UNLESS NOTED OTHERWISE, THE SIZE OF EACH BRANCH DUCT TO AN AIR TERMINAL SHALL
MATCH THE INLET SIZE.
3. ALIGN TEMPERATURE SENSORS WITH LIGHT SWITCHES WHEN IN CLOSE PROXIMITY TO
EACH OTHER.
4. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT.
5. EXISTING AIR INLET AND OUTLET CFM SHOWN ON DRAWINGS ARE FROM EXISTING
DRAWINGS, AND ARE FOR REFERENCE ONLY.
6. CONTRACTOR MAY REUSE PORTIONS OF EXISTING DUCT PROVIDED SIZES AND PRESSURE
CLASSES ARE CORRECT, DUCT IS THOROUGHLY CLEANED AND FREE OF DEFECTS, AND ALL
TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS ARE SEALED
AS SPECIFIED FOR NEW DUCTWORK.
VENTILATION GENERAL NOTES:
1. THE SIZE OF BRANCH PIPING TO TERMINAL HEATING DEVICES AND COILS SHALL BE 3/4"
UNLESS NOTED OTHERWISE.
2. PIPE DRAIN LINES FROM EQUIPMENT TO NEAREST FLOOR DRAIN.
3. INSTALL ALL REFRIGERANT LIQUID AND SUCTION PIPING SIZED PER EQUIPMENT
MANUFACTURER RECOMMENDATIONS.
PIPING GENERAL NOTES:
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL
EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT
LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,
TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.
16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH
OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE
EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO
THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED
ELECTRICAL SPACE INCLUDING: DUCTWORK, PIPING, ETC.
17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL RENOVATION NOTES:
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND
SHALL NOTIFY THE ARCHITECT/ENGINEER PRIOR TO BIDDING IF OTHER UTILITIES ARE
REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
BIDDING.
7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
MECHANICAL PHASING NOTES:
1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO
ARCHITECT'S INSTRUCTIONS FOR MORE DETAILS AND PHASING SCHEDULES AND FOR
CONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT
THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY
DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF
THE PHASING CRITERIA.
2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.
WITH AFFECTED ADJACENT AREAS.
3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE
ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF
PROJECT.
4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP
ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT
5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.
6. COORDINATE PHASING IN MAIN COMPUTER ROOM WITH TELECOMMUNICATIONS PHASING
PLANS.
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N O R
HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR
SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL
MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.
FIRE / SMOKE BARRIER DESIGNATIONS
2 HOUR FIRE PARTITION
SMOKE PARTITION
1 HOUR FIRE/SMOKE PARTITION
2 HOUR FIRE/SMOKE PARTITION
1 HOUR FIRE PARTITION
INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES: V3.1, JULY 1, 2021
VA FIRE PROTECTION DESIGN MANUAL: 8TH ED., JUNE 1, 2021
VA PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL: REV. JULY 1, 2021
VA PLUMBING DESIGN MANUAL: REV. JUNE 1, 2022
VA HVAC DESIGN MANUAL: REV. OCTOBER 1, 2022
VA SITE DESIGN MANUAL: REV. APRIL 1, 2021
NFPA 13 INSTALLATION OF SPRINKLER SYSTEMS: 2022 EDITION
NFPA 72 FIRE ALARM AND SIGNALING CODE: 2022 EDITION
NFPA 75 FIRE PROTECTION OF IT EQUIPTMENT: 2020 EDITION
NFPA 99 HEALTHCARE FACILITIES CODE: 2021 EDITION
NFPA 101 LIFE SAFETY CODE: 2021 EDITION
NFPA 2001 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS: 2022 EDITION
INTERNATIONAL BUILDING CODE: 2021 EDITION
INTERNATIONAL MECHANICAL CODE: 2021 EDITION
INTERNATIONAL PLUMBING CODE: 2021 EDITION
APPLICABLE CODES AND STANDARDS
CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.
MECHANICAL ABBREVIATION KEY
ABBR: DESCRIPTION:
NOT IN CONTRACTNIC
EA EXHAUST/RELIEF AIR
FD FIRE DAMPER
FSD FIRE/SMOKE DAMPER
MA MIXED AIR
OA OUTSIDE AIR
RA RETURN AIR
SA SUPPLY AIR
SD SMOKE DAMPER
TRANSFER DUCTTD
TERMINAL AIR BOXTAB
TYPICALTYP
NORMALLY CLOSEDN.C.
NORMALLY OPENN.O.
MIXING VALVEMV
PROJECT ALTITUDE: 338.00 FT. ABOVE SEA LEVEL
MECHANICAL DESIGN CONDITIONS:
SUMMER:
WINTER:
DESIGN CONDITIONS:
TYPICAL ROOM SETPOINTS (AT IT EQUIPMENT INLET):
BASED ON WEATHER DATA FOR: MEMPHIS, TENNESSEE
TR CONDITIONS: 41-95°F DRY BULB, 8-80% RELATIVE HUMIDITY
MCR CONDITIONS: 72-81°F DRY BULB, 8-60% RELATIVE HUMIDITY
SUMMER SETBACK: NONE
WINTER SETBACK: NONE
REFER TO CONTROL DIAGRAMS FOR ROOM SPECIFICS.
96.7°F DRY BULB, 77.2°F WET BULB
18.7°F DRY BULB
OCCUPANCY SENSORO
HUMIDISTAT SENSOR
CARBON MONOXIDE SENSOR
CARBON DIOXIDE SENSOR
H HUMIDISTAT / SENSOR
TEMPERATURE SENSOR WITH WELL
T
THERMOMETER WITH WELL (DIAL TYPE)T
THERMOMETER WITH WELL (FILLED TYPE)
DIRECTION OF AIR FLOW
FLEXIBLE DUCT
MANUAL VOLUME DAMPER
RISE IN DIRECTION OF AIR FLOWR
DUCT CAP
DROP IN DIRECTION OF AIR FLOWD
DUCT DOWN
DUCT UP
SUPPLY/OUTSIDE AIR DUCT SECTION
RETURN AIR DUCT SECTION
EXHAUST/RELIEF AIR DUCT SECTION
4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION
SD-1
6/115
AIR TERMINAL PROPERTIES SYMBOL
NECK SIZE/CFM
TERMINAL AIR BOX (REFER TO SCHEDULE)###
### TERMINAL AIR BOX w/REHEAT COIL (REFER TO SCHEDULE)
HUMIDIFIERH
OPPOSED BLADE DAMPER (REFER TO SCHEDULE)
PARALLEL BLADE DAMPER (REFER TO SCHEDULE)
DIFFERENTIAL PRESSURE SENSOR
PRESSURE SENSOR/MONITORP
PRESSURE SENSOR (DUCT MOUNTED)P
THERMOSTAT/SENSORT
TEMPERATURE SENSORT
THERMOSTAT/SENSOR WITH HEAVY DUTY ENCLOSURET
MECHANICAL SYMBOL LIST
SYMBOL: DESCRIPTION:
AIRFLOW MEASUREMENT SYMBOL
XX - AHU SYMBOL
Y - SEQUENTIAL NUMBER
XX-Y
NOT ALL SYMBOLS MAY APPLY.
FAN POWERED TERMINAL AIR BOX w/REHEAT COIL
(REFER TO SCHEDULE)
CONTROL VALVE (TWO-WAY)
PITCH PIPE IN DIRECTION
DIELECTRIC CONNECTION
UNION/FLANGE
BALANCING VALVE (NUMBER INDICATES GPM)
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
DIRECTION OF FLOW IN PIPE
SHUTOFF VALVE NORMALLY OPEN
SHUTOFF VALVE NORMALLY CLOSED
THROTTLING VALVE
AUTOMATIC BALANCING VALVE
MIXING VALVE
CONTROL VALVE (THREE-WAY)
SOLENOID VALVE
CHECK VALVE
SAFETY/RELIEF VALVE
PRESSURE REDUCING VALVE (LIQUID/GAS)
TRIPLE DUTY VALVE (ANGLE TYPE)
TRIPLE DUTY VALVE (IN-LINE TYPE)
VACUUM BREAKER
"WYE" - STRAINER
"WYE" - STRAINER W/SHUTOFF VALVE AND HOSE CONNECTION WITH CAP
BASKET STRAINER
FLEXIBLE CONNECTION
PRESSURE/TEMPERATURE TEST PLUG
REDUCER - REFERENCE SPECIFICATION
FOR CONCENTRIC/ECCENTRIC AND FOT/FOB
SUCTION DIFFUSER WITH SUPPORT FOOT
AUTOMATIC AIR VENT
MANUAL AIR VENT
DRAIN VALVE WITH HOSE CONNECTION AND CAP
ALIGNMENT GUIDE
PIPE ANCHOR
EXPANSION JOINT
#.#" IS THE EXPANSION TRAVEL INCHES
HEATING/CHILLED WATER RETURNHCR
CONDENSER WATER RETURNCR
CONDENSER WATER SUPPLYCS
CHILLED WATER RETURNCWR
CHILLED WATER SUPPLYCWS
HEATING WATER RETURNHWR
HEATING WATER SUPPLYHWS
REFRIGERANT LIQUIDLIQ
REHEAT WATER RETURNRWR
REHEAT WATER SUPPLYRWS
REFRIGERANT SUCTIONSUC
HEATING/CHILLED WATER SUPPLYHCS
CONDENSATE DRAINCD
PUMP
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
DIFFERENTIAL PRESSURE SENSOR
PRESSURE SENSOR (FURNISHED WITH BALL VALVE)P
FLOW METER
FM
FLOW SWITCH
F
FS FLOW SENSOR
MECHANICAL SYMBOL LIST
SYMBOL: DESCRIPTION:
NOT ALL SYMBOLS MAY APPLY.
BACKFLOW PREVENTER
EJ-#
REFRIGERANTREF
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:3
:5
A M
M000
MECHANICAL GENERAL NOTES AND LEGENDS VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
N/A
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
MECHANICAL SHEET INDEX
M000 MECHANICAL GENERAL NOTES AND LEGENDS
B01-M100 B01 GROUND LEVEL PLAN - OVERALL
B01-M100AE B01 PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION AE
B01-M100AW B01 PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION AW
B01-M100BE B01 PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION BE
B01-M100BW B01 PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION BW
B01-M100CE B01 PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION CE
B01-M100CW B01 PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION CW
B01-M100J B01 PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION J
B01-M101 B01 FIRST LEVEL PLAN - OVERALL
B01-M101AE B01 PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION AE
B01-M101AW B01 PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION AW
B01-M101BE B01 PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION BE
B01-M101BW B01 PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION BW
B01-M101CE B01 PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION CE
B01-M101CW B01 PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION CW
B01-M101J B01 PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION J
B01-M102 B01 SECOND LEVEL PLAN - OVERALL
B01-M102AE B01 PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION AE
B01-M102AW B01 PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION AW
B01-M102BE B01 PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION BE
B01-M102BW B01 PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION BW
B01-M102CE B01 PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION CE
B01-M102CW B01 PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION CW
B01-M102J B01 PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION J
B01-M103 B01 THIRD LEVEL PLAN - OVERALL
B01-M103BW B01 PARTIAL THIRD LEVEL PLAN - MECHANICAL - SECTION BW
B01-M103CW B01 PARTIAL THIRD LEVEL PLAN - MECHANICAL - SECTION CW
B01-M103J B01 PARTIAL THIRD LEVEL PLAN - MECHANICAL - SECTION J
B01-M104 B01 FOURTH LEVEL PLAN - OVERALL
B01-M104BW B01 PARTIAL FOURTH LEVEL PLAN - MECHANICAL - SECTION BW
B01-M104CW B01 PARTIAL FOURTH LEVEL PLAN - MECHANICAL - SECTION CW
B01A-M100 B01A GROUND LEVEL PLAN - OVERALL
B01A-M100D B01A PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION D
B01A-M100E B01A PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION E
B01A-M100F B01A PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION F
B01A-M100G B01A PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION G
B01A-M101 B01A FIRST LEVEL PLAN - OVERALL
B01A-M101D B01A PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION D
B01A-M101E B01A PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION E
B01A-M101F B01A PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION F
B01A-M101G B01A PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION G
B01A-M102 B01A SECOND LEVEL PLAN - OVERALL
B01A-M102D B01A PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION D
B01A-M102E B01A PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION E
B01A-M102F B01A PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION F
B01A-M102G B01A PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION G
B01A-M103 B01A THIRD LEVEL PLAN - OVERALL
B01A-M103D B01A PARTIAL THIRD LEVEL PLAN - MECHANICAL - SECTION D
B01A-M103E B01A PARTIAL THIRD LEVEL PLAN - MECHANICAL - SECTION E
B01A-M103F B01A PARTIAL THIRD LEVEL PLAN - MECHANICAL - SECTION F
B01A-M103G B01A PARTIAL THIRD LEVEL PLAN - MECHANICAL - SECTION G
B01A-M104 B01A FOURTH LEVEL PLAN - OVERALL
B01A-M104D B01A PARTIAL FOURTH LEVEL PLAN - MECHANICAL - SECTION D
B01A-M104E B01A PARTIAL FOURTH LEVEL PLAN - MECHANICAL - SECTION E
B01A-M104F B01A PARTIAL FOURTH LEVEL PLAN - MECHANICAL - SECTION F
B01A-M104G B01A PARTIAL FOURTH LEVEL PLAN - MECHANICAL - SECTION G
B01A-M105 B01A FIFTH LEVEL PLAN - OVERALL
B01A-M105D B01A PARTIAL FIFTH LEVEL PLAN - MECHANICAL - SECTION D
B01A-M105E B01A PARTIAL FIFTH LEVEL PLAN - MECHANICAL - SECTION E
B01A-M105F B01A PARTIAL FIFTH LEVEL PLAN - MECHANICAL - SECTION F
B01A-M105G B01A PARTIAL FIFTH LEVEL PLAN - MECHANICAL - SECTION G
B01A-M106 B01A SIXTH LEVEL ROOF PLAN - OVERALL - MECHANICAL
B05-M100 B05 GROUND LEVEL PLAN - OVERALL
B05-M100A B05 PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION 5A
B05-M100B B05 PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION 5B
B05-M101 B05 FIRST LEVEL PLAN - OVERALL
B05-M101A B05 PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION 5A
B05-M101B B05 PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION 5B
B05-M102 B05 SECOND LEVEL PLAN - OVERALL
B05-M102A B05 PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION 5A
B07-M100 B07 GROUND LEVEL PLAN - OVERALL
B07-M100A-B B07 PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION 7A-B
B07-M100C B07 PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION 7C
B07-M100D-E B07 PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION 7D-E
B07-M101 B07 FIRST LEVEL PLAN - OVERALL
B07-M101A B07 PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION 7A
B07-M101B B07 PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION 7B
B07-M101C B07 PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION 7C
B07-M101D B07 PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION 7D
B07-M101E B07 PARTIAL FIRST LEVEL PLAN - MECHANICAL - SECTION 7E
B07-M102 B07 SECOND LEVEL PLAN - OVERALL
B07-M102A B07 PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION 7A
B07-M102B-E B07 PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION 7B-E
B07-M102C-D B07 PARTIAL SECOND LEVEL PLAN - MECHANICAL - SECTION 7C-D
B10-M100 B10 PARTIAL GROUND LEVEL PLAN - MECHANICAL
M400 MECHANICAL DETAILS
M500 MECHANICAL DIAGRAMS
M600 MECHANICAL SCHEDULES
M700 TEMPERATURE CONTROLS DIAGRAMS AND SEQUENCES
GRAND TOTAL: 90
Revisions: Date:
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:3
:2
A M
B01-M100
B01 GROUND LEVEL PLAN - OVERALL VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1" = 20'-0"B01-M100
1 B01 - GROUND LEVEL PLAN - OVERALL
SHEET NOTES:
1. REFER TO SECTION PLANS ON SUBSEQUENT
DRAWINGS FOR ADDITIONAL INFORMATION.
2. HATCHED AREAS INDICATE LOCATIONS OF
NEW TELECOMMUNICATION ROOMS.
SHEET NOTES:
1. REFER TO SECTION PLANS ON SUBSEQUENT
DRAWINGS FOR ADDITIONAL INFORMATION.
2. HATCHED AREAS INDICATE LOCATIONS OF
NEW TELECOMMUNICATION ROOMS.
0 20' 40'10'
T H
T H
Q
R
S
T
U
U.7
V
V.8
W
18.818.417.517.116.215.915.3
14.9
1413121110
14.113.112.811.911.110.69.89.2 9.79.3
B01-M100AE
B01-M100AE
B01-M100AE
4REF 3/4"CD
AWG18B
AFGE
AEG18A
STAIR
NO-8
BIO MED EQUIP EQUIP MECH RM
AEG13
AFGE
AEG10
OFFICE
AEG10A
PROJET FILE
AEG 11
OFFICE
AEG15A
AEG11A
ENV. MANAGMENT
AEG15
AEG11B
MENS TOILET
AEG12
WOMENS
TOILET
AEG 14
HAC
AWG42
AEG18
AEG 20E
ENGG CORRIDOR
AEG-C1
WORK ORDER
AEG17A
WORK RM
INT. DESIGN OFFICE
AEG15D
ENG CHIEF
AEG17B SECY
AEG17
SIGN SHOP
AEG 20
CONFERENCE
AEG 22
OFFICE
AEG24
OFFICE
AEG26
ENG TECH
AEG28
COPIER
AEG19A
ASST. CHIEF
AEG 17C
OFFICE
AWG59
CONFERENCE
OFFICE
AEG19
PLAN RM.
AEG 30
UNION
AEG21
MECH EQUP RM.
AEG 32
OFFICE
AEG19C
IRM COMPUTER
SHOP
AEG23
STAIR
REC / STO
AEG 70
EXISTING
MECH RM.
AEG33
CORRIDOR
STOR
AEG38
SERVER
AEG35
AEG 36
BREAK RM
AEG69
PHYSICS
AEG37CONFERENCE ROOM
AEG39
WORK ROOM
AEG41
CORRIDOR
MD
AEG68
AWG79
AWG80
CAD DRAFTING
AEG 30A
ADMIN ASST
AEG44
EXAM-2
AEG47
SUPPLY
AEG46
NURSES
AEG 60
CHEIF TECH
AEG 62
TLT
AEG63
CHIEF OF SVC
AEG43
EQUIP
AEG73A
AEG50
ACCELERATOR
AEG73
MAZE
AEG52
RECEPTION
AEG54
STAGING
AEG4
EXAM
EXAM-4
AEG51
WAITING
AEG7
PT. TLT
AEG48
AEG57
SECY
AEG45
STFF TLT
AEF40
RESEARCH LAB
AEG 9C
RESEARCH LAB
AEG9
TISSUE CULLTURE
AEG9A
OFFICE
AEG9B
OFFICE
AEG9C
SIMULATOR
AEG55
TR
AEG15B
ENGG CORRIDOR
AEG-C1
AC-AEG15B
20x10 SA
24x24 OA
18x10 OA ø
S A
TR
AE15B
SG-1
8x6/50
AEG15B
OFFICE
20x10 SA
3"CWR
3"CWS
2 1/2"HWS
2 1/2"HWR
24x24 OA x1
O
A
3"MPS
1 1/2"LPC
ø
R A ø
S A
OFFICE
AEG15A
ENV. MANAGMENT
AEG15
AC-AEG15B
3"CWR
3"CWS
REF
3/4"CD
1 1/2"LPC
3"MPS
2 1/2"HWR
2 1/2"HWS
OFFICE
AEG15A
TR
AEG15B
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A .M
P R
A
L L
S e c ti o n .r v t
/1 /2
:3
:3
A
M
B01-M100AE
B01 PARTIAL GROUND LEVEL PLAN -
MECHANICAL - SECTION AE
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01-M100AE
1 B01 - PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION AE
SCALE: 1/4" = 1'-0"B01-M100AE
3 B01 - GROUND LEVEL - ENLARGED ROOM AEG15B - VENTILATION
SHEET NOTES:
1. DRIP PANS TO BE PROVIDED UNDER ALL
EXISTING HYDRNOIC, PLUMBING, AND FIRE
PROTECTION PIPING OVERHEAD IN TR
SPACES. FOR CLARITY DRIP PANS ARE ONLY
SHOWN ON PLUMBING DRAWINGS.
MECHANICAL CONTRACTOR SHALL
COORDINATE WITH PLUMBING CONTRACTOR
TO VERIFY ALL EXISTING AND NEW PIPING
OVERHEAD ARE PROVIDED WITH DRIP PAN
COVERAGE.
2. DO NOT SPILL CONDENSATE PIPING INTO DRIP
PANS OVER TR SPACES. COORDINATE
INSTALLATION OF REFRIGERANT AND
CONDENSATE PIPING WITH DRIP PAN
LOCATIONS. AVOID PENETRATIONS OF NEW
DRIP PANS. SEAL ANY NECESSARY
PENETRATIONS WATER TIGHT.
3. TEMPERATURE CONTROLS CONTRACTOR
SHALL COORDINATE LOCATION OF ALL DRIP
PANS FOR LEAK DETECTION MONITORING.
4. TEMPERATURE CONTROLS CONTRACTOR
SHALL BE RESPONSIBLE FOR INTEGRATION OF
ALL TEMPERATURE AND HUMIDITY SENSORS
INTO EXISTING FACILITY CONTROLS SYSTEM.
COORDINATE ALL RACK-MOUNTED SENSORS
WITH TELECOMMUNICATIONS CONTRACTOR.
5. ELECTRICAL AND TELECOMMUNICATIONS
EQUIPMENT SHOWN FOR REFERENCE ONLY.
SCALE: 1/4" = 1'-0"B01-M100AE
2 B01 - GROUND LEVEL - ENLARGED ROOM AEG15B - MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"B01-M100AE
4 B01 - GROUND LEVEL - ENLARGED ROOM AEG15B - MECHANICAL PIPING
0 16' 32'8' 0 4' 8'2'
0 4' 8'2'
0 4' 8'2'
KEYNOTES:
1. REMOVE EXISTING CEILING DEVICE. DEMOLISH
DUCT TO POINT INDICATED AND CAP.
2. INSTALL WALL MOUNTED SPLIT SYSTEM PER
MANUFACTURER'S INSTRUCTIONS.
COORDINATE EXACT LOCATION WITH
ELECTRICAL AND TELECOMMUNICATIONS
CONTRACTORS.
3. INSTALL NEW SPLIT SYSTEM THERMOSTAT
AND HUMIDISTAT ON WALL ADJACENT TO
LIGHT SWITCH. REFER TO M700.
4. ROUTE CONDENSATE DRAIN PIPING ABOVE
CEILING TO HAC. ROUTE PIPING DOWN WALL
AND SPILL INTO MOP BASIN. TERMINATE
PIPING 3" ABOVE FLOOR OF MOP BASIN.
5. ROUTE REFRIGERANT LINESET, SIZED PER
MANUFACTURER'S INSTRUCTIONS, AS
INDICATED. REFER TO SHEET B01-M101AE FOR
CONTINUATION.
Q
R
S
T
U
U.7
V
V.8
W
9.2 9.79.3
87654321
8.37.97.16.25.84.94.13.62.71.91.30.70.3
GENERATORS
GB1103
TRANS VAULT
GB1102
STAIR
SW GEAR
GB1105A
OPEN TO BELOW
OFFICE
GB1105B
MECH ROOM
AWG 19
BOILE ROOM
(OPEN TO BELOW)
MECH RM
AWG 21
OFFICE
AWG 27
OFFICE
MEZZANINE
AWG23
WATER
TREATMENT
AWG 26A
STAIR
BOILER RM.
AWG 26
STAIR
LOGISTCIS
AWG24B
LOGISTICS
AWG24
CORRIDOR
AWG16
TOILET
AWG22
WORK ROOM
AWG24A
LOGISTICS
AWG20
LOGISTICS
AWG20A
LOGISTICS
AWG20B
CORRIDOR TO
NURSING
ROOM
LOGISTICS
CONFERENCE
AWG18
CLOSET
AWG18A
AWG18B
AFGE
AEG18A
STAIR
NO-8
BIO MED EQUIP
PIPE BASEMENT
MENS LOCKER
ROOM
AWG10
RESEARCH LAB
AEG 9C
ELEV MECH RM
AWG8
SWITCHGEAR
AWG15
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:3
:4
A M
B01-M100AW
B01 PARTIAL GROUND LEVEL PLAN -
MECHANICAL - SECTION AW
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01-M100AW
1 B01 - PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION AW
SHEET NOTES:
1. SHEET INCLUDED FOR REFERENCE ONLY. NO
MECHANICAL SCOPE IN THIS AREA.
0 16' 32'8'
TH
M
L
K
J
H
N
P
P1
P2
P4
P5
15.9
1514 16 17 18 1913121110
B01-M100BE
B01-M100BE
B01-M100BE
EC
EC
AEG1 EC
AEG1A
OFFICE RM
AEG3
IRM STAGING
STORAGE
STORAGE
STORAGE IRM
AEG4A
OIT WORK RM
AEG 5
LOBBY
PT. TLT
AEG 52
ELEC
AEG76
STAIR
HAC
OFFICE
C
OFFICE
CWG 20C
EEO OFFICE
CWG 15-C
EEO OFFICE
CWG 15B
CWG 16B
OFFICE
CWG 20D
BULKFEED AND
GENERAL STORAGE
BWG 10
A/C SHOP
BWG 4
A/C SHOP
BWG 4B
WOMEN'S
LOCKER & TLT
BWG 7
MENS LOCKER /
TOILET
BWG 8
CORRIDOR
BE C1
DIRTY CAGE
STAGING
BWG14
CLEAN CAGE
BEDDING / STAGING
BWG 13
EQUIP
POOL SVC ROOM
BECEG1
CORRIDOR
BW C20
ANIMAL 1
BEG 3
ANIMAL 2
BEG 4
ANIMAL RM. 3
BEG 5
ANIMAL RM. 4
BEG6 ANIMAL RM. 5
BEG7
ANIMAL RM. 6
BEG8
EXIST COMM
BEG 23A
STORAGE
BEG 23
AUTO WATER
BEG 24
HKS
BEC3
HSK
BG25
BRU OFFICE
BEG 26C
BRU OFFICE
BEG26B
OFFICE
CEG 58C
OFFICE
CEG58D
CLOSET
CEG 58E
OFFICE
CEG 58B
OFFICE
CEG 58A
OFFICE
CEG 45
KITCHENETTE
CEG 48C
BRU OFFICE
CEG 44
BRU OFFICE
CEG 43
BRU OFFICE
CEG 42BRU OFFICE
CEG 41
CONFERENCE
CEG48
HSRD CONFERENCE
CEG 38
HSRD
CEG 40
HSRD OFFICE
CEG39
HSRD OFFICE
CEG 34
HSRD OFFICE
CEG 35
HSRD OFFICE
CEG 36
MEN
CEG 32
WOMENS
CEG 33
ANIMAL RM. 7
BEG 13
ANIMAL RM 8
BEG 12
VMU STORAGE
BEG 14
HSRD BREAK
BEG 15 BEG 16
ANIMAL RM. 9
BEG11
BRU OFFICE
BEG 17
ANIMAL RM. 10
BEG 10
BRU OFFICE
BEG 18
BRU OFFICE
BEG 19
BRU OFFICE
BEG 20
ELECTRICAL
BEG 21
IRR
BEG22
PROCEDURE
BEG 9
CWG 20B
INFO SYSTEMS
SECURITY
CWG 16
CWG 16A
BREAK ROOM
CWG 16C
CONTAINMENT
BWG 11C
CONTAINMENT LAB
BWG 11D CONTAINMENT
BWG 11A
SHAFT
ANTE
BWG 11
EUTH
BWG 12
STORAGE
BWG 16
CORRIDOR
BECE -C2
CORRIDOR
CE C3
CORRIDOR
CE C2
CORRIDOR
WOMEN
CEG 48D
CORRIDOR
BG26
COPY
CEG 48B
A/V
CEG48A
ELECTRICAL
BWG 9
CORRIDOR
BW-C25
TR
AEG 2
CORRIDOR
BW-C25
3/4"CD
AEG2
FLOOR
MACHINE
AEG1B
STORAGE
48x24 EA
10x10 SA 10x10 SA
3/4"HWS
3/4"HWR
1 1 1
EC
AEG1A
CORRIDOR
BW-C25
CORRIDOR
BW-C25
AC-AEG2
SG-1
8x6/50
48x24 EA
10x10 SA
TR
AEG 2
CORRIDOR
BW-C25
AC-AEG2
R E
F
3/4"CD
EC
AEG1A
CORRIDOR
BW-C25
TR
AEG 2
TR
AEG 2
CORRIDOR
BW-C25
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:3
:5
A M
B01-M100BE
B01 PARTIAL GROUND LEVEL PLAN -
MECHANICAL - SECTION BE
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01-M100BE
1 B01 - PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION BE
SCALE: 1/4" = 1'-0"B01-M100BE
2 B01 - GROUND LEVEL - ENLARGED ROOM AEG2 - MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"B01-M100BE
3 B01 - GROUND LEVEL - ENLARGED ROOM AEG2 - VENTILATION
SCALE: 1/4" = 1'-0"B01-M100BE
4 B01 - GROUND LEVEL - ENLARGED ROOM AEG2 - MECHANICAL PIPING
SHEET NOTES:
1. DRIP PANS TO BE PROVIDED UNDER ALL
EXISTING HYDRNOIC, PLUMBING, AND FIRE
PROTECTION PIPING OVERHEAD IN TR
SPACES. FOR CLARITY DRIP PANS ARE ONLY
SHOWN ON PLUMBING DRAWINGS.
MECHANICAL CONTRACTOR SHALL
COORDINATE WITH PLUMBING CONTRACTOR
TO VERIFY ALL EXISTING AND NEW PIPING
OVERHEAD ARE PROVIDED WITH DRIP PAN
COVERAGE.
2. DO NOT SPILL CONDENSATE PIPING INTO DRIP
PANS OVER TR SPACES. COORDINATE
INSTALLATION OF REFRIGERANT AND
CONDENSATE PIPING WITH DRIP PAN
LOCATIONS. AVOID PENETRATIONS OF NEW
DRIP PANS. SEAL ANY NECESSARY
PENETRATIONS WATER TIGHT.
3. TEMPERATURE CONTROLS CONTRACTOR
SHALL COORDINATE LOCATION OF ALL DRIP
PANS FOR LEAK DETECTION MONITORING.
4. TEMPERATURE CONTROLS CONTRACTOR
SHALL BE RESPONSIBLE FOR INTEGRATION OF
ALL TEMPERATURE AND HUMIDITY SENSORS
INTO EXISTING FACILITY CONTROLS SYSTEM.
COORDINATE ALL RACK-MOUNTED SENSORS
WITH TELECOMMUNICATIONS CONTRACTOR.
5. ELECTRICAL AND TELECOMMUNICATIONS
EQUIPMENT SHOWN FOR REFERENCE ONLY.
0 16' 32'8' 0 4' 8'2'
0 4' 8'2'
0 4' 8'2'
KEYNTOES:
1. REMOVE EXISTING CEILING DEVICE. DEMOLISH
DUCT TO POINT INDICATED AND CAP.
2. REMOVE EXISTING CEILING DEVICE. DEMOLISH
DUCT TO POINT INDICATED AND PREPARE FOR
RECONNECTION.
3. DEMOLISH EXISTING PIPING TO UNDERSIDE OF
FLOOR SLAB AND CAP.
4. INSTALL WALL MOUNTED SPLIT SYSTEM PER
MANUFACTURER'S INSTRUCTIONS.
COORDINATE EXACT LOCATION WITH
ELECTRICAL AND TELECOMMUNICATIONS
CONTRATORS.
5. CONNECT TO EXISTING DUCT AND EXTEND TO
NEW SIDEWALL GRILLE. PROVIDE TRANSITION
AS REQUIRED.
6. INSTALL NEW SPLIT SYSTEM THERMOSTAT
AND HUMIDISTAT ON WALL ADJACENT TO
LIGHT SWITCH. REFER TO SHEET M700.
7. ROUTE REFRIGERANT LINESET, SIZED PER
MANUFACTURER'S INSTRUCTIONS, AS
INDICATED. REFER TO SHEET B01-M101BE FOR
CONTINUATION.
8. ROUTE CONDENSATE DRAIN PIPING ABOVE
CEILING TO HAC. ROUTE PIPING DOWN WALL
AND SPILL INTO MOP BASIN. TERMINATE
PIPING 3" ABOVE FLOOR OF MOP BASIN.
T
T H
M
L
K
J
H
N
P
P1
P2
P4
P5
9876543
B01-PL100BW
B01-PL100BW
B01-PL100BW
B01-M100BW
2REF
3/4"CD
ELEV MECH RM
AWG8
ELEV LOBBY
FITNESS CENTER
AWG3
TLT
AWG10A
STORAGE
CORRIDOR
AW-C11
WOMENS LOCKER
RM
AWG 13
TOILETS &
SHOWERS
AWG11A
FEMALE LOUNGE
AWG 11
STAIR
CORRIDOR
BWC31A
AUTOPSY
CWG2
PARAFFIN
CWG4 FRAM STOR
CWG6A
OFFICE
CWG6B
LAB STORAGE LAB STORAGE
CWG 9
CYTOLOGY
CWG 7
OFFICE
CWG 7B
SCREENING
CWG 7A
OFFICE
CWG 20A
OFFICE
CWG 20C
COMPLIANCE
OFFICE
CWG 20MECH RM.
BWG 1REFRIGERANT
STORAGE
BWG 24B
REFRIGERANT
STORAGE
BWG 24A
ELEC SHOP
STORAGE
BWG 25
BIO MED SERVER
ROOM
BWG 2A
AC SHOP STORAGE
BWG24
EEO OFFICE
CWG 15A
HAC
CWG 14
EEO OFFICE
CWG 15-C
EEO OFFICE
CWG 15B
MECH ROOM
BIO MED
STORAGE
BWG 2
CHIEF
BWG 33B
CLERICAL SEC/WAIT
BWG 33
ASST
BWG33A
CORRIDOR
BWC 30
OFFICE
BWG30
OFFICE
BWG 29
CONF
BWG 28
CARE OFFICE
BWG 27
STUDY
BWG 26
CONSULT
BWG 32
PHARM
BWG 31
COPY
BWG33C
A/C SHOP
BWG 4
A/C SHOP
BWG 4B
OFFICE
BWG 4A
CORRIDOR
BWC 29
CORRIDOR
BWC 28
TR
AWG 9
TR
AWG 9
CORRIDOR
AW-C11
/4
"C D
AWG 9
LOCK SMITH
STORAGE
20x14 EA
"C
W S
"C
W R
CORRIDOR
AW-C11
CORRIDOR
AW-C11
AC-AWG9
REF
"C
W S
"C
W R
/4
"C D
CORRIDOR
AW-C11
TR
AWG 9
TR
AWG 9
CORRIDOR
AW-C11
AC-AWG9
20x14 EA x1
E
A
TR
AWG 9
CORRIDOR
AW-C11
SG-1
8x6/50
8x6 SA
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:3
:0
A M
B01-M100BW
B01 PARTIAL GROUND LEVEL PLAN -
MECHANICAL - SECTION BW
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01-M100BW
1 B01 - PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION BW
SCALE: 1/4" = 1'-0"B01-M100BW
2 B01 - GROUND LEVEL - ENLARGED ROOM AWG9 - MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"B01-M100BW
3 B01 - GROUND LEVEL - ENLARGED ROOM AWG9 - MECHANICAL PIPING
SCALE: 1/4" = 1'-0"B01-M100BW
4 B01 - GROUND LEVEL - ENLARGED ROOM AWG9 - VENTILATION
SHEET NOTES:
1. DRIP PANS TO BE PROVIDED UNDER ALL
EXISTING HYDRNOIC, PLUMBING, AND FIRE
PROTECTION PIPING OVERHEAD IN TR
SPACES. FOR CLARITY DRIP PANS ARE ONLY
SHOWN ON PLUMBING DRAWINGS.
MECHANICAL CONTRACTOR SHALL
COORDINATE WITH PLUMBING CONTRACTOR
TO VERIFY ALL EXISTING AND NEW PIPING
OVERHEAD ARE PROVIDED WITH DRIP PAN
COVERAGE.
2. DO NOT SPILL CONDENSATE PIPING INTO DRIP
PANS OVER TR SPACES. COORDINATE
INSTALLATION OF REFRIGERANT AND
CONDENSATE PIPING WITH DRIP PAN
LOCATIONS. AVOID PENETRATIONS OF NEW
DRIP PANS. SEAL ANY NECESSARY
PENETRATIONS WATER TIGHT.
3. TEMPERATURE CONTROLS CONTRACTOR
SHALL COORDINATE LOCATION OF ALL DRIP
PANS FOR LEAK DETECTION MONITORING.
4. TEMPERATURE CONTROLS CONTRACTOR
SHALL BE RESPONSIBLE FOR INTEGRATION OF
ALL TEMPERATURE AND HUMIDITY SENSORS
INTO EXISTING FACILITY CONTROLS SYSTEM.
COORDINATE ALL RACK-MOUNTED SENSORS
WITH TELECOMMUNICATIONS CONTRACTOR.
5. ELECTRICAL AND TELECOMMUNICATIONS
EQUIPMENT SHOWN FOR REFERENCE ONLY.
0 16' 32'8' 0 4' 8'2'
0 4' 8'2'
0 4' 8'2'
KEYNOTES:
1. REMOVE EXISTING CEILING DEVICE. DEMOLISH
DUCT TO POINT INDICATED AND CAP.
2. REMOVE EXISTING CEILING DEVICE. DEMOLISH
DUCT TO POINT INDICATED AND PREPARE FOR
RECONNECTION.
3. INSTALL WALL MOUNTED SPLIT SYSTEM PER
MANUFACTURER'S INSTRUCTIONS.
COORDINATE EXACT LOCATION WITH
ELECTRICAL AND TELECOMMUNICATIONS
CONTRACTORS.
4. CONNECT TO EXISTING DUCT AND EXTEND TO
NEW SIDEWALL GRILLE. PROVIDE TRANSITION
AS REQUIRED.
5. INSTALL NEW SPLIT SYSTEM THERMOSTAT
AND HUMIDISTAT ON WALL ADJACENT TO
LIGHT SWITCH. REFER TO SHEET M700.
6. ROUTE REFRIGERANT LINESET, SIZED PER
MANUFACTURER'S INSTRUCTIONS, AS
INDICATED. REFER TO SHEET B01-M101AE FOR
CONTINUATION.
7. ROUTE CONDENSATE DRAIN PIPING ABOVE
CEILING TO MECHANICAL ROOM. ROUTE
PIPING DOWN WALL AND SPILL INTO FLOOR
DRAIN. TERMINATE PIPING WITHIN FLOOR
DRAIN BODY. PIPING SHALL NOT BE INSTALLED
IN SUCH A WAY THAT A TRIP HAZARD IS
CREATED.
8. ROUTE CONDENSATE DRAIN PIPING ABOVE
CEILING TO HAC. ROUTE PIPING DOWN WALL
AND SPILL INTO MOP BASIN. TERMINATE
PIPING 3" ABOVE FLOOR OF MOP BASIN.
G
F
E
D
C
B
A
1514 16 17 18 19131211109
OFFICE
6005A
OFFICE
POLICE OFFICE
CEG 22
OFFICE
CEG 22A
OFFICE
CEG22B
OFFICE
CEG 22C
OFFICE
CEG 22D
OFFICE
CEG 22E
OFFICE
CEG 22F
OFFICE
CEG 23E
EXAM
OFFICE
CEG 23D
EXAM OFFICE
CEG 23 B
EXAM OFFICE
CEG 23 C
STORAGE
CEG 22G
EMS
OFFICE
CEG 23
OFFICE
CEG 23A
EMS WORK
LENDER
CEG 24A
HAC OFFICE
CEG 24B
OFFICE
CEG 24C
OFFICE
CEG 24D
OFFICE
HOUSEKEEPING
CEG 24
EMS STORAGE
CEG 24 E
BREAK
CEG 26C
SUPV
CEG 26A
POLICE
CEG 27
POLICE
INVESTIGATION
CEG 28
STORAGE
CEG 29A
CEG 29
LOCKSMITH OFFICE
CEG 29B
MECH
CEG29C
STORAGE
CWG 31D
EMS STORAGE
CWG 31
GA ELECTRIC
CWG 47A
EMS STORAGE
CWG 47
MAIL ROOM
CWG 30
UPS
TRACKING
CWG 30B
REPRODUCTION
STORAGE
CWG 31 A COPY RM.
CEG 26B
STORAGE
CEG 57
OFFICE
CEG 56C
OFFICE
CEG 20A
POLICE
CEG 21
OFFICE
CEG20
POLICE
CEG 19A
STAIR
OFFICE
CEG 16D
CHIEF OFFICE
CEG 16C
CEG 19B
POLICE
CEG 19
FIRE CONTROL
CEG 18
OFFICE
CEG 16B
POLICE
CEG 16
POLICE OFFICE
CEG 16A
CORRIDOR
CE C1
CEG 5C
POLICE
CEG 5A
CEG 5B
CEG 7
CEG6CEG5
EVIDENCE
CEG 4
POLICE DISPATCH
CEG 1
STORAGE
CEG 3
COMM
CEG 52
VENDING
CEG 51
STORAGE
CEG 53
OFFICE
CEG 54 A
OFFICE
CEG 54 B
CLINICAL
CEG 54
OFFICE
CEG 54D
OFFICE
CEG 54 C
OFFICE
CEG 55B
OFFICE
CEG 55A
OFFICE
CEG55D
OFFICE
CEG 55C
OFFICE
CEG 55E
OFFICE
CEG 56B
OFFICE
CEG 56 A OFFICE
CEG 56D
OFFICE
CEG 56 E
OFFICE
CEG 46
OFFICE
CEG 47
HSRD OFFICE
CEG 50
HSRD OFFICE
CEG 49
HSRD OFFICE
CEG 37
TRAINEE
CEG 31
CEG 30
ISS
OFFICE
CWG 16D
OFFICE
POLICE TRAINING
CWG 20 D
VNGE OFFICE
CWG 26
VNGE OFFICE
CWG 27
OFFICEELEVATOR
ELEVATOR
ELEC CLOSET
MEN
CEG 48E
PASSENGER
ELEVATOR LOBBY
CWC 45
FEMALE
TLT
MALE
TLT
TR
TR
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:3
:1
A M
B01-M100CE
B01 PARTIAL GROUND LEVEL PLAN -
MECHANICAL - SECTION CE
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01-M100CE
1 B01 - PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION CE
SHEET NOTES:
1. SHEET INCLUDED FOR REFERENCE ONLY. NO
MECHANICAL SCOPE IN THIS AREA.
TH
G
F
E
D
C
B
A
987654321
B01-M100CW
B01-M100CW
B01-M100CW
REF
CORRIDOR
CB1-9
HAC
DB1104
BMSA STORAGE
DB1103
TOILET
CWG40
TOILET
CWG41
BREAK ROOM
CWG 42
WAREHOUSE
CWG 32G STORAGE
CWG 31D
WAREHOUSE
STORAGE
CWG 32 F
PHARMACY
STORAGE
CWG 32 E
NITROUS OXIDE
CWG 33
NARCOTICS AND
ALCOHOL VAULT
CWG 32 A
OFFICE
CWG 35
LAUNDRY
CWG 39
WAREHOUSE
STORAGE
CWG 32 D
STORAGE
CWG 32 H
LAUNDRY
CWG 51 A
LAUNDRY
CWG 51B
EMS
CWG 46
BREAK ROOM /
STORAGE
CWG 48
EMS STORAGE
CWG 31
GA ELECTRIC
CWG 47A
EMS STORAGE
CWG 47
WRAPPING RM.
CWG 39A
UNIFORM ISSUE
CWG 39B
WASH RM.
CWG 51
UNIFORM STORAGE
CWG 52
SVC ELEVATOR
LOBBY
CWC 44
MED
WASH
CWG 53
PATHOLOGY
STORAGE/LAB EMS STORAGE
CWG 12
LAB STORAGE LAB STORAGE
CWG 9
CONFERENCE RM.
CWG 15D
EEO OFFICE
CWG 15-C
ELEVATOR
ELEVATOR
ELEC CLOSET
TELECOM
ELEVATOR
S2
ELEVATOR
S3 PASSENGER
ELEVATOR LOBBY
CWC 45
TEL CLOSET
SIGN
CLOSET
TR
CWG 1
TR
CWG 1
SVC ELEVATOR
LOBBY
CWC 44
CU-CW160C
CU-CWG1.1
CU-CWG1.2
REF
REF 3/4"CD
3/4"CD
2"CHS
1 1/4"CHR
x8
S A
TR
CWG 1
TR
CWG 1
AC-CWG1.1
AC-CWG1.2
2"CHS
1 1/4"CHR
3/4"CD
3/4"CD
TR
CWG 1
TR
CWG 1
R E
F R
E F
AC-CWG1.1
AC-CWG1.2
SG-1
8x6/50
TR
CWG 1
8x6 SA
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:3
:2
A M
B01-M100CW
B01 PARTIAL GROUND LEVEL PLAN -
MECHANICAL - SECTION CW
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01-M100CW
1 B01 - PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION CW
SCALE: 1/4" = 1'-0"B01-M100CW
2 B01 - GROUND LEVEL - ENLARGED ROOM CWG1 - MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"B01-M100CW
4 B01 - GROUND LEVEL - ENLARGED ROOM CWG1 - MECHANICAL PIPING
SCALE: 1/4" = 1'-0"B01-M100CW
3 B01 - GROUND LEVEL - ENLARGED ROOM CWG1 - VENTILATION
SHEET NOTES:
1. DRIP PANS TO BE PROVIDED UNDER ALL
EXISTING HYDRNOIC, PLUMBING, AND FIRE
PROTECTION PIPING OVERHEAD IN TR
SPACES. FOR CLARITY DRIP PANS ARE ONLY
SHOWN ON PLUMBING DRAWINGS.
MECHANICAL CONTRACTOR SHALL
COORDINATE WITH PLUMBING CONTRACTOR
TO VERIFY ALL EXISTING AND NEW PIPING
OVERHEAD ARE PROVIDED WITH DRIP PAN
COVERAGE.
2. DO NOT SPILL CONDENSATE PIPING INTO DRIP
PANS OVER TR SPACES. COORDINATE
INSTALLATION OF REFRIGERANT AND
CONDENSATE PIPING WITH DRIP PAN
LOCATIONS. AVOID PENETRATIONS OF NEW
DRIP PANS. SEAL ANY NECESSARY
PENETRATIONS WATER TIGHT.
3. TEMPERATURE CONTROLS CONTRACTOR
SHALL COORDINATE LOCATION OF ALL DRIP
PANS FOR LEAK DETECTION MONITORING.
4. TEMPERATURE CONTROLS CONTRACTOR
SHALL BE RESPONSIBLE FOR INTEGRATION OF
ALL TEMPERATURE AND HUMIDITY SENSORS
INTO EXISTING FACILITY CONTROLS SYSTEM.
COORDINATE ALL RACK-MOUNTED SENSORS
WITH TELECOMMUNICATIONS CONTRACTOR.
5. ELECTRICAL AND TELECOMMUNICATIONS
EQUIPMENT SHOWN FOR REFERENCE ONLY.
0 16' 32'8' 0 4' 8'2'
0 4' 8'2'
0 4' 8'2'
KEYNOTES:
1. DEMOLISH EXISTING FAN COIL UNIT AND ALL
ASSOCIATED DUCT WORK, CEILING DEVICES,
CONTROLS, ETC. DEMOLISH CHILLED WATER
AND CONDENSATE PIPING TO POINT
INDICATED AND CAP.
2. INSTALL WALL MOUNTED SPLIT SYSTEM PER
MANUFACTURER'S INSTRUCTIONS.
COORDINATE EXACT LOCATION WITH
ELECTRICAL AND TELECOMMUNICATIONS
CONTRACTORS.
3. INSTALL NEW SIDEWALL SUPPLY GRILLE
ABOVE DOOR. ROUTE 8X6 SA DUCT TO
EXISTING FAN COIL ABOVE LOBBY CEILING.
CONNECT NEW DUCT TO EXISTING SUPPLY
PLENUM.
4. INSTALL NEW SPLIT SYSTEM THERMOSTAT
AND HUMIDISTAT ON WALL ADJACENT TO
LIGHT SWITCH. REFER TO SHEET M700.
5. ROUTE NEW CONDENSATE DRAIN PIPING
ABOVE CEILING AS INDICATED. REFER TO
SHEET B01-M100BW FOR CONTINUATION.
6. ROUTE REFRIGERANT LINESET, SIZED PER
MANUFACTURER'S INSTRUCTIONS, AS
INDICATED.
7. REFRIGERANT PIPING UP. REFER TO SHEET
B01-M101BE FOR CONTINUATION.
8. INSTALL CONDENSING UNIT MOUNTED ON
WALL WITH MANUFACTURER'S WALL HANGING
KIT.
9. UNITS ARE STACKED VERITICALLY.
10. ALL EXTERIOR PIPING SHALL BE INSULATED,
JACKETED, AND SUPPORTED PER DETAILS
AND SPECIFICATIONS. ROUTE PIPING UP ON
EXTERIOR OF WALL TO ABOVE INTERIOR
CEILING HEIGHT AND TURN IN TO BUILDING.
SEAL ALL EXTERIOR PENETRATIONS WEATHER
TIGHT.
T H
2726252423222120
G
F
E
D
C
B
A
B01-M100J
B01-M100J
B01-M100J
REF
MECH EQUIP
AREA WAYSTAIR
HEALTH INFO RM.
OFFICE
6027 A
OFFICE
6018C
OFFICE
6018B
OFFICE
6018A
MAS
MASS CONFERENCE
CENTER
ELEC
AMBULATORY CARE
& PROCESSING
OFFICE
TRANSCRIPTION
6008A
OFFICE
OFFICE
ROI
TRANSCRIPTION
RELEASE OF INFO
GENERAL OFFICE
OFFICE
6018D
OFFICE
6018E
BUSINESS OFFICE
SUPPLY
OFFICE
6018F
OFFICE
6002A
OFFICE
OFFICE
6002B
BREAK ROOMHAC
CREDIT UNION
EMS STORAGE
SUPV MED
NURSE
OFFICE 6030
MEN
WOMEN
PUMP RM.
MEN
WOMEN
STAIR
MEDICAL RECORDS
OFFICE
6005A
OFFICE
OFFICE
CEG22B
OFFICE
CEG 22C
HSCPAC OFFICE
ELEVATOR MACHS
ELEVATOR
ELEVATOR
CORRIDOR
60-C4
CORRIDOR
60-C2
CORRIDOR
50-C1
ELEVATOR LOBBY
FILE SURV OFFICE
6003A
OFFICE
CEG 20A
POLICE
CEG 21
MEN
WOMEN
TR
TR
CORRIDOR
60-C2
OFFICE
2"CD
3/4"HWR
3/4"HWS
36x24 RA36x20 RA
8x5 EA x1
S
A x4
S A x5
E A
AC-6007.2
AC-6007.1
8x5 EA
36x24 RA x1
S
A
4SG-1
6x8/50
TR
AC-6007.1
AC-6007.2
R E
F
REF
2"CD
3/4"CD
TR
TR
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:3
:3
A M
B01-M100J
B01 PARTIAL GROUND LEVEL PLAN -
MECHANICAL - SECTION J
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01-M100J
1 B01 - PARTIAL GROUND LEVEL PLAN - MECHANICAL - SECTION J
SCALE: 1/4" = 1'-0"B01-M100J
2 B01 - GROUND LEVEL - ENLARGED ROOM 6007 - MECHANICAL DEMOLITION
SCALE: 1/4" = 1'-0"B01-M100J
3 B01 - GROUND LEVEL - ENLARGED ROOM 6007 - VENTILATION
SCALE: 1/4" = 1'-0"B01-M100J
4 B01 - GROUND LEVEL - ENLARGED ROOM 6007 - MECHANICAL PIPING
SHEET NOTES:
1. DRIP PANS TO BE PROVIDED UNDER ALL
EXISTING HYDRNOIC, PLUMBING, AND FIRE
PROTECTION PIPING OVERHEAD IN TR
SPACES. FOR CLARITY DRIP PANS ARE ONLY
SHOWN ON PLUMBING DRAWINGS.
MECHANICAL CONTRACTOR SHALL
COORDINATE WITH PLUMBING CONTRACTOR
TO VERIFY ALL EXISTING AND NEW PIPING
OVERHEAD ARE PROVIDED WITH DRIP PAN
COVERAGE.
2. DO NOT SPILL CONDENSATE PIPING INTO DRIP
PANS OVER TR SPACES. COORDINATE
INSTALLATION OF REFRIGERANT AND
CONDENSATE PIPING WITH DRIP PAN
LOCATIONS. AVOID PENETRATIONS OF NEW
DRIP PANS. SEAL ANY NECESSARY
PENETRATIONS WATER TIGHT.
3. TEMPERATURE CONTROLS CONTRACTOR
SHALL COORDINATE LOCATION OF ALL DRIP
PANS FOR LEAK DETECTION MONITORING.
4. TEMPERATURE CONTROLS CONTRACTOR
SHALL BE RESPONSIBLE FOR INTEGRATION OF
ALL TEMPERATURE AND HUMIDITY SENSORS
INTO EXISTING FACILITY CONTROLS SYSTEM.
COORDINATE ALL RACK-MOUNTED SENSORS
WITH TELECOMMUNICATIONS CONTRACTOR.
5. ELECTRICAL AND TELECOMMUNICATIONS
EQUIPMENT SHOWN FOR REFERENCE ONLY.
0 16' 32'8' 0 4' 8'2'
0 4' 8'2'
0 4' 8'2'
KEYNOTES:
1. REMOVE EXISTING CEILING DEVICE. DEMOLISH
DUCT TO POINT INDICATED AND CAP.
2. REMOVE EXISTING CEILING DEVICE. DEMOLISH
DUCT TO POINT INDICATED AND PREPARE FOR
RECONNECTION.
3. INSTALL WALL MOUNTED SPLIT SYSTEM PER
MANUFACTURER'S INSTRUCTIONS.
COORDINATE EXACT LOCATION WITH
ELECTRICAL AND TELECOMMUNICATIONS
CONTRACTORS.
4. CONNECT TO EXISTING DUCT AND EXTEND TO
NEW SIDEWALL GRILLE. PROVIDE TRANSITION
AS REQUIRED.
5. INSTALL NEW SPLIT SYSTEM THERMOSTAT
AND HUMIDISTAT ON WALL ADJACENT TO
LIGHT SWITCH. REFER TO SHEET M700.
6. ROUTE 3/4" CONDENSATE DRAIN PIPING AS
INDICATED. HOLD TIGHT TO WALL. ROUTE
PIPING DOWN WALL AND ALONG FLOOR TO
SPILL INTO FLOOR DRAIN. TERMINATE PIPING
WITHIN DRAIN BODY. PIPING SHALL NOT
CREATE A TRIPPING HAZARD.
7. ROUTE REFRIGERANT LINESET, SIZED PER
MANUFACTURER'S INSTRUCTIONS, AS
INDICATED. REFER TO SHEET B01-M101J FOR
CONTINUATION.
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
GF
E D
BW
CW CE
J
BE
AE
7D 7E
7B7C
7A
5A
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BE5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .