Drawing Vol 1-5-3 Architectural 614-700-AE-20231011.pdf
PDF 42 MB Posted
- Attached to
- Y1DA--614-22-700 EHRM Infrastructure Upgrades Construction Memphis TN Federal contract opportunity
- Solicitation number
- 36C77624B0013_1
About this file
This document appears to be a set of architectural drawings associated with a federal contract opportunity for EHRM Infrastructure Upgrades Construction at the Memphis, TN VA Medical Center.
The solicitation number is 36C77624B0013_1, and the contract opportunity is for the construction work on the EHRM Infrastructure Upgrades project at the Memphis, TN VAMC. The Department of Veterans Affairs Technology Acquisition Center Austin is the procuring agency. The opportunity type is a Solicitation, indicating this is a request for bids or proposals from contractors. The drawings provided likely detail the design and specifications for the construction work required under this contract.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B1A-M
B1A-L
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
B1A-M
B1A-L
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
B1A-M
B1A-L
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
B1A-M
B1A-L
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
PASS ELEVATOR
LOBBY
CB1-1A
PHARMACY
DB1102
SW GEAR
FB1100
VAULT
GB110G
STAIR
CORRIDOR
CB1-19
CORRIDOR
CB1-19A
TRANS VAULT
GB1101
ELEC RM
GB110H OFFICE RM
GB110I
INTAKE /
REGISTRATION /
WAITING
LOBBY
OUTSIDE AREA WAY
(OPEN TO BELOW)
SW GEAR
GB1105A
OPEN TO BELOW
OFFICE
GB1105B
Room
GB110S
MECH ROOM
AWG 19
BOILE ROOM
(OPEN TO BELOW)
STAIR
WAITING RM
GB110 GB110E
BREAK ROOM
GB1100J
TLT
GB110L
TLT
GB110M
GB110F
CONSULT
GB110A
CONSULT
GB110B
CONSULT
C
CONSULT
D
SWITCHGEAR
AWG15
WOMENS LOCKER
RM
AWG 13
STAIR
CORRIDOR
BWC31A
TOILET
GB1106
RESIDENT
GB1108
CORRIDOR
CB1-4
ELEC
GB1109
HAC
GB1111
COMM
GB1110
CORRIDOR
CB1-2
CHIEF
BWG 33B
CORRIDOR
BWC 30
OFFICE
BWG30
PASS ELEVATOR
LOBBY
CB1-1A
PHARMACY
DB1102
SW GEAR
FB1100
VAULT
GB110G
STAIR
CORRIDOR
CB1-19
CORRIDOR
CB1-19A
TRANS VAULT
GB1101
ELEC RM
GB110H OFFICE RM
GB110I
INTAKE /
REGISTRATION /
WAITING
LOBBY
OUTSIDE AREA WAY
(OPEN TO BELOW)
SW GEAR
GB1105A
OPEN TO BELOW
OFFICE
GB1105B
Room
GB110S
MECH ROOM
AWG 19
BOILE ROOM
(OPEN TO BELOW)
STAIR
WAITING RM
GB110 GB110E
BREAK ROOM
GB1100J
TLT
GB110L
TLT
GB110M
GB110F
CONSULT
GB110A
CONSULT
GB110B
CONSULT
C
CONSULT
D
SWITCHGEAR
AWG15
WOMENS LOCKER
RM
AWG 13
STAIR
CORRIDOR
BWC31A
TOILET
GB1106
RESIDENT
GB1108
CORRIDOR
CB1-4
ELEC
GB1109
HAC
GB1111
COMM
GB1110
CORRIDOR
CB1-2
CHIEF
BWG 33B
CORRIDOR
BWC 30
OFFICE
BWG30
PASS ELEVATOR
LOBBY
CB1-1A
PHARMACY
DB1102
SW GEAR
FB1100
VAULT
GB110G
STAIR
CORRIDOR
CB1-19
CORRIDOR
CB1-19A
TRANS VAULT
GB1101
ELEC RM
GB110H OFFICE RM
GB110I
INTAKE /
REGISTRATION /
WAITING
LOBBY
OUTSIDE AREA WAY
(OPEN TO BELOW)
SW GEAR
GB1105A
OPEN TO BELOW
OFFICE
GB1105B
Room
GB110S
MECH ROOM
AWG 19
BOILE ROOM
(OPEN TO BELOW)
STAIR
WAITING RM
GB110 GB110E
BREAK ROOM
GB1100J
TLT
GB110L
TLT
GB110M
GB110F
CONSULT
GB110A
CONSULT
GB110B
CONSULT
C
CONSULT
D
SWITCHGEAR
AWG15
WOMENS LOCKER
RM
AWG 13
STAIR
CORRIDOR
BWC31A
TOILET
GB1106
RESIDENT
GB1108
CORRIDOR
CB1-4
ELEC
GB1109
HAC
GB1111
COMM
GB1110
CORRIDOR
CB1-2
CHIEF
BWG 33B
CORRIDOR
BWC 30
OFFICE
BWG30
PASS ELEVATOR
LOBBY
CB1-1A
PHARMACY
DB1102
SW GEAR
FB1100
VAULT
GB110G
STAIR
CORRIDOR
CB1-19
CORRIDOR
CB1-19A
TRANS VAULT
GB1101
ELEC RM
GB110H OFFICE RM
GB110I
INTAKE /
REGISTRATION /
WAITING
LOBBY
OUTSIDE AREA WAY
(OPEN TO BELOW)
SW GEAR
GB1105A
OPEN TO BELOW
OFFICE
GB1105B
Room
GB110S
MECH ROOM
AWG 19
BOILE ROOM
(OPEN TO BELOW)
STAIR
WAITING RM
GB110 GB110E
BREAK ROOM
GB1100J
TLT
GB110L
TLT
GB110M
GB110F
CONSULT
GB110A
CONSULT
GB110B
CONSULT
C
CONSULT
D
SWITCHGEAR
AWG15
WOMENS LOCKER
RM
AWG 13
STAIR
CORRIDOR
BWC31A
TOILET
GB1106
RESIDENT
GB1108
CORRIDOR
CB1-4
ELEC
GB1109
HAC
GB1111
COMM
GB1110
CORRIDOR
CB1-2
CHIEF
BWG 33B
CORRIDOR
BWC 30
OFFICE
BWG30
- 1 HR FIRE PARTITION
- 2 HR FIRE PARTITION
- 0 HR SMOKE PARTITION
- 1 HR FIRE/SMOKE PARTITION
- 2 HR FIRE/SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project :
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is E
H R
M I n fr a s tr u c tu re /6
-7
.A
R C
H .2
.r v t
/1 /2
:5
:2
A M
B01A-AE100G
B01A GROUND LEVEL FLOOR
PLAN - SECTION G
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
1A
10/11/2023 LNS KJW
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01A-AE100G
1 B01A - GROUND LEVEL FLOOR PLAN - SECTION G
SCALE: 1/16" = 1'-0"B01A-AE100G
2 B01A - GROUND LEVEL CEIING PLAN - SECTION G
SCALE: 1/16" = 1'-0"B01A-AE100G
3 B01A - GROUND LEVEL DEMO PLAN - SECTION G
SCALE: 1/16" = 1'-0"B01A-AE100G
4 B01A - GROUND LEVEL DEMO CEIING PLAN - SECTION G
N
0' 8' 16'4' 32'
**NOTE: REFERENCE ENLARGED PLANS FOR ADDITIONAL INFORMATION
NO ARCHITECTURAL WORK SCHEDULED
FOR THIS AREA OF THE BUILDING
Revisions: Date:
E107
D182
G107
F101
E107
D182
G107
F101
SLIDINGSLIDINGSLIDING
SLIDINGSLIDINGSLIDING
AW144
AW 143
G142
G115
G146 G147
G140
G139 G138 G137 G136
G119
C1-30
G141 G132 G131
G133 G130
G134
G135
G148 G145
G159
G151
G153
G152 G149
G114
G117
G117A
G122
G122A
G123
G125
G125 A
G127
G118 G120
G124
G116
G115A G124A
G115 G126
C1-7
C1-26
E108
E129
E128
E127
E126
E125
E108E E108D
E108C E108B
E107
E106
E105
E109
E110
E111
E112E114E115
E116
E117E119E121E123E124
C1-23
C1-24
E122D
E129 E130 E131 E132 E133
E134 E135
E137
E136
E118AE118B419E122AE122B
E122C
E138
E118D E118C
E101
E102
E103
E104
D127
D126 D124 D122
D125 D123
D116
D117
D115
D113
D114
D112
D112A D111
D112C
D112D
D118
D119
D120
D121
E100
C1-21
C1-19 C1-17
C1-1B
C1-1A
C1-14
C1-15
C1-32
C1-31
C1-22
D112B
C1-4
C1-3
C1-1
C1-2
P1 P2
G106
G105
G104
G102
G100
P4 P3
G129
G155
C1-33
E113
C1-18A
D130
D131
D129
D182
AW173
AW175G101
G103
BE154
G112
G110
G111
G109
D100
D102
D106
D110C
D110D
D110
D110A
D110B
D105
D107
D108
D109
D104
S7
D128 1
D101
D103
BE179
BE183
CW101E
CW101
C1-13A
C1-13
D104B
D104A
C1-13B
C1-12
C1-10
G107 G108
C1-11 C1-8
C1-9
S5
S6
C1-11A
BW129
BW130
SLIDINGSLIDINGSLIDING
AW144
AW 143
G142
G115
G146 G147
G140
G139 G138 G137 G136
G119
C1-30
G141 G132 G131
G133 G130
G134
G135
G148 G145
G159
G151
G153
G152 G149
G114
G117
G117A
G122
G122A
G123
G125
G125 A
G127
G118 G120
G124 G116
G115A G124A
G115 G126
C1-7
ELEV
MACHINE
ROOM
ELECTRICAL CHIEFASSIST CHIEF
SUPER
SUPER SUPER
WAITING
CLINICALCLINICALTLTCLINICALCLINICAL
STUDENTSTUDENT
TLT
CLINICAL
BREAK RM
SHARED
CONFERENCE ROOM
COMMON WORK
ROOM
C1-26
E108
E129
E128
E127
E126
E125
E108E E108D
E108C E108B
E107
E106
E105
E109
E110
E111
E112E114E115 E116
E117E119E121E123E124
C1-23
C1-24
E122D
E129 E130 E131E132E133 E134 E135
E137
E136
E118AE118B419E122AE122B
E122C
E138
E118DE118C
OFFICE
OFFICE
E101
E102
E103
E104
D127
SHAFT
D126 D124 D122
D125 D123
D116 D117
D115
D113
D114
D112 D112A D111
D112C
D112D
D118
D119
D120
D121
E100
C1-21
C1-19 C1-17
C1-1B
C1-1A
C1-14
C1-15
C1-32
C1-31
C1-22
D112B
C1-4
C1-3
C1-1
C1-2
P1 P2
G106
G105
G104
G102
G100
P4 P3
G129
QUALITY
MANAGMENTG155
C1-33
E113
C1-18A
D130
D131
D129
D182
AW173
AW175G101SHAFT
G103
BE154
G112
G110
G111
G109
D100
D102
D106
D110C D110D
D110
D110A
D110B
D105
D107
D108 D109
D104 S7
D128 1
D101
D103
BE179
BE183
CW101E
CW101
C1-13A
C1-13
D104B
D104A
C1-13B
C1-12
C1-10
G107 G108
C1-11C1-8
C1-9
S5
S6
C1-11A
BW129
BW130
SLIDINGSLIDINGSLIDING
AW144
AW 143
G142
G115
G146 G147
G140
G139 G138 G137 G136
G119
C1-30
G141 G132 G131
G133 G130
G134
G135
G148 G145
G159
G151
G153
G152 G149
G114
G117
G117A
G122
G122A
G123
G125
G125 A
G127
G118 G120
G124
G116
G115A G124A
G115 G126
C1-7
C1-26
E108
E129
E128
E127
E126
E125
E108E E108D
E108C E108B
E106
E105
E109
E110
E111
E112E114E115
E116
E117E119E121E123E124
C1-23
C1-24
E122D
E129 E130 E131 E132 E133
E134 E135
E137
E136
E118AE118B419E122AE122B
E122C
E138
E118D E118C
E101
E102
E103
E104
D127
D126 D124 D122
D125 D123
D116
D117
D115
D113
D114
D112
D112A D111
D112C
D112D
D118
D119
D120
D121
E100
C1-21
C1-19 C1-17
C1-1B
C1-1A
C1-14
C1-15
C1-32
C1-31
C1-22
D112B
C1-4
C1-3
C1-1
C1-2
P1 P2
G106
G105
G104
G102
G100
P4 P3
G129
G155
C1-33
E113
C1-18A
D130
D131
AW173
AW175G101 G112
G110
G111
G109
D100
D102
D106
D110C
D110D
D110
D110A
D110B
D105
D107
D108
D109
D104
S7
D128 1
D101
D103
BE179
BE183
CW101E
CW101
C1-13A
C1-13
D104B
D104A
C1-13B
C1-12
C1-10
G107 G108
C1-11 C1-8
C1-9
S5
S6
C1-11A
BW129
BW130
SLIDINGSLIDINGSLIDING
AW144
AW 143
G142
G115
G146 G147
G140
G139 G138 G137 G136
G119
C1-30
G141 G132 G131
G133 G130
G134
G135
G148 G145
G159
G151
G153
G152 G149
G114
G117
G117A
G122
G122A
G123
G125
G125 A
G127
G118 G120
G124 G116
G115A G124A
G115 G126
C1-7
ELEV
MACHINE
ROOM
ELECTRICAL CHIEFASSIST CHIEF
SUPER
SUPER SUPER
WAITING
CLINICALCLINICALTLTCLINICALCLINICAL
STUDENTSTUDENT
TLT
CLINICAL
BREAK RM
SHARED
CONFERENCE ROOM
COMMON WORK
ROOM
C1-26
E108
E129
E128
E127
E126
E125
E108E E108D
E108C E108B
E107
E106
E105
E109
E110
E111
E112E114E115 E116
E117E119E121E123E124
C1-23
C1-24
E122D
E129 E130 E131E132E133 E134 E135
E137
E136
E118AE118B419E122AE122B
E122C
E138
E118DE118C
OFFICE
OFFICE
E101
E102
E103
E104
D127
SHAFT
D126 D124 D122
D125 D123
D116 D117
D115
D113
D114
D112 D112A D111
D112C
D112D
D118
D119
D120
D121
E100
C1-21
C1-19 C1-17
C1-1B
C1-1A
C1-14
C1-15
C1-32
C1-31
C1-22
D112B
C1-4
C1-3
C1-1
C1-2
P1 P2
G106
G105
G104
G102
G100
P4 P3
G129
QUALITY
MANAGMENTG155
C1-33
E113
C1-18A
D130
D131
D129
D182
AW173
AW175G101SHAFT
G103
BE154
G112
G110
G111
G109
D100
D102
D106
D110C D110D
D110
D110A
D110B
D105
D107
D108 D109
D104 S7
D128 1
D101
D103
BE179
BE183
CW101E
CW101
C1-13A
C1-13
D104B
D104A
C1-13B
C1-12
C1-10
G107 G108
C1-11C1-8
C1-9
S5
S6
C1-11A
BW129
BW130
- 1 HR FIRE PARTITION
- 2 HR FIRE PARTITION
- 0 HR SMOKE PARTITION
- 1 HR FIRE/SMOKE PARTITION
- 2 HR FIRE/SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
GF
E D
BW
CW CE
J
BE
AE
7D 7E
7B7C
7A
5A
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project :
5BE5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is E
H R
M I n fr a s tr u c tu re /6
-7
.A
R C
H .2
.r v t
/1 /2
:5
:4
A M
B01A-AE101
B01A FIRST LEVEL FLOOR PLAN -
OVERALL
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
1A
10/11/2023 LNS KJW
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1" = 30'-0"B01A-AE101
1 B01A - FIRST LEVEL FLOOR PLAN - OVERALL
SCALE: 1" = 30'-0"B01A-AE101
2 B01A - FIRST LEVEL CEILING PLAN - OVERALL
SCALE: 1" = 30'-0"B01A-AE101
3 B01A - FIRST LEVEL DEMO PLAN - OVERALL
SCALE: 1" = 30'-0"B01A-AE101
4 B01A - FIRST LEVEL DEMO CEILING PLAN - OVERALL
N
0' 15' 30' 60'
**NOTE: REFERENCE ENLARGED PLANS FOR ADDITIONAL INFORMATION
B1A-G2
B1A-G
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
AE412
B1A-G2
B1A-G
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
AE412
UPS
D182
B1A-G2
B1A-G
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
SLIDING SLIDINGSLIDING
AE412
B1A-G2
B1A-G
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
AE412
WAITING
SHARED
CONFERENCE ROOM
OFFICE
OFFICE
TOILET
E101
TOILET
E102
STAFF TOILET
E103
ENT
E104
EXAM
D127
SHAFT
EXAM
D126
EXAM
D124
EXAM
D122
EXAM
D125
PROCEDURE
D123
SURGICAL BLOCK
RM.
D116
MICRO
D117
MECH
D115
OFFICE
D114
LOUNGE
D112 LOCKERS
D112A
BIO MED LAB
STORAGE
D111
LOCKERS
D112C
TOLET
D112D
SWALLOW
D120
EXAM
D121
WTG
E100
CORRIDOR
C1-21
CORRIDOR
C1-19
LOBBY
C1-1B
PASS ELEVATOR
LOBBY
C1-1A
CORRIDOR
C1-15
TOILET
D112B
CORRIDOR
C1-1
CORRIDOR
C1-2
ELEVATOR
P1
ELEVATOR
P2
SHOP
G106
ELEVATOR
P4
ELEVATOR
P3
AUDIO
C1-18A
TRASH CHUTE
D130
LINEN
CHUTE
D131
HAC
D129
BATT
D182
IMAGE
G109
IMAGE
D100
CARDIAC NUCLEAR
IMAGING
D102
CONFERENCE
D106
CHIEF
D110C
FILE WORK AREA
D110D
NUCLEAR MEDICINE
D110
PHYS
D110A
TECH
D110B
EXAM
D105
PAT DOSE
D107
TOILET
D108
TOILET
D109
EXERCISE STRESS
TEST
D104
ELEVATOR
S7
DW
D128
DW
STAFF
TLT
D101
SOIL HLD
D103
STAIR
PET/CT RM
CW101D
Room
BE179
Room
BE183
HOT LAB
CW101E CORRIDOR
CW101
WAIT
C1-13A
CORRIDOR
C1-13
D104B
IMAGE PROCESS &
READ
D104A
STRET
C1-13B
CORRIDOR
C1-12
COMM
G107
ELECATRICAL
G108
CORRIDOR
C1-11
CORRIDOR
C1-8
CORRIDOR
C1-9
Room
AW105
ELEVATOR
S5
ELEVATOR
S6
EQUIPMENT
LINEN
C1-11A
Room
BW124
Room
BW129
Room
BW130
WAITING
SHARED
CONFERENCE ROOM
OFFICE
OFFICE
TOILET
E101
TOILET
E102
STAFF TOILET
E103
ENT
E104
EXAM
D127
SHAFT
EXAM
D126
EXAM
D124
EXAM
D122
EXAM
D125
PROCEDURE
D123
SURGICAL BLOCK
RM.
D116
MICRO
D117
MECH
D115
OFFICE
D114
LOUNGE
D112 LOCKERS
D112A
BIO MED LAB
STORAGE
D111
LOCKERS
D112C
TOLET
D112D
SWALLOW
D120
EXAM
D121
WTG
E100
CORRIDOR
C1-21
CORRIDOR
C1-19
LOBBY
C1-1B
PASS ELEVATOR
LOBBY
C1-1A
CORRIDOR
C1-15
TOILET
D112B
CORRIDOR
C1-1
CORRIDOR
C1-2
ELEVATOR
P1
ELEVATOR
P2
SHOP
G106
ELEVATOR
P4
ELEVATOR
P3
AUDIO
C1-18A
TRASH CHUTE
D130
LINEN
CHUTE
D131
IMAGE
G109
IMAGE
D100
CARDIAC NUCLEAR
IMAGING
D102
CONFERENCE
D106
CHIEF
D110C
FILE WORK AREA
D110D
NUCLEAR MEDICINE
D110
PHYS
D110A
TECH
D110B
EXAM
D105
PAT DOSE
D107
TOILET
D108
TOILET
D109
EXERCISE STRESS
TEST
D104
ELEVATOR
S7
DW
D128
DW
STAFF
TLT
D101
SOIL HLD
D103
STAIR
PET/CT RM
CW101D
Room
BE179
Room
BE183
HOT LAB
CW101E CORRIDOR
CW101
WAIT
C1-13A
CORRIDOR
C1-13
D104B
IMAGE PROCESS &
READ
D104A
STRET
C1-13B
CORRIDOR
C1-12
COMM
G107
ELECATRICAL
G108
CORRIDOR
C1-11
CORRIDOR
C1-8
CORRIDOR
C1-9
Room
AW105
ELEVATOR
S5
ELEVATOR
S6
EQUIPMENT
LINEN
C1-11A
Room
BW124
Room
BW129
Room
BW130
WAITING
SHARED
CONFERENCE ROOM
OFFICE
OFFICE
TOILET
E101
TOILET
E102
STAFF TOILET
E103
ENT
E104
EXAM
D127
SHAFT
EXAM
D126
EXAM
D124
EXAM
D122
EXAM
D125
PROCEDURE
D123
SURGICAL BLOCK
RM.
D116
MICRO
D117
MECH
D115
OFFICE
D114
LOUNGE
D112 LOCKERS
D112A
BIO MED LAB
STORAGE
D111
LOCKERS
D112C
TOLET
D112D
SWALLOW
D120
EXAM
D121
WTG
E100
CORRIDOR
C1-21
CORRIDOR
C1-19
LOBBY
C1-1B
PASS ELEVATOR
LOBBY
C1-1A
CORRIDOR
C1-15
TOILET
D112B
CORRIDOR
C1-1
CORRIDOR
C1-2
ELEVATOR
P1
ELEVATOR
P2
SHOP
G106
ELEVATOR
P4
ELEVATOR
P3
AUDIO
C1-18A
TRASH CHUTE
D130
LINEN
CHUTE
D131
HAC
D129
BATT
D182
IMAGE
G109
IMAGE
D100
CARDIAC NUCLEAR
IMAGING
D102
CONFERENCE
D106
CHIEF
D110C
FILE WORK AREA
D110D
NUCLEAR MEDICINE
D110
PHYS
D110A
TECH
D110B
EXAM
D105
PAT DOSE
D107
TOILET
D108
TOILET
D109
EXERCISE STRESS
TEST
D104
ELEVATOR
S7
DW
D128
DW
STAFF
TLT
D101
SOIL HLD
D103
STAIR
PET/CT RM
CW101D
Room
BE179
Room
BE183
HOT LAB
CW101E CORRIDOR
CW101
WAIT
C1-13A
CORRIDOR
C1-13
D104B
IMAGE PROCESS &
READ
D104A
STRET
C1-13B
CORRIDOR
C1-12
COMM
G107
ELECATRICAL
G108
CORRIDOR
C1-11
CORRIDOR
C1-8
CORRIDOR
C1-9
Room
AW105
ELEVATOR
S5
ELEVATOR
S6
EQUIPMENT
LINEN
C1-11A
Room
BW124
Room
BW129
Room
BW130
WAITING
SHARED
CONFERENCE ROOM
OFFICE
OFFICE
TOILET
E101
TOILET
E102
STAFF TOILET
E103
ENT
E104
EXAM
D127
SHAFT
EXAM
D126
EXAM
D124
EXAM
D122
EXAM
D125
PROCEDURE
D123
SURGICAL BLOCK
RM.
D116
MICRO
D117
MECH
D115
OFFICE
D114
LOUNGE
D112 LOCKERS
D112A
BIO MED LAB
STORAGE
D111
LOCKERS
D112C
TOLET
D112D
SWALLOW
D120
EXAM
D121
WTG
E100
CORRIDOR
C1-21
CORRIDOR
C1-19
LOBBY
C1-1B
PASS ELEVATOR
LOBBY
C1-1A
CORRIDOR
C1-15
TOILET
D112B
CORRIDOR
C1-1
CORRIDOR
C1-2
ELEVATOR
P1
ELEVATOR
P2
SHOP
G106
ELEVATOR
P4
ELEVATOR
P3
AUDIO
C1-18A
TRASH CHUTE
D130
LINEN
CHUTE
D131
HAC
D129
BATT
D182
IMAGE
G109
IMAGE
D100
CARDIAC NUCLEAR
IMAGING
D102
CONFERENCE
D106
CHIEF
D110C
FILE WORK AREA
D110D
NUCLEAR MEDICINE
D110
PHYS
D110A
TECH
D110B
EXAM
D105
PAT DOSE
D107
TOILET
D108
TOILET
D109
EXERCISE STRESS
TEST
D104
ELEVATOR
S7
DW
D128
DW
STAFF
TLT
D101
SOIL HLD
D103
STAIR
PET/CT RM
CW101D
Room
BE179
Room
BE183
HOT LAB
CW101E CORRIDOR
CW101
WAIT
C1-13A
CORRIDOR
C1-13
D104B
IMAGE PROCESS &
READ
D104A
STRET
C1-13B
CORRIDOR
C1-12
COMM
G107
ELECATRICAL
G108
CORRIDOR
C1-11
CORRIDOR
C1-8
CORRIDOR
C1-9
Room
AW105
ELEVATOR
S5
ELEVATOR
S6
EQUIPMENT
LINEN
C1-11A
Room
BW124
Room
BW129
Room
BW130
- 1 HR FIRE PARTITION
- 2 HR FIRE PARTITION
- 0 HR SMOKE PARTITION
- 1 HR FIRE/SMOKE PARTITION
- 2 HR FIRE/SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
GF
E D
BW
CW CE
J
BE
AE
7D 7E
7B7C
7A
5A
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project :
5BE5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is E
H R
M I n fr a s tr u c tu re /6
-7
.A
R C
H .2
.r v t
/1 /2
:5
:0
A M
B01A-AE101D
B01A FIRST LEVEL FLOOR PLAN -
SECTION D
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
1A
10/11/2023 LNS KJW
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01A-AE101D
1 B01A - FIRST LEVEL FLOOR PLAN - SECTION D
SCALE: 1/16" = 1'-0"B01A-AE101D
2 B01A - FIRST LEVEL CEILING PLAN - SECTION D
SCALE: 1/16" = 1'-0"B01A-AE101D
3 B01A - FIRST LEVEL DEMO PLAN - SECTION D
SCALE: 1/16" = 1'-0"B01A-AE101D
4 B01A - FIRST LEVEL DEMO CEILING PLAN - SECTION D
N
0' 8' 16'4' 32'
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6
AE413
SERVER ROOM
E107
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6
AE413
SERVER ROOM
E107
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6
AE414
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6
AE414
CORRIDOR
C1-26
STAFF / TECH
CLERICAL
E108
SPEECH GT ROOM
E129
SPEECH
E128
OFFICE
E127
OFFICE
E126
OFFICE
E125
PROGRAM
E108E
CONFERENCE
E108D
ASST CHIEF
E108C
IRMS CHIEF
E108B
SUPPLY
E106
MECH
E105
ELEC
E109
EAR MOLD
E110
INST CALB STOR
E111
AUDIO
E112
AUDIO
E114
AUDIO
E115OFFICE EXAM
E116
OFFICE EXAM
E117
ACOUSTI IMP
E119
AUDIO
E121
AUDIO
E123
AUDIO
E124
CORRIDOR
C1-23
CORRIDOR
C1-24
E122D
AUDIOLOGY
E129
ELEC
E130
COMM
E131
OFFICE
E132
OFFICE
E133
AUDIO GT RM
E134 WORK ROOM
E135
SOUND SUITE
E137
STORAGE
E136
E118A
SOUND SUITE
E118B
Room
419E122A
SOUND BOOTH
E122B
E122C
HAC
E138
E118D E118C TOILET
E101
TOILET
E102
STAFF TOILET
E103
ENT
E104
EXAM
D127
SHAFT
WTG
E100
CORRIDOR
C1-21
CORRIDOR
C1-19
CORRIDOR
C1-22
CORRIDOR
C1-1
REC/SEC
E113
AUDIO
C1-18A
CORRIDOR
C1-26
STAFF / TECH
CLERICAL
E108
SPEECH GT ROOM
E129
SPEECH
E128
OFFICE
E127
OFFICE
E126
OFFICE
E125
PROGRAM
E108E
CONFERENCE
E108D
ASST CHIEF
E108C
IRMS CHIEF
E108B
SUPPLY
E106
MECH
E105
ELEC
E109
EAR MOLD
E110
INST CALB STOR
E111
AUDIO
E112
AUDIO
E114
AUDIO
E115OFFICE EXAM
E116
OFFICE EXAM
E117
ACOUSTI IMP
E119
AUDIO
E121
AUDIO
E123
AUDIO
E124
CORRIDOR
C1-23
CORRIDOR
C1-24
E122D
AUDIOLOGY
E129
ELEC
E130
COMM
E131
OFFICE
E132
OFFICE
E133
AUDIO GT RM
E134 WORK ROOM
E135
SOUND SUITE
E137
STORAGE
E136
E118A
SOUND SUITE
E118B
Room
419E122A
SOUND BOOTH
E122B
E122C
HAC
E138
E118D E118C TOILET
E101
TOILET
E102
STAFF TOILET
E103
ENT
E104
EXAM
D127
SHAFT
WTG
E100
CORRIDOR
C1-21
CORRIDOR
C1-19
CORRIDOR
C1-22
CORRIDOR
C1-1
REC/SEC
E113
AUDIO
C1-18A
CORRIDOR
C1-26
STAFF / TECH
CLERICAL
E108
SPEECH GT ROOM
E129
SPEECH
E128
OFFICE
E127
OFFICE
E126
OFFICE
E125
PROGRAM
E108E
CONFERENCE
E108D
ASST CHIEF
E108C
IRMS CHIEF
E108B
COMPUTER
E107
SUPPLY
E106
MECH
E105
ELEC
E109
EAR MOLD
E110
INST CALB STOR
E111
AUDIO
E112
AUDIO
E114
AUDIO
E115OFFICE EXAM
E116
OFFICE EXAM
E117
ACOUSTI IMP
E119
AUDIO
E121
AUDIO
E123
AUDIO
E124
CORRIDOR
C1-23
CORRIDOR
C1-24
E122D
AUDIOLOGY
E129
ELEC
E130
COMM
E131
OFFICE
E132
OFFICE
E133
AUDIO GT RM
E134 WORK ROOM
E135
SOUND SUITE
E137
STORAGE
E136
E118A
SOUND SUITE
E118B
Room
419E122A
SOUND BOOTH
E122B
E122C
HAC
E138
E118D E118C TOILET
E101
TOILET
E102
STAFF TOILET
E103
ENT
E104
EXAM
D127
SHAFT
WTG
E100
CORRIDOR
C1-21
CORRIDOR
C1-19
CORRIDOR
C1-22
CORRIDOR
C1-1
REC/SEC
E113
AUDIO
C1-18A
CORRIDOR
C1-26
STAFF / TECH
CLERICAL
E108
SPEECH GT ROOM
E129
SPEECH
E128
OFFICE
E127
OFFICE
E126
OFFICE
E125
PROGRAM
E108E
CONFERENCE
E108D
ASST CHIEF
E108C
IRMS CHIEF
E108B
COMPUTER
E107
SUPPLY
E106
MECH
E105
ELEC
E109
EAR MOLD
E110
INST CALB STOR
E111
AUDIO
E112
AUDIO
E114
AUDIO
E115OFFICE EXAM
E116
OFFICE EXAM
E117
ACOUSTI IMP
E119
AUDIO
E121
AUDIO
E123
AUDIO
E124
CORRIDOR
C1-23
CORRIDOR
C1-24
E122D
AUDIOLOGY
E129
ELEC
E130
COMM
E131
OFFICE
E132
OFFICE
E133
AUDIO GT RM
E134 WORK ROOM
E135
SOUND SUITE
E137
STORAGE
E136
E118A
SOUND SUITE
E118B
Room
419E122A
SOUND BOOTH
E122B
E122C
HAC
E138
E118D E118C TOILET
E101
TOILET
E102
STAFF TOILET
E103
ENT
E104
EXAM
D127
SHAFT
WTG
E100
CORRIDOR
C1-21
CORRIDOR
C1-19
CORRIDOR
C1-22
CORRIDOR
C1-1
REC/SEC
E113
AUDIO
C1-18A
- 1 HR FIRE PARTITION
- 2 HR FIRE PARTITION
- 0 HR SMOKE PARTITION
- 1 HR FIRE/SMOKE PARTITION
- 2 HR FIRE/SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
GF
E D
BW
CW CE
J
BE
AE
7D 7E
7B7C
7A
5A
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project :
5BE5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is E
H R
M I n fr a s tr u c tu re /6
-7
.A
R C
H .2
.r v t
/1 /2
:5
:1
A M
B01A-AE101E
B01A FIRST LEVEL FLOOR PLAN -
SECTION E
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
1A
10/11/2023 LNS KJW
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01A-AE101E
1 B01A - FIRST LEVEL FLOOR PLAN - SECTION E
SCALE: 1/16" = 1'-0"B01A-AE101E
2 B01A - FIRST LEVEL CEILING PLAN - SECTION E
SCALE: 1/16" = 1'-0"B01A-AE101E
3 B01A - FIRST LEVEL DEMO PLAN - SECTION E
SCALE: 1/16" = 1'-0"B01A-AE101E
4 B01A - FIRST LEVEL DEMO CEILING PLAN - SECTION E
N
0' 8' 16'4' 32'
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6 B1A-7
AE406
TR
F101
B1A-M
B1A-L
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6 B1A-7
AE406
B1A-M
B1A-L
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6 B1A-7
AE406
B1A-M
B1A-L
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6 B1A-7
AE406
TR
F101
OFFICE
G142
OFFICE
G115 G146
OFFICE
G147
CONFERENCE
G140
STAIR / ELEV LOBBY
ELEV
MACHINE
ROOM
ELECTRICAL CHIEF
ASSIST CHIEF
SUPER
SUPER
WAITING
CLINICALTLTCLINICALCLINICAL
STUDENT
STUDENT TLT
CLINICAL
BREAK RM
SHARED
CONFERENCE ROOM
COMMON WORK
ROOM
CORRIDOR
C1-26
SPEECH GT ROOM
E129
AUDIOLOGY
E129
ELEC
E130
COMM
E131
OFFICE
E132
OFFICE
E133
AUDIO GT RM
E134 WORK ROOM
E135
OFFICE
WTG
E100
CORRIDOR
C1-1
MECHANICAL
VACANT SHELL
SPACE
OFFICE
G142
OFFICE
G115 G146
OFFICE
G147
CONFERENCE
G140
STAIR / ELEV LOBBY
ELEV
MACHINE
ROOM
ELECTRICAL CHIEF
ASSIST CHIEF
SUPER
SUPER
WAITING
CLINICALTLTCLINICALCLINICAL
STUDENT
STUDENT TLT
CLINICAL
BREAK RM
SHARED
CONFERENCE ROOM
COMMON WORK
ROOM
CORRIDOR
C1-26
SPEECH GT ROOM
E129
AUDIOLOGY
E129
ELEC
E130
COMM
E131
OFFICE
E132
OFFICE
E133
AUDIO GT RM
E134 WORK ROOM
E135
OFFICE
WTG
E100
CORRIDOR
C1-1
MECHANICAL
VACANT SHELL
SPACE
OFFICE
G142
OFFICE
G115 G146
OFFICE
G147
CONFERENCE
G140
STAIR / ELEV LOBBY
ELEV
MACHINE
ROOM
ELECTRICAL CHIEF
ASSIST CHIEF
SUPER
SUPER
WAITING
CLINICALTLTCLINICALCLINICAL
STUDENT
STUDENT TLT
CLINICAL
BREAK RM
SHARED
CONFERENCE ROOM
COMMON WORK
ROOM
CORRIDOR
C1-26
SPEECH GT ROOM
E129
AUDIOLOGY
E129
ELEC
E130
COMM
E131
OFFICE
E132
OFFICE
E133
AUDIO GT RM
E134 WORK ROOM
E135
OFFICE
WTG
E100
CORRIDOR
C1-1
MECHANICAL
I.T.
VACANT SHELL
SPACE
OFFICE
G142
OFFICE
G115 G146
OFFICE
G147
CONFERENCE
G140
STAIR / ELEV LOBBY
ELEV
MACHINE
ROOM
ELECTRICAL CHIEF
ASSIST CHIEF
SUPER
SUPER
WAITING
CLINICALTLTCLINICALCLINICAL
STUDENT
STUDENT TLT
CLINICAL
BREAK RM
SHARED
CONFERENCE ROOM
COMMON WORK
ROOM
CORRIDOR
C1-26
SPEECH GT ROOM
E129
AUDIOLOGY
E129
ELEC
E130
COMM
E131
OFFICE
E132
OFFICE
E133
AUDIO GT RM
E134 WORK ROOM
E135
OFFICE
WTG
E100
CORRIDOR
C1-1
MECHANICAL
VACANT SHELL
SPACE
I.T.
- 1 HR FIRE PARTITION
- 2 HR FIRE PARTITION
- 0 HR SMOKE PARTITION
- 1 HR FIRE/SMOKE PARTITION
- 2 HR FIRE/SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
GF
E D
BW
CW CE
J
BE
AE
7D 7E
7B7C
7A
5A
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project :
5BE5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is E
H R
M I n fr a s tr u c tu re /6
-7
.A
R C
H .2
.r v t
/1 /2
:5
:2
A M
B01A-AE101F
B01A FIRST LEVEL FLOOR PLAN -
SECTION F
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
1A
10/11/2023 LNS KJW
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01A-AE101F
2 B01A - FIRST LEVEL CEILING PLAN - SECTION F
SCALE: 1/16" = 1'-0"B01A-AE101F
3 B01A - FIRST LEVEL DEMO PLAN - SECTION F
SCALE: 1/16" = 1'-0"B01A-AE101F
4 B01A - FIRST LEVEL DEMO CEILING PLAN - SECTION F
SCALE: 1/16" = 1'-0"B01A-AE101F
1 B01A - FIRST LEVEL FLOOR PLAN - SECTION FN
0' 8' 16'4' 32'
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
AE407
2TR
G107
B1A-M
B1A-L
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
SLIDING SLIDINGSLIDING
AE407
B1A-M
B1A-L
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
AE407
B1A-M
B1A-L
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
AE407
TR
G107
MHC GROUP
THERAPY
AW144
MHC GROUP
THERAPY
AW 143
OFFICE
G142
G146
OFFICE
G147
CONFERENCE
G140
OFFICE
G139
OFFICE
G138
OFFICE
G137
OFFICE
G136
MECH
G119
OFFICE
G141
OFFICE
G132
OFFICE
G131
OFFICE
G133
OFFICE
G130
OFFICE
G134
OFFICE
G135
OFFICE
G148
CLASSROOM
G145
OFFICE
G159
OFFICE
G151
Room
Room
OFFICE
G153
COPIER
G152
STG
G149
LOUNGE
G114
BREAK
G117
BATH
G117A
ON CALL
G122
BATH
G122A
ON CALL
G123
ON CALL
G125
BATH
G125 A
ON CALL
G127
LIN
G118
HAC
G120
ON CALL
G124
ON CALL
G116
BATH
G115A
BATH
G124A
ON CALL
G115
ON CALL
G126
Room
CORRIDOR
C1-7
ASSIST CHIEF
SUPER
SUPER SUPER
WAITING
CLINICALCLINICALTLTCLINICAL
STUDENT TLT
SHARED
CONFERENCE ROOM
COMMON WORK
ROOM
CORRIDOR
C1-32
CORRIDOR
C1-31
CORRIDOR
C1-4
CORRIDOR
C1-1
CORRIDOR
C1-2
SHOP
G106
NVT MED STORAGE
G105
RADW STOR
G104
RES OFFICE
G102
HAC
G100
RECEPTION
G129
QUALITY
MANAGMENT
Room
G155
CONSULTATION
PSYCHIATRY
OFFICE
AW173TELECOM
AW175
STAIR
NO 5
STOR
G101
SHAFT
IMAGE
G112
IMAGE
G110
RADIO PHARM
G111
IMAGE
G109
IMAGE
D100
COMM
G107
ELECATRICAL
G108
CORRIDOR
C1-11
CORRIDOR
C1-8
CORRIDOR
C1-9
Room
AW105
EQUIPMENT
LINEN
C1-11A
Room
BW129
MHC GROUP
THERAPY
AW144
MHC GROUP
THERAPY
AW 143
OFFICE
G142
G146
OFFICE
G147
CONFERENCE
G140
OFFICE
G139
OFFICE
G138
OFFICE
G137
OFFICE
G136
MECH
G119
OFFICE
G141
OFFICE
G132
OFFICE
G131
OFFICE
G133
OFFICE
G130
OFFICE
G134
OFFICE
G135
OFFICE
G148
CLASSROOM
G145
OFFICE
G159
OFFICE
G151
Room
Room
OFFICE
G153
COPIER
G152
STG
G149
LOUNGE
G114
BREAK
G117
BATH
G117A
ON CALL
G122
BATH
G122A
ON CALL
G123
ON CALL
G125
BATH
G125 A
ON CALL
G127
LIN
G118
HAC
G120
ON CALL
G124
ON CALL
G116
BATH
G115A
BATH
G124A
ON CALL
G115
ON CALL
G126
Room
CORRIDOR
C1-7
ASSIST CHIEF
SUPER
SUPER SUPER
WAITING
CLINICALCLINICALTLTCLINICAL
STUDENT TLT
SHARED
CONFERENCE ROOM
COMMON WORK
ROOM
CORRIDOR
C1-32
CORRIDOR
C1-31
CORRIDOR
C1-4
CORRIDOR
C1-1
CORRIDOR
C1-2
SHOP
G106
NVT MED STORAGE
G105
RADW STOR
G104
RES OFFICE
G102
HAC
G100
RECEPTION
G129
QUALITY
MANAGMENT
Room
G155
CONSULTATION
PSYCHIATRY
OFFICE
AW173TELECOM
AW175
STAIR
NO 5
STOR
G101
SHAFT
IMAGE
G112
IMAGE
G110
RADIO PHARM
G111
IMAGE
G109
IMAGE
D100
COMM
G107
ELECATRICAL
G108
CORRIDOR
C1-11
CORRIDOR
C1-8
CORRIDOR
C1-9
Room
AW105
EQUIPMENT
LINEN
C1-11A
Room
BW129
MHC GROUP
THERAPY
AW144
MHC GROUP
THERAPY
AW 143
OFFICE
G142
G146
OFFICE
G147
CONFERENCE
G140
OFFICE
G139
OFFICE
G138
OFFICE
G137
OFFICE
G136
MECH
G119
OFFICE
G141
OFFICE
G132
OFFICE
G131
OFFICE
G133
OFFICE
G130
OFFICE
G134
OFFICE
G135
OFFICE
G148
CLASSROOM
G145
OFFICE
G159
OFFICE
G151
Room
Room
OFFICE
G153
COPIER
G152
STG
G149
LOUNGE
G114
BREAK
G117
BATH
G117A
ON CALL
G122
BATH
G122A
ON CALL
G123
ON CALL
G125
BATH
G125 A
ON CALL
G127
LIN
G118
HAC
G120
ON CALL
G124
ON CALL
G116
BATH
G115A
BATH
G124A
ON CALL
G115
ON CALL
G126
Room
CORRIDOR
C1-7
ASSIST CHIEF
SUPER
SUPER SUPER
WAITING
CLINICALCLINICALTLTCLINICAL
STUDENT TLT
SHARED
CONFERENCE ROOM
COMMON WORK
ROOM
CORRIDOR
C1-32
CORRIDOR
C1-31
CORRIDOR
C1-4
CORRIDOR
C1-1
CORRIDOR
C1-2
SHOP
G106
NVT MED STORAGE
G105
RADW STOR
G104
RES OFFICE
G102
HAC
G100
RECEPTION
G129
QUALITY
MANAGMENT
Room
G155
CONSULTATION
PSYCHIATRY
OFFICE
AW173TELECOM
AW175
STAIR
NO 5
STOR
G101
SHAFT
LOUNGE
G103
IMAGE
G112
IMAGE
G110
RADIO PHARM
G111
IMAGE
G109
IMAGE
D100
COMM
G107
ELECATRICAL
G108
CORRIDOR
C1-11
CORRIDOR
C1-8
CORRIDOR
C1-9
Room
AW105
EQUIPMENT
LINEN
C1-11A
Room
BW129
MHC GROUP
THERAPY
AW144
MHC GROUP
THERAPY
AW 143
OFFICE
G142
G146
OFFICE
G147
CONFERENCE
G140
OFFICE
G139
OFFICE
G138
OFFICE
G137
OFFICE
G136
MECH
G119
OFFICE
G141
OFFICE
G132
OFFICE
G131
OFFICE
G133
OFFICE
G130
OFFICE
G134
OFFICE
G135
OFFICE
G148
CLASSROOM
G145
OFFICE
G159
OFFICE
G151
Room
Room
OFFICE
G153
COPIER
G152
STG
G149
LOUNGE
G114
BREAK
G117
BATH
G117A
ON CALL
G122
BATH
G122A
ON CALL
G123
ON CALL
G125
BATH
G125 A
ON CALL
G127
LIN
G118
HAC
G120
ON CALL
G124
ON CALL
G116
BATH
G115A
BATH
G124A
ON CALL
G115
ON CALL
G126
Room
CORRIDOR
C1-7
ASSIST CHIEF
SUPER
SUPER SUPER
WAITING
CLINICALCLINICALTLTCLINICAL
STUDENT TLT
SHARED
CONFERENCE ROOM
COMMON WORK
ROOM
CORRIDOR
C1-32
CORRIDOR
C1-31
CORRIDOR
C1-4
CORRIDOR
C1-1
CORRIDOR
C1-2
SHOP
G106
NVT MED STORAGE
G105
RADW STOR
G104
RES OFFICE
G102
HAC
G100
RECEPTION
G129
QUALITY
MANAGMENT
Room
G155
CONSULTATION
PSYCHIATRY
OFFICE
AW173TELECOM
AW175
STAIR
NO 5
STOR
G101
SHAFT
LOUNGE
G103
IMAGE
G112
IMAGE
G110
RADIO PHARM
G111
IMAGE
G109
IMAGE
D100
COMM
G107
ELECATRICAL
G108
CORRIDOR
C1-11
CORRIDOR
C1-8
CORRIDOR
C1-9
Room
AW105
EQUIPMENT
LINEN
C1-11A
Room
BW129
- 1 HR FIRE PARTITION
- 2 HR FIRE PARTITION
- 0 HR SMOKE PARTITION
- 1 HR FIRE/SMOKE PARTITION
- 2 HR FIRE/SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
GF
E D
BW
CW CE
J
BE
AE
7D 7E
7B7C
7A
5A
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project :
5BE5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is E
H R
M I n fr a s tr u c tu re /6
-7
.A
R C
H .2
.r v t
/1 /2
:5
:3
A M
B01A-AE101G
B01A FIRST LEVEL FLOOR PLAN -
SECTION G
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
1A
10/11/2023 LNS KJW
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01A-AE101G
2 B01A - FIRST LEVEL CEILING PLAN - SECTION G
SCALE: 1/16" = 1'-0"B01A-AE101G
3 B01A - FIRST LEVEL DEMO PLAN - SECTION G
SCALE: 1/16" = 1'-0"B01A-AE101G
4 B01A - FIRST LEVEL DEMO CEILING PLAN - SECTION G
SCALE: 1/16" = 1'-0"B01A-AE101G
1 B01A - FIRST LEVEL FLOOR PLAN - SECTION GN
0' 8' 16'4' 32'
F201F201
AW216
AW218
AW218A
AW217
AW C1
AW268C AW268B
NO 5
BW202
BW235D
BW235A
BW235A
BW235A
CW C2
CW C5
CW C6
F221
F219
F218
F217
F212
F210
F205
F209
F204
F203
NO 16
E234
E232A
E232
E230
E228
E228A
E224A
E226
E224
E223
E222 E221 E220 E219
E219A
C2-10C
C2-10B C2-10
C2-10A
E218 E217
E217A
E216
E215A
E215
NO 15
E214
E213A
E213BE213E212
E211
E212B
E212A
E210
E210A
E208A
E208
E206
E207
E209E225
E227
C2-12A
C2-13
C2-11 C2-14
E204A
E204
E203
E200
E203A
E235
E236
E201
E233
E231
E202
E229
E205
C2-15 C2-2
F200
F201
F206
F202
F200A
F240
F239
F238
F237 F215
F208
F211
F213
F214
C2-17B
C2-17
C2-17A
C2-16
C2-19A
F235
F233 F216A
F216
C2-16A
C2-20A
C2-19
F220 F224
C2-20
F236
F234
F231A
F231 G217
F231B
F232
F230
F229
F228F227F226F225F223F222
F211A
C2-18
C2-21 C2-22
C2-23
C2-25
C2-22A
C2-2
C2-1 C2-1A
C2-1C
C2-6
C2-9
C2-8
C2-7
C2-4
C2-3B
C2-3A
D229 D228
E256
D230A
C2-6A
C2-6B
D231
D226
D225
D224
D232
NO P4 NO P3
NO P1 NO P2
C2-5
D208
NO S6
NO S5
NO S7
D223
NO 1
D206
NO 14
D221 D220 D218
D222
D219 D217
D216
D215
D214
D212
D213
D211
D210
D209
D207
D205
D203D204
D228A D227
D202
D200
D201
G232
G216
G218 G220
G219
G223
G222
G224
G221B
G221
G221C
G221A
G225B
G235
G227
G225A
G225
G225E
G225F
G225C
G225D
G226
G215A
G216A
G215
G214
G213
G211A
G212
G211
G207 G208
G209
G207A C2-24
G206 G205
G200
G205A
G201 G234 G233
G230
G228
G210
G204
G203
G202
G229
G231
C2-1D
2A
2B
AW216
AW218
AW218A
AW217
AW C1
AW268C AW268B
NO 5
BW202
BW235D
BW235A
BW235A
BW235A
CW C2
CW C5
CW C6
F221
F219
F218
F217
F212
F210
F205
F209
F204
F203
NO 16
E234
E232A
E232
E230
E228
E228A
E224A
E226
E224
E223
E222 E221 E220 E219
E219A
C2-10C
C2-10B C2-10
C2-10A
E218 E217
E217A
E216
E215A
E215
NO 15
E214
E213A
E213BE213E212
E211
E212B
E212A
E210
E210A
E208A
E208
E206
E207
E209E225
E227
C2-12A
C2-13
C2-11 C2-14
E204A
E204
E203
E200
E203A
E235
E236
E201
E233
E231
E202
E229
E205
C2-15 C2-2
F200
F201
F206
F202
F200A
F240
F239
F238
F237 F215
F208
F211
F213
F214
C2-17B
C2-17
C2-17A
C2-16
C2-19A
F235
F233 F216A
F216
C2-16A
C2-20A
C2-19
F220 F224
C2-20
F236
F234
F231A
F231 G217
F231B
F232
F230
F229
F228F227F226F225F223F222
F211A
C2-18
C2-21 C2-22
C2-23
C2-25
C2-22A
C2-2
C2-1 C2-1A
C2-1C
C2-6
C2-9
C2-8
C2-7
C2-4
C2-3B
C2-3A
D229 D228
E256
D230A
C2-6A
C2-6B
D231
D226
D225
D224
D232
NO P4 NO P3
NO P1 NO P2
C2-5
D208
NO S6
NO S5
NO S7
D223
NO 1
D206
NO 14
D221 D220 D218
D222
D219 D217
D216
D215
D214
D212
D213
D211
D210
D209
D207
D205
D203D204
D228A D227
D202
D200
D201
G232
G216
G218 G220
G219
G223
G222
G224
G221B
G221
G221C
G221A
G225B
G235
G227
G225A
G225
G225E
G225F
G225C
G225D
G226
G215A
G216A
G215
G214
G213
G211A
G212
G211
G207 G208
G209
G207A C2-24
G206 G205
G200
G205A
G201 G234 G233
G230
G228
G210
G204
G203
G202
G229
G231
C2-1D
2A
2B
AW216
AW218
AW218A
AW217
AW C1
AW268C AW268B
NO 5
BW202
BW235D
BW235A
BW235A
BW235A
CW C2
CW C5
CW C6
F221
F219
F218
F217
F212
F210
F205
F209
F204
F203
NO 16
E234
E232A
E232
E230
E228
E228A
E224A
E226
E224
E223
E222 E221 E220 E219
E219A
C2-10C
C2-10B C2-10
C2-10A
E218 E217
E217A
E216
E215A
E215
NO 15
E214
E213A
E213BE213E212
E211
E212B
E212A
E210
E210A
E208A
E208
E206
E207
E209E225
E227
C2-12A
C2-13
C2-11 C2-14
E204A
E204
E203
E200
E203A
E235
E236
E201
E233
E231
E202
E229
E205
C2-15 C2-2
F200
F201
F206
F202
F200A
F240
F239
F238
F237 F215
F208
F211
F213
F214
C2-17B
C2-17
C2-17A
C2-16
C2-19A
F235
F233 F216A
F216
C2-16A
C2-20A
C2-19
F220 F224
C2-20
F236
F234
F231A
F231 G217
F231B
F232
F230
F229
F228F227F226F225F223F222
F211A
C2-18
C2-21 C2-22
C2-23
C2-25
C2-22A
C2-2
C2-1 C2-1A
C2-1C
C2-6
C2-9
C2-8
C2-7
C2-4
C2-3B
C2-3A
D229 D228
E256
D230A
C2-6A
C2-6B
D231
D226
D225
D224
D232
NO P4 NO P3
NO P1 NO P2
C2-5
D208
NO S6
NO S5
NO S7
D223
NO 1
D206
NO 14
D221 D220 D218
D222
D219 D217
D216
D215
D214
D212
D213
D211
D210
D209
D207
D205
D203D204
D228A D227
D202
D200
D201
G232
G216
G218 G220
G219
G223
G222
G224
G221B
G221
G221C
G221A
G225B
G235
G227
G225A
G225
G225E
G225F
G225C
G225D
G226
G215A
G216A
G215
G214
G213
G211A
G212
G211
G207 G208
G209
G207A C2-24
G206 G205
G200
G205A
G201 G234 G233
G230
G228
G210
G204
G203
G202
G229
G231
C2-1D
2A
2B
AW216
AW218
AW218A
AW217
AW C1
AW268C AW268B
NO 5
BW202
BW235D
BW235A
BW235A
BW235A
CW C2
CW C5
CW C6
F221
F219
F218
F217
F212
F210
F205
F209
F204
F203
NO 16
E234
E232A
E232
E230
E228
E228A
E224A
E226
E224
E223
E222 E221 E220 E219
E219A
C2-10C
C2-10B C2-10
C2-10A
E218 E217
E217A
E216
E215A
E215
NO 15
E214
E213A
E213BE213E212
E211
E212B
E212A
E210
E210A
E208A
E208
E206
E207
E209E225
E227
C2-12A
C2-13
C2-11 C2-14
E204A
E204
E203
E200
E203A
E235
E236
E201
E233
E231
E202
E229
E205
C2-15 C2-2
F200
F201
F206
F202
F200A
F240
F239
F238
F237 F215
F208
F211
F213
F214
C2-17B
C2-17
C2-17A
C2-16
C2-19A
F235
F233 F216A
F216
C2-16A
C2-20A
C2-19
F220 F224
C2-20
F236
F234
F231A
F231 G217
F231B
F232
F230
F229
F228F227F226F225F223F222
F211A
C2-18
C2-21 C2-22
C2-23
C2-25
C2-22A
C2-2
C2-1 C2-1A
C2-1C
C2-6
C2-9
C2-8
C2-7
C2-4
C2-3B
C2-3A
D229 D228
E256
D230A
C2-6A
C2-6B
D231
D226
D225
D224
D232
NO P4 NO P3
NO P1 NO P2
C2-5
D208
NO S6
NO S5
NO S7
D223
NO 1
D206
NO 14
D221 D220 D218
D222
D219 D217
D216
D215
D214
D212
D213
D211
D210
D209
D207
D205
D203D204
D228A D227
D202
D200
D201
G232
G216
G218 G220
G219
G223
G222
G224
G221B
G221
G221C
G221A
G225B
G235
G227
G225A
G225
G225E
G225F
G225C
G225D
G226
G215A
G216A
G215
G214
G213
G211A
G212
G211
G207 G208
G209
G207A C2-24
G206 G205
G200
G205A
G201 G234 G233
G230
G228
G210
G204
G203
G202
G229
G231
C2-1D
2A
2B
- 1 HR FIRE PARTITION
- 2 HR FIRE PARTITION
- 0 HR SMOKE PARTITION
- 1 HR FIRE/SMOKE PARTITION
- 2 HR FIRE/SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
5A
AW AE
BW BE
CW CE
J
DE
F G
7C 7B
7A
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project :
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is E
H R
M I n fr a s tr u c tu re /6
-7
.A
R C
H .2
.r v t
/1 /2
:5
:5
A M
B01A-AE102
B01A SECOND LEVEL FLOOR PLAN
- OVERALL
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
1A
10/11/2023 LNS KJW
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1" = 30'-0"B01A-AE102
1 B01A - SECOND LEVEL FLOOR PLAN - OVERALL
SCALE: 1" = 30'-0"B01A-AE102
2 B01A - SECOND LEVEL CEILING PLAN - OVERALL
SCALE: 1" = 30'-0"B01A-AE102
3 B01A - SECOND LEVEL DEMO PLAN - OVERALL
SCALE: 1" = 30'-0"B01A-AE102
4 B01A - SECOND LEVEL DEMO CEILING PLAN - OVERALL
N
0' 15' 30' 60'
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
B1A-G2
B1A-G
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
B1A-G2
B1A-G
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
B1A-G2
B1A-G
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-6 B1A-7 B1A-7.9 B1A-8 B1A-9 B1A-9.5 B1A-10 B1A-11 B1A-12B1A-11.5
CANTEEN RETAIL
STORAGE
CW255
NEUTRISION - FOOD
OFFICE
CW267DCORRIDOR
CW C6
CORRIDOR
CW C2
STAFF DINING
BW202
DRY STORAGE
BW235D
KITCHEN
BW235A
BW235
PATIENT
E215
STAIR
NO 15
SHAFT
STORE
E214
CORRIDOR
C2-2
CORRIDOR
C2-2
CORRIDOR
C2-1
PASS ELEVATOR
LOBBY
C2-1A
WAITING
C2-1C
CORRIDOR
C2-6
CORRIDOR
C2-9
CORRIDOR
C2-8
CORRIDOR
C2-7
CORRIDOR
C2-4
CHART
C2-3B
CHART
C2-3A
MECH
D229
CARDIO/PULMONARY
REHAB
D228
Room
E256
CARDIOLOGY LIPID
CLINICREHAB OFFICE
CLERICAL/TECH
SUPV
D230A
RECEPTION
C2-6A
WAITING
C2-6B
TOILET
D231 HAC
D226
LINEN CHUTE
D225
TRASH CHUTE
D224
WOMENS TOILET
D232
ELEVATOR
NO P4
ELEVATOR
NO P3
ELEVATOR
NO P1
ELEVATOR
NO P2
SVC ELEVATOR
LOBBY
C2-5
NURSE/TECH WORK
D208
ELEVATOR
NO S6
ELEVATOR
NO S5
ELEVATOR
NO S7
DW
D223
DW
NO 1
VIEW/READ
D206
STAIR
NO 14
EXAM
D221
EXAM
D220
EXAM
D218
PRINTER
D222 EXAM
D219
EXAM
D217
BIOMED
D216
SUPPLY
D215
EXAM
D214
EXAM
D212
EXAM
D213
EXAM
D211
EXAM
D210
LAB
D209
PACEMAKER
D207
ECG
D205
ECHO
D203
HAC
D204
TOILET/SHOWER
D228A
TOILET FILE STORAGE
D227
PATIENT TOILET
D202
TOILET
D200
ECHO
D201
STRESS LAB
G232
BREAK RM
G200 PATIENT FILE
G201
COMM
G234
ELECTRICAL
G233
CRIT CARE WAITNG
C2-1D
CANTEEN RETAIL
STORAGE
CW255
NEUTRISION - FOOD
OFFICE
CW267DCORRIDOR
CW C6
CORRIDOR
CW C2
STAFF DINING
BW202
DRY STORAGE
BW235D
KITCHEN
BW235A
BW235
PATIENT
E215
STAIR
NO 15
SHAFT
STORE
E214
CORRIDOR
C2-2
CORRIDOR
C2-2
CORRIDOR
C2-1
PASS ELEVATOR
LOBBY
C2-1A
WAITING
C2-1C
CORRIDOR
C2-6
CORRIDOR
C2-9
CORRIDOR
C2-8
CORRIDOR
C2-7
CORRIDOR
C2-4
CHART
C2-3B
CHART
C2-3A
MECH
D229
CARDIO/PULMONARY
REHAB
D228
Room
E256
CARDIOLOGY LIPID
CLINICREHAB OFFICE
CLERICAL/TECH
SUPV
D230A
RECEPTION
C2-6A
WAITING
C2-6B
TOILET
D231 HAC
D226
LINEN CHUTE
D225
TRASH CHUTE
D224
WOMENS TOILET
D232
ELEVATOR
NO P4
ELEVATOR
NO P3
ELEVATOR
NO P1
ELEVATOR
NO P2
SVC ELEVATOR
LOBBY
C2-5
NURSE/TECH WORK
D208
ELEVATOR
NO S6
ELEVATOR
NO S5
ELEVATOR
NO S7
DW
D223
DW
NO 1
VIEW/READ
D206
STAIR
NO 14
EXAM
D221
EXAM
D220
EXAM
D218
PRINTER
D222 EXAM
D219
EXAM
D217
BIOMED
D216
SUPPLY
D215
EXAM
D214
EXAM
D212
EXAM
D213
EXAM
D211
EXAM
D210
LAB
D209
PACEMAKER
D207
ECG
D205
ECHO
D203
HAC
D204
TOILET/SHOWER
D228A
TOILET FILE STORAGE
D227
PATIENT TOILET
D202
TOILET
D200
ECHO
D201
STRESS LAB
G232
BREAK RM
G200 PATIENT FILE
G201
COMM
G234
ELECTRICAL
G233
CRIT CARE WAITNG
C2-1D
CANTEEN RETAIL
STORAGE
CW255
NEUTRISION - FOOD
OFFICE
CW267DCORRIDOR
CW C6
CORRIDOR
CW C2
STAFF DINING
BW202
DRY STORAGE
BW235D
KITCHEN
BW235A
BW235
PATIENT
E215
STAIR
NO 15
SHAFT
STORE
E214
CORRIDOR
C2-2
CORRIDOR
C2-2
CORRIDOR
C2-1
PASS ELEVATOR
LOBBY
C2-1A
WAITING
C2-1C
CORRIDOR
C2-6
CORRIDOR
C2-9
CORRIDOR
C2-8
CORRIDOR
C2-7
CORRIDOR
C2-4
CHART
C2-3B
CHART
C2-3A
MECH
D229
CARDIO/PULMONARY
REHAB
D228
Room
E256
CARDIOLOGY LIPID
CLINICREHAB OFFICE
CLERICAL/TECH
SUPV
D230A
RECEPTION
C2-6A
WAITING
C2-6B
TOILET
D231 HAC
D226
LINEN CHUTE
D225
TRASH CHUTE
D224
WOMENS TOILET
D232
ELEVATOR
NO P4
ELEVATOR
NO P3
ELEVATOR
NO P1
ELEVATOR
NO P2
SVC ELEVATOR
LOBBY
C2-5
NURSE/TECH WORK
D208
ELEVATOR
NO S6
ELEVATOR
NO S5
ELEVATOR
NO S7
DW
D223
DW
NO 1
VIEW/READ
D206
STAIR
NO 14
EXAM
D221
EXAM
D220
EXAM
D218
PRINTER
D222 EXAM
D219
EXAM
D217
BIOMED
D216
SUPPLY
D215
EXAM
D214
EXAM
D212
EXAM
D213
EXAM
D211
EXAM
D210
LAB
D209
PACEMAKER
D207
ECG
D205
ECHO
D203
HAC
D204
TOILET/SHOWER
D228A
TOILET FILE STORAGE
D227
PATIENT TOILET
D202
TOILET
D200
ECHO
D201
STRESS LAB
G232
BREAK RM
G200 PATIENT FILE
G201
COMM
G234
ELECTRICAL
G233
CRIT CARE WAITNG
C2-1D
CANTEEN RETAIL
STORAGE
CW255
NEUTRISION - FOOD
OFFICE
CW267DCORRIDOR
CW C6
CORRIDOR
CW C2
STAFF DINING
BW202
DRY STORAGE
BW235D
KITCHEN
BW235A
BW235
PATIENT
E215
STAIR
NO 15
SHAFT
STORE
E214
CORRIDOR
C2-2
CORRIDOR
C2-2
CORRIDOR
C2-1
PASS ELEVATOR
LOBBY
C2-1A
WAITING
C2-1C
CORRIDOR
C2-6
CORRIDOR
C2-9
CORRIDOR
C2-8
CORRIDOR
C2-7
CORRIDOR
C2-4
CHART
C2-3B
CHART
C2-3A
MECH
D229
CARDIO/PULMONARY
REHAB
D228
Room
E256
CARDIOLOGY LIPID
CLINICREHAB OFFICE
CLERICAL/TECH
SUPV
D230A
RECEPTION
C2-6A
WAITING
C2-6B
TOILET
D231 HAC
D226
LINEN CHUTE
D225
TRASH CHUTE
D224
WOMENS TOILET
D232
ELEVATOR
NO P4
ELEVATOR
NO P3
ELEVATOR
NO P1
ELEVATOR
NO P2
SVC ELEVATOR
LOBBY
C2-5
NURSE/TECH WORK
D208
ELEVATOR
NO S6
ELEVATOR
NO S5
ELEVATOR
NO S7
DW
D223
DW
NO 1
VIEW/READ
D206
STAIR
NO 14
EXAM
D221
EXAM
D220
EXAM
D218
PRINTER
D222 EXAM
D219
EXAM
D217
BIOMED
D216
SUPPLY
D215
EXAM
D214
EXAM
D212
EXAM
D213
EXAM
D211
EXAM
D210
LAB
D209
PACEMAKER
D207
ECG
D205
ECHO
D203
HAC
D204
TOILET/SHOWER
D228A
TOILET FILE STORAGE
D227
PATIENT TOILET
D202
TOILET
D200
ECHO
D201
STRESS LAB
G232
BREAK RM
G200 PATIENT FILE
G201
COMM
G234
ELECTRICAL
G233
CRIT CARE WAITNG
C2-1D
- 1 HR FIRE PARTITION
- 2 HR FIRE PARTITION
- 0 HR SMOKE PARTITION
- 1 HR FIRE/SMOKE PARTITION
- 2 HR FIRE/SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
5A
AW AE
BW BE
CW CE
J
DE
F G
7C 7B
7A
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project :
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is E
H R
M I n fr a s tr u c tu re /6
-7
.A
R C
H .2
.r v t
/1 /2
:5
:0
A M
B01A-AE102D
B01A SECOND LEVEL FLOOR PLAN
- SECTION D
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
1A
10/11/2023 LNS KJW
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01A-AE102D
1 B01A - SECOND LEVEL FLOOR PLAN - SECTION D
SCALE: 1/16" = 1'-0"B01A-AE102D
2 B01A - SECOND LEVEL CEILING PLAN - SECTION D
SCALE: 1/16" = 1'-0"B01A-AE102D
3 B01A - SECOND LEVEL DEMO PLAN - SECTION D
SCALE: 1/16" = 1'-0"B01A-AE102D
4 B01A - SECOND LEVEL DEMO CEILING PLAN - SECTION D
N
0' 8' 16'4' 32'
**NOTE: REFERENCE ENLARGED PLANS FOR ADDITIONAL INFORMATION
NO ARCHITECTURAL WORK SCHEDULED
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6
B1A-F
B1A-E
B1A-E.8
B1A-E.9
B1A-D.9
B1A-E.2
B1A-D
B1A-C.9
B1A-D.2
B1A-C
B1A-B.9
B1A-C.2
B1A-A
B1A-B
B1A-B.2
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6
STAIR
NO 16
STORAGE
E234
BATH
E232A
PATIENT
E232
PATIENT
E230
PATIENT
E228
BATH
E228A
BATH
E224A
PATIENT
E226
PATIENT
E224
E223
DAY RM
E222
HEAD
E221
PATIENT
E220
PATIENT
E219
BATH
E219A
NURSE STATION
C2-10C
CORRIDOR
C2-10B
CORRIDOR
C2-10
CRASH
C2-10A
PATIENT
E218
PATIENT
E217
BATH
E217A
PATIENT
E216
BATH
E215A
PATIENT
E215
STAIR
NO 15
SHAFT
STORE
E214
ISO
E213A
BATH
E213B
ANTE
E213
ANTE
E212
ELECTRICAL
E211
BATH
E212B
ISO
E212A
WORK RM
E210
DICT
E210A
BATH
E208A
PATIENT
E208
PATIENT
E206
CLEAN LINEN
E207
NOUR
E209
MED
E225
CU
E227
CORRIDOR
C2-12A
CORRIDOR
C2-13
CORRIDOR
C2-11
CORRIDOR
C2-14 BATH
E204A
PATIENT
E204
OFFICE
E203
MONITOR RM
E200
BATH
E203A
ELECTRICAL
E235
COMM
E236
PHYS CONS
E201
HAC
E233
TOILET
E231
EXAM
E202
SU
E229 LOUNGE/LKRS
E205
CORRIDOR
C2-15
STAIR
NO 16
STORAGE
E234
BATH
E232A
PATIENT
E232
PATIENT
E230
PATIENT
E228
BATH
E228A
BATH
E224A
PATIENT
E226
PATIENT
E224
E223
DAY RM
E222
HEAD
E221
PATIENT
E220
PATIENT
E219
BATH
E219A
NURSE STATION
C2-10C
CORRIDOR
C2-10B
CORRIDOR
C2-10
CRASH
C2-10A
PATIENT
E218
PATIENT
E217
BATH
E217A
PATIENT
E216
BATH
E215A
PATIENT
E215
STAIR
NO 15
SHAFT
STORE
E214
ISO
E213A
BATH
E213B
ANTE
E213
ANTE
E212
ELECTRICAL
E211
BATH
E212B
ISO
E212A
WORK RM
E210
DICT
E210A
BATH
E208A
PATIENT
E208
PATIENT
E206
CLEAN LINEN
E207
NOUR
E209
MED
E225
CU
E227
CORRIDOR
C2-12A
CORRIDOR
C2-13
CORRIDOR
C2-11
CORRIDOR
C2-14 BATH
E204A
PATIENT
E204
OFFICE
E203
MONITOR RM
E200
BATH
E203A
ELECTRICAL
E235
COMM
E236
PHYS CONS
E201
HAC
E233
TOILET
E231
EXAM
E202
SU
E229 LOUNGE/LKRS
E205
CORRIDOR
C2-15
STAIR
NO 16
STORAGE
E234
BATH
E232A
PATIENT
E232
PATIENT
E230
PATIENT
E228
BATH
E228A
BATH
E224A
PATIENT
E226
PATIENT
E224
E223
DAY RM
E222
HEAD
E221
PATIENT
E220
PATIENT
E219
BATH
E219A
NURSE STATION
C2-10C
CORRIDOR
C2-10B
CORRIDOR
C2-10
CRASH
C2-10A
PATIENT
E218
PATIENT
E217
BATH
E217A
PATIENT
E216
BATH
E215A
PATIENT
E215
STAIR
NO 15
SHAFT
STORE
E214
ISO
E213A
BATH
E213B
ANTE
E213
ANTE
E212
ELECTRICAL
E211
BATH
E212B
ISO
E212A
WORK RM
E210
DICT
E210A
BATH
E208A
PATIENT
E208
PATIENT
E206
CLEAN LINEN
E207
NOUR
E209
MED
E225
CU
E227
CORRIDOR
C2-12A
CORRIDOR
C2-13
CORRIDOR
C2-11
CORRIDOR
C2-14 BATH
E204A
PATIENT
E204
OFFICE
E203
MONITOR RM
E200
BATH
E203A
ELECTRICAL
E235
COMM
E236
PHYS CONS
E201
HAC
E233
TOILET
E231
EXAM
E202
SU
E229 LOUNGE/LKRS
E205
CORRIDOR
C2-15
STAIR
NO 16
STORAGE
E234
BATH
E232A
PATIENT
E232
PATIENT
E230
PATIENT
E228
BATH
E228A
BATH
E224A
PATIENT
E226
PATIENT
E224
E223
DAY RM
E222
HEAD
E221
PATIENT
E220
PATIENT
E219
BATH
E219A
NURSE STATION
C2-10C
CORRIDOR
C2-10B
CORRIDOR
C2-10
CRASH
C2-10A
PATIENT
E218
PATIENT
E217
BATH
E217A
PATIENT
E216
BATH
E215A
PATIENT
E215
STAIR
NO 15
SHAFT
STORE
E214
ISO
E213A
BATH
E213B
ANTE
E213
ANTE
E212
ELECTRICAL
E211
BATH
E212B
ISO
E212A
WORK RM
E210
DICT
E210A
BATH
E208A
PATIENT
E208
PATIENT
E206
CLEAN LINEN
E207
NOUR
E209
MED
E225
CU
E227
CORRIDOR
C2-12A
CORRIDOR
C2-13
CORRIDOR
C2-11
CORRIDOR
C2-14 BATH
E204A
PATIENT
E204
OFFICE
E203
MONITOR RM
E200
BATH
E203A
ELECTRICAL
E235
COMM
E236
PHYS CONS
E201
HAC
E233
TOILET
E231
EXAM
E202
SU
E229 LOUNGE/LKRS
E205
CORRIDOR
C2-15
- 1 HR FIRE PARTITION
- 2 HR FIRE PARTITION
- 0 HR SMOKE PARTITION
- 1 HR FIRE/SMOKE PARTITION
- 2 HR FIRE/SMOKE PARTITION
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
5A
AW AE
BW BE
CW CE
J
DE
F G
7C 7B
7A
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com
SES Project :
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project :
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V
A M e m p h is E
H R
M I n fr a s tr u c tu re /6
-7
.A
R C
H .2
.r v t
/1 /2
:5
:1
A M
B01A-AE102E
B01A SECOND LEVEL FLOOR PLAN
- SECTION E
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
1A
10/11/2023 LNS KJW
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/16" = 1'-0"B01A-AE102E
1 B01A - SECOND LEVEL FLOOR PLAN - SECTION E
SCALE: 1/16" = 1'-0"B01A-AE102E
2 B01A - SECOND LEVEL CEILING PLAN - SECTION E
SCALE: 1/16" = 1'-0"B01A-AE102E
3 B01A - SECOND LEVEL DEMO PLAN - SECTION E
SCALE: 1/16" = 1'-0"B01A-AE102E
4 B01A - SECOND LEVEL DEMO CEILING PLAN - SECTION E
N
0' 8' 16'4' 32'
**NOTE: REFERENCE ENLARGED PLANS FOR ADDITIONAL INFORMATION
NO ARCHITECTURAL WORK SCHEDULED
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6 B1A-7
AE407
TR
F201
B1A-M
B1A-L
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6 B1A-7
AE407
TR
F201
B1A-M
B1A-L
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6 B1A-7
AE407
B1A-M
B1A-L
B1A-K.9
B1A-K.1
B1A-K
B1A-J.9
B1A-J.1
B1A-J
B1A-H.9
B1A-H.2
B1A-H
B1A-G.9
B1A-H.3
B1A-G3
B1A-G2
B1A-G
B1A-F
B1A-E.9
B1A-1 B1A-1.1 B1A-2 B1A-3 B1A-4 B1A-4.8 B1A-5 B1A-5.1 B1A-6 B1A-7
AE407
MICU PATIENT RM
F221
MICU PATIENT RM
F219
MICU PATIENT RM
F218
MICU PATIENT RM
F217
MICU PATIENT RM
F212
MICU PATIENT RM
F210
PHYS OFFICE
F205
ANTE
F209
PHYS OFFICE
F204
HAC
F203
STAIR
NO 16
STORAGE
E234
MONITOR RM
E200
ELECTRICAL
E235
COMM
E236
CORRIDOR
C2-15
CORRIDOR
C2-2
SAT PHARM
F200
FAMILY CONSULT
F201
OFFICE
F206
CONSULT
F202
STERILE PREP
F200A
PRACTICE RM
F240
CICU PATIENT RM
F239
CICU PATIENT RM
F238
CICU PATIENT RM
F237
CLEAN UTILITY
F215
OFFICE
F208
ON CALL
F211
S U
F213
ON CALL
F214
PORT X-RAY
C2-17B
CORRIDOR
C2-17
STRETCH/WHEELCHR
C2-17A
CORRIDOR
C2-16
CONTROL
C2-19A
CLEAN LINEN
F235
EQUIP
F233
NOURISHMENT
F216A
CLEAN UTILITY
F216
MICU
C2-16A
CONTROL
C2-20A
CORRIDOR
C2-19
MED
F220
COMP EQUIP
F224
CORRIDOR
C2-20
CICU PATIENT RM
F236
CICU PATIENT RM
F234
LOCKER
F231A BREAK
F231
BLOOD GAS
G217
STAFF TOILET
F231B
TOILET
F232
STAIR
CLASS/CONFERENCE
RM
F230
ANTE
F229
MICU PATIENT RM
F228
MICU PATIENT RM
F227
MICU PATIENT RM
F226MICU PATIENT RM
F225
MICU PATIENT RM
F223
MICU PATIENT RM
F222
BATH
F211A
CORRIDOR
C2-18
CORRIDOR
C2-2
MICU PATIENT RM
F221
MICU PATIENT RM
F219
MICU PATIENT RM
F218
MICU PATIENT RM
F217
MICU PATIENT RM
F212
MICU PATIENT RM
F210
PHYS OFFICE
F205
ANTE
F209
PHYS OFFICE
F204
HAC
F203
STAIR
NO 16
STORAGE
E234
MONITOR RM
E200
ELECTRICAL
E235
COMM
E236
CORRIDOR
C2-15
SAT PHARM
F200
FAMILY CONSULT
F201
OFFICE
F206
CONSULT
F202
STERILE PREP
F200A
PRACTICE RM
F240
CICU PATIENT RM
F239
CICU PATIENT RM
F238
CICU PATIENT RM
F237
CLEAN UTILITY
F215
OFFICE
F208
ON CALL
F211
S U
F213
ON CALL
F214
PORT X-RAY
C2-17B
CORRIDOR
C2-17
STRETCH/WHEELCHR
C2-17A
CORRIDOR
C2-16
CONTROL
C2-19A
CLEAN LINEN
F235
EQUIP
F233
NOURISHMENT
F216A
CLEAN UTILITY
F216
MICU
C2-16A
CONTROL
C2-20A
CORRIDOR
C2-19
MED
F220
COMP EQUIP
F224
CORRIDOR
C2-20
CICU PATIENT RM
F236
CICU PATIENT RM
F234
LOCKER
F231A BREAK
F231
BLOOD GAS
G217
STAFF TOILET
F231B
TOILET
F232
STAIR
CLASS/CONFERENCE
RM
F230
ANTE
F229
MICU PATIENT RM
F228
MICU PATIENT RM
F227
MICU PATIENT RM
F226MICU PATIENT RM
F225
MICU PATIENT RM
F223
MICU PATIENT RM
F222
BATH
F211A
CORRIDOR
C2-18
CORRIDOR
C2-2
MICU PATIENT RM
F221
MICU PATIENT RM
F219
MICU PATIENT RM
F218
MICU PATIENT RM
F217
MICU PATIENT RM
F212
MICU…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .