Drawing Vol 1-5-1 Architectural 614-700-AE-20231011.pdf
PDF 44 MB Posted
- Attached to
- Y1DA--614-22-700 EHRM Infrastructure Upgrades Construction Memphis TN Federal contract opportunity
- Solicitation number
- 36C77624B0013_1
About this file
This document appears to be Drawing Vol 1-5-1 Architectural 614-700-AE-20231011.pdf, which is related to the federal contract opportunity for Solicitation Number 36C77624B0013_1, titled "Y1DA--614-22-700 EHRM Infrastructure Upgrades Construction Memphis TN".
The solicitation is for the construction of EHRM (Electronic Health Record Modernization) infrastructure upgrades at the Memphis, TN VA Medical Center, issued by the Department of Veterans Affairs Technology Acquisition Center Austin. The contract will require the provision of architectural, engineering, and construction services to support this infrastructure upgrade project. No other specific details about the required products or services, response dates, award dates, pricing terms, set asides, incumbents, or other key information are provided in this drawing document alone. As this appears to be an architectural drawing rather than the full solicitation document, it does not contain the comprehensive details about the contract opportunity.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
DRAWING NUMBER
SHEET
LOCATION
DETAIL REFERENCE
OBJECT
REFERENCED
OBJECT
REFERENCED
X
XXXX
X
XXXX
SCALE: ??
VIEW TITLE
N
NORTH ARROW
LED WALL MOUNTED LIGHT FIXTURE
LED SURFACE MOUNTED LIGHT FIXTURE
LED SURFACE MOUNTED LIGHT FIXTURE
LED RECESSED LIGHT FIXTURE
HVAC RETURN AIR GRILLE
HVAC SUPPLY DIFFUSER
PENDANT LIGHT
ACCESS PANEL
EXIT LIGHTING
S
D
SPEAKER
SMOKE DETECTOR
LED RECESSED LIGHT FIXTURE
A 9'-0"
CEILING TAG CEILING TYPE
FINISHED CEILING HEIGHT
REFER TO CEILING LEGEND FOR MORE
INFORMATION
EXTENT OF REVISION
REVISION SET
MECH/ELEC ITEMS: REFER TO MEP SHEETS AS APPLICABLE
PROJECT BOUNDARY
BEYOND PROJECT BOUNDARY, NIC
DETAIL/DRAWING SCALE
TITLE OF DETAIL/DRAWING
DETAIL/DRAWING NUMBER
SHEET NUMBER
A/C AIR CONDITION
A/E ARCHITECT/ENGINEER
AB ANCHOR BOLT
ABC AGGREGATE BASE COURSE
AC ASBESTOS CEMENT OR ASPHALTIC CONCRETE
ACS DR ACCESS DOOR
ACS FLR ACCESS FLOOR
ACS PNL ACCESS PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADC AUTOMATIC DOOR CLOSER
ADDL ADDITIONAL
ADDN ADDITION
ADH ADHESIVE
ADJ ADJACENT, ADJOINING, OR ADJUSTABLE
ADMIN ADMINISTRATION
AFC ABOVE FINISHED COUNTER
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISHED SLAB
AGGR AGGREGATE
AHJ AUTHORITY HAVING JURISDICTION
AHR ANCHOR
AHU AIR HANDLING UNIT
AIA AMERICAN INSTITUTE OF ARCHITECTS
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINUM
AMP AMPERE
AMT AMOUNT
ANOD ANODIZE
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
ANT ANTENNA
APPD APPROVED
APPROX APPROXIMATE
AR AS REQUIRED
ARCH ARCHITECT
ASB ASBESTOS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTION
ASKLR AUTOMATIC SPRINKLER
ASPH ASPHALT
ASSN ASSOCIATION
ATCH ATTACHMENT
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AUX AUXILIARY
AV AUDIO VISUAL
AVG AVERAGE
AW ACID WASTE
AWI ARCHITECTURAL WOODWORKING INSTITUTE
AWS AMERICAN WELDING SOCIETY
AWT ACOUSTICAL WALL TREATMENT
B PL BASE PLATE
BALC BALCONY
BAT BATTEN
BB BULLETIN BOARD
BD BOARD
BEV BEVEL
BI FLD DR BIFOLDING DOORS
BITUM BITUMINOUS
BKG BACKING
BLD BUILD
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BM BEAM OR BENCHMARK
BOT BOTTOM
BRCG BRACING
BRDG BRIDGING
BRG BEARING
BRKT BRACKET
BRZ BRONZE
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT-UP ROOFING
C CELSIUS CHANNEL OR CHANNEL CELSIUS
C CONC CAST CONCRETE
C TO C CENTER TO CENTER
CAB CABINET
CB CORNER BEAD
CBB CEMENTITIOUS (BACKER) BOARD
CC CUBIC CENTIMETER
CCTV CLOSED CIRCUIT TELEVISION
CCW COUNTERCLOCKWISE
CEM CEMENT
CEM PLAS CEMENT PLASTER
CER CERAMIC
CF CONTRACTOR FURNISHED
CF/CI CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CF/OI CONTRACTOR FURNISHED/OWNER INSTALLED
CFLG COUNTERFLASHING
CFM CUBIC FEET PER MINUTE
CFMF COLD-FORMED METAL FRAMING
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CGSFU CERAMIC GLAZED STRUCTURAL FACING UNITS
CH BD CHALKBOARD
CHEM CHEMICAL
CHFR CHAMFER
CI CAST IRON
CIP CAST-IN-PLACE
CIR CIRCLE
CIRC CIRCULAR
CJ CONSTRUCTION JOINT OR CONTROL JOINT
CL CENTER LINE
CLDG CLADDING
CLG CEILING
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CNR CORNER
CNTR COUNTER
CO CARBON MONOXIDE, CLEANOUT
CO₂ CARBON DIOXIDE
COL COLUMN
COM COMMON
COMB COMBINATION, COMBINED
COMM COMMUNICATION
COMP COMPONENT
CONC CONCRETE
COND CONDENSER OR CONDITION
CONF CONFERENCE
CONN CONNECT
CONSTR CONSTRUCTION
CONT CONTINUE
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPM CRITICAL PATH METHOD
CPRS COMPRESSIBLE
CPT CARPET
CRS COLD ROLLED STEEL
CS CAST CONCRETE STONE
CSB CONCRETE SPLASH BLOCK
CSG CASING
CSK COUNTER SUNK
CSMT CASEMENT
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTF CERAMIC TILE FLOOR
CTG COATING
CTR CENTER
CTRL CONTROL
CTV CABLE TELEVISION
CU COPPER C
CU FT CUBIC FEET
CU IN CUBIC INCH
CU YD CUBIC YARD
CURT CURTAIN
CYL CYLINDER
CYL L CYLINDER LOCK
N NORTH
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NC NOISE CRITERIA
NCOMBL NONCOMBUSTIBLE
NEG NEGATIVE
NEUT NEUTRAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NR NOISE REDUCTION
NRC NOISE REDUCTION COEFFICIENT
NRP NONREMOVABLE
NS NARROW STILE
NUM NUMERAL
O/O OUT TO OUT
O OXYGEN
OA OUTSIDE AIR OR OVERALL
OC ON CENTER
OCC OCCUPY
OCT OCTAGON
OD OUTSIDE DIAMETER OR OUTSIDE DIMENSION
OF/CI OWNER FURNISHED/CONTRACTOR INSTALLED
OFD OVERFLOW DRAIN
OFF OFFICE
OF/OI OWNER FURNISHED/OWNER INSTALLED
OH OVERHANG
OH DR OVERHEAD (COILING) DOOR
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
OPT OPTIONAL
OR OPERATING ROOM OR OUTSIDE RADIUS
ORD ORDNANCE OR OVERFLOW ROOF DRAIN
ORG ORGANIC
ORIG ORIGINAL
ORN ORNAMENTAL
OUT OUTLET
OZ OUNCE
PAR PARALLEL OR PARAPET
PART PARTIAL
PAT PATTERN
PB PUSHBUTTON
PBD PARTICLEBOARD
PC PIECE, POLYCARBONATE OR PORTLAND CEMENT
PCC PRECAST CONCRETE
PCCP CONCRETE PAVEMENT
PCD PAPER CUP DISPENSER
PCF POUNDS PER CUBIC FOOT
PCP PORTLAND CEMENT PLASTER
PED PEDESTAL
PEN PENETRATE
PEND PENDANT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PGBD PEGBOARD
PHS PHILLIPS HEAD SCREW
PKG PACKAGE
PL PLATE, PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER OR PLASTIC
PLBG PLUMBING
PLYWD PLYWOOD
PMTL PAINTED METAL
PNEU PNEUMATIC
PNL PANEL
POLY POLYETHYLENE (PLASTIC)
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATE
PREFIN PREFINISH
PRELIM PRELIMINARY
PREP PREPARATION
PRESS PRESSURE
PREV PREVIOUS
PRKG PARKING
PRMLD PREMOLDED
PROJ PROJECT
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PNEUMATIC TUBE, OR PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE (PLASTIC)
PVG PAVING
PWR POWER
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QRY QUARRY
QT QUARRY TILE
QTB QUARRY TILE BASE
QTF QUARRY TILE FLOOR
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RADIUS OR RISER
RA RETURN AIR
RAD RADIATOR
RB RESILIENT BASE OR RUBBER BASE
RB HK ROBE HOOK
RBM REINFORCED BRICK MASONRY
RBR RUBBER
RCP REFLECTED CEILING PLAN
RCVR RECEIVER
RD ROAD OR ROOF DRAIN
REC RECESSED
RECD RECEIVED
RECPT RECEPTACLE
RECT RECTANGLE
REF REFERENCE OR REFRIGERATOR
REFR REFRACTORY REFRIGERATION OR REFRIGERATION
REFRACTORY
REG REGISTER
REINF REINFORCE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RESIL RESILIENT
RET RETURN
REV REVISION
RF RADIO FREQUENCY
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RHMS ROUND HEAD MACHINE SCREW
RHR RIGHT HAND REVERSE
RHWS ROUND HEAD WOOD SCREW
RL ROOF LEADER
RLG RAILING
RM ROOM
RND ROUND
RO ROUGH OPENING
ROW RIGHT OF WAY
RPM REVOLUTIONS PER MINUTE
RS ROUGH SAWN
RT RIGHT
RV ROOF VENT
RVS REVERSE
RWD REDWOOD
RWL RAIN WATER LEADER
W/ WITH
W/O WITHOUT
WARR WARRANTY
WBL WOOD BLOCKING
WC WALL COVERING OR WATER CLOSET
WC WL HNG WATER CLOSET, WALL HUNG
WCHR WATER CHILLER
WCL WL MTD WATER COOLER, WALL HUNG
WD WOOD
WDW WINDOW
WF WIDE FLANGE
WFAB WALL FABRIC
WFR WOOD FRAME
WFS WOOD FURRING STRIPS
WH WATER HEATER
WHSE WAREHOUSE
WLD WELDED
WM WIRE MESH
WP WATERPROOFING
WPD WATER PRESSURE DROP
WPM WATERPROOF MEMBRANE
WR WEATHER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
X BRACE CROSS BRACE
XPS EXTRUDED POLYSTYRENE BOARD (INSULATION)
YD YARD
YR YEAR
1. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING REVIT®
SOFTWARE IN A MICROSOFT WINDOWS ENVIRONMENT. A BUILDING INFORMATION
MODEL (BIM) HAS BEEN DEVELOPED FOR DESIGN COMMUNICATION. THE MODEL
DOES NOT CONTAIN COMPLETE INFORMATION FOR USE IN COST ESTIMATING,
SYSTEMS PERFORMANCE, COORDINATION, SCHEDULING, OR FACILITIES
MANAGEMENT.
2. THE CONTRACT DOCUMENT DRAWINGS HAVE BEEN PREPARED USING THE
CONSTRUCTION SPECIFICATIONS INSTITUTE'S UNIFORM DRAWING SYSTEM AND THE
NATIONAL CAD STANDARD AS GUIDES.
3. DISCREPANCIES IN THE CONTRACT DOCUMENTS SHALL BE IMMEDIATELY BROUGHT
TO THE ATTENTION OF THE ARCHITECT AND OWNER’S REPRESENTATIVE/COR.
CONTRACTOR SHALL PROVIDE THE HIGHER GRADE OF QUALITY AND/OR GREATER
QUANTITY OF WORK WHEN BIDDING IF A CLARIFICATION CAN NOT BE OBTAINED BY
THE BID DUE DATE.
4. CONTRACTOR IS RESPONSIBLE FOR COORDINATING SCOPE OF WORK WITH
OWNER’S REPRESENTATIVE/COR AND VARIOUS FACILITY PERSONNEL INVOLVED
WITH UTILITY SHUT DOWN, INFECTION CONTROLS, OCCUPANT/EMPLOYEE SAFETY,
ACCESS CONTROL, ETC.
5. ANY INDICATION OF PROJECT LIMITS OR BOUNDARY OF DEMARCATION ARE SHOWN
FOR THE CONVENIENCE OF THE CONTRACTOR, THE FULL SCOPE OF THE PROJECT
LIMIT OF BOUNDARY REQUIRES COORDINATION WITH THE DESIGN SCOPE OF WORK
AND ACCESS TO EXISTING UTILITIES FOR TIE IN.
6. DRAWINGS ARE PREPARED FROM FIELD VERIFICATION, EXISTING FACILITY DRAWING
BASE FILES, AND USING DIMENSIONS, CONFIGURATIONS AND DETAILS OF SPECIFIC
MANUFACTURERS AS A BASIS OF DESIGN. CONTRACTOR IS RESPONSIBLE FOR
VERIFICATION OF ACTUAL DIMENSIONS, THE COORDINATION OF THE DETAILS WITH
THE PRODUCTS WHICH ARE PROVIDED PER THE SCOPE OF THE SPECIFICATIONS
AND THE SURROUNDING CONSTRUCTION. CONTRACTOR SHALL VERIFY DIMENSIONS,
ROUGH-IN DIMENSIONS, CONNECTIONS, AND OVERALL INSTALLATION
REQUIREMENTS.
7. CONTRACTOR IS RESPONSIBLE FOR THE COMPLETION OF THE ENTIRE SCOPE OF
WORK OUTLINED IN THE CONTRACT DOCUMENTS. CONTRACTOR IS RESPONSIBLE
FOR THE COORDINATION OF ALL SUB-CONTRACTORS AND THE SCOPE OF WORK
THEY PROVIDE. SUB-CONTRACTORS ARE RESPONSIBLE FOR THEIR FULL SCOPE OF
WORK WITHIN THE CONTRACT DOCUMENTS, TRADES ARE NOT SEGMENTED TO ONLY
CERTAIN SHEETS AND SPECIFICATIONS, CROSS COORDINATION IS REQUIRED.
8. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR
UNDERSTANDING INFORMATION OUTLINED IN THE SPECIFICATIONS, KEY NOTES,
GENERAL NOTES, LEGEND, CODES, ETC., PROVIDED IN THE CONTRACT DOCUMENTS.
9. CONTRACTOR AND SUB-CONTRACTORS ARE BOTH RESPONSIBLE FOR PROVIDING
AND MAINTAINING SMOKE/FIRE RATINGS OF NEW CONSTRUCTION AND EXISTING
CONSTRUCTION AS INDICATED ON DRAWINGS. THIS INCLUDES PATCHING
PENETRATIONS IN SHAFTS, WALLS, SLABS AND ROOF. ONLY U.L. APPROVED
METHODS, MATERIALS AND INSTALLATION ARE ACCEPTABLE.
10. MECHANICAL, PLUMBING, FIRE PROTECTION AND ELECTRICAL DRAWINGS SHOW
INFORMATION IN A DIAGRAMMATIC FASHION WITHOUT DIMENSIONING. THE GENERAL
CONTRACTOR IS TO COORDINATE THE LOCATIONS OF ALL MECHANICAL, PLUMBING
AND ELECTRICAL EQUIPMENT WITH RESPECT TO THE ARCHITECTURAL AND
STRUCTURAL DETAILING OF SHAFTS, CHASES, CEILING CONSTRUCTION, ETC.
11. CONTRACTOR IS RESPONSIBLE FOR VERIFYING DIMENSIONS IDENTIFIED AND NOT
IDENTIFIED IN THE CONTRACT DOCUMENTS WITH THE EXISTING AND NEW
CONSTRUCTION ELEMENTS. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION
BETWEEN THE CONTRACT DOCUMENTS, INSTALLED AND UNINSTALLED
CONSTRUCTION BEFORE THE ORDERING OF MATERIALS AND EQUIPMENT. NOTIFY
ARCHITECT AND OWNER’S REPRESENTATIVE/COR OF ANY DISCREPANCIES OR
MISSING DIMENSIONS.
12. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR GENERAL
ORIENTATION AND CONTEXT ONLY.
13. THE TERM "ALIGN" MEANS TO INSTALL DIFFERENT/SIMILAR COMPONENTS OF
CONSTRUCTION TO PROVIDE A FLUSH FINISH SURFACE.
14. ALL DIMENSIONS INDICATED ARE TO FACE OF EXISTING MEMBERS, FACE OF NEW
STRUCTURAL MEMBERS, FACE OF NEW MASONRY, FACE OF NEW STUDS OR COLUMN
GRID LINES UNLESS NOTED OTHERWISE.
15. FLOOR ELEVATION 100'-0" IS EQUAL TO THE FINISH FLOOR SLAB OF THE EXISTING
SLAB FLOOR CONSTRUCTION UNLESS OTHERWISE NOTED.
16. ROUGH OPENINGS SHALL ALLOW FOR SHIM SPACE.
17. CONTRACTOR TO PROVIDE WORK WHERE DETAILS AND NOTES ARE IDENTIFIED AS
“TYPICAL” OR “SIMILAR” EACH INSTANCE THAT IS THE SAME IN NATURE TO THE
DETAIL, AREA, OR ITEM REFERENCED.
18. PROVIDED WORK SHALL BE FURNISHED AND INSTALLED BY THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF DELIVERY, MOUNTING,
INSTALLATION, NECESSARY BLOCKING AND ROUGH-IN.
19. INSTALLED WORK IS THE CONTRACTOR INSTALLING OWNER FURNISHED MATERIALS
AND EQUIPMENT. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF MATERIAL
DELIVERY, MOUNTING, INSTALLATION AND ROUGH IN.
20. FURNISHED WORK IS THE CONTRACTOR FURNISHING THE MATERIALS AND
EQUIPMENT TO THE OWNER. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF
DELIVERY AND ROUGH-IN.
21. ALL PROVIDED WORK SHALL BE WITH NEW MATERIALS UNLESS SPECIFICALLY
CALLED OUT AS SALVAGED OR RELOCATED WITHIN THE CONTRACT DOCUMENTS.
22. ALL PERSONS DIRECTLY OR INDIRECTLY ASSOCIATED WITH THE PROJECT SHALL BE
FAMILIAR WITH THE RULES AND REGULATIONS OF THE OCCUPATIONAL SAFETY AND
HEALTH ACT, AND IMPLEMENT THOSE RULES AS THEY APPLY TO THIS PROJECT.
23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING ALL
UTILITY LINES. LOCATIONS SHOWN ARE APPROXIMATE. REPAIR ALL DAMAGE TO
UTILITY LINES CAUSED BY CONSTRUCTION OPERATIONS AT NO COST TO THE
OWNER.
24. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL TEMPORARY BRACING AND SHORING
REQUIRED DURING CONSTRUCTION.
25. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ADJACENT
CONSTRUCTION, FINISHES, EQUIPMENT, AND TRAVEL ROUTE TO AND FROM THE
CONSTRUCTION SITE. ANY DAMAGE OR UNACCEPTABLE WEAR BY THE
CONSTRUCTION TEAM SHALL BE REPAIRED/REPLACED BY THE CONTRACTOR AT NO
COST TO THE OWNER.
26. IN THE CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT
DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER
QUALITY OF WORK, AS DETERMINED BY THE COR SHALL BE PROVIDED.
27. CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND COORDINATING HARDWARE,
ACCESS CONTROL AND AUTOMATIC OPERATORS ARE PROVIDED WITH COMPLETE
AND COMPATIBLE SYSTEMS REQUIRED FOR THEIR OPERATION. REFER TO DOOR
HARDWARE SCHEDULE, HARDWARE SPECIFICATIONS, AUTOMATIC OPERATOR
SPECIFICATIONS, ACCESS CONTROL SPECIFICATIONS AND ELECTRICAL DRAWINGS.
28. AREAS AFFECTED BY DEMOLITION OR NEW WORK AS PART OF THIS PROJECT TO BE
REPAIRED TO AN "AS-NEW" CONDITION.
29. COORDINATE WITH OTHER DISCIPLINES. ARCHITECTURAL REPAIR TO EXISTING
INSTALLED SYSTEMS AND ASSEMBLIES TO ACCOMMODATE DEMOLITION AND
CONSTRUCTION ACTIVITIES WITH REGARD TO THIS PROJECT. REF. CIVIL,
HAZAEDOUS MATERIALS, MECHANICAL, ELECTRICAL, PLUMBING,
TELECOMMUNICATION, FIRE PROTECTION, AND STRUCTURAL.
D DEPTH OR PENNY (NAIL)
D LABEL CLASS D DOOR
DAT DATUM
DB DECIBEL
DBL DOUBLE
DBL GLZ DOUBLE GLAZE
DC DIRECT CURRENT
DEG DEGREE
DEL DELETE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL DIAGRAM OR DIAGRAM DIAGONAL
DIFF DIFFERENCE OR DIFFUSER
DIM DIMENSION
DIR DIRECTION
DISP DISPENSER
DIST DISTANCE
DIV DIVIDE OR DIVISION
DL DEAD LOAD
DOC DOCUMENT
DOZ DOZEN
DN DOWN
DR DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DS DOWNSPOUT
DSGN DESIGN
DW DISHWASHER
DWG DRAWING
DWTR DUMBWAITER
E EAST
EA EACH
EFF EFFICIENCY
EFS EXTERIOR FINISH SYSTEM
EIFS EXTERIOR INSULATION AND FINISH SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELAST ELASTOMERIC
ELEC ELECTRIC
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
ENVIR ENVIRONMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EPO EMERGENCY POWER OFF
EPS EXPANDED POLYSTYRENE BOARD (INSULATION)
EQ EQUAL
EQL SP EQUALLY SPACED
EQUIP EQUIPMENT
EQUIV EQUIVALENT
ERD EXISTING ROOF DRAIN
ESC ESCAPE OR ESCUTCHEON
ESCAL ESCALATOR
EST ESTIMATE
ETC AND SO FORTH OR ET CETERA
ETS EXPOSE TO STRUCTURE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EWS EYE WASH STATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION OR EXPOSED
EXT EXTERIOR, EXTERNAL, OR EXTINGUISHER
F FAHRENHEIT OR FEMALE
FA FIRE ALARM
FAB FABRIC
FAC FACTOR
FACIL FACILITY
FAS FASCIA
FCO FLOOR CLEANOUT
FCTY FACTORY
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FF&E FURNITURE, FIXTURE, AND EQUIPMENT
FH FLAT HEAD OR FLAT HEAD SCREWS
FHC FIRE HOSE CABINET
FHMS FLAT HEAD MACHINE SCREW
FHP FULL HEIGHT PARTITION
FHWS FLAT HEAD WOOD SCREW
FIG FIGURE
FIL FILLET
FIN FINISH
FIP FILLER PANEL
FIXT FIXTURE
FL FLOORLINE
FLASH FLASHING
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLR FLOOR
FLUOR FLUORESCENT
FM FACTORY MUTUAL
FM-G FACTORY MUTUAL GLOBAL
FO FINISHED OPENING
FOC FACE OF CONCRETE OR FACE OF CURB
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF SLAB OR FACE OF STUD
FOUNT FOUNTAIN
FOW FACE OF WALL
FP FIRE PROTECTION OR FIREPROOF
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FIRE RATING, FIRE RESISTANT, OR FRAME
FR SNK FLUSHING RIM SINK
FREQ FREQUENCY
FRMG FRAMING
FRP FIBER REINFORCED POLYESTER OR FIBERGLASS
REINFORCED PLASTIC
FRZ FREEZER
FS FEDERAL SPECIFICATION
FSTNR FASTENER
FT FEET OR FOOT
FTG FOOTING
FURG FURRING
FURN FURNISH OR FURNITURE
FUT FUTURE
FWC FABRIC WALLCOVERING
GA GAGE OR GYPSUM ASSOCIATION
GAL GALLON
GALV GALVANIC OR GALVANIZED
GALV STL GALVANIZED STEEL
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GUARD
GDR GUARD RAIL
GEN GENERAL OR GENERATOR
GFRC GLASS-FIBER-REINFORCED CONCRETE
GFRG GLASS-FIBER-REINFORCED GYPSUM
GFRP GLASS-FIBER-REINFORCED PLASTIC
GI GALVANIZED IRON
GL GLASS
GLU LAM GLUED LAMINATED WOOD
GR FL GROUND FLOOR
GRAN GRANITE
GRTG GRATING
GSB GYPSUM SHEATHING BOARD
GSM GALVANIZED SHEET METAL
GSU GLAZED STRUCTURAL UNIT
GT GROUT
GUAR GUARANTEE
GUT GUTTER
GYP GYPSUM
H HIGH
H PLAM HIGH PRESSURE PLASTIC LAMINATE
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HCWD HOLLOW CORE WOOD DOOR
HDBD HARDBOARD
HDNR HARDENER
HDO HIGH DENSITY OVERLAY
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEX HEXAGON
HF HIGH FREQUENCY
HGR HANGER
HM HECTOMETER OR HOLLOW METAL
HMD HOLLOW METAL DOOR
HMDF HOLLOW METAL DOOR AND FRAME
HMF HOLLOW METAL FRAME
HNDRL HANDRAIL
HO HOLD OPEN
HORIZ HORIZONTAL
HOSP HOSPITAL
HP HIGH PRESSURE OR HORSEPOWER
HS HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HSKPG HOUSEKEEPING
HST HOIST
HT HEIGHT
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HVY HEAVY
HW HOT WATER
HYD HYDRANT
HYDR HYDRAULIC
I INTERSTATE (HIGHWAY) OR MOMENT OF INERTIA
IAQ INDOOR AIR QUALITY
IBC INTERNATIONAL BUILDING CODE
ID IDENTIFICATION, INSIDE DIAMETER
ID NO IDENTIFICATION NUMBER
ILLUM ILLUMINATION
INCL INCLUDED
IND INDEPENDENT OR INDUSTRIAL
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INTERCOM INTERCOMMUNICATION
INTL INTERNATIONAL
IRMA INVERTED ROOF MEMBRANE ASSEMBLY
IWH INSTANTANEOUS WATER HEATER
JAN JANITOR
J-BOX JUNCTION BOX
JT JOINT
KD KILN DRIED OR KNOCKED DOWN
KIT KITCHEN
KO KNOCKOUT
KPL KICKPLATE
L ANGLE
LAB LABORATORY
LAD LADDER
LAM LAMINATE
LAM GL LAMINATED GLASS
LAU LAUNDRY
LAV LAVATORY
LBR LUMBER
LBS POUND
LD BRG LOAD-BEARING
LDR LEADER
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LH LEFT HAND
LHR LEFT HAND REVERSE OR LEFT HAND REVERSE
LATENT HEAT RATIO
LIB LIBRARY
LIN LINEAR
LINO LINOLEUM
LIQ LIQUID
LKR LOCKER
LKR RM LOCKER ROOM
LKWASH LOCKWASHER
LL LEAD LINED
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LMST LIMESTONE
LNDSCP LANDSCAPE
LR LIVING ROOM
LRG LARGE
LRV LOUVERED ROOF VENT
LS LUMP SUM
LT LIGHT
LT GA LIGHT GAGE
LT WT LIGHTWEIGHT
LTG LIGHTING
LTNG LIGHTNING
LVD LOUVERED
LVR LOUVER
LWC LIGHTWEIGHT CONCRETE
LWIC LIGHTWEIGHT INSULATING CONCRETE
LYR LAYER
MACH MACHINE
MACH RM MACHINE ROOM
MAINT MAINTENANCE
MAN MANUAL
MATL MATERIAL
MATV MASTER ANTENNA TELEVISION SYSTEM
MAX MAXIMUM
MB MACHINE BOLT
MCB METAL CORNER BEAD
MD DECK
ME MECHANICAL ENGINEER
MEAS MEASURE
MECH MECHANICAL
MECH RM MECHANICAL ROOM
MED MEDICAL MEDIUM OR MEDIUM MEDICAL
MEK METHYL ETHYL KETONE
MEL MELAMINE
MEMB MEMBRANE
MEMO MEMORANDUM
MEZZ MEZZANINE
MF MILL FINISH
MFD MANUFACTURED
MFG MANUFACTURING
MFR MANUFACTURER
MFR REC MANUFACTURER'S RECOMMENDATION
MGT MANAGEMENT
MH MANHOLE
MIC MICROPHONE
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM MINUTE OR MINUTE MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MIT MITER
MKR MARKER
ML METAL LATH
MLDG MOLDING (MOULDING)
MLWK MILLWORK
mm MILLIMETER
MO MASONRY OPENING OR MOTOR OPERATED
MOD MODEL, MODIFY OR MODULE
MOD BIT MODIFIED BITUMEN
MON MONITOR
MOPR MOP RACK
MR MOISTURE RESISTANT
MS MACHINE SCREW OR MOP SINK
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MW MICROWAVE
MWP MEMBRANE WATERPROOFING
X
X
XXXX
SHEET LOCATION
VIEW NUMBER
X X
X
SHEET LOCATION
VIEW NUMBER
XXXX
BUILDING SECTION REFERENCE
DRAWING NUMBER
SHEET LOCATION
BUILDING X
XXXX
X
XXXX
ELEVATION REFERENCES
NEW WALL
WALL TO BE
REMOVED
S3A.G
INDICATES STRUCTURAL MATERIAL
INDICATES NOMINAL SIZE
INDICATES STRUCTURE AND FINISH HEIGHTS
INDICATES QUALIFER
EXISTING WALL TO
REMAIN
TEMPORARY IC
BARRIER WALL
CONSTRUCTION
ROOM
ROOM TAG
NEW DOOR
EXISTING DOOR
DEMOLISHED DOOR
SA SUPPLY AIR
SALV SALVAGE
SAMP SAMPLE
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SATC SUSPENDED ACOUSTICAL TILE CEILING
SB SPLASH BLOCK
SBS STYRENE BUTADIEN STYRENE
SBSTR SUBSTRATE
SC SHADING COEFFICIENT OR SOLID CORE
SCH SCHOOL
SCHED SCHEDULE
SCHEM SCHEMATIC
SCP SCUPPER
SCRN SCREEN
SCT STRUCTURAL CLAY TILE
SCWD SOLID CORE WOOD DOOR
SD SHOP DRAWINGS, SMOKE DETECTOR OR SOAP
DISPENSER
SDG SIDING
SECT SECTION
SEG SEGMENT
SEL SELECT
SEP SEPARATE
SF SQUARE FOOT (FEET)
SFTWD SOFTWOOD
SGD SLIDING GLASS DOOR
SGL SINGLE
SHR SHOWER
SHR HD SHOWER HEAD
SHRD SHOWER DRAIN
SHT SHEET
SHT MTL FLASH SHEET METAL (FLASHING)
SHTHG SHEATHING
SHV SHELVING
SIM SIMILAR
SJ SCORED JOINT
SK SKETCH
SKLT SKYLIGHT
SLD WDW HORIZONTAL SLIDING WINDOW
SLDG SLIDING
SLNT SEALANT
SM SHEET METAL
SMK SMOKE
SND SANITARY NAPKIN DISPENSER
SND INS SOUND INSULATION
S SOUTH
SNDU SANITARY NAPKIN DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SPKR SPEAKER
SPLY SUPPLY
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SANITARY SEWER OR SERVICE SINK
SST STAINLESS STEEL
ST STAIRS OR STREET
STC SOUND TRANSMISSION CLASS
STD STANDARD
STIF STIFFENER
STL STEEL
STL LNTL STEEL LINTEL
STL RF DK STEEL ROOF DECK
STL TB STEEL TUBE
STNLS STAINLESS
STOR STORAGE
STR STRINGERS
STRUCT STRUCTURAL
SUB SUBSTITUTE
SURF SURFACE
SUSP SUSPEND
SV SHEET VINYL
SW SWITCH
SWDR SWING DOOR
SYM SYMBOL
SYNTH SYNTHETIC
SYS SYSTEM
T TREAD
TA TOILET ACCESSORY
T&G TONGUE AND GROOVE
T&M TIME AND MATERIALS
TB THROUGH BOLT OR TOWEL BAR
TCA TILE COUNCIL OF AMERICA
TCP TELEPHONE CONTROL PANEL OR TEMPERATURE
CONTROL PANEL OR TRAFFIC CONTROL PLAN
TD TOWEL DISPENSER
TECH TECHNICAL
TEL TELEPHONE
TEMP TEMPERATURE OR TEMPORARY
TER TERRAZZO
THD THREAD
THERM THERMAL
THK THICKNESS
THRES THRESHOLD
THRU THROUGH
THRUOUT THROUGHOUT
TK BD TACKBOARD
TMPD TEMPERED
TN TRUE NORTH
TO TOP OF ___
TO FDN TOP OF FOUNDATION
TOB TOP OF BEAM
TOM TOP OF MASONRY
TOP TOP OF PARAPET
TOS TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TR TOWEL RACK
TRANS TRANSOM
TRANS WD FIN TRANSPARENT WOOD FINISH
TRTD TREATED
TS TENSILE STRENGTH OR TUBE STEEL
TSTAT THERMOSTAT
TV TELEVISION
TYP TYPICAL
U HEAT TRANSFER COEFFICIENT
UC UNDERCUT
UCD UNDERCUT DOOR
UGND UNDERGROUND
UL UNDERWRITERS LABORATORIES
ULT ULTIMATE
UNFIN UNFINISH
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
UR URINAL
UTIL UTILITY
UV ULTRAVIOLET
V VOLT
VAC VACUUM
VAR VARIES
VCT VINYL COMPOSITION TILE OR VITRIFIED CLAY TILE
VEH VEHICLE
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFAT VINYL FACED ACOUSTICAL TILE
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VNR VENEER
VOC VOLATILE ORGANIC COMPOUND
VOL VOLUME
VOLT VOLTAGE
VP VENEER PLASTER
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
VWF VINYL WALL FABRIC
REVISION TO PLAN CALLOUT
WALLS
DOOR TAG
KEY NOTE TAGS
WALL TAG : REFER TO WALL LEGEND FOR MORE INFORMATION
DOORS
PT-1
A
T
101 EQUIPMENT/FURNITURE TAG
FINISH INDICATION
FRAME / WINDOW
GLAZING1
1 PLAN NOTE
1 DEMOLITION NOTE
CEILING NOTE
KEY NOTE SYMBOLS
CONSTRUCTION GENERAL NOTESARCHITECTURAL SYMBOLS
REFLECTED CEILING PLAN SYMBOLS
ARCHITECTURAL ABBREVIATIONS
TEMPORARY IC
BARRIER DOOR
CONSTRUCTION
TEMPORARY IC BARRIER WALL
CONSTRUCTION (DUST WALL)
5/8" TYPE X GYP BD
3 5/8" STEEL STUDS @ 16"
O.C.
BEAD OF CONT. SEALANT
6-MIL FIRE RETARDENT POLY
INTERIOR SIDE
CEILING
2" DEEP LEG 3 5/8" STEEL SLIP TRACK
3 5/8" STEEL STUD TRACK
6" M
IN
CONTINUOUSLY ADHERE 6-MIL. FIRE
RETARDANT POLY TO DECK WITH TAPE
CONTINUOUSLY ADHERE FIRE RETARDENT
POLY TO FLOOR WITH TAPE
EXISTING DECK
CONSTRUCTION
SIDE
OCCUPIED
SIDE
PUBLIC
SIDE
1 HOUR FIRE RATED METAL DOOR ASSEMBLY
AND FRAME WITH SEALS, CARD READER,
HARDWARE AND CLOSER
TRIATEK MONITOR
HAND SANITIZER
SEAL ALL EDGES WITH TAPE
SEAL ALL EDGES WITH TAPE
REFER TO TEMPORARY BARRIER TYPE
FOR REQUIRED CONDITION TO
STRUCTURE ABOVE
VA / OSHA TEMPORARY SIGNAGE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project :
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is E
H R
M I n fr a s tr u c tu re /6
-7
.A
R C
H .2
.r v t
/1 /2
:4
:5
A M
AE001
ARCHITECTURAL SYMBOLS AND
ABBREVIATIONS
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
N/A
10/11/2023 LNS KJW
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1 1/2" = 1'-0"AE001
2 TEMPORARY IC BARRIER WALL CONSTRUCTION
SCALE: 1/4" = 1'-0"AE001
1 TEMPORSARY WALL CONSTRUCTION ELEVATION
Revisions: Date:
TEMPORARY WALL CONSTRUCTION ELEVATION
AE15B
AWG 9 AEG 2
CWG 1
AE15B
AWG 9 AEG 2
CWG 1
CWG40 CWG41 CWG 42
GB1105A
GB1105B
GB110S
AWG 19
AWG 21
AWG 27
AWG23
AWG 26A
AWG 26
AWG24B
AWG24
AWG16
AWG22
AWG24A
AWG20
AWG20A
AWG20B
AWG16
AWG18
AWG18A AWG18B
AEG18A
NO-8
AEG18A AEG13
AEG10
AEG10A AEG 11
AEG15A
AEG11A
AEG15
AEG11B
AEG12 AEG 14
AWG42
AEG18
AEG 20E
AEG-C1
AEG17A
AEG15D
AEG17B
AEG17
AEG 20
AEG 22 AEG24
AEG26
AEG28
AEG19A
AEG 17C
AWG59
AEG19
AEG 30
AEG21
AEG 32
AEG19C
AEG23
AEG 70
AEG33
AEG38
AEG35
AEG 36
AEG69
AEG37
AEG39
AEG41
AEG68
AWG79
AWG80
AEG 30A
AEG44
AEG47 AEG46
AEG 60
AEG 62
AEG63
AEG43
AEG73A
AEG50
AEG73
AEG52
AEG54AEG4
AEG50
AEG51
AEG7
AEG48
AEG57
AEG45
AEF40
AWG10
AEG 9C
AEG9
AEG9A
AEG9B
AEG9C
AWG8
AWG3
AWG10A
GB110E
AWG15
AW-C11
AWG 13 AWG11A
AWG 11
AEG1
AEG1A
AEG3
AEG4
AEG4A
AEG 5
AEG 52 AEG76
60-C4
60-C2
50-C1
6003A
BEG 24 BEC3
BG25
BEG 26C BEG26B
CEG 58C
CEG58D
CEG 58E
CEG 58BCEG 58A
CEG 57
CEG 56C
CEG 20A
CEG 21CEG20CEG 19A
CEG 16D
CEG 16C
CEG 19B
CEG 19
CEG 18
CEG 16B
CEG 16CEG 16A
CE C1
CEG 5C
CEG 5A
CEG 5B
CEG 7
CEG6CEG5
CEG 4
CEG 1
CEG 3
CEG 52
CEG 51
CEG 53
CEG 54 A
CEG 54 B
CEG 54
CEG 54D
CEG 54 C
CEG 55B
CEG 55A CEG55D
CEG 55C
CEG 55E
CEG 56B
CEG 56 A CEG 56D
CEG 56 E
CEG 46
CEG 47
CEG 45CEG 48C
CEG 44CEG 43CEG 42CEG 41
CEG48
CEG 38
CEG 50 CEG 49
CEG 40
CEG39CEG 34
CEG 35
CEG 36
CEG 37
CEG 31
CEG 32
CEG 33
BEG 13 BEG 12
BEG 14
BEG 15 BEG 16
BEG11
BEG 17
BEG 10
BEG 18 BEG 19 BEG 20 BEG 21
BEG22BEG 9
CWG 16D
CWG 20
CWG 20 D
CWG 20A
CWG 20B
CWG 16
CWG 16A CWG 16C
BWG 11C
BWG 11D
BWG 11A
BWG 11
BWG 12
BWG 16
CWG 26
CWG 27CWG 47A
S2 S3
BECE -C2CE C3
CE C2
CE C3
CEG 48D
CEG 48E
CWG 32 E CWG 32 F
CWG 32G
GB110JJJJJJ
CWG 32G
GB110AAAAAAA
CWG 39A
CWG 39B
GB110IIIIIII
CWG 39
AEG55
BWG 33
BWG 33B
BWC 30
BWG30
BWG 29
BWG 31
BWG33A BWG33C
BWG 32
BWG 28 BWG 27
BWG 26
BWG 25
BWG 24A
BWG 24B
CWG2
CWG4
CWG6A CWG6B
BWG 1
BWG 2A
BWC 29
BWC 28
BWG24
CWG 47
CWG 47A
CWG 46CWG 51BCWG 51 A
CWG 51
CWG 52
CWG 53
CWG 31 A
CWG 30
CWG 32 D
GB110DDDDDD
GB110CCCCCC
GB110BBBBBB
GB110FFFFFF GB110EEEEEEGB110ZZZZZ
GB110YYYYY
GB110HHHHHHGB110GGGGGG
CWG 35
CWG 33
CWG 32 A
CWG 32 E
CWG 31D
GB110QQQQQ
CWG 31
CWG 30B
CEG 28 CEG 27
CEG 29A
CEG 29
CEG 29B
CEG 26A
CEG 26B
CEG 26B
CEG 26C
CEG29C CEG 24 E
CEG 24
CEG 24D
CEG 24C
CEG 24B
CEG 23A
CEG 23 B
CEG 23 C
CEG 23D
CEG 23E
CEG 22G
CEG 23
CEG 22A
CEG22B
CEG 22C
CEG 22D
CEG 22E
CEG 22F
6002A
60026002B
6018E6018F
NURSE OFFICE 6030
6018D
6018C 6018B6018A
6005A
CEG 22
60-C4
6027 A
6008A
BEG 23
BEG 23A
BEG8BEG7
BEG6BEG 5
BEG 4
BEG 3
BECEG1
BW C20
BWG 10
CCWG 20A
BWG 4B
BWG 4
BWG 4A
BWG 7
BWG 13
BWG14
BE C1
CB19
GB110ZZZ
BG26
CEG 48B
CEG48A
CEG 24A
CWC 44
CWC 45
BWG 8
BWG 2
BWG 9
GB110VVVVVV
GB110UUUUUU
CWG 48
CWG 32 H
CWG 7A
BWG 1
CWG 7B
CWG 7
CWG 12
CWG 9
CWG 15D
CWG 15-C
CWG 15B
CWG 15A
CWG 14
CWG 20
CWG 20C
CWG 20D
CWG 16B
BW-C25
CWG40 CWG41 CWG 42
GB1105A
GB1105B
GB110S
AWG 19
AWG 21
AWG 27
AWG23
AWG 26A
AWG 26
AWG24B
AWG24
AWG16
AWG22
AWG24A
AWG20
AWG20A
AWG20B
AWG16
AWG18
AWG18A AWG18B
AEG18A
NO-8
AEG18A AEG13
AEG10
AEG10A AEG 11
AEG15A
AEG15B
AEG11A
AEG15
AEG11B
AEG12 AEG 14
AWG42
AEG18
AEG 20E
AEG-C1
AEG17A
AEG15D
AEG17B
AEG17
AEG 20
AEG 22 AEG24
AEG26
AEG28
AEG19A
AEG 17C
AWG59
AEG19
AEG 30
AEG21
AEG 32
AEG19C
AEG23
AEG 70
AEG33
AEG38
AEG35
AEG 36
AEG69
AEG37
AEG39
AEG41
AEG68
AWG79
AWG80
AEG 30A
AEG44
AEG47 AEG46
AEG 60
AEG 62
AEG63
AEG43
AEG73A
AEG50
AEG73
AEG52
AEG54AEG4
AEG50
AEG51
AEG7
AEG48
AEG57
AEG45
AEF40
AWG10
AEG 9C
AEG9
AEG9A
AEG9B
AEG9C
AWG8
AWG3
AWG10A
AWG15
AW-C11
AWG 13 AWG11A
AWG 9
AWG 11
AEG1
AEG1A AEG1B AEG2
AEG3
AEG4
AEG4A
AEG 5
AEG 52 AEG76
60-C4
60-C2
50-C1
6003A
BEG 24 BEC3
BG25
BEG 26C BEG26B
CEG 58C
CEG58D
CEG 58E
CEG 58BCEG 58A
CEG 57
CEG 56C
CEG 20A
CEG 21CEG20CEG 19A
CEG 16D
CEG 16C
CEG 19B
CEG 19
CEG 18
CEG 16B
CEG 16CEG 16A
CE C1
CEG 5C
CEG 5A
CEG 5B
CEG 7
CEG6CEG5
CEG 4
CEG 1
CEG 3
CEG 52
CEG 51
CEG 53
CEG 54 A
CEG 54 B
CEG 54
CEG 54D
CEG 54 C
CEG 55B
CEG 55A CEG55D
CEG 55C
CEG 55E
CEG 56B
CEG 56 A CEG 56D
CEG 56 E
CEG 46
CEG 47
CEG 45CEG 48C
CEG 44CEG 43CEG 42CEG 41
CEG48
CEG 38
CEG 50 CEG 49
CEG 40
CEG39CEG 34
CEG 35
CEG 36
CEG 37
CEG 31
CEG 32
CEG 33
BEG 13 BEG 12
BEG 14
BEG 15 BEG 16
BEG11
BEG 17
BEG 10
BEG 18 BEG 19 BEG 20 BEG 21
BEG22BEG 9
CWG 16D
CWG 20
CWG 20 D
CWG 20A
CWG 20B
CWG 16
CWG 16A CWG 16C
BWG 11C
BWG 11D
BWG 11A
BWG 11
BWG 12
BWG 16
CWG 26
CWG 27CWG 47A
S2 S3
BECE -C2CE C3
CE C2
CE C3
CEG 48D
CEG 48E
CWG 32 E CWG 32 F
CWG 32G
GB110JJJJJJ
CWG 32G
GB110AAAAAAA
CWG 39A
CWG 39B
GB110IIIIIII
CWG 39
AEG55
BWG 33
BWG 33B
BWC 30
BWG30
BWG 29
BWG 31
BWG33A BWG33C
BWG 32
BWG 28 BWG 27
BWG 26
BWG 25
BWG 24A
BWG 24B
CWG2
CWG4
CWG6A CWG6B
BWG 1
BWG 2A
BWC 29
BWC 28
BWG24
CWG 47
CWG 47A
CWG 46CWG 51BCWG 51 A
CWG 51
CWG 52
CWG 53
CWG 31 A
CWG 30
CWG 32 D
GB110DDDDDD
GB110CCCCCC
GB110BBBBBB
GB110FFFFFF GB110EEEEEEGB110ZZZZZ
GB110YYYYY
GB110HHHHHHGB110GGGGGG
CWG 35
CWG 33
CWG 32 A
CWG 32 E
CWG 31D
GB110QQQQQ
CWG 31
CWG 30B
CEG 28 CEG 27
CEG 29A
CEG 29
CEG 29B
CEG 26A
CEG 26B
CEG 26B
CEG 26C
CEG29C CEG 24 E
CEG 24
CEG 24D
CEG 24C
CEG 24B
CEG 23A
CEG 23 B
CEG 23 C
CEG 23D
CEG 23E
CEG 22G
CEG 23
CEG 22A
CEG22B
CEG 22C
CEG 22D
CEG 22E
CEG 22F
6002A 60026002B
6018E6018F
NURSE OFFICE 6030
6018D
6018C 6018B6018A
6005A
CEG 22
60-C4
6027 A
6008A
BEG 23
BEG 23A
BEG8BEG7
BEG6BEG 5
BEG 4
BEG 3
BECEG1
BW C20
BWG 10
CCWG 20A
BWG 4B
BWG 4
BWG 4A
BWG 7
BWG 13
BWG14
BE C1
CB19
GB110ZZZ
BG26
CEG 48B
CEG48A
CEG 24A
CWC 44
CWC 45
BWG 8
BWG 2
BWG 9
GB110VVVVVV
GB110UUUUUU
CWG 48
CWG 32 H
CWG 7A
BWG 1
CWG 7B
CWG 7
CWG 12
CWG 9
CWG 15D
CWG 15-C
CWG 15B
CWG 15A
CWG 14
CWG 20
CWG 20C
CWG 20D
CWG 16B
CWG40 CWG41 CWG 42
GB1105A
GB1105B
GB110S
AWG 19
AWG 21
AWG 27
AWG23
AWG 26A
AWG 26
AWG24B
AWG24
AWG16
AWG22
AWG24A
AWG20
AWG20A
AWG20B
AWG16
AWG18
AWG18A AWG18B
AEG18A
NO-8
AEG18A AEG13
AEG10
AEG10A AEG 11
AEG15A
AEG11A
AEG15
AEG11B
AEG12 AEG 14
AWG42
AEG18
AEG 20E
AEG-C1
AEG17A
AEG15D
AEG17B
AEG17
AEG 20
AEG 22 AEG24
AEG26
AEG28
AEG19A
AEG 17C
AWG59
AEG19
AEG 30
AEG21
AEG 32
AEG19C
AEG23
AEG 70
AEG33
AEG38
AEG35
AEG 36
AEG69
AEG37
AEG39
AEG41
AEG68
AWG79
AWG80
AEG 30A
AEG44
AEG47 AEG46
AEG 60
AEG 62
AEG63
AEG43
AEG73A
AEG50
AEG73
AEG52
AEG54AEG4
AEG50
AEG51
AEG7
AEG48
AEG57
AEG45
AEF40
AWG10
AEG 9C
AEG9
AEG9A
AEG9B
AEG9C
AWG8
AWG3
AWG10A
AWG15
AW-C11
AWG 13 AWG11A
AWG 11
AEG1
AEG1A
AEG3
AEG4
AEG4A
AEG 5
AEG 52 AEG76
60-C4
60-C2
50-C1
6003A
BEG 24 BEC3
BG25
BEG 26C BEG26B
CEG 58C
CEG58D
CEG 58E
CEG 58BCEG 58A
CEG 57
CEG 56C
CEG 20A
CEG 21CEG20CEG 19A
CEG 16D
CEG 16C
CEG 19B
CEG 19
CEG 18
CEG 16B
CEG 16CEG 16A
CE C1
CEG 5C
CEG 5A
CEG 5B
CEG 7
CEG6CEG5
CEG 4
CEG 1
CEG 3
CEG 52
CEG 51
CEG 53
CEG 54 A
CEG 54 B
CEG 54
CEG 54D
CEG 54 C
CEG 55B
CEG 55A CEG55D
CEG 55C
CEG 55E
CEG 56B
CEG 56 A CEG 56D
CEG 56 E
CEG 46
CEG 47
CEG 45CEG 48C
CEG 44CEG 43CEG 42CEG 41
CEG48
CEG 38
CEG 50 CEG 49
CEG 40
CEG39CEG 34
CEG 35
CEG 36
CEG 37
CEG 31
CEG 32
CEG 33
BEG 13 BEG 12
BEG 14
BEG 15 BEG 16
BEG11
BEG 17
BEG 10
BEG 18 BEG 19 BEG 20 BEG 21
BEG22BEG 9
CWG 16D
CWG 20
CWG 20 D
CWG 20A
CWG 20B
CWG 16
CWG 16A CWG 16C
BWG 11C
BWG 11D
BWG 11A
BWG 11
BWG 12
BWG 16
CWG 26
CWG 27CWG 47A
S2 S3
BECE -C2CE C3
CE C2
CE C3
CEG 48D
CEG 48E
CWG 32 E CWG 32 F
CWG 32G
GB110JJJJJJ
CWG 32G
GB110AAAAAAA
CWG 39A
CWG 39B
GB110IIIIIII
CWG 39
AEG55
BWG 33
BWG 33B
BWC 30
BWG30
BWG 29
BWG 31
BWG33A BWG33C
BWG 32
BWG 28 BWG 27
BWG 26
BWG 25
BWG 24A
BWG 24B
CWG2
CWG4
CWG6A CWG6B
BWG 1
BWG 2A
BWC 29
BWC 28
BWG24
CWG 47
CWG 47A
CWG 46CWG 51BCWG 51 A
CWG 51
CWG 52
CWG 53
CWG 31 A
CWG 30
CWG 32 D
GB110DDDDDD
GB110CCCCCC
GB110BBBBBB
GB110FFFFFF GB110EEEEEEGB110ZZZZZ
GB110YYYYY
GB110HHHHHHGB110GGGGGG
CWG 35
CWG 33
CWG 32 A
CWG 32 E
CWG 31D
GB110QQQQQ
CWG 31
CWG 30B
CEG 28 CEG 27
CEG 29A
CEG 29
CEG 29B
CEG 26A
CEG 26B
CEG 26B
CEG 26C
CEG29C CEG 24 E
CEG 24
CEG 24D
CEG 24C
CEG 24B
CEG 23A
CEG 23 B
CEG 23 C
CEG 23D
CEG 23E
CEG 22G
CEG 23
CEG 22A
CEG22B
CEG 22C
CEG 22D
CEG 22E
CEG 22F
6002A
60026002B
6018E6018F
NURSE OFFICE 6030
6018D
6018C 6018B6018A
6005A
CEG 22
60-C4
6027 A
6008A
BEG 23
BEG 23A
BEG8BEG7
BEG6BEG 5
BEG 4
BEG 3
BECEG1
BW C20
BWG 10
CCWG 20A
BWG 4B
BWG 4
BWG 4A
BWG 7
BWG 13
BWG14
BE C1
CB19
GB110ZZZ
BG26
CEG 48B
CEG48A
CEG 24A
CWC 44
CWC 45
BWG 8
BWG 2
BWG 9
GB110VVVVVV
GB110UUUUUU
CWG 48
CWG 32 H
CWG 7A
BWG 1
CWG 7B
CWG 7
CWG 12
CWG 9
CWG 15D
CWG 15-C
CWG 15B
CWG 15A
CWG 14
CWG 20
CWG 20C
CWG 20D
CWG 16B
CWG40 CWG41 CWG 42
GB1105A
GB1105B
GB110S
AWG 19
AWG 21
AWG 27
AWG23
AWG 26A
AWG 26
AWG24B
AWG24
AWG16
AWG22
AWG24A
AWG20
AWG20A
AWG20B
AWG16
AWG18
AWG18A AWG18B
AEG18A
NO-8
AEG18A AEG13
AEG10
AEG10A AEG 11
AEG15A
AEG15B
AEG11A
AEG15
AEG11B
AEG12 AEG 14
AWG42
AEG18
AEG 20E
AEG-C1
AEG17A
AEG15D
AEG17B
AEG17
AEG 20
AEG 22 AEG24
AEG26
AEG28
AEG19A
AEG 17C
AWG59
AEG19
AEG 30
AEG21
AEG 32
AEG19C
AEG23
AEG 70
AEG33
AEG38
AEG35
AEG 36
AEG69
AEG37
AEG39
AEG41
AEG68
AWG79
AWG80
AEG 30A
AEG44
AEG47 AEG46
AEG 60
AEG 62
AEG63
AEG43
AEG73A
AEG50
AEG73
AEG52
AEG54AEG4
AEG50
AEG51
AEG7
AEG48
AEG57
AEG45
AEF40
AWG10
AEG 9C
AEG9
AEG9A
AEG9B
AEG9C
AWG8
AWG3
AWG10A
AWG15
AW-C11
AWG 13 AWG11A
AWG 9
AWG 11
AEG1
AEG1A AEG1B AEG2
AEG3
AEG4
AEG4A
AEG 5
AEG 52 AEG76
60-C4
60-C2
50-C1
6003A
BEG 24 BEC3
BG25
BEG 26C BEG26B
CEG 58C
CEG58D
CEG 58E
CEG 58BCEG 58A
CEG 57
CEG 56C
CEG 20A
CEG 21CEG20CEG 19A
CEG 16D
CEG 16C
CEG 19B
CEG 19
CEG 18
CEG 16B
CEG 16CEG 16A
CE C1
CEG 5C
CEG 5A
CEG 5B
CEG 7
CEG6CEG5
CEG 4
CEG 1
CEG 3
CEG 52
CEG 51
CEG 53
CEG 54 A
CEG 54 B
CEG 54
CEG 54D
CEG 54 C
CEG 55B
CEG 55A CEG55D
CEG 55C
CEG 55E
CEG 56B
CEG 56 A CEG 56D
CEG 56 E
CEG 46
CEG 47
CEG 45CEG 48C
CEG 44CEG 43CEG 42CEG 41
CEG48
CEG 38
CEG 50 CEG 49
CEG 40
CEG39CEG 34
CEG 35
CEG 36
CEG 37
CEG 31
CEG 32
CEG 33
BEG 13 BEG 12
BEG 14
BEG 15 BEG 16
BEG11
BEG 17
BEG 10
BEG 18 BEG 19 BEG 20 BEG 21
BEG22BEG 9
CWG 16D
CWG 20
CWG 20 D
CWG 20A
CWG 20B
CWG 16
CWG 16A CWG 16C
BWG 11C
BWG 11D
BWG 11A
BWG 11
BWG 12
BWG 16
CWG 26
CWG 27CWG 47A
S2 S3
BECE -C2CE C3
CE C2
CE C3
CEG 48D
CEG 48E
CWG 32 E CWG 32 F
CWG 32G
GB110JJJJJJ
CWG 32G
GB110AAAAAAA
CWG 39A
CWG 39B
GB110IIIIIII
CWG 39
AEG55
BWG 33
BWG 33B
BWC 30
BWG30
BWG 29
BWG 31
BWG33A BWG33C
BWG 32
BWG 28 BWG 27
BWG 26
BWG 25
BWG 24A
BWG 24B
CWG2
CWG4
CWG6A CWG6B
BWG 1
BWG 2A
BWC 29
BWC 28
BWG24
CWG 47
CWG 47A
CWG 46CWG 51BCWG 51 A
CWG 51
CWG 52
CWG 53
CWG 31 A
CWG 30
CWG 32 D
GB110DDDDDD
GB110CCCCCC
GB110BBBBBB
GB110FFFFFF GB110EEEEEEGB110ZZZZZ
GB110YYYYY
GB110HHHHHHGB110GGGGGG
CWG 35
CWG 33
CWG 32 A
CWG 32 E
CWG 31D
GB110QQQQQ
CWG 31
CWG 30B
CEG 28 CEG 27
CEG 29A
CEG 29
CEG 29B
CEG 26A
CEG 26B
CEG 26B
CEG 26C
CEG29C CEG 24 E
CEG 24
CEG 24D
CEG 24C
CEG 24B
CEG 23A
CEG 23 B
CEG 23 C
CEG 23D
CEG 23E
CEG 22G
CEG 23
CEG 22A
CEG22B
CEG 22C
CEG 22D
CEG 22E
CEG 22F
6002A 60026002B
6018E6018F
NURSE OFFICE 6030
6018D
6018C 6018B6018A
6005A
CEG 22
60-C4
6027 A
6008A
BEG 23
BEG 23A
BEG8BEG7
BEG6BEG 5
BEG 4
BEG 3
BECEG1
BW C20
BWG 10
CCWG 20A
BWG 4B
BWG 4
BWG 4A
BWG 7
BWG 13
BWG14
BE C1
CB19
GB110ZZZ
BG26
CEG 48B
CEG48A
CEG 24A
CWC 44
CWC 45
BWG 8
BWG 2
BWG 9
GB110VVVVVV
GB110UUUUUU
CWG 48
CWG 32 H
CWG 7A
BWG 1
CWG 7B
CWG 7
CWG 12
CWG 9
CWG 15D
CWG 15-C
CWG 15B
CWG 15A
CWG 14
CWG 20
CWG 20C
CWG 20D
CWG 16B
- 1 HR FIRE PARTITION
- 2 HR FIRE PARTITION
- 0 HR SMOKE PARTITION
- 1 HR FIRE/SMOKE PARTITION
- 2 HR FIRE/SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project :
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is E
H R
M I n fr a s tr u c tu re /6
-7
.A
R C
H .2
.r v t
/1 /2
:4
:1
A M
B01-AE100
B01 GROUND LEVEL FLOOR PLAN
- OVERALL
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LNS KJW
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1" = 40'-0"B01-AE100
1 B01 - GROUND LEVEL FLOOR PLAN - OVERALL
SCALE: 1" = 40'-0"B01-AE100
2 B01 - GROUND LEVEL CEILING PLAN
SCALE: 1" = 40'-0"B01-AE100
3 B01 - GROUND LEVEL DEMO PLAN - OVERALL
SCALE: 1" = 40'-0"B01-AE100
4 B01 - GROUND LEVEL DEMO CEILING PLAN - OVERALL
0' 20' 40' 80'
N
**NOTE: REFERENCE ENLARGED PLANS FOR ADDITIONAL INFORMATION**NOTE: REFERENCE ENLARGED PLANS FOR ADDITIONAL INFORMATION
Q
R
S
T
U
U.7
V
V.8
W
18.818.417.517.116.215.915.31514.91413121110 14.113.112.811.911.110.69.89.79.3
AE401
TR
AE15B
Q
R
S
T
U
U.7
V
V.8
W
18.818.417.517.116.215.915.31514.91413121110 14.113.112.811.911.110.69.89.7
AE401
TR
AE15B
Q
R
S
T
U
U.7
V
V.8
W
18.818.417.517.116.215.915.31514.91413121110 14.113.112.811.911.110.69.89.79.3
AE401
Q
R
S
T
U
U.7
V
V.8
W
18.818.417.517.116.215.915.31514.91413121110 14.113.112.811.911.110.69.89.7
AE401
AWG18B
AFGE
AEG18A
STAIR
NO-8
BIO MED EQUIP
AEG18A
EQUIP MECH RM
AEG13
AFGE
AEG10
OFFICE
AEG10A
PROJET FILE
AEG 11
OFFICE
AEG15A
AEG11A
ENV. MANAGMENT
AEG15
AEG11B
MENS TOILET
AEG12
WOMENS
TOILET
AEG 14
HAC
AWG42
AEG18
AEG 20E
ENGG CORRIDOR
AEG-C1
WORK ORDER
AEG17A
WORK RM
INT. DESIGN OFFICE
AEG15D
ENG CHIEF
AEG17B SECY
AEG17
SIGN SHOP
AEG 20
CONFERENCE
AEG 22
OFFICE
AEG24
OFFICE
AEG26
ENG TECH
AEG28
COPIER
AEG19A
ASST. CHIEF
AEG 17C
OFFICE
AWG59
CONFERENCE
OFFICE
AEG19
PLAN RM.
AEG 30
UNION
AEG21
MECH EQUP RM.
AEG 32
OFFICE
AEG19C
IRM COMPUTER
SHOP
AEG23
STAIR
REC / STO
AEG 70
EXISTING
MECH RM.
AEG33
CORRIDOR
STOR
AEG38
SERVER
AEG35
AEG 36
BREAK RM
AEG69
PHYSICS
AEG37CONFERENCE ROOM
AEG39
WORK ROOM
AEG41
CORRIDOR
MD
AEG68
Room
AWG79
Room
AWG80
CAD DRAFTING
AEG 30A
ADMIN ASST
AEG44
EXAM-2
AEG47
SUPPLY
AEG46
NURSES
AEG 60
CHEIF TECH
AEG 62
TLT
AEG63
CHIEF OF SVC
AEG43
EQUIP
AEG73A
Room
AEG50
ACCELERATOR
AEG73
MAZE
AEG52
RECEPTION
AEG54
STAGING
AEG4
EXAM
AEG50 EXAM-4
AEG51
WAITING
AEG7
PT. TLT
AEG48
AEG57
SECY
AEG45
STFF TLT
AEF40
PIPE BASEMENT
RESEARCH LAB
AEG 9C
RESEARCH LAB
AEG9
TISSUE CULLTURE
AEG9A
OFFICE
AEG9B
OFFICE
AEG9C
SIMULATOR
AEG55
CORRIDOR
CB19
AWG18B
AFGE
AEG18A
STAIR
NO-8
BIO MED EQUIP
AEG18A
EQUIP MECH RM
AEG13
AFGE
AEG10
OFFICE
AEG10A
PROJET FILE
AEG 11
OFFICE
AEG15A
OFFICE
AEG15B
AEG11A
ENV. MANAGMENT
AEG15
AEG11B
MENS TOILET
AEG12
WOMENS
TOILET
AEG 14
HAC
AWG42
AEG18
AEG 20E
ENGG CORRIDOR
AEG-C1
WORK ORDER
AEG17A
WORK RM
INT. DESIGN OFFICE
AEG15D
ENG CHIEF
AEG17B SECY
AEG17
SIGN SHOP
AEG 20
CONFERENCE
AEG 22
OFFICE
AEG24
OFFICE
AEG26
ENG TECH
AEG28
COPIER
AEG19A
ASST. CHIEF
AEG 17C
OFFICE
AWG59
CONFERENCE
OFFICE
AEG19
PLAN RM.
AEG 30
UNION
AEG21
MECH EQUP RM.
AEG 32
OFFICE
AEG19C
IRM COMPUTER
SHOP
AEG23
STAIR
REC / STO
AEG 70
EXISTING
MECH RM.
AEG33
CORRIDOR
STOR
AEG38
SERVER
AEG35
AEG 36
BREAK RM
AEG69
PHYSICS
AEG37CONFERENCE ROOM
AEG39
WORK ROOM
AEG41
CORRIDOR
MD
AEG68
Room
AWG79
Room
AWG80
CAD DRAFTING
AEG 30A
ADMIN ASST
AEG44
EXAM-2
AEG47
SUPPLY
AEG46
NURSES
AEG 60
CHEIF TECH
AEG 62
TLT
AEG63
CHIEF OF SVC
AEG43
EQUIP
AEG73A
Room
AEG50
ACCELERATOR
AEG73
MAZE
AEG52
RECEPTION
AEG54
STAGING
AEG4
EXAM
AEG50 EXAM-4
AEG51
WAITING
AEG7
PT. TLT
AEG48
AEG57
SECY
AEG45
STFF TLT
AEF40
PIPE BASEMENT
RESEARCH LAB
AEG 9C
RESEARCH LAB
AEG9
TISSUE CULLTURE
AEG9A
OFFICE
AEG9B
OFFICE
AEG9C
SIMULATOR
AEG55
CORRIDOR
CB19
AWG18B
AFGE
AEG18A
STAIR
NO-8
BIO MED EQUIP
AEG18A
EQUIP MECH RM
AEG13
AFGE
AEG10
OFFICE
AEG10A
PROJET FILE
AEG 11
OFFICE
AEG15A
AEG11A
ENV. MANAGMENT
AEG15
AEG11B
MENS TOILET
AEG12
WOMENS
TOILET
AEG 14
HAC
AWG42
AEG18
AEG 20E
ENGG CORRIDOR
AEG-C1
WORK ORDER
AEG17A
WORK RM
INT. DESIGN OFFICE
AEG15D
ENG CHIEF
AEG17B SECY
AEG17
SIGN SHOP
AEG 20
CONFERENCE
AEG 22
OFFICE
AEG24
OFFICE
AEG26
ENG TECH
AEG28
COPIER
AEG19A
ASST. CHIEF
AEG 17C
OFFICE
AWG59
CONFERENCE
OFFICE
AEG19
PLAN RM.
AEG 30
UNION
AEG21
MECH EQUP RM.
AEG 32
OFFICE
AEG19C
IRM COMPUTER
SHOP
AEG23
STAIR
REC / STO
AEG 70
EXISTING
MECH RM.
AEG33
CORRIDOR
STOR
AEG38
SERVER
AEG35
AEG 36
BREAK RM
AEG69
PHYSICS
AEG37CONFERENCE ROOM
AEG39
WORK ROOM
AEG41
CORRIDOR
MD
AEG68
Room
AWG79
Room
AWG80
CAD DRAFTING
AEG 30A
ADMIN ASST
AEG44
EXAM-2
AEG47
SUPPLY
AEG46
NURSES
AEG 60
CHEIF TECH
AEG 62
TLT
AEG63
CHIEF OF SVC
AEG43
EQUIP
AEG73A
Room
AEG50
ACCELERATOR
AEG73
MAZE
AEG52
RECEPTION
AEG54
STAGING
AEG4
EXAM
AEG50 EXAM-4
AEG51
WAITING
AEG7
PT. TLT
AEG48
AEG57
SECY
AEG45
STFF TLT
AEF40
PIPE BASEMENT
RESEARCH LAB
AEG 9C
RESEARCH LAB
AEG9
TISSUE CULLTURE
AEG9A
OFFICE
AEG9B
OFFICE
AEG9C
SIMULATOR
AEG55
CORRIDOR
CB19
AWG18B
AFGE
AEG18A
STAIR
NO-8
BIO MED EQUIP
AEG18A
EQUIP MECH RM
AEG13
AFGE
AEG10
OFFICE
AEG10A
PROJET FILE
AEG 11
OFFICE
AEG15A
OFFICE
AEG15B
AEG11A
ENV. MANAGMENT
AEG15
AEG11B
MENS TOILET
AEG12
WOMENS
TOILET
AEG 14
HAC
AWG42
AEG18
AEG 20E
ENGG CORRIDOR
AEG-C1
WORK ORDER
AEG17A
WORK RM
INT. DESIGN OFFICE
AEG15D
ENG CHIEF
AEG17B SECY
AEG17
SIGN SHOP
AEG 20
CONFERENCE
AEG 22
OFFICE
AEG24
OFFICE
AEG26
ENG TECH
AEG28
COPIER
AEG19A
ASST. CHIEF
AEG 17C
OFFICE
AWG59
CONFERENCE
OFFICE
AEG19
PLAN RM.
AEG 30
UNION
AEG21
MECH EQUP RM.
AEG 32
OFFICE
AEG19C
IRM COMPUTER
SHOP
AEG23
STAIR
REC / STO
AEG 70
EXISTING
MECH RM.
AEG33
CORRIDOR
STOR
AEG38
SERVER
AEG35
AEG 36
BREAK RM
AEG69
PHYSICS
AEG37CONFERENCE ROOM
AEG39
WORK ROOM
AEG41
CORRIDOR
MD
AEG68
Room
AWG79
Room
AWG80
CAD DRAFTING
AEG 30A
ADMIN ASST
AEG44
EXAM-2
AEG47
SUPPLY
AEG46
NURSES
AEG 60
CHEIF TECH
AEG 62
TLT
AEG63
CHIEF OF SVC
AEG43
EQUIP
AEG73A
Room
AEG50
ACCELERATOR
AEG73
MAZE
AEG52
RECEPTION
AEG54
STAGING
AEG4
EXAM
AEG50 EXAM-4
AEG51
WAITING
AEG7
PT. TLT
AEG48
AEG57
SECY
AEG45
STFF TLT
AEF40
PIPE BASEMENT
RESEARCH LAB
AEG 9C
RESEARCH LAB
AEG9
TISSUE CULLTURE
AEG9A
OFFICE
AEG9B
OFFICE
AEG9C
SIMULATOR
AEG55
CORRIDOR
CB19
- 1 HR FIRE PARTITION
- 2 HR FIRE PARTITION
- 0 HR SMOKE PARTITION
- 1 HR FIRE/SMOKE PARTITION
- 2 HR FIRE/SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project :
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is E
H R
M I n fr a s tr u c tu re /6
-7
.A
R C
H .2
.r v t
/1 /2
:4
:3
A M
B01-AE100AE
B01 GROUND LEVEL FLOOR PLAN
- SECTION AE
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LNS KJW
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01-AE100AE
1 B01 - GROUND LEVEL FLOOR PLAN - SECTION AE
SCALE: 1/16" = 1'-0"B01-AE100AE
2 B01 - GROUND LEVEL CEILING PLAN - SECTION AE
SCALE: 1/16" = 1'-0"B01-AE100AE
3 B01 - GROUND LEVEL DEMO PLAN - SECTION AE
SCALE: 1/16" = 1'-0"B01-AE100AE
4 B01 - GROUND LEVEL DEMO CEILING PLAN - SECTION AE
N
0' 8' 16'4' 32'
**NOTE: REFERENCE ENLARGED PLANS FOR ADDITIONAL INFORMATION
S
T
U
U.7
V
V.8
W
9.2 9.79.3
87654321
8.37.97.16. 25 .84.94.13.62.71.91.30.70.3
Q
R
S
T
U
U.7
V
V.8
W
9.2 9.79.3
87654321
8.37.97.16. 25 .84.94.13.62.71.91.30.70.3
TRANS VAULT
GB1101
GENERATORS
GB1103
TRANS VAULT
GB1102
STAIR
OUTSIDE AREA WAY
(OPEN TO BELOW)
SW GEAR
GB1105A
OPEN TO BELOW
OFFICE
GB1105B
Room
GB110S
MECH ROOM
AWG 19
BOILE ROOM
(OPEN TO BELOW)
MECH RM
AWG 21
OFFICE
AWG 27
OFFICE
MEZZANINE
AWG23
WATER
TREATMENT
AWG 26A
STAIR
BOILER RM.
AWG 26
STAIR
CORRIDOR
LOGISTCIS
AWG24B
LOGISTICS
AWG24
CORRIDOR
AWG16
TOILET
AWG22
WORK ROOM
AWG24A
LOGISTICS
AWG20
LOGISTICS
AWG20A
LOGISTICS
AWG20B
CORRIDOR TO
NURSING
ROOM
CONFERENCE
AWG18
CLOSET
AWG18A AWG18B
AFGE
AEG18A
STAIR
NO-8
BIO MED EQUIP
AEG18A
PIPE BASEMENT
MENS LOCKER
ROOM
AWG10
RESEARCH LAB
AEG 9C
TLT
AWG10A
SWITCHGEAR
AWG15
CORRIDOR
AW-C11
WOMENS LOCKER
RM
AWG 13
TOILETS &
SHOWERS
AWG11A
TRANS VAULT
GB1101
GENERATORS
GB1103
TRANS VAULT
GB1102
STAIR
OUTSIDE AREA WAY
(OPEN TO BELOW)
SW GEAR
GB1105A
OPEN TO BELOW
OFFICE
GB1105B
Room
GB110S
MECH ROOM
AWG 19
BOILE ROOM
(OPEN TO BELOW)
MECH RM
AWG 21
OFFICE
AWG 27
OFFICE
MEZZANINE
AWG23
WATER
TREATMENT
AWG 26A
STAIR
BOILER RM.
AWG 26
STAIR
CORRIDOR
LOGISTCIS
AWG24B
LOGISTICS
AWG24
CORRIDOR
AWG16
TOILET
AWG22
WORK ROOM
AWG24A
LOGISTICS
AWG20
LOGISTICS
AWG20A
LOGISTICS
AWG20B
CORRIDOR TO
NURSING
ROOM
CONFERENCE
AWG18
CLOSET
AWG18A AWG18B
AFGE
AEG18A
STAIR
NO-8
BIO MED EQUIP
AEG18A
PIPE BASEMENT
MENS LOCKER
ROOM
AWG10
RESEARCH LAB
AEG 9C
TLT
AWG10A
SWITCHGEAR
AWG15
CORRIDOR
AW-C11
WOMENS LOCKER
RM
AWG 13
TOILETS &
SHOWERS
AWG11A
- 1 HR FIRE PARTITION
- 2 HR FIRE PARTITION
- 0 HR SMOKE PARTITION
- 1 HR FIRE/SMOKE PARTITION
- 2 HR FIRE/SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project :
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is E
H R
M I n fr a s tr u c tu re /6
-7
.A
R C
H .2
.r v t
/1 /2
:4
:3
A M
B01-AE100AW1
B01 GROUND LEVEL FLOOR PLAN
- SECTION AW
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LNS KJW
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01-AE100AW1
1 B01 - GROUND LEVEL FLOOR PLAN - SECTION AW
SCALE: 1/16" = 1'-0"B01-AE100AW1
2 B01 - GROUND LEVEL CEILING PLAN - SECTION AW
N
0' 8' 16'4' 32'
**NOTE: REFERENCE ENLARGED PLANS FOR ADDITIONAL INFORMATION
NO ARCHITECTURAL WORK SCHEDULED
FOR THIS AREA OF THE BUILDING
S
T
U
U.7
V
V.8
W
9.2 9.79.3
87654321
8.37.97.16. 25 .84.94.13.62.71.91.30.70.3
Q
R
S
T
U
U.7
V
V.8
W
9.2 9.79.3
87654321
8.37.97.16. 25 .84.94.13.62.71.91.30.70.3
TRANS VAULT
GB1101
GENERATORS
GB1103
TRANS VAULT
GB1102
STAIR
OUTSIDE AREA WAY
(OPEN TO BELOW)
SW GEAR
GB1105A
OPEN TO BELOW
OFFICE
GB1105B
Room
GB110S
MECH ROOM
AWG 19
BOILE ROOM
(OPEN TO BELOW)
MECH RM
AWG 21
OFFICE
AWG 27
OFFICE
MEZZANINE
AWG23
WATER
TREATMENT
AWG 26A
STAIR
BOILER RM.
AWG 26
STAIR
CORRIDOR
LOGISTCIS
AWG24B
LOGISTICS
AWG24
CORRIDOR
AWG16
TOILET
AWG22
WORK ROOM
AWG24A
LOGISTICS
AWG20
LOGISTICS
AWG20A
LOGISTICS
AWG20B
CORRIDOR TO
NURSING
ROOM
CONFERENCE
AWG18
CLOSET
AWG18A AWG18B
AFGE
AEG18A
STAIR
NO-8
BIO MED EQUIP
AEG18A
PIPE BASEMENT
MENS LOCKER
ROOM
AWG10
RESEARCH LAB
AEG 9C
TLT
AWG10A
SWITCHGEAR
AWG15
CORRIDOR
AW-C11
WOMENS LOCKER
RM
AWG 13
TOILETS &
SHOWERS
AWG11A
TRANS VAULT
GB1101
GENERATORS
GB1103
TRANS VAULT
GB1102
STAIR
OUTSIDE AREA WAY
(OPEN TO BELOW)
SW GEAR
GB1105A
OPEN TO BELOW
OFFICE
GB1105B
Room
GB110S
MECH ROOM
AWG 19
BOILE ROOM
(OPEN TO BELOW)
MECH RM
AWG 21
OFFICE
AWG 27
OFFICE
MEZZANINE
AWG23
WATER
TREATMENT
AWG 26A
STAIR
BOILER RM.
AWG 26
STAIR
CORRIDOR
LOGISTCIS
AWG24B
LOGISTICS
AWG24
CORRIDOR
AWG16
TOILET
AWG22
WORK ROOM
AWG24A
LOGISTICS
AWG20
LOGISTICS
AWG20A
LOGISTICS
AWG20B
CORRIDOR TO
NURSING
ROOM
CONFERENCE
AWG18
CLOSET
AWG18A AWG18B
AFGE
AEG18A
STAIR
NO-8
BIO MED EQUIP
AEG18A
PIPE BASEMENT
MENS LOCKER
ROOM
AWG10
RESEARCH LAB
AEG 9C
TLT
AWG10A
SWITCHGEAR
AWG15
CORRIDOR
AW-C11
WOMENS LOCKER
RM
AWG 13
TOILETS &
SHOWERS
AWG11A
- 1 HR FIRE PARTITION
- 2 HR FIRE PARTITION
- 0 HR SMOKE PARTITION
- 1 HR FIRE/SMOKE PARTITION
- 2 HR FIRE/SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project :
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is E
H R
M I n fr a s tr u c tu re /6
-7
.A
R C
H .2
.r v t
/1 /2
:4
:4
A M
B01-AE100AW2
B01 GROUND LEVEL FLOOR PLAN
- SECTION AW
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LNS KJW
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01-AE100AW2
1 B01 - GROUND LEVEL DEMO PLAN - SECTION AW
SCALE: 1/16" = 1'-0"B01-AE100AW2
2 B01 - GROUND LEVEL DEMO CEILING PLAN - SECTION AW
N
0' 8' 16'4' 32'
**NOTE: REFERENCE ENLARGED PLANS FOR ADDITIONAL INFORMATION
NO ARCHITECTURAL WORK SCHEDULED
M
L
K
J
H
N
P
P1
P2
P4
P5
15.91514
17 18 19
13121110
AE401
TR
AEG 2
M
L
K
J
H
N
P
P1
P2
P4
P5
15.91514
17 18 19
13121110
AE401
TR
AEG 2
M
L
K
J
H
N
P
P1
P2
P4
P5
15.91514
17 18 19
13121110
AE401
M
L
K
J
H
N
P
P1
P2
P4
P5
15.91514
17 18 19
13121110
AE401
WAITING
AEG7RESEARCH LAB
AEG 9C
RESEARCH LAB
AEG9
ELEV LOBBY
EC
EC
AEG1 EC
AEG1A
OFFICE RM
AEG3
STORAGE
STORAGE
PT. TLT
AEG 52
ELEC
AEG76
STAIR
HAC
AUTO WATER
BEG 24
HKS
BEC3
HSK
BG25
BRU OFFICE
BEG 26C
BRU OFFICE
BEG26B
OFFICE
CEG 58C
OFFICE
CEG58D
CLOSET
CEG 58E
OFFICE
CEG 58B
OFFICE
CEG 58A
OFFICE
CEG 46
OFFICE
CEG 47
OFFICE
CEG 45
KITCHENETTE
CEG 48C
BRU OFFICE
CEG 44
BRU OFFICE
CEG 43
BRU OFFICE
CEG 42
BRU OFFICE
CEG 41
CONFERENCE
CEG48
HSRD CONFERENCE
CEG 38
HSRD OFFICE
CEG 50
HSRD OFFICE
CEG 49
HSRD
CEG 40
HSRD OFFICE
CEG39
HSRD OFFICE
CEG 34
HSRD OFFICE
CEG 35
HSRD OFFICE
CEG 36
HSRD OFFICE
CEG 37
TRAINEE
CEG 31
CEG 30
MEN
CEG 32
WOMENS
CEG 33
ANIMAL RM. 7
BEG 13
ANIMAL RM 8
BEG 12
VMU STORAGE
BEG 14
HSRD BREAK
BEG 15 BEG 16
ANIMAL RM. 9
BEG11
BRU OFFICE
BEG 17
ANIMAL RM. 10
BEG 10
BRU OFFICE
BEG 18
BRU OFFICE
BEG 19
BRU OFFICE
BEG 20
ELECTRICAL
BEG 21
IRR
BEG22
PROCEDURE
BEG 9
CWG 20A
CWG 20B
INFO SYSTEMS
SECURITY
CWG 16
CWG 16A
BREAK ROOM
CWG 16C
CONTAINMENT
BWG 11C
CONTAINMENT LAB
BWG 11D CONTAINMENT
BWG 11A
SHAFT
ANTE
BWG 11
EUTH
BWG 12
STORAGE
BWG 16
CORRIDOR
BECE -C2
CORRIDOR
CE C3
CORRIDOR
CE C2
CORRIDOR
CE C3
WOMEN
CEG 48D
STORAGE
BEG 23
EXIST COMM
BEG 23A
ANIMAL RM. 6
BEG8
ANIMAL RM. 5
BEG7ANIMAL RM. 4
BEG6
ANIMAL RM. 3
BEG 5
ANIMAL 2
BEG 4
ANIMAL 1
BEG 3
POOL SVC ROOM
BECEG1
CORRIDOR
BW C20
BULKFEED AND
GENERAL STORAGE
BWG 10
OFFICE
C
OFFICE
CWG 20A
A/C SHOP
BWG 4B
A/C SHOP
BWG 4
WOMEN'S
LOCKER & TLT
BWG 7
CLEAN CAGE
BEDDING / STAGING
BWG 13
DIRTY CAGE
STAGING
BWG14
EQUIP
CORRIDOR
BE C1
CORRIDOR
BG26
COPY
CEG 48B
A/V
CEG48A
MENS LOCKER /
TOILET
BWG 8
ELECTRICAL
BWG 9
EEO OFFICE
CWG 15-C
EEO OFFICE
CWG 15B
EEO OFFICE
CWG 15A
COMPLIANCE
OFFICE
CWG 20
OFFICE
CWG 20C OFFICE
CWG 20D
CWG 16B
OIT WORK RM
AEG 5
STORAGE IRM
AEG4A
IRM STAGING
AEG4
LOBBY
WAITING
AEG7RESEARCH LAB
AEG 9C
RESEARCH LAB
AEG9
ELEV LOBBY
EC
EC
AEG1 EC
AEG1A
OFFICE RM
AEG3
STORAGE
STORAGE
PT. TLT
AEG 52
ELEC
AEG76
STAIR
HAC
AUTO WATER
BEG 24
HKS
BEC3
HSK
BG25
BRU OFFICE
BEG 26C
BRU OFFICE
BEG26B
OFFICE
CEG 58C
OFFICE
CEG58D
CLOSET
CEG 58E
OFFICE
CEG 58B
OFFICE
CEG 58A
OFFICE
CEG 46
OFFICE
CEG 47
OFFICE
CEG 45
KITCHENETTE
CEG 48C
BRU OFFICE
CEG 44
BRU OFFICE
CEG 43
BRU OFFICE
CEG 42
BRU OFFICE
CEG 41
CONFERENCE
CEG48
HSRD CONFERENCE
CEG 38
HSRD OFFICE
CEG 50
HSRD OFFICE
CEG 49
HSRD
CEG 40
HSRD OFFICE
CEG39
HSRD OFFICE
CEG 34
HSRD OFFICE
CEG 35
HSRD OFFICE
CEG 36
HSRD OFFICE
CEG 37
TRAINEE
CEG 31
CEG 30
MEN
CEG 32
WOMENS
CEG 33
ANIMAL RM. 7
BEG 13
ANIMAL RM 8
BEG 12
VMU STORAGE
BEG 14
HSRD BREAK
BEG 15 BEG 16
ANIMAL RM. 9
BEG11
BRU OFFICE
BEG 17
ANIMAL RM. 10
BEG 10
BRU OFFICE
BEG 18
BRU OFFICE
BEG 19
BRU OFFICE
BEG 20
ELECTRICAL
BEG 21
IRR
BEG22
PROCEDURE
BEG 9
CWG 20A
CWG 20B
INFO SYSTEMS
SECURITY
CWG 16
CWG 16A
BREAK ROOM
CWG 16C
CONTAINMENT
BWG 11C
CONTAINMENT LAB
BWG 11D CONTAINMENT
BWG 11A
SHAFT
ANTE
BWG 11
EUTH
BWG 12
STORAGE
BWG 16
CORRIDOR
BECE -C2
CORRIDOR
CE C3
CORRIDOR
CE C2
CORRIDOR
CE C3
WOMEN
CEG 48D
STORAGE
BEG 23
EXIST COMM
BEG 23A
ANIMAL RM. 6
BEG8
ANIMAL RM. 5
BEG7ANIMAL RM. 4
BEG6
ANIMAL RM. 3
BEG 5
ANIMAL 2
BEG 4
ANIMAL 1
BEG 3
POOL SVC ROOM
BECEG1
CORRIDOR
BW C20
BULKFEED AND
GENERAL STORAGE
BWG 10
OFFICE
C
OFFICE
CWG 20A
A/C SHOP
BWG 4B
A/C SHOP
BWG 4
WOMEN'S
LOCKER & TLT
BWG 7
CLEAN CAGE
BEDDING / STAGING
BWG 13
DIRTY CAGE
STAGING
BWG14
EQUIP
CORRIDOR
BE C1
CORRIDOR
BG26
COPY
CEG 48B
A/V
CEG48A
MENS LOCKER /
TOILET
BWG 8
ELECTRICAL
BWG 9
EEO OFFICE
CWG 15-C
EEO OFFICE
CWG 15B
EEO OFFICE
CWG 15A
COMPLIANCE
OFFICE
CWG 20
OFFICE
CWG 20C OFFICE
CWG 20D
CWG 16B
OIT WORK RM
AEG 5
STORAGE IRM
AEG4A
IRM STAGING
AEG4
LOBBY
WAITING
AEG7RESEARCH LAB
AEG 9C
RESEARCH LAB
AEG9
ELEV LOBBY
EC
EC
AEG1 EC
AEG1A
STORAGE
AEG1B
FLOOR
MACHINE
AEG2
OFFICE RM
AEG3
STORAGE
STORAGE
PT. TLT
AEG 52
ELEC
AEG76
STAIR
HAC
AUTO WATER
BEG 24
HKS
BEC3
HSK
BG25
BRU OFFICE
BEG 26C
BRU OFFICE
BEG26B
OFFICE
CEG 58C
OFFICE
CEG58D
CLOSET
CEG 58E
OFFICE
CEG 58B
OFFICE
CEG 58A
OFFICE
CEG 46
OFFIC…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .