This document is a set of construction drawings for the EHRM Infrastructure Upgrades project at the Memphis, Tennessee VA Medical Center. The project involves the upgrade and renovation of IT infrastructure, building systems, and related architectural, mechanical, electrical, plumbing, fire protection, and telecommunications work across multiple buildings and floors. The drawings provide detailed plans, elevations, and schematics for the construction work required. Key details include the project number (614-22-700), location (Memphis, TN), architect/engineer of record, phased construction schedule, sheet index, and drawings covering various disciplines and building areas. This appears to be part of the 36C77624B0013_1 solicitation for the EHRM Infrastructure Upgrades Construction project issued by the Department of Veterans Affairs Technology Acquisition Center Austin.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--614-22-700 EHRM Infrastructure Upgrades Construction Memphis TN, newest first.
File Type Posted
00 01 15 - List of Drawing Sheets.pdf PDF
36C77624B0013 Amendment 0004.docx DOCX document
614-700.ET_R21.pdf PDF
36C77624B0013 Amendment 0003.docx DOCX document
ENG FORM 4288-R 1-97.pdf PDF
CS501 Addendum _1.pdf PDF
Technical Questions Tracking Spreadsheet - Memphis IU Construction 6.20.24.docx DOCX document
S06 - 36C77624B0013 Amendment 0002.docx DOCX document
S06 - Wage rates Memphis 5.31.24.pdf PDF
Site Visit Sign-in Sheets - EHRM Infra - Memphis.pdf PDF
36C77624B0013 Amendment 0001.docx DOCX document
Site Visit Instructions.docx DOCX document
Wage Rates - Memphis 3.22.24.pdf PDF
VHA ICRA 614-22-700TR-03 EHRM Infrastructure TR Build-Out Level IV - High Risk.pdf PDF
VHA ICRA 614-22-700CD-03 EHRM Infrastructure Cable-Drops Level IV - High Risk.pdf PDF
VHA ICRA 614-22-700CD-02 EHRM Infrastructure Cable-Drops Level III - Medium Risk.pdf PDF
VHA ICRA 614-22-700CD-01 EHRM Infrastructure Cable-Drops Level II - Low Risk.pdf PDF
VHA ICRA 614-22-700TR-01 EHRM Infrastructure TR Build-Out Level II - Low Risk.pdf PDF
Limitations on Subcontracting - Construction.docx DOCX document
Drawing Vol 1-5-4 Architectural 614-700-AE-20231011.pdf PDF
Drawing Vol 1-5-2 Architectural 614-700-AE-20231011.pdf PDF
Drawing Vol 1-1 General 614-700-GI-20231011.pdf PDF
Drawing Vol 1-5-6 Architectural 614-700-AE-20231011.pdf PDF
Drawing Vol 1-7 Fire Protection 614-700-FX-20231011.pdf PDF
Drawing Vol 1-4 Structural 614-700-SF-20231011.pdf PDF
Drawing Vol 2-2 Technology 614-700-TJ-20231011.pdf PDF
VHA ICRA 614-22-700CD-04 EHRM Infrastructure Cable-Drops Level IV - Highest Risk.pdf PDF
VHA ICRA 614-22-700TR-04 EHRM Infrastructure TR Build-Out Level IV - Highest Risk.pdf PDF
VHA PCRA 31May2023-EHRM Infrastructure.pdf PDF
Section 01 45 35 Schedule of Special Inspections.docx DOCX document
VHA ICRA 614-22-700TR-02 EHRM Infrastructure TR Build-Out Level III - Medium Risk.pdf PDF
Drawing Vol 2-1 Telecommunication 614-700-TN-20231011.pdf PDF
Drawing Vol 1-8 Mechanical 614-700-MH-20231011.pdf PDF
Drawing Vol 1-6 Plumbing 614-700-PL-20231011.pdf PDF
Brand Name Justification Memphis EHRM.pdf PDF
36C77624B0013_1.docx DOCX document
Drawing Vol 1-5-1 Architectural 614-700-AE-20231011.pdf PDF
Drawing Vol 1-5-5 Architectural 614-700-AE-20231011.pdf PDF
Specifications - Final.pdf PDF
Drawing Vol 1-2 Hazardous 614-700-HA-20231011.pdf PDF
Section 01 45 35 Statement of SI Template.xlsx XLSX spreadsheet
Drawing Vol 1-5-3 Architectural 614-700-AE-20231011.pdf PDF
Drawing Vol 1-9 Electrical 614-700-EP-20231011.pdf PDF
Drawing Vol 1-3 Civil 614-700-CS-20231011.pdf PDF
Show all 44

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project :

35% SCHEMATIC DESIGN 10/31/2022

65% DESIGN DEVELOPMENT 05/03/2023

95% CONSTRUCTION DOCUMENTS 08/16/2023

100% FINAL BID DOCUMENTS 09/27/2023

100% FINAL STAMPED BID DOCUMENTS 10/11/2023

B

IM

/2

.3

V

A M e m p h is E

H R

M I n fr a s tr u c tu re /6

-7

.A

R C

H .2

.r v t

/2

/2

:3

:3

A M

GI101

SHEET LIST VA MEMPHIS INFRASTRUCTURE

UPGRADE

MEMPHIS, TN

614-22-700

N/A

10/11/2023 LNS KJW

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

B07-AE102A B07 SECOND LEVEL FLOOR PLAN - SECTION 7A B01-FX103BW B01 PARTIAL THIRD LEVEL PLAN -FIRE PROTECTION -SECTION BW B01A-M105F B01A PARTIAL FIFTH LEVEL PLAN -MECHANICAL -SECTION F B01A-TD101 FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL

B07-AE102 B07 SECOND LEVEL FLOOR PLAN - OVERALL B01-FX103 B01 THIRD LEVEL PLAN -OVERALL B01A-M105E B01A PARTIAL FIFTH LEVEL PLAN -MECHANICAL -SECTION E B01A-TD100G GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA G

B07-AE101E B07 FIRST LEVEL FLOOR PLAN - SECTION 7E B01-FX102J B01 PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION J B01A-M105D B01A PARTIAL FIFTH LEVEL PLAN -MECHANICAL -SECTION D B01A-TD100F GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA F

B07-AE101D B07 FIRST LEVEL FLOOR PLAN - SECTION 7D B01-FX102CW B01 PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION CW B01A-M105 B01A FIFTH LEVEL PLAN -OVERALL B01A-TD100E GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA E

B07-AE101C B07 FIRST LEVEL FLOOR PLAN - SECTION 7C B01-FX102CE B01 PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION CE B01A-M104G B01A PARTIAL FOURTH LEVEL PLAN -MECHANICAL -SECTION G B01A-TD100D GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA D

B07-AE101B B07 FIRST LEVEL FLOOR PLAN - SECTION 7B B01-FX102BW B01 PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION BW B01A-M104F B01A PARTIAL FOURTH LEVEL PLAN -MECHANICAL -SECTION F B01A-TD100 GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL

B07-AE101A B07 FIRST LEVEL FLOOR PLAN - SECTION 7A B01-FX102BE B01 PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION BE B01A-M104E B01A PARTIAL FOURTH LEVEL PLAN -MECHANICAL -SECTION E B01-TD104CW FOURTH LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA CW

B07-AE101 B07 FIRST LEVEL FLOOR PLAN - OVERALL B01-FX102AW B01 PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION AW B01A-M104D B01A PARTIAL FOURTH LEVEL PLAN -MECHANICAL -SECTION D B01-TD104 FOURTH LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL

B07-AE100D-E2 B07 GROUND LEVEL FLOOR PLAN - SECTION 7D/7E B01-FX102AE B01 PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION AE B01A-M104 B01A FOURTH LEVEL PLAN -OVERALL B01-TD103CW THIRD LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA CW

B07-AE100D-E1 B07 GROUND LEVEL FLOOR PLAN - SECTION 7D/7E B01-FX102 B01 SECOND LEVEL PLAN -OVERALL B01A-M103G B01A PARTIAL THIRD LEVEL PLAN -MECHANICA -SECTION G B01-TD103BW THIRD LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA BW

B07-AE100C B07 GROUND LEVEL FLOOR PLAN - SECTION 7C B01-FX101J B01 PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION J B01A-M103F B01A PARTIAL THIRD LEVEL PLAN -MECHANICA -SECTION F B01-TD103 THIRD LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL

B07-AE100A-B B07 GROUND LEVEL FLOOR PLAN - SECTION 7A/7B B01-FX101CW B01 PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION CW B01A-M103E B01A PARTIAL THIRD LEVEL PLAN -MECHANICA -SECTION E B01-TD102J SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA J

B07-AE100 B07 GROUND LEVEL FLOOR PLAN - OVERALL B01-FX101CE B01 PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION CE B01A-M103D B01A PARTIAL THIRD LEVEL PLAN -MECHANICA -SECTION D B01-TD102CW SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA CW

B06-AE101 B06 FIRST LEVEL FLOOR PLAN - OVERALL B01-FX101BW B01 PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION BW B01A-M103 B01A THIRD LEVEL PLAN -OVERALL B01-TD102CE SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA CE

B05-AE102 B05 SECOND LEVEL FLOOR PLAN - OVERALL B01-FX101BE B01 PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION BE B01A-M102G B01A PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION G B01-TD102BW SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA BW

B05-AE101BW B05 FIRST LEVEL FLOOR PLAN - SECTION 5BW B01-FX101AW B01 PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION AW B01A-M102F B01A PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION F B01-TD102BE SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA BE

B05-AE101BE B05 FIRST LEVEL FLOOR PLAN - SECTION 5BE B01-FX101AE B01 PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION AE B01A-M102E B01A PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION E B01-TD102AW SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA AW

B05-AE101A B05 FIRST LEVEL FLOOR PLAN - SECTION 5A B01-FX100J B01 PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION J B01A-M102D B01A PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION D B01-TD102AE SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA AE

B05-AE101 B05 FIRST LEVEL FLOOR PLAN - OVERALL B01-FX100CW B01 PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION CW B01A-M102 B01A SECOND LEVEL PLAN -OVERALL B01-TD102 SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITON - OVERALL

B05-AE100BW B05 GROUND LEVEL FLOOR PLAN - SECTION 5BW B01-FX100CE B01 PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION CE B01A-M101G B01A PARTIAL FIRST LEVEL PLAN -MECHANICA -SECTION G B01-TD101J FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA J

B05-AE100BE B05 GROUND LEVEL FLOOR PLAN - SECTION 5BE B01-FX100BW B01 PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION BW B01A-M101F B01A PARTIAL FIRST LEVEL PLAN -MECHANICA -SECTION F B01-TD101CW FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA CW

B05-AE100A B05 GROUND LEVEL FLOOR PLAN - SECTION 5A B01-FX100BE B01 PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION BE B01A-M101E B01A PARTIAL FIRST LEVEL PLAN -MECHANICA -SECTION E B01-TD101CE FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA CE

B05-AE100 B05 GROUND LEVEL FLOOR PLAN - OVERALL B01-FX100AW B01 PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION AW B01A-M101D B01A PARTIAL FIRST LEVEL PLAN -MECHANICA -SECTION D B01-TD101BW FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA BW

B01A-AE105G B01A FIFTH LEVEL FLOOR PLAN - SECTION G B01-FX100AE B01 PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION AE B01A-M100G B01A PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION G B01-TD101BE FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA BE

B01A-AE105F B01A FIFTH LEVEL FLOOR PLAN - SECTION F B01-FX100 B01 GROUND LEVEL PLAN -OVERALL B01A-M100F B01A PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION F B01-TD101AW FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA AW

B01A-AE105E B01A FIFTH LEVEL FLOOR PLAN - SECTION E FX000 FIRE PROTECTION GENERAL NOTES AND LEGENDS B01A-M100E B01A PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION E B01-TD101AE FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA AE

B01A-AE105D B01A FIFTH LEVEL FLOOR PLAN - SECTION D Fire Protection B01A-M100D B01A PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION D B01-TD101 FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL

B01A-AE105 B01A FIFTH LEVEL FLOOR PLAN - OVERALL B01A-M100 B01A GROUND LEVEL PLAN -OVERALL B01-TD100J GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA J

B01A-AE104G B01A FOURTH LEVEL FLOOR PLAN - SECTION G P400 PLUMBING DETAILS B01-M104CW B01 PARTIAL FOURTH LEVEL PLAN -MECHANICAL -SECTION CW B01-TD100CW GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION- AREA CW

B01A-AE104F B01A FOURTH LEVEL FLOOR PLAN - SECTION F B10-PL100 B10 PARTIAL GROUND LEVEL PLAN -PLUMBING B01-M104BW B01 PARTIAL FOURTH LEVEL PLAN -MECHANICAL -SECTION BW B01-TD100CE GROUND FLOOR PLAN - TELECOM DEMOLITION- AREA CE

B01A-AE104E B01A FOURTH LEVEL FLOOR PLAN - SECTION E B07-PL102C-D B07 PARTIAL SECOND LEVEL PLAN -PLUMBING SECTION 7C-D B01-M104 B01 FOURTH LEVEL PLAN -OVERALL B01-TD100BW GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA BW

B01A-AE104D B01A FOURTH LEVEL FLOOR PLAN - SECTION D B07-PL102B-E B07 PARTIAL SECOND LEVEL PLAN -PLUMBING SECTION 7B-E B01-M103J B01 PARTIAL THIRD LEVEL PLAN -MECHANICAL SECTION J B01-TD100BE GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA BE

B01A-AE104 B01A FOURTH LEVEL FLOOR PLAN - OVERALL B07-PL102A B07 PARTIAL SECOND LEVEL PLAN -PLUMBING SECTION 7A B01-M103CW B01 PARTIAL THIRD LEVEL PLAN -MECHANICAL SECTION CW B01-TD100AW GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA AW

B01A-AE103G B01A THIRD LEVEL FLOOR PLAN - SECTION G B07-PL102 B07 SECOND LEVEL PLAN -OVERALL B01-M103BW B01 PARTIAL THIRD LEVEL PLAN -MECHANICAL SECTION BW B01-TD100AE GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA AE

B01A-AE103F B01A THIRD LEVEL FLOOR PLAN - SECTION F B07-PL101E B07 PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION 7E B01-M103 B01 THIRD LEVEL PLAN -OVERALL B01-TD100 GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL

B01A-AE103E B01A THIRD LEVEL FLOOR PLAN - SECTION E B07-PL101D B07 PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION 7D B01-M102J B01 PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION J TN008 FIBER RISER DIAGRAM - A SIDE AND B SIDE

B01A-AE103D B01A THIRD LEVEL FLOOR PLAN - SECTION D B07-PL101C B07 PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION 7C B01-M102CW B01 PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION CW TN007-05 FIFTH LEVEL FLOOR PLAN - CAMPUS OVERALL - INTRA-BUILDING FIBER ROUTING DIAGRAM

B01A-AE103 B01A THIRD LEVEL FLOOR PLAN - OVERALL B07-PL101B B07 PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION 7B B01-M102CE B01 PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION CE TN006-04 FOURTH LEVEL FLOOR PLAN - CAMPUS OVERALL - INTRA-BUILDING FIBER ROUTING DIAGRAM

B01A-AE102G B01A SECOND LEVEL FLOOR PLAN - SECTION G B07-PL101A B07 PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION 7A B01-M102BW B01 PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION BW TN005-03 THIRD LEVEL FLOOR PLAN - CAMPUS OVERALL - INTRA-BUILDING FIBER ROUTING DIAGRAM

B01A-AE102F B01A SECOND LEVEL FLOOR PLAN - SECTION F B07-PL101 B07 FIRST LEVEL PLAN -OVERALL B01-M102BE B01 PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION BE TN004-02 SECOND LEVEL FLOOR PLAN - CAMPUS OVERALL - INTRA-BUILDING FIBER ROUTING DIAGRAM

B01A-AE102E B01A SECOND LEVEL FLOOR PLAN - SECTION E B07-PL100D-E B07 PARTIAL GROUND LEVEL PLAN -PLUMBING SECTION 7D-E B01-M102AW B01 PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION AW TN003-01 FIRST LEVEL FLOOR PLAN - CAMPUS OVERALL - INTRA-BUILDING FIBER ROUTING DIAGRAM

B01A-AE102D B01A SECOND LEVEL FLOOR PLAN - SECTION D B07-PL100C B07 PARTIAL GROUND LEVEL PLAN -PLUMBING SECTION 7C B01-M102AE B01 PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION AE TN002-00 GROUND LEVEL FLOOR PLAN - CAMPUS OVERALL - INTRA-BUILDING FIBER ROUTING DIAGRAM

B01A-AE102 B01A SECOND LEVEL FLOOR PLAN - OVERALL B07-PL100A-B B07 PARTIAL GROUND LEVEL PLAN -PLUMBING SECTION 7A-B B01-M102 B01 SECOND LEVEL PLAN -OVERALL TN001 CAMPUS TELECOMMUNICATIONS PATHWAYS

B01A-AE101G B01A FIRST LEVEL FLOOR PLAN - SECTION G B07-PL100 B07 GROUND LEVEL PLAN -OVERALL B01-M101J B01 PARTIAL FIRST LEVEL PLAN -MECHANICAL SECTION J TN000 TELECOMMUNICATIONS SYMBOLS AND ABBREVIATIONS

B01A-AE101F B01A FIRST LEVEL FLOOR PLAN - SECTION F B05-PL102A B05 PARTIAL SECOND LEVEL PLAN -PLUMBING SECTION 5A B01-M101CW B01 PARTIAL FIRST LEVEL PLAN -MECHANICAL SECTION CW Telecomm

B01A-AE101E B01A FIRST LEVEL FLOOR PLAN - SECTION E B05-PL102 B05 SECOND LEVEL PLAN -OVERALL B01-M101CE B01 PARTIAL FIRST LEVEL PLAN -MECHANICAL SECTION CE

B01A-AE101D B01A FIRST LEVEL FLOOR PLAN - SECTION D B05-PL101B B05 PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION 5B B01-M101BW B01 PARTIAL FIRST LEVEL PLAN -MECHANICAL SECTION BW EE900 ELECTRICAL SCHEDULES

B01A-AE101 B01A FIRST LEVEL FLOOR PLAN - OVERALL B05-PL101A B05 PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION 5A B01-M101BE B01 PARTIAL FIRST LEVEL PLAN -MECHANICAL SECTION BE EE800 ELECTRICAL DETAILS

B01A-AE100G B01A GROUND LEVEL FLOOR PLAN - SECTION G B05-PL101 B05 FIRST LEVEL PLAN -OVERALL B01-M101AW B01 PARTIAL FIRST LEVEL PLAN -MECHANICAL SECTION AW B10-E701 PANEL SCHEDULES - TELECOMMUNICATIONS ROOM

B01A-AE100F B01A GROUND LEVEL FLOOR PLAN - SECTION F B05-PL100B B05 PARTIAL GROUND LEVEL PLAN -PLUMBING SECTION 5B B01-M101AE B01 PARTIAL FIRST LEVEL PLAN -MECHANICAL SECTION AE B7-E702 PANEL SCHEDULES - TELECOMMUNICATIONS ROOM

B01A-AE100E B01A GROUND LEVEL FLOOR PLAN - SECTION E B05-PL100A B05 PARTIAL GROUND LEVEL PLAN -PLUMBING SECTION 5A B01-M101 B01 FIRST LEVEL PLAN -OVERALL B7-E701 PANEL SCHEDULES - TELECOMMUNICATIONS ROOM

B01A-AE100D B01A GROUND LEVEL FLOOR PLAN - SECTION D B05-PL100 B05 GROUND LEVEL PLAN -OVERALL B01-M100J B01 PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION J B7-E700 PANEL SCHEDULES - DISTRIBUTION

B01A-AE100 B01A GROUND LEVEL FLOOR PLAN - OVERALL B01A-PL105G B01A PARTIAL FIFTH LEVEL PLAN -PLUMBING -SECTION G B01-M100CW B01 PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION CW B5-E701 PANEL SCHEDULES - TELECOMMUNICATIONS ROOM

B01-AE104CW2 B01 FOURTH LEVEL FLOOR PLAN - SECTION CW B01A-PL105F B01A PARTIAL FIFTH LEVEL PLAN -PLUMBING -SECTION F B01-M100CE B01 PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION CE B5-E700 PANEL SCHEDULES - DISTRIBUTION

B01-AE104CW1 B01 FOURTH LEVEL FLOOR PLAN - SECTION CW B01A-PL105E B01A PARTIAL FIFTH LEVEL PLAN -PLUMBING -SECTION E B01-M100BW B01 PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION BW B1A-E702 PANEL SCHEDULES - TELECOMMUNICATIONS ROOM

B01-AE104BW2 B01 FOURTH LEVEL FLOOR PLAN - SECTION BW B01A-PL105D B01A PARTIAL FIFTH LEVEL PLAN -PLUMBING -SECTION D B01-M100BE B01 PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION BE B1A-E701 PANEL SCHEDULES - TELECOMMUNICATIONS ROOM

B01-AE104BW1 B01 FOURTH LEVEL FLOOR PLAN - SECTION BW B01A-PL105 B01A FIFTH LEVEL PLAN -OVERALL B01-M100AW B01 PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION AW B1A-E700 PANEL SCHEDULES - DISTRIBUTION

B01-AE104 B01 FOURTH LEVEL FLOOR PLAN - OVERALL B01A-PL104G B01A PARTIAL FOURTH LEVEL PLAN -PLUMBIN -SECTION G B01-M100AE B01 PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION AE B1-E705 PANEL SCHEDULES - TELECOMMUNICATIONS ROOM

B01-AE103CW2 B01 THIRD LEVEL FLOOR PLAN - SECTION CW B01A-PL104F B01A PARTIAL FOURTH LEVEL PLAN -PLUMBIN -SECTION F B01-M100 B01 GROUND LEVEL PLAN -OVERALL B1-E704 PANEL SCHEDULES - TELECOMMUNICATIONS ROOM

B01-AE103CW1 B01 THIRD LEVEL FLOOR PLAN - SECTION CW B01A-PL104E B01A PARTIAL FOURTH LEVEL PLAN -PLUMBIN -SECTION E M000 MECHANICAL GENERAL NOTES AND LEGENDS B1-E703 PANEL SCHEDULES - TELECOMMUNICATIONS ROOM

B01-AE103BW2 B01 THIRD LEVEL FLOOR PLAN - SECTION BW B01A-PL104D B01A PARTIAL FOURTH LEVEL PLAN -PLUMBIN -SECTION D Mechanical B1-E702 PANEL SCHEDULES - TELECOMMUNICATIONS ROOM

B01-AE103BW1 B01 THIRD LEVEL FLOOR PLAN - SECTION BW B01A-PL104 B01A FOURTH LEVEL PLAN -OVERALL B1-E701 PANEL SCHEDULES - TELECOMMUNICATIONS ROOM

B01-AE103 B01 THIRD LEVEL FLOOR PLAN - OVERALL B01A-PL103G B01A PARTIAL THIRD LEVEL PLAN -PLUMBING -SECTION G FX401 FIRE PROTECTION DETAILS B1-E700 PANEL SCHEDULES - DISTRIBUTION

B01-AE102J B01 SECOND LEVEL FLOOR PLAN - SECTION J B01A-PL103F B01A PARTIAL THIRD LEVEL PLAN -PLUMBING -SECTION F FX400 FIRE PROTECTION DETAILS B10-E600 ONE-LINE DIAGRAM

B01-AE102CW B01 SECOND LEVEL FLOOR PLAN - SECTION CW B01A-PL103E B01A PARTIAL THIRD LEVEL PLAN -PLUMBING -SECTION E B10-FX100 B10 PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION B07-E600 ONE-LINE DIAGRAM

B01-AE102CE B01 SECOND LEVEL FLOOR PLAN - SECTION CE B01A-PL103D B01A PARTIAL THIRD LEVEL PLAN -PLUMBING -SECTION D B07-FX102C-D B07 PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION 7C-D B05-E600 ONE-LINE DIAGRAM

B01-AE102BW B01 SECOND LEVEL FLOOR PLAN - SECTION BW B01A-PL103 B01A THIRD LEVEL PLAN -OVERALL B07-FX102B-E B07 PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION 7B-E B01A-E600 ONE-LINE DIAGRAM

B01-AE102BE B01 SECOND LEVEL FLOOR PLAN - SECTION BE B01A-PL102G B01A PARTIAL SECOND LEVEL PLAN -PLUMBIN -SECTION G B07-FX102A B07 PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION 7A B01-E600 ONE-LINE DIAGRAM

B01-AE102AW B01 SECOND LEVEL FLOOR PLAN - SECTION AW B01A-PL102F B01A PARTIAL SECOND LEVEL PLAN -PLUMBIN -SECTION F B07-FX102 B07 SECOND LEVEL PLAN -OVERALL B01-EE401 ENLARGED PLANS - ELECTRICAL

B01-AE102AE B01 SECOND LEVEL FLOOR PLAN - SECTION AE B01A-PL102E B01A PARTIAL SECOND LEVEL PLAN -PLUMBIN -SECTION E B07-FX101E B07 PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION 7E B01-EE400 ENLARGED PLANS - ELECTRICAL

B01-AE102 B01 SECOND LEVEL FLOOR PLAN - OVERALL B01A-PL102D B01A PARTIAL SECOND LEVEL PLAN -PLUMBIN -SECTION D B07-FX101D B07 PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION 7D B10-EE100 GROUND LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE101J B01 FIRST LEVEL FLOOR PLAN - SECTION J B01A-PL102 B01A SECOND LEVEL PLAN -OVERALL B07-FX101C B07 PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION 7C B07-EE102 SECOND LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE101CW B01 FIRST LEVEL FLOOR PLAN - SECTION CW B01A-PL101G B01A PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION G B07-FX101B B07 PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION 7B B07-EE101 FIRST LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE101CE B01 FIRST LEVEL FLOOR PLAN - SECTION CE B01A-PL101F B01A PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION F B07-FX101A B07 PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION 7A B07-EE100 GROUND LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE101BW B01 FIRST LEVEL FLOOR PLAN - SECTION BW B01A-PL101E B01A PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION E B07-FX101 B07 FIRST LEVEL PLAN -OVERALL B05-EE102 SECOND LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE101BE B01 FIRST LEVEL FLOOR PLAN - SECTION BE B01A-PL101D B01A PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION D B07-FX100D-E B07 PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION 7D-E B05-EE101 FIRST LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE101AW B01 FIRST LEVEL FLOOR PLAN - SECTION AW B01A-PL101 B01A FIRST LEVEL PLAN -OVERALL B07-FX100C B07 PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION 7C B05-EE100 GROUND LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE101AE B01 FIRST LEVEL FLOOR PLAN - SECTION AE B01A-PL100G B01A PARTIAL GROUND LEVEL PLAN -PLUMBIN -SECTION G B07-FX100A-B B07 PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION 7A-B B01A-EE106 SIXTH LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE101 B01 FIRST LEVEL FLOOR PLAN - OVERALL B01A-PL100F B01A PARTIAL GROUND LEVEL PLAN -PLUMBIN -SECTION F B07-FX100 B07 GROUND LEVEL PLAN -OVERALL B01A-EE105 FIFTH LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE100J B01 GROUND LEVEL FLOOR PLAN - SECTION J B01A-PL100E B01A PARTIAL GROUND LEVEL PLAN -PLUMBIN -SECTION E B05-FX102A B05 PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION 5A B01A-EE104 FOURTH LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE100CW B01 GROUND LEVEL FLOOR PLAN - SECTION CW B01A-PL100D B01A PARTIAL GROUND LEVEL PLAN -PLUMBIN -SECTION D B05-FX102 B05 SECOND LEVEL PLAN -OVERALL B01A-EE103 THIRD LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE100CE B01 GROUND LEVEL FLOOR PLAN - SECTION CE B01A-PL100 B01A GROUND LEVEL PLAN -OVERALL B05-FX101B B05 PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION 5B B01A-EE102 SECOND LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE100BW B01 GROUND LEVEL FLOOR PLAN - SECTION BW B01-PL104CW B01 PARTIAL FOURTH LEVEL PLAN -PLUMBING SECTION CW B05-FX101A B05 PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION 5A B01A-EE101 FIRST LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE100BE B01 GROUND LEVEL FLOOR PLAN - SECTION BE B01-PL104BW B01 PARTIAL FOURTH LEVEL PLAN -PLUMBING SECTION BW B05-FX101 B05 FIRST LEVEL PLAN -OVERALL B01A-EE100 GROUND LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE100AW2 B01 GROUND LEVEL FLOOR PLAN - SECTION AW B01-PL104 B01 FOURTH LEVEL PLAN -OVERALL B05-FX100A B05 PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION 5A B01-EE104 FOURTH LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE100AW1 B01 GROUND LEVEL FLOOR PLAN - SECTION AW B01-PL103CW B01 PARTIAL THIRD LEVEL PLAN -PLUMBING -SECTION CW B05-FX100 B05 GROUND LEVEL PLAN -OVERALL B01-EE103 THIRD LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE100AE B01 GROUND LEVEL FLOOR PLAN - SECTION AE B01-PL103BW B01 PARTIAL THIRD LEVEL PLAN -PLUMBING -SECTION BW B01A-FX105G B01A PARTIAL FIFTH LEVEL PLAN -FIRE PROTECTION -SECTION G B01-EE102 SECOND LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

B01-AE100 B01 GROUND LEVEL FLOOR PLAN - OVERALL B01-PL103 B01 THIRD LEVEL PLAN -OVERALL B01A-FX105F B01A PARTIAL FIFTH LEVEL PLAN -FIRE PROTECTION -SECTION F B01-EE101 FIRST LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS B01-PL102J B01 PARTIAL SECOND LEVEL PLAN -PLUMBING SECTION J B01A-FX105E B01A PARTIAL FIFTH LEVEL PLAN -FIRE PROTECTION -SECTION E B01-EE100 GROUND LEVEL FLOOR PLAN - ELECTRICAL - OVERALL

Architectural B01-PL102CW B01 PARTIAL SECOND LEVEL PLAN -PLUMBING SECTION CW B01A-FX105D B01A PARTIAL FIFTH LEVEL PLAN -FIRE PROTECTION -SECTION D B01-ED400 ENLARGED PLANS - ELECTRICAL - DEMO

B01-PL102CE B01 PARTIAL SECOND LEVEL PLAN -PLUMBING SECTION CE B01A-FX105 B01A FIFTH LEVEL PLAN -OVERALL EE000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

SF502 STRUCTURAL SECTIONS AND DETAILS B01-PL102BW B01 PARTIAL SECOND LEVEL PLAN -PLUMBING SECTION BW B01A-FX104G B01A PARTIAL FOURTH LEVEL PLAN -FIRE PROTECTION -SECTION G Electrical

SF501 TYPICAL STRUCTURAL DETAILS B01-PL102BE B01 PARTIAL SECOND LEVEL PLAN -PLUMBING SECTION BE B01A-FX104F B01A PARTIAL FOURTH LEVEL PLAN -FIRE PROTECTION -SECTION F

SF104 ENLARGED FLOOR PLANS B01-PL102AW B01 PARTIAL SECOND LEVEL PLAN -PLUMBING SECTION AW B01A-FX104E B01A PARTIAL FOURTH LEVEL PLAN -FIRE PROTECTION -SECTION E M700 TEMPERATURE CONTROLS DIAGRAMS AND SEQUENCES

SF103 ENLARGED FLOOR PLANS B01-PL102AE B01 PARTIAL SECOND LEVEL PLAN -PLUMBING SECTION AE B01A-FX104D B01A PARTIAL FOURTH LEVEL PLAN -FIRE PROTECTION -SECTION D M600 MECHANICAL SCHEDULES

B01-SF102 BUILDING 1 OVERALL FLOOR PLAN B01-PL102 B01 SECOND LEVEL PLAN -OVERALL B01A-FX104 B01A FOURTH LEVEL PLAN -OVERALL M500 MECHANICAL DIAGRAMS

B07-SF101 BUILDING 7 OVERALL FLOORPLAN B01-PL101J B01 PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION J B01A-FX103G B01A PARTIAL THIRD LEVEL PLAN -FIRE PROTECTION -SECTION G M400 MECHANICAL DETAILS

B01A-SF100 BUILDING 1A OVERALL FLOOR PLAN B01-PL101CW B01 PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION CW B01A-FX103F B01A PARTIAL THIRD LEVEL PLAN -FIRE PROTECTION -SECTION F B10-M100 B10 PARTIAL GROUND LEVEL PLAN -MECHANICAL

SI002 STRUCTURAL GENERAL NOTES B01-PL101CE B01 PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION CE B01A-FX103E B01A PARTIAL THIRD LEVEL PLAN -FIRE PROTECTION -SECTION E B07-M102C-D B07 PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION 7C-D

SI001 STRUCTURAL ABBREVIATIONS, SYMBOLS, AND SCHEDULES B01-PL101BW B01 PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION BW B01A-FX103D B01A PARTIAL THIRD LEVEL PLAN -FIRE PROTECTION -SECTION D B07-M102B-E B07 PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION 7B-E

Structural B01-PL101BE B01 PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION BE B01A-FX103 B01A THIRD LEVEL PLAN -OVERALL B07-M102A B07 PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION 7A

B01-PL101AW B01 PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION AW B01A-FX102G B01A PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION G B07-M102 B07 SECOND LEVEL PLAN -OVERALL

B07-HA102 B07 SECOND LEVEL FLOOR PLAN -ASBESTOS ABATEMENT PLAN B01-PL101AE B01 PARTIAL FIRST LEVEL PLAN -PLUMBING -SECTION AE B01A-FX102F B01A PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION F B07-M101E B07 PARTIAL FIRST LEVEL PLAN -MECHANICAL SECTION 7E

B07-HA100 B07 GROUND LEVEL FLOOR PLAN - ASBESTOS ABATEMENT PLAN B01-PL101 B01 FIRST LEVEL PLAN -OVERALL B01A-FX102E B01A PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION E B07-M101D B07 PARTIAL FIRST LEVEL PLAN -MECHANICAL SECTION 7D

B05-HA100 B05 GROUND LEVEL FLOOR PLAN - ASBESTOS ABATEMENT PLAN B01-PL100J B01 PARTIAL GROUND LEVEL PLAN -PLUMBING SECTION J B01A-FX102D B01A PARTIAL SECOND LEVEL PLAN -FIRE PROTECTION -SECTION D B07-M101C B07 PARTIAL FIRST LEVEL PLAN -MECHANICAL SECTION 7C

B01-HA103 B01 THIRD LEVEL FLOOR PLAN -ASBESTOS ABATEMENT PLAN B01-PL100CW B01 PARTIAL GROUND LEVEL PLAN -PLUMBING SECTION CW B01A-FX102 B01A SECOND LEVEL PLAN -OVERALL B07-M101B B07 PARTIAL FIRST LEVEL PLAN -MECHANICAL SECTION 7B

B01-HA100 B01 GROUND LEVEL FLOOR PLAN - ASBESTOS ABATEMENT PLAN B01-PL100CE B01 PARTIAL GROUND LEVEL PLAN -PLUMBING SECTION CE B01A-FX101G B01A PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION G B07-M101A B07 PARTIAL FIRST LEVEL PLAN -MECHANICAL SECTION 7A

Hazardous B01-PL100BW B01 PARTIAL GROUND LEVEL PLAN -PLUMBING SECTION BW B01A-FX101F B01A PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION F B07-M101 B07 FIRST LEVEL PLAN -OVERALL

B01-PL100BE B01 PARTIAL GROUND LEVEL PLAN -PLUMBING SECTION BE B01A-FX101E B01A PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION E B07-M100C B07 PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION 7C

CJ501 EROSION CONTROL DETAILS B01-PL100AW B01 PARTIAL GROUND LEVEL PLAN -PLUMBING SECTION AW B01A-FX101D B01A PARTIAL FIRST LEVEL PLAN -FIRE PROTECTION -SECTION D B07-M100A-B B07 PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION 7A-B

CJ101 EROSION CONTROL PLAN B01-PL100AE B01 PARTIAL GROUND LEVEL PLAN -PLUMBING SECTION AE B01A-FX101 B01A FIRST LEVEL PLAN -OVERALL B07-M100 B07 GROUND LEVEL PLAN -OVERALL

CS501 SITE DETAILS B01-PL100 B01 GROUND LEVEL PLAN -OVERALL B01A-FX100G B01A PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION G B05-M102A B05 PARTIAL SECOND LEVEL PLAN -MECHANICAL -SECTION 5A

CS101 SITE DEVELOPMENT PLAN AND PROFILE LINE B-1 P000 PLUMBING GENERAL NOTES AND LEGENDS B01A-FX100F B01A PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION F B05-M102 B05 SECOND LEVEL PLAN -OVERALL

GI002 PHASING PLAN Plumbing B01A-FX100E B01A PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION E B05-M101B B05 PARTIAL FIRST LEVEL PLAN -MECHANICAL SECTION 5B

GI001 CIVIL GENERAL NOTES B01A-FX100D B01A PARTIAL GROUND LEVEL PLAN -FIRE PROTECTION -SECTION D B05-M101 B05 FIRST LEVEL PLAN -OVERALL

Civil B09-AE101 B09 FIRST LEVEL FLOOR PLAN - OVERALL B01A-FX100 B01A GROUND LEVEL PLAN -OVERALL B05-M100B B05 PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION 5B

B07-AE102C-D2 B07 SECOND LEVEL FLOOR PLAN - SECTION 7C/7D B01-FX104CW B01 PARTIAL FOURTH LEVEL PLAN -FIRE PROTECTION -SECTION CW B05-M100A B05 PARTIAL GROUND LEVEL PLAN -MECHANICAL -SECTION 5A

GI102 SHEET INDEX B07-AE102C-D1 B07 SECOND LEVEL FLOOR PLAN - SECTION 7C/7D B01-FX104BW B01 PARTIAL FOURTH LEVEL PLAN -FIRE PROTECTION -SECTION BW B05-M100 B05 GROUND LEVEL PLAN -OVERALL

GI101 SHEET INDEX B07-AE102B-E2 B07 SECOND LEVEL FLOOR PLAN - SECTION 7B/7E B01-FX104 B01 FOURTH LEVEL PLAN -OVERALL B01A-M106 B01A SIXTH LEVEL ROOF PLAN -OVERALL -MECHANICAL

GI000 COVER SHEET B07-AE102B-E1 B07 SECOND LEVEL FLOOR PLAN - SECTION 7B/7E B01-FX103CW B01 PARTIAL THIRD LEVEL PLAN -FIRE PROTECTION -SECTION CW B01A-M105G B01A PARTIAL FIFTH LEVEL PLAN -MECHANICAL -SECTION G

General Architectural Fire Protection Mechanical

VOLUME: 1

Sheet Number Sheet Number Sheet Name Sheet Number Sheet Name Sheet Number Sheet Name

Revisions: Date:

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com

SES Project :

1221 N. Pennsylvania St.

Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com

GD Project :

35% SCHEMATIC DESIGN 10/31/2022

65% DESIGN DEVELOPMENT 05/03/2023

95% CONSTRUCTION DOCUMENTS 08/16/2023

100% FINAL BID DOCUMENTS 09/27/2023

100% FINAL STAMPED BID DOCUMENTS 10/11/2023

B

IM

/2

.3

V

A M e m p h is E

H R

M I n fr a s tr u c tu re /6

-7

.A

R C

H .2

.r v t

/2

/2

:3

:3

A M

GI102

SHEET LIST VA MEMPHIS INFRASTRUCTURE

UPGRADE

MEMPHIS, TN

614-22-700

N/A

10/11/2023 LNS KJW

100% FINAL STAMPED

BID DOCUMENTS

FULLY SPRINKLERED

B01A-TN102 SECOND LEVEL FLOOR PLAN - TELECOM - OVERALL B07-TN500 GROUND LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01A-TN101G FIRST LEVEL FLOOR PLAN - TELECOM - AREA G B05-TN502 SECOND LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01A-TN101F FIRST LEVEL FLOOR PLAN - TELECOM - AREA F B05-TN501 FIRST LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01A-TN101E FIRST LEVEL FLOOR PLAN - TELECOM - AREA E B05-TN500 GROUND LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01A-TN101D FIRST LEVEL FLOOR PLAN - TELECOM - AREA D B01A-TN505 FIFTH LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01A-TN101 FIRST LEVEL FLOOR PLAN - TELECOM - OVERALL B01A-TN504 FOURTH LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01A-TN100G GROUND LEVEL FLOOR PLAN - TELECOM - AREA G B01A-TN503 THIRD LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01A-TN100F GROUND LEVEL FLOOR PLAN - TELECOM - AREA F B01A-TN502 SECOND LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01A-TN100E GROUND LEVEL FLOOR PLAN - TELECOM - AREA E B01A-TN501 FIRST LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01A-TN100D GROUND LEVEL FLOOR PLAN - TELECOM - AREA D B01A-TN500 GROUND LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01A-TN100 GROUND LEVEL FLOOR PLAN - TELECOM - OVERALL B01-TN504 FOURTH LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01-TN104CW FOURTH LEVEL FLOOR PLAN - TELECOM - AREA CW B01-TN503 THIRD LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01-TN104 FOURTH LEVEL FLOOR PLAN - TELECOM - OVERALL B01-TN502 SECOND LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01-TN103CW THIRD LEVEL FLOOR PLAN - TELECOM - AREA CW B01-TN501 FIRST LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01-TN103BW THIRD LEVEL FLOOR PLAN - TELECOM - AREA BW B01-TN500 GROUND LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01-TN103 THIRD LEVEL FLOOR PLAN - TELECOM - OVERALL TN605 TELECOMMUNICATIONS DETAILS

B01-TN102J SECOND LEVEL FLOOR PLAN - TELECOM - AREA J TN604 TELECOMMUNICATIONS DETAILS

B01-TN102CW SECOND LEVEL FLOOR PLAN - TELECOM - AREA CW TN603 TELECOMMUNICATIONS DETAILS

B01-TN102CE SECOND LEVEL FLOOR PLAN - TELECOM - AREA CE TN602 TELECOMMUNICATIONS DETAILS

B01-TN102BW SECOND LEVEL FLOOR PLAN - TELECOM - AREA BW TN601 TELECOMMUNICATIONS DETAILS

B01-TN102BE SECOND LEVEL FLOOR PLAN - TELECOM - AREA BE TN600 DATA COUNTS SCHEDULE

B01-TN102AW SECOND LEVEL FLOOR PLAN - TELECOM - AREA AW B10-TN400 ENLARGED PLANS - TR E24-10

B01-TN102AE SECOND LEVEL FLOOR PLAN - TELECOM - AREA AE B07-TN405 ENLARGED PLANS - TR BC311A

B01-TN102 SECOND LEVEL FLOOR PLAN - TELECOM - OVERALL B07-TN404 ENLARGED PLANS -TR BB353A

B01-TN101J FIRST LEVEL FLOOR PLAN - TELECOM - AREA J B07-TN403 ENLARGED PLANS - TR BB253A

B01-TN101CW FIRST LEVEL FLOOR PLAN - TELECOM - AREA CW B07-TN402 ENLARGED PLANS - TR BC211A

B01-TN101CE FIRST LEVEL FLOOR PLAN - TELECOM - AREA CE B07-TN401 ENLARGED PLANS - TR BB153A

B01-TN101BW FIRST LEVEL FLOOR PLAN - TELECOM - AREA BW B07-TN400 ENLARGED PLANS - TR BC111A

B01-TN101BE FIRST LEVEL FLOOR PLAN - TELECOM - AREA BE B05-TN402 ENLARGED PLANS - TR 5201A

B01-TN101AW FIRST LEVEL FLOOR PLAN - TELECOM - AREA AW B05-TN401 ENLARGED PLANS - TR 5242

B01-TN101AE FIRST LEVEL FLOOR PLAN - TELECOM - AREA AE B05-TN400 ENLARGED PLANS - TR 5146A

B01-TN101 FIRST LEVEL FLOOR PLAN - TELECOM - OVERALL B01A-TN407 ENLARGED PLANS - TR F501

B01-TN100J GROUND LEVEL FLOOR PLAN - TELECOM - AREA J B01A-TN406 ENLARGED PLANS - TR F401

B01-TN100CW GROUND LEVEL FLOOR PLAN - TELECOM - AREA CW B01A-TN405 ENLARGED PLANS - TR F301

B01-TN100CE GROUND LEVEL FLOOR PLAN - TELECOM - AREA CE B01A-TN404 ENLARGED PLANS - TR F201

B01-TN100BW GROUND LEVEL FLOOR PLAN - TELECOM - AREA BW B01A-TN403 ENLARGED PLAN - TELECOM - ENTRANCE ROOM 2 AND TR G107

B01-TN100BE GROUND LEVEL FLOOR PLAN - TELECOM - AREA BE B01A-TN402 ENLARGED PLAN - TELECOM - ENTRANCE ROOM 1 AND TR F101

B01-TN100AW GROUND LEVEL FLOOR PLAN - TELECOM - AREA AW B01A-TN401 ENLARGED PLANS - TR F001

B01-TN100AE GROUND LEVEL FLOOR PLAN - TELECOM - AREA AE B01A-TN400 ENLARGED PLANS - TR DB1107A

B01-TN100 GROUND LEVEL FLOOR PLAN - TELECOM - OVERALL B01-TN413 ENLARGED PLANS - TR CW463

B10-TD400 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO B01-TN412 ENLARGED PLANS - TR CW003

B09-TD400 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO B01-TN411 ENLARGED PLANS - TR 6206

B07-TD400 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO B01-TN410 ENLARGED PLANS - TR CW002

B05-TD400 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO B01-TN409 ENLARGED PLANS - TR BW002

B01A-TD401 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO B01-TN408 ENLARGED PLANS - TR AE200

B01A-TD400 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO B01-TN407 ENLARGED PLANS - TR C2-507

B01-TD401 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO B01-TN406 ENLARGED PLANS - TR C2-373

B01-TD400 ENLARGED PLANS - TELECOMMUNICATIONS - DEMO B01-TN405 ENLARGED PLANS - TR AW101D

B10-TD100 GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL B01-TN404 ENLARGED PLANS - TR AE100

B09-TD101 FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL B01-TN403 ENLARGED PLANS - TR 6007

B07-TD102C SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 7C B01-TN402 ENLARGED PLANS - TR CWG 1

B07-TD102B SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 7B B01-TN401 ENLARGED PLANS - TR AEG 2

B07-TD102A SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 7A B01-TN400 ENLARGED PLANS - TR AEG15B

B07-TD102 SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL B10-TN100 GROUND LEVEL FLOOR PLAN - TELECOM - OVERALL

B07-TD101E FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 7E B09-TN101 FIRST LEVEL FLOOR PLAN - TELECOM - OVERALL

B07-TD101D FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 7D B07-TN102C SECOND LEVEL FLOOR PLAN - TELECOM - AREAS 7C

B07-TD101C FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 7C B07-TN102B SECOND LEVEL FLOOR PLAN - TELECOM - AREAS 7B

B07-TD101B FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 7B B07-TN102A SECOND LEVEL FLOOR PLAN - TELECOM - AREA 7A

B07-TD101A FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 7A B07-TN102 SECOND LEVEL FLOOR PLAN - TELECOM - OVERALL

B07-TD101 FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL B07-TN101E FIRST LEVEL FLOOR PLAN - TELECOM - AREA 7E

B07-TD100E GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 7E B07-TN101D FIRST LEVEL FLOOR PLAN - TELECOM - AREA 7D

B07-TD100D GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 7D B07-TN101C FIRST LEVEL FLOOR PLAN - TELECOM - AREA 7C

B07-TD100C GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 7C B07-TN101B FIRST LEVEL FLOOR PLAN - TELECOM - AREA 7B

B07-TD100B GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 7B B07-TN101A FIRST LEVEL FLOOR PLAN - TELECOM - AREA 7A

B07-TD100 GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL B07-TN101 FIRST LEVEL FLOOR PLAN - TELECOM - OVERALL

B05-TD102A SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 5A B07-TN100E GROUND LEVEL FLOOR PLAN - TELECOM - AREA 7E

B05-TD102 SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL B07-TN100D GROUND LEVEL FLOOR PLAN - TELECOM - AREA 7D

B05-TD101BW FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 5BW B07-TN100C GROUND LEVEL FLOOR PLAN - TELECOM - AREA 7C

B05-TD101BE FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 5BE B07-TN100A-B GROUND LEVEL FLOOR PLAN - TELECOM - AREA 7A/7B

B05-TD101A FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 5A B07-TN100 GROUND LEVEL FLOOR PLAN - TELECOM - OVERALL

B05-TD101 FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL B05-TN102A SECOND LEVEL FLOOR PLAN - TELECOM - AREA 5A

B05-TD100BW GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 5BW B05-TN102 SECOND LEVEL FLOOR PLAN - TELECOM - OVERALL

B05-TD100BE GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 5BE B05-TN101BW FIRST LEVEL FLOOR PLAN - TELECOM - AREA 5BW

B05-TD100A GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA 5A B05-TN101BE FIRST LEVEL FLOOR PLAN - TELECOM - AREA 5BE

B05-TD100 GROUND LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL B05-TN101A FIRST LEVEL FLOOR PLAN - TELECOM - AREA 5A

B01A-TD105G FIFTH LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA G B05-TN101 FIRST LEVEL FLOOR PLAN - TELECOM - OVERALL

B01A-TD105F FIFTH LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA F B05-TN100BW GROUND LEVEL FLOOR PLAN - TELECOM - AREA 5BW

B01A-TD105E FIFTH LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA E B05-TN100BE GROUND LEVEL FLOOR PLAN - TELECOM - AREA 5BE

B01A-TD105D FIFTH LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA D B05-TN100A GROUND LEVEL FLOOR PLAN - TELECOM - AREA 5A

B01A-TD105 FIFTH LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL B05-TN100 GROUND LEVEL FLOOR PLAN - TELECOM - OVERALL B01A-TN710 TECHNOLOGY ENLARGED PLANS - FINAL

B01A-TD104G FOURTH LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA G B01A-TN105G FIFTH LEVEL FLOOR PLAN - TELECOM - AREA G B01A-TN707 TECHNOLOGY ENLARGED PLANS - PHASE 7

B01A-TD104F FOURTH LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA F B01A-TN105F FIFTH LEVEL FLOOR PLAN - TELECOM - AREA F B01A-TN706 TECHNOLOGY ENLARGED PLANS - PHASE 6

B01A-TD104E FOURTH LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA E B01A-TN105E FIFTH LEVEL FLOOR PLAN - TELECOM - AREA E B01A-TN705 TECHNOLOGY ENLARGED PLANS - PHASE 5

B01A-TD104D FOURTH LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA D B01A-TN105D FIFTH LEVEL FLOOR PLAN - TELECOM - AREA D B01A-TN704 TECHNOLOGY ENLARGED PLANS - PHASE 4

B01A-TD104 FOURTH LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL B01A-TN105 FIFTH LEVEL FLOOR PLAN - TELECOM - OVERALL B01A-TN703 TECHNOLOGY ENLARGED PLANS - PHASE 3

B01A-TD103G THIRD LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA G B01A-TN104G FOURTH LEVEL FLOOR PLAN - TELECOM - AREA G B01A-TN702 TECHNOLOGY ENLARGED PLANS - PHASE 2

B01A-TD103F THIRD LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA F B01A-TN104F FOURTH LEVEL FLOOR PLAN - TELECOM - AREA F B01A-TN701 TECHNOLOGY ENLARGED PLANS - PHASE 1

B01A-TD103E THIRD LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA E B01A-TN104E FOURTH LEVEL FLOOR PLAN - TELECOM - AREA E B01A-TN700 TECHNOLOGY ENLARGED PLANS - EXISTING

B01A-TD103D THIRD LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA D B01A-TN104D FOURTH LEVEL FLOOR PLAN - TELECOM - AREA D TN705 TECHNOLOGY EQUIPMENT SCHEDULE

B01A-TD103 THIRD LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL B01A-TN104 FOURTH LEVEL FLOOR PLAN - TELECOM - OVERALL TN704 TECHNOLOGY RISER DIAGRAM

B01A-TD102G SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA G B01A-TN103G THIRD LEVEL FLOOR PLAN - TELECOM - AREA G TN703 TECHNOLOGY EQUIPMENT ELEVATIONS

B01A-TD102F SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA F B01A-TN103F THIRD LEVEL FLOOR PLAN - TELECOM - AREA F TN702 TECHNOLOGY DETAILS

B01A-TD102E SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA E B01A-TN103E THIRD LEVEL FLOOR PLAN - TELECOM - AREA E TN701 LEVEL 01 - TECHNOLOGY

B01A-TD102D SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA D B01A-TN103D THIRD LEVEL FLOOR PLAN - TELECOM - AREA D TN700 TECHNOLOGY COVERSHEET

B01A-TD102 SECOND LEVEL FLOOR PLAN - TELECOM DEMOLITION - OVERALL B01A-TN103 THIRD LEVEL FLOOR PLAN - TELECOM - OVERALL Telecomm - Data Center

B01A-TD101G FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA G B01A-TN102G SECOND LEVEL FLOOR PLAN - TELECOM - AREA G

B01A-TD101F FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA F B01A-TN102F SECOND LEVEL FLOOR PLAN - TELECOM - AREA F B10-TN500 GROUND LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01A-TD101E FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA E B01A-TN102E SECOND LEVEL FLOOR PLAN - TELECOM - AREA E B07-TN502 SECOND LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

B01A-TD101D FIRST LEVEL FLOOR PLAN - TELECOM DEMOLITION - AREA D B01A-TN102D SECOND LEVEL FLOOR PLAN - TELECOM - AREA D B07-TN501 FIRST LEVEL FLOOR PLAN - CABLE DISTANCE - OVERALL

Telecomm Telecomm Telecomm

VOLUME: 2

Sheet Number Sheet Number Sheet Name

Revisions: Date:

Sheets
GI101 - SHEET LIST
GI102 - SHEET LIST