Drawing Vol 1-7 Fire Protection 614-700-FX-20231011.pdf
PDF 13 MB Posted
- Attached to
- Y1DA--614-22-700 EHRM Infrastructure Upgrades Construction Memphis TN Federal contract opportunity
- Solicitation number
- 36C77624B0013_1
About this file
This document appears to be a drawing volume related to the fire protection aspects of the EHRM Infrastructure Upgrades Construction project at the Memphis, TN VAMC.
The associated federal contract opportunity is a solicitation (Solicitation Number: 36C77624B0013_1) issued by the Department of Veterans Affairs Technology Acquisition Center Austin for the EHRM Infrastructure Upgrades Construction project at the Memphis, TN VAMC. The project involves construction work on the EHRM infrastructure. The solicitation closing date is not provided. The contracting agency is the Department of Veterans Affairs.
View the file
Other files for this federal contract opportunity
Show all 44
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE PROTECTION SYMBOL LIST
SYMBOL: DESCRIPTION:
FIRE PROTECTIONFP
FIRE PROTECTION - DRY SYSTEMFPD
SERVICE WATER - POTABLEW
AIR PRESSURE MAINTENANCE DEVICE
AIR SUPERVISORY SWITCH
ANGLE VALVE
BUTTERFLY VALVE WITH MONITOR SWITCH
OS&Y GATE VALVE
OS&Y GATE VALVE WITH MONITOR SWITCH
PRESSURE SWITCH
P
LIGHT HAZARD
ORDINARY GROUP 1
ORDINARY GROUP 2
SPRINKLER - WALL MOUNTED
SPRINKLER
INSPECTOR TEST AND DRAIN VALVE
MONITOR SWITCH
COMPRESSED AIR - FIRE PROTECTIONCAF
PIPE CAP
PIPE DOWN
PIPE UP OR UP/DOWN
SHUTOFF VALVE NORMALLY OPEN
DEMOLITION
DRAINDFP
NOT ALL SYMBOLS MAY APPLY.
AUTOMATIC DRAIN VALVE
UNION/FLANGE
DIRECTION OF FLOW IN PIPE
PRESSURE GAUGE (FURNISHED WITH BALL VALVE)P
CHECK VALVE
FLOW SWITCH
F
ROUTE TO DRAIN
AREA BOUNDARY
BACKFLOW PREVENTER
FIRE PROTECTION ABBREVIATION KEY
AD ACCESS DOOR
BFP BACKFLOW PREVENTER
N.C. NORMALLY CLOSED
ABOVE FINISHED FLOORAFF
NOT IN CONTRACTNIC
NORMALLY OPENN.O.
ABBR: DESCRIPTION:
TYPICALTYP
UNLESS OTHERWISE NOTEDUON
I.E. INVERT ELEVATION
SHORT CIRCUIT CURRENT RATINGSCCR
PLAN OR DETAIL NUMBER
PLAN OR DETAIL NAME
PLAN OR DETAIL SCALE
DETAIL REFERRED TO BY SECTION CUT
SHEET DETAIL IS LOCATED ON
NAME
VIEW NAME
1/8" = 1'-0"
M101
SIMSIM
INDICATES SIMILAR DETAIL REFERENCED
IN MULTIPLE LOCATIONS
LEVEL NAME
10'-0" HEIGHT ABOVE
PROJECT 0'-0"
1 INDICATES NOTE USED TO DESCRIBE
ADDITIONAL INFORMATION ABOUT
WORK REQUIRED, SPECIFIC TO THE
SHEET AND/OR DETAIL
N O R
HT
INDICATES DIRECTION OF TRUE NORTH
VIEW KEY
LINE TYPE AND TAG KEY:
NEW WORK BY THIS CONTRACTOR (WIDE LINE)
NEW
EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
EXISTING
EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
HALFTONING DOES NOT MODIFY SCOPE.
'TAG'-E TAGS WITH DASH 'E' INDICATES THE REFERENCED OBJECT IS EXISTING
TAG UNDERLINED TAG INDICATES OBJECT IS IN-SCOPE. IF NEW, ADDITIONAL
INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
T101
THE LINE TYPES SHOWN ARE FOR THE CONVENIENCE OF THE CONTRACTOR. THE CONTRACTOR
SHALL VERIFY RATINGS WITH THE LATEST SET OF ARCHITECTURAL PLANS AND FURNISH ALL
MATERIALS REQUIRED TO COMPLY WITH THOSE RATINGS WHETHER SHOWN OR NOT.
FIRE / SMOKE BARRIER DESIGNATIONS
2 HOUR FIRE PARTITION
SMOKE PARTITION
1 HOUR FIRE/SMOKE PARTITION
2 HOUR FIRE/SMOKE PARTITION
1 HOUR FIRE PARTITION
INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES: V3.1, JULY 1, 2021
VA FIRE PROTECTION DESIGN MANUAL: 8TH ED., JUNE 1, 2021
VA PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL: REV. JULY 1, 2021
VA PLUMBING DESIGN MANUAL: REV. JUNE 1, 2022
VA HVAC DESIGN MANUAL: REV. OCTOBER 1, 2022
VA SITE DESIGN MANUAL: REV. APRIL 1, 2021
NFPA 13 INSTALLATION OF SPRINKLER SYSTEMS: 2022 EDITION
NFPA 72 FIRE ALARM AND SIGNALING CODE: 2022 EDITION
NFPA 75 FIRE PROTECTION OF IT EQUIPTMENT: 2020 EDITION
NFPA 99 HEALTHCARE FACILITIES CODE: 2021 EDITION
NFPA 101 LIFE SAFETY CODE: 2021 EDITION
NFPA 2001 CLEAN AGENT FIRE EXTINGUISHING SYSTEMS: 2022 EDITION
INTERNATIONAL BUILDING CODE: 2021 EDITION
INTERNATIONAL MECHANICAL CODE: 2021 EDITION
INTERNATIONAL PLUMBING CODE: 2021 EDITION
APPLICABLE CODES AND STANDARDS
CONTRACTOR SHALL COMPLY WITH APPLICABLE CODES AND LOCAL AMENDMENTS.
MECHANICAL GENERAL NOTES:
THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
TO, FIRE PROTECTION, PLUMBING, MEDICAL GAS, VENTILATION, PIPING AND TEMPERATURE
CONTROL.
1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
WITH FABRICATION OR EQUIPMENT ORDERS.
4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
ACCESS.
5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
EXPENSE TO OTHERS.
6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
DESIGN.
7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
AUDIO/VISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
MOUNTED DEVICES, OTHER THAN SPRINKLERS.
8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
FINISH.
9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
PANELS PRIOR TO BIDDING.
10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
FOR OUTDOOR USE.
11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON-FIRE RATED WALL,
PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
WITHIN ROOMS.
12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
PIPING, DUCTWORK, ETC.
14. DO NOT BLOCK EQUIPMENT SERVICE CLEARANCES.
15. MAINTAIN A MINIMUM WORKING CLEARANCE OF 3’-6” IN FRONT OF ALL ELECTRICAL
EQUIPMENT REQUIRING MAINTENANCE, INSPECTION, AND TESTING INCLUDING BUT NOT
LIMITED TO PANELS, DISTRIBUTION PANELS, SWITCHBOARDS, MOTOR CONTROL CENTERS,
TRANSFORMERS, EQUIPMENT DISCONNECTS AND STARTERS.
16. MAINTAIN THE DEDICATED ELECTRICAL EQUIPMENT SPACE DEFINED BY THE WIDTH / DEPTH
OF ELECTRICAL EQUIPMENT MEASURED FROM THE FLOOR TO A HEIGHT 6’-0” ABOVE THE
EQUIPMENT OR THE STRUCTURAL CEILING, WHICHEVER IS LOWER. SYSTEMS FOREIGN TO
THE ELECTRICAL DISTRIBUTION SYSTEM ARE NOT ALLOWED IN THE DEDICATED
ELECTRICAL SPACE INCLUDING: DUCTWORK, PIPING, ETC.
17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
MECHANICAL RENOVATION NOTES:
1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
SURVEYS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY EXISTING CONDITIONS AND
REPORT ANY CONFLICTS BEFORE PROCEEDING.
2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
CONDITIONS.
4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF THEIR WORK AND
SHALL NOTIFY THE ARCHITECT/ENGINEER PRIOR TO BIDDING IF OTHER UTILITIES ARE
REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO THEIR AREA OF WORK.
5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR CUTTING, REMOVAL AND PATCHING OF
ROOFS, WALLS, AND FLOORS ASSOCIATED WITH WORK BY ALL CONTRACTORS.
CONTRACTORS SHALL NOTIFY THE GC OF AFFECTED AREAS PRIOR TO BIDDING.
6. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILINGS, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
BIDDING.
7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
REMAIN ACTIVE.
9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
SYSTEMS ARE INSTALLED.
10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
THAT HAS BEEN REMOVED.
MECHANICAL PHASING NOTES:
1. REFER TO ARCHITECTURAL DRAWINGS FOR GENERAL DESCRIPTION OF PHASES. REFER TO
ARCHITECT'S INSTRUCTIONS FOR MORE DETAILS AND PHASING SCHEDULES AND FOR
CONCURRENT WORK. MECHANICAL, ELECTRICAL AND TECHNOLOGY DRAWINGS DEPICT
THE INTENT OF THE FINAL DESIGN. THE MECHANICAL, ELECTRICAL, AND TECHNOLOGY
DRAWINGS DO NOT DEPICT THE MEANS AND METHODS TO MEET THE REQUIREMENTS OF
THE PHASING CRITERIA.
2. REVIEW PROJECT PHASING PLANS TO COORDINATE DEMOLITION WORK, OUTAGES, ETC.
WITH AFFECTED ADJACENT AREAS.
3. PROVIDE TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ZONE VALVES, ZONE
ALARMS, ETC. AS NEEDED TO MAINTAIN SERVICE TO ALL AREAS DURING ALL PHASES OF
PROJECT.
4. INSTALL TEMPORARY DUCTWORK, PIPING, SHUTOFF VALVES, ETC. AS NECESSARY TO KEEP
ALL OCCUPIED SPACES OPERATIONAL THROUGHOUT ALL PHASES OF THE PROJECT
5. PHASE DEMOLITION WORK TO MINIMIZE DOWNTIME.
6. COORDINATE PHASING IN MAIN COMPUTER ROOM WITH TELECOMMUNICATIONS PHASING
PLANS.
PROJECT ALTITUDE: 338.00 FT. ABOVE SEA LEVEL
1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE
CONTRACTOR. CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS
REQUIRED FOR FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
2. CENTER SPRINKLERS IN CEILING TILES IN BOTH DIRECTIONS IN ALL AREAS. IN AREAS
WITH 2’X4’ CEILING TILES CENTERING USING A 2’X2’ CEILING PATTERN IS ACCEPTABLE.
SPRINKLER HEADS SHALL BE ALIGNED WITH OTHER SPRINKLER HEADS, LIGHTING,
DIFFUSERS, AND ANY OTHER FEATURES IN THE CEILING.
3. REFER TO DRAWINGS AND SPECIFICATIONS FOR TYPES OF SPRINKLER HEADS TO BE
USED IN EACH AREA.
4. PROVIDE COVERAGE ABOVE AND BELOW ALL DUCTWORK GREATER THAN 48" WIDE.
5. PROVIDE COVERAGE ABOVE (IF APPLICABLE) AND BELOW FLOATING CEILINGS, REFER
TO ARCHITECTURAL PLANS.
6. PROVIDE COVERAGE ABOVE (IF APPLICABLE) AND BELOW PIPE DRIP PANS. REFER TO
PLUMBING DRAWINGS.
7. FIRE PROTECTION PIPE ROUTING IS SHOWN FOR GENERAL LAYOUT. DETERMINE EXACT
NUMBER OF SPRINKLERS, PIPE SIZING, AND PIPE ROUTING.
8. THE FIRE PROTECTION SYSTEM SHALL BE DESIGNED TO MEET OWNER'S INSURANCE
COMPANY STANDARDS WHERE APPLICABLE. THE MORE STRINGENT OF THE OWNER'S
INSURANCE UNDERWRITER'S DESIGN CRITERIA AND THE NFPA STANDARDS SHALL BE
USED.
9. ALL BUILDING AREA SHALL BE FULLY SPRINKLERED INCLUDING CANOPIES, WALKWAYS,
OVERHANGS, SOFFITS, AND BUILDING PROJECTIONS. ALL ACCESSIBLE COMBUSTIBLE
CONCEALED SPACES SHALL BE FULLY PROTECTED BY THE SPRINKLER SYSTEM.
10. WHERE FEASIBLE INSTALL PIPES HIGH AS POSSIBLE TO AVOID CONFLICT WITH OTHER
DISCIPLINES, AND TO REDUCE THE AMOUNT OF REQUIRED ROD STIFFENER SUPPORTS.
11. INSTALL SYSTEM DRAINS AT LOW POCKET AREAS CONTAINING FIVE GALLONS OF
WATER OR MORE, PROVIDE WITH ISOLATION VALVE AND THREADED HOSE
CONNECTION.
12. FINAL HEAD LOCATION, TYPE AND FINISH SHALL BE REVIEWED AND APPROVED BY THE
ARCHITECT.
13. A GRAPHIC ANNUNCIATOR PANEL SHALL BE PROVIDED TO INCLUDE AREAS BEING
PROVIDED WITH A PRE-ACTION OR CLEAN AGENT SYSTEM WHICH HAVE CONCEALED
AREAS.
14. EXACT LOCATION OF THE ALL PANELS SHALL BE VERIFIED ON SITE AND COORDINATED
WITH THE ELECTRICAL CONTRACTOR.
15. PAINT ALL EXPOSED PIPING TO MATCH BACKGROUND OR AS DIRECTED BY THE
ARCHITECT.
16. THE OWNER MUST BE NOTIFIED PRIOR TO EACH AND EVERY DRAINING OR RECHARGING
OF THE SPRINKLER SYSTEM.
17. THE CONTRACTOR SHALL PREPARE A COORDINATED SET OF SHOP DRAWINGS AND
SHALL OBTAIN APPROVAL FROM THE AUTHORITIES HAVING JURISDICTION AND THE
LOCAL FIRE DEPARTMENT PRIOR TO ANY INSTALLATION.
18. WHERE PIPE PASSES THROUGH HOLES IN PLATFORMS, FOUNDATIONS, WALL, OR
FLOORS, THE HOLES SHALL BE SIZED SUCH THAT DIAMETER OF THE HOLE IS
NOMINALLY 2 INCHES LARGER THAN THE PIPE FOR 1” NOMINAL TO 3 ½” NOMINAL AND 4”
LARGER THAN THE PIPE FOR PIPE 4” AND LARGER.
19. DRAWING SHOW LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT,
ETC. AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
20. VERIFY ALL DIMENSIONS AND CLEARANCES FROM ARCHITECTURAL, STRUCTURAL,
SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR PHYSICALLY AT SITE. REVIEW
ALL DRAWINGS. INCLUDING THOSE OF OTHER TRADES.
FIRE PROTECTION GENERAL NOTES:FIRE PROTECTION SHEET INDEX
FX000 FIRE PROTECTION GENERAL NOTES AND LEGENDS
B01-FX100 B01 GROUND LEVEL PLAN - OVERALL
B01-FX100AE B01 PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION AE
B01-FX100AW B01 PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION AW
B01-FX100BE B01 PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION BE
B01-FX100BW B01 PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION BW
B01-FX100CE B01 PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION CE
B01-FX100CW B01 PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION CW
B01-FX100J B01 PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION J
B01-FX101 B01 FIRST LEVEL PLAN - OVERALL
B01-FX101AE B01 PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION AE
B01-FX101AW B01 PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION AW
B01-FX101BE B01 PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION BE
B01-FX101BW B01 PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION BW
B01-FX101CE B01 PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION CE
B01-FX101CW B01 PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION CW
B01-FX101J B01 PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION J
B01-FX102 B01 SECOND LEVEL PLAN - OVERALL
B01-FX102AE B01 PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION AE
B01-FX102AW B01 PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION AW
B01-FX102BE B01 PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION BE
B01-FX102BW B01 PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION BW
B01-FX102CE B01 PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION CE
B01-FX102CW B01 PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION CW
B01-FX102J B01 PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION J
B01-FX103 B01 THIRD LEVEL PLAN - OVERALL
B01-FX103BW B01 PARTIAL THIRD LEVEL PLAN - FIRE PROTECTION - SECTION BW
B01-FX103CW B01 PARTIAL THIRD LEVEL PLAN - FIRE PROTECTION - SECTION CW
B01-FX104 B01 FOURTH LEVEL PLAN - OVERALL
B01-FX104BW B01 PARTIAL FOURTH LEVEL PLAN - FIRE PROTECTION - SECTION BW
B01-FX104CW B01 PARTIAL FOURTH LEVEL PLAN - FIRE PROTECTION - SECTION CW
B01A-FX100 B01A GROUND LEVEL PLAN - OVERALL
B01A-FX100D B01A PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION D
B01A-FX100E B01A PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION E
B01A-FX100F B01A PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION F
B01A-FX100G B01A PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION G
B01A-FX101 B01A FIRST LEVEL PLAN - OVERALL
B01A-FX101D B01A PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION D
B01A-FX101E B01A PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION E
B01A-FX101F B01A PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION F
B01A-FX101G B01A PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION G
B01A-FX102 B01A SECOND LEVEL PLAN - OVERALL
B01A-FX102D B01A PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION D
B01A-FX102E B01A PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION E
B01A-FX102F B01A PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION F
B01A-FX102G B01A PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION G
B01A-FX103 B01A THIRD LEVEL PLAN - OVERALL
B01A-FX103D B01A PARTIAL THIRD LEVEL PLAN - FIRE PROTECTION - SECTION D
B01A-FX103E B01A PARTIAL THIRD LEVEL PLAN - FIRE PROTECTION - SECTION E
B01A-FX103F B01A PARTIAL THIRD LEVEL PLAN - FIRE PROTECTION - SECTION F
B01A-FX103G B01A PARTIAL THIRD LEVEL PLAN - FIRE PROTECTION - SECTION G
B01A-FX104 B01A FOURTH LEVEL PLAN - OVERALL
B01A-FX104D B01A PARTIAL FOURTH LEVEL PLAN - FIRE PROTECTION - SECTION D
B01A-FX104E B01A PARTIAL FOURTH LEVEL PLAN - FIRE PROTECTION - SECTION E
B01A-FX104F B01A PARTIAL FOURTH LEVEL PLAN - FIRE PROTECTION - SECTION F
B01A-FX104G B01A PARTIAL FOURTH LEVEL PLAN - FIRE PROTECTION - SECTION G
B01A-FX105 B01A FIFTH LEVEL PLAN - OVERALL
B01A-FX105D B01A PARTIAL FIFTH LEVEL PLAN - FIRE PROTECTION - SECTION D
B01A-FX105E B01A PARTIAL FIFTH LEVEL PLAN - FIRE PROTECTION - SECTION E
B01A-FX105F B01A PARTIAL FIFTH LEVEL PLAN - FIRE PROTECTION - SECTION F
B01A-FX105G B01A PARTIAL FIFTH LEVEL PLAN - FIRE PROTECTION - SECTION G
B05-FX100 B05 GROUND LEVEL PLAN - OVERALL
B05-FX100A B05 PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION 5A
B05-FX100B B05 PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION 5B
B05-FX101 B05 FIRST LEVEL PLAN - OVERALL
B05-FX101A B05 PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION 5A
B05-FX101B B05 PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION 5B
B05-FX102 B05 SECOND LEVEL PLAN - OVERALL
B05-FX102A B05 PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION 5A
B07-FX100 B07 GROUND LEVEL PLAN - OVERALL
B07-FX100A-B B07 PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION 7A-B
B07-FX100C B07 PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION 7C
B07-FX100D-E B07 PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION 7D-E
B07-FX101 B07 FIRST LEVEL PLAN - OVERALL
B07-FX101A B07 PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION 7A
B07-FX101B B07 PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION 7B
B07-FX101C B07 PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION 7C
B07-FX101D B07 PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION 7D
B07-FX101E B07 PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION 7E
B07-FX102 B07 SECOND LEVEL PLAN - OVERALL
B07-FX102A B07 PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION 7A
B07-FX102B-E B07 PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION 7B-E
B07-FX102C-D B07 PARTIAL SECOND LEVEL PLAN - FIRE PROTECTION - SECTION 7C-D
B10-FX100 B10 PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION
FX400 FIRE PROTECTION DETAILS
FX401 FIRE PROTECTION DETAILS
GRAND TOTAL: 86
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:0
:3
A
M
FX000
FIRE PROTECTION GENERAL NOTES AND
LEGENDS
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
N/A
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
Revisions: Date:
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:0
:0
A
M
B01-FX100
B01 GROUND LEVEL PLAN - OVERALL VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1" = 20'-0"B01-FX100
1 B01 - GROUND LEVEL PLAN - OVERALL
SHEET NOTES:
1. REFER TO SECTION PLANS ON SUBSEQUENT
DRAWINGS FOR ADDITIONAL INFORMATION.
2. HATCHED AREAS INDICATE LOCATIONS OF
NEW TELECOMMUNICATION ROOMS.
0 20' 40'10'
Q
R
S
T
U
U.7
V
V.8
W
18.818.417.517.116.215.915.3
14.9
1413121110
14.113.112.811.911.110.69.89.2 9.79.3
F P
AWG18B
AFGE
AEG18A
STAIR
NO-8
BIO MED EQUIP
EQUIP MECH RM
AEG13
AFGE
AEG10
OFFICE
AEG10A
PROJET FILE
AEG 11
OFFICE
AEG15A
AEG11A
ENV. MANAGMENT
AEG15
AEG11B
MENS TOILET
AEG12
WOMENS
TOILET
AEG 14
HAC
AWG42
AEG18
AEG 20E
ENGG CORRIDOR
AEG-C1
WORK ORDER
AEG17A
WORK RM
INT. DESIGN OFFICE
AEG15D
ENG CHIEF
AEG17B SECY
AEG17
SIGN SHOP
AEG 20
CONFERENCE
AEG 22
OFFICE
AEG24
OFFICE
AEG26
ENG TECH
AEG28
COPIER
AEG19A
ASST. CHIEF
AEG 17C
OFFICE
AWG59
CONFERENCE OFFICE
AEG19
PLAN RM.
AEG 30
UNION
AEG21
MECH EQUP RM.
AEG 32
OFFICE
AEG19C
IRM COMPUTER SHOP
AEG23
STAIR
REC / STO
AEG 70
EXISTING
MECH RM.
AEG33
CORRIDOR
STOR
AEG38
SERVER
AEG35
AEG 36
BREAK RM
AEG69
PHYSICS
AEG37CONFERENCE ROOM
AEG39
WORK ROOM
AEG41
CORRIDOR
MD
AEG68
AWG79
AWG80
CAD DRAFTING
AEG 30A
ADMIN ASST
AEG44
EXAM-2
AEG47
SUPPLY
AEG46
NURSES
AEG 60
CHEIF TECH
AEG 62
TLT
AEG63
CHIEF OF SVC
AEG43
EQUIP
AEG73A
AEG50
ACCELERATOR
AEG73
MAZE
AEG52
RECEPTION
AEG54
STAGING
AEG4
EXAM
EXAM-4
AEG51
WAITING
AEG7
PT. TLT
AEG48
AEG57
SECY
AEG45
STFF TLT
AEF40
RESEARCH LAB
AEG 9C
RESEARCH LAB
AEG9
TISSUE CULLTURE
AEG9A
OFFICE
AEG9B
OFFICE
AEG9C
SIMULATOR
AEG55
TR
AEG15B
ENGG CORRIDOR
AEG-C1
FP
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:0
:0
A
M
B01-FX100AE
B01 PARTIAL GROUND LEVEL PLAN - FIRE
PROTECTION - SECTION AE
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"B01-FX100AE
1 B01 - PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION AE
SHEET NOTES:
1. TELECOMMUNICATIONS ROOMS SHALL BE
PROVIDED WITH STANDARD RESPONSE
SPRINKLER HEADS WITH PROTECTIVE CAGES.
IN ALL OTHER SPACES WHERE SPRINKLER
REWORK IS REQUIRED, PROVIDE QUICK
RESPONSE SPRINKLER HEADS.
2. FOR NEW TRS CONSTRUCTED AS BUILDING
ADDITIONS OR NEW ROOMS IN LARGER
SPACES, PROVIDE SIDEWALL SPRINKLER
HEADS.
3. FOR RENOVATED TRS, PROVIDE SIDEWALL OR
UPRIGHT SPRINKLER HEADS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING SPRINKLER
PIPING SERVING TRS.
A. WHERE FP PIPING ROUTED OVER A TR IS
BRANCH PIPING SERVING ONLY THE TR,
DEMOLISH PIPING TO OUTSIDE OF TR AND
PROVIDE NEW SIDEWALL SPRINKLER
HEAD.
B. WHERE FP PIPING ROUTED OVER A TR IS
BRANCH PIPING SERVING THE TR AND
OTHER DOWNSTREAM SPACES, PROVIDE
NEW UPRIGHT SPRINKLER HEAD. BRANCH
PIPING TO REMAIN.
4. ANY CPVC SPRINKLER BRANCH PIPING
LOCATED IN OR SERVING TR SPACES SHALL BE
DEMOLISHED AND REPLACED WITH STEEL.
5. REFER TO PLUMBING DRAWINGS FOR LAYOUT
OF PIPE DRIP PAN SYSTEMS. SPRINKLER
HEADS SHALL BE LOCATED SUCH THAT
COVERAGE IS NOT IMPEDED BY DRIP PANS.
PROVIDE SPRINKLERS ABOVE AND BELOW
DRIP PANS WHERE REQUIRED BY SIZE OF
PANS.
6. SPRINKLER COVERAGE SHALL BE MAINTAINED
THROUGHOUT CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR DEMOLITION
AND NEW WORK REFLECTED CEILING PLANS
AND PHASING PLANS. PROVIDE TEMPORARY
UPRIGHT HEADS AS REQUIRED TO PROTECT
SPACES DURING CONSTRUCTION.
7. MECHANICAL EQUIPMENT IS SHOWN FOR
REFERENCE ONLY.
0 8' 16'4'
KEYNOTES:
1. REWORK SPRINKLER HEADS IN OUTLINED
AREAS AS REQUIRED TO PROVIDE FULL
COVERAGE PER NFPA 13.
2. DEMOLISH FP PIPING OUT OF ROOM AND
PROVIDE NEW SIDEWALL SPRINKLER HEAD.
S
T
U
U.7
V
V.8
W
9.2 9.79.3
87654321
8.37.97.16.25.84.94.13.62.71.91.30.70.3
GENERATORS
GB1103
TRANS VAULT
GB1102
STAIR
SW GEAR
GB1105A
OPEN TO BELOW
OFFICE
GB1105B
MECH ROOM
AWG 19
BOILE ROOM
(OPEN TO BELOW)
MECH RM
AWG 21
OFFICE
AWG 27
OFFICE
MEZZANINE
AWG23
WATER
TREATMENT
AWG 26A
STAIR
BOILER RM.
AWG 26
STAIR
EMERGENCY
GENERATOR
LOGISTCIS
AWG24B
LOGISTICS
AWG24
CORRIDOR
AWG16
TOILET
AWG22
WORK ROOM
AWG24A
LOGISTICS
AWG20
LOGISTICS
AWG20A
LOGISTICS
AWG20B
CORRIDOR TO
NURSING
ROOM
LOGISTICS
CONFERENCE
AWG18
CLOSET
AWG18A
AWG18B
AFGE
AEG18A
STAIR
NO-8
BIO MED EQUIP
PIPE BASEMENT
MENS LOCKER ROOM
AWG10
RESEARCH LAB
AEG 9C
ELEV MECH RM
AWG8
SWITCHGEAR
AWG15
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:0
:1
A
M
B01-FX100AW
B01 PARTIAL GROUND LEVEL PLAN - FIRE
PROTECTION - SECTION AW
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"B01-FX100AW
1 B01 - PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION AW
SHEET NOTES:
1. SHEET INCLUDED FOR REFERENCE ONLY. NO
FIRE PROTECTION SCOPE IN THIS AREA.
0 8' 16'4'
M
L
K
J
H
N
P
P1
P2
P4
P5
15.9
1514 16 17 18 1913121110
FP
EC
EC
AEG1
EC
AEG1A OFFICE RM
AEG3
IRM STAGING
STORAGE
STORAGE
STORAGE IRM
AEG4A
OIT WORK RM
AEG 5
LOBBY
PT. TLT
AEG 52
ELEC
AEG76
STAIR
HAC
OFFICE
C
OFFICE
CWG
20C
EEO OFFICE
CWG
15B
CWG
16B
OFFICE
CWG
20D
BULKFEED AND
GENERAL STORAGE
BWG 10
A/C SHOP
BWG 4
A/C SHOP
BWG 4B
WOMEN'S
LOCKER & TLT
BWG 7
MENS LOCKER /
TOILET
BWG 8
CORRIDOR
BE C1
DIRTY CAGE STAGING
BWG14
CLEAN CAGE
BEDDING / STAGING
BWG 13
EQUIP
POOL SVC ROOM
BECEG1
CORRIDOR
BW C20
ANIMAL 1
BEG 3
ANIMAL 2
BEG 4
ANIMAL RM. 3
BEG 5
ANIMAL RM. 4
BEG6 ANIMAL RM. 5
BEG7
ANIMAL RM. 6
BEG8
EXIST COMM
BEG 23A
STORAGE
BEG 23
AUTO WATER
BEG 24
HKS
BEC3
HSK
BG25
BRU OFFICE
BEG 26C
BRU OFFICE
BEG26B
OFFICE
CEG 58COFFICE
CEG58D
CLOSET
CEG 58E
OFFICE
CEG 58BOFFICE
CEG 58A
OFFICE
CEG 45
KITCHENETTE
CEG 48C
BRU OFFICE
CEG 44
BRU OFFICE
CEG 43BRU OFFICE
CEG 42
BRU OFFICE
CEG 41
CONFERENCE
CEG48
HSRD CONFERENCE
CEG 38
HSRD
CEG 40
HSRD OFFICE
CEG39
HSRD OFFICE
CEG 34
HSRD OFFICE
CEG 35
HSRD OFFICE
CEG 36
MEN
CEG 32
WOMENS
CEG 33
ANIMAL RM. 7
BEG 13
ANIMAL RM 8
BEG 12
VMU STORAGE
BEG 14
HSRD BREAK
BEG 15 BEG 16
ANIMAL RM. 9
BEG11
BRU OFFICE
BEG 17
ANIMAL RM. 10
BEG 10
BRU OFFICE
BEG 18
BRU OFFICE
BEG 19
BRU OFFICE
BEG 20
ELECTRICAL
BEG 21
IRR
BEG22
PROCEDURE
BEG 9
CWG
16A
BREAK ROOM
CWG
16C
CONTAINMENT
BWG
11C
CONTAINMENT LAB
BWG
11D CONTAINMENT
BWG 11A
SHAFT
ANTE
BWG 11 EUTH
BWG 12
STORAGE
BWG 16 CORRIDOR
BECE
-C2
CORRIDOR
CE C3
CORRIDOR
CORRIDOR
BG26
COPY
CEG 48B
A/V
CEG48A
ELECTRICAL
BWG 9
CORRIDOR
BW-C25
TR
AEG 2
CORRIDOR
BW-C25
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:0
:1
A
M
B01-FX100BE
B01 PARTIAL GROUND LEVEL PLAN - FIRE
PROTECTION - SECTION BE
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"B01-FX100BE
1 B01 - PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION BE
SHEET NOTES:
1. TELECOMMUNICATIONS ROOMS SHALL BE
PROVIDED WITH STANDARD RESPONSE
SPRINKLER HEADS WITH PROTECTIVE CAGES.
IN ALL OTHER SPACES WHERE SPRINKLER
REWORK IS REQUIRED, PROVIDE QUICK
RESPONSE SPRINKLER HEADS.
2. FOR NEW TRS CONSTRUCTED AS BUILDING
ADDITIONS OR NEW ROOMS IN LARGER
SPACES, PROVIDE SIDEWALL SPRINKLER
HEADS.
3. FOR RENOVATED TRS, PROVIDE SIDEWALL OR
UPRIGHT SPRINKLER HEADS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING SPRINKLER
PIPING SERVING TRS.
A. WHERE FP PIPING ROUTED OVER A TR IS
BRANCH PIPING SERVING ONLY THE TR,
DEMOLISH PIPING TO OUTSIDE OF TR AND
PROVIDE NEW SIDEWALL SPRINKLER
HEAD.
B. WHERE FP PIPING ROUTED OVER A TR IS
BRANCH PIPING SERVING THE TR AND
OTHER DOWNSTREAM SPACES, PROVIDE
NEW UPRIGHT SPRINKLER HEAD. BRANCH
PIPING TO REMAIN.
4. ANY CPVC SPRINKLER BRANCH PIPING
LOCATED IN OR SERVING TR SPACES SHALL BE
DEMOLISHED AND REPLACED WITH STEEL.
5. REFER TO PLUMBING DRAWINGS FOR LAYOUT
OF PIPE DRIP PAN SYSTEMS. SPRINKLER
HEADS SHALL BE LOCATED SUCH THAT
COVERAGE IS NOT IMPEDED BY DRIP PANS.
PROVIDE SPRINKLERS ABOVE AND BELOW
DRIP PANS WHERE REQUIRED BY SIZE OF
PANS.
6. SPRINKLER COVERAGE SHALL BE MAINTAINED
THROUGHOUT CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR DEMOLITION
AND NEW WORK REFLECTED CEILING PLANS
AND PHASING PLANS. PROVIDE TEMPORARY
UPRIGHT HEADS AS REQUIRED TO PROTECT
SPACES DURING CONSTRUCTION.
7. MECHANICAL EQUIPMENT IS SHOWN FOR
REFERENCE ONLY.
0 8' 16'4'
KEYNOTES:
1. REWORK SPRINKLER HEADS IN OUTLINED
AREAS AS REQUIRED TO PROVIDE FULL
COVERAGE PER NFPA 13.
2. DEMOLISH FP PIPING OUT OF ROOM AND
PROVIDE NEW SIDEWALL SPRINKLER HEAD.
K
J
H
N
P
P1
P2
P4
P5
9876543
ELEV MECH RM
AWG8
ELEV LOBBY
FITNESS CENTER
AWG3
TLT
AWG10A
STORAGE
CORRIDOR
AW-C11
WOMENS LOCKER RM
AWG 13
TOILETS & SHOWERS
AWG11A
FEMALE LOUNGE
AWG 11
STAIR
CORRIDOR
BWC31A
AUTOPSY
CWG2
PARAFFIN
CWG4
FRAM STOR
CWG6A
OFFICE
CWG6B
LAB STORAGE
CYTOLOGY
CWG 7
OFFICE
CWG 7B
SCREENING
CWG 7A
OFFICE
CWG
20A
OFFICE
CWG
20C
COMPLIANCE OFFICE
CWG 20MECH RM.
BWG 1
REFRIGERANT
STORAGE
BWG 24B
REFRIGERANT
STORAGE
BWG 24A
ELEC SHOP STORAGE
BWG 25
BIO MED SERVER
ROOM
BWG 2A
AC SHOP STORAGE
BWG24
EEO OFFICE
CWG
15A
HAC
CWG 14
MECH ROOM
BIO MED
STORAGE
BWG 2
CHIEF
BWG 33B
CLERICAL SEC/WAIT
BWG 33
ASST
BWG33A
CORRIDOR
BWC 30
OFFICE
BWG30
OFFICE
BWG 29
CONF
BWG 28
CARE OFFICE
BWG 27
STUDY
BWG 26
CONSULT
BWG 32
PHARM
BWG 31
COPY
BWG33C
A/C SHOP
BWG 4B
OFFICE
BWG 4A
CORRIDOR
BWC 29
CORRIDOR
BWC 28
TR
AWG 9
CORRIDOR
AW-C11
FP
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:0
:1
A
M
B01-FX100BW
B01 PARTIAL GROUND LEVEL PLAN - FIRE
PROTECTION - SECTION BW
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"B01-FX100BW
1 B01 - PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION BW
SHEET NOTES:
1. TELECOMMUNICATIONS ROOMS SHALL BE
PROVIDED WITH STANDARD RESPONSE
SPRINKLER HEADS WITH PROTECTIVE CAGES.
IN ALL OTHER SPACES WHERE SPRINKLER
REWORK IS REQUIRED, PROVIDE QUICK
RESPONSE SPRINKLER HEADS.
2. FOR NEW TRS CONSTRUCTED AS BUILDING
ADDITIONS OR NEW ROOMS IN LARGER
SPACES, PROVIDE SIDEWALL SPRINKLER
HEADS.
3. FOR RENOVATED TRS, PROVIDE SIDEWALL OR
UPRIGHT SPRINKLER HEADS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING SPRINKLER
PIPING SERVING TRS.
A. WHERE FP PIPING ROUTED OVER A TR IS
BRANCH PIPING SERVING ONLY THE TR,
DEMOLISH PIPING TO OUTSIDE OF TR AND
PROVIDE NEW SIDEWALL SPRINKLER
HEAD.
B. WHERE FP PIPING ROUTED OVER A TR IS
BRANCH PIPING SERVING THE TR AND
OTHER DOWNSTREAM SPACES, PROVIDE
NEW UPRIGHT SPRINKLER HEAD. BRANCH
PIPING TO REMAIN.
4. ANY CPVC SPRINKLER BRANCH PIPING
LOCATED IN OR SERVING TR SPACES SHALL BE
DEMOLISHED AND REPLACED WITH STEEL.
5. REFER TO PLUMBING DRAWINGS FOR LAYOUT
OF PIPE DRIP PAN SYSTEMS. SPRINKLER
HEADS SHALL BE LOCATED SUCH THAT
COVERAGE IS NOT IMPEDED BY DRIP PANS.
PROVIDE SPRINKLERS ABOVE AND BELOW
DRIP PANS WHERE REQUIRED BY SIZE OF
PANS.
6. SPRINKLER COVERAGE SHALL BE MAINTAINED
THROUGHOUT CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR DEMOLITION
AND NEW WORK REFLECTED CEILING PLANS
AND PHASING PLANS. PROVIDE TEMPORARY
UPRIGHT HEADS AS REQUIRED TO PROTECT
SPACES DURING CONSTRUCTION.
7. MECHANICAL EQUIPMENT IS SHOWN FOR
REFERENCE ONLY.
0 8' 16'4'
KEYNOTES:
1. REWORK SPRINKLER HEADS IN OUTLINED
AREAS AS REQUIRED TO PROVIDE FULL
COVERAGE PER NFPA 13.
2. EXISTING PIPING ROUTED THROUGH TR TO
REMAIN. PROVIDE NEW UPRIGHT SPRINKLER
HEAD.
G
F
E
D
C
B
A
1514 16 17 18 19131211109
F P
POLICE OFFICE
CEG 22
OFFICE
CEG 22A
OFFICE
CEG22B
OFFICE
CEG 22C
OFFICE
CEG 22D
OFFICE
CEG 22EOFFICE
CEG 22F
OFFICE
CEG 23E
EXAM
OFFICE
CEG 23D
EXAM OFFICE
CEG 23
B
EXAM OFFICE
CEG 23
C
STORAGE
CEG 22G
EMS
OFFICE
CEG 23
OFFICE
CEG 23A
EMS WORK
LENDER
CEG 24A
HAC OFFICE
CEG 24B
OFFICE
CEG 24C
OFFICE
CEG 24D
OFFICE
HOUSEKEEPING
CEG 24
EMS STORAGE
CEG 24
E
BREAK
CEG 26C
SUPV
CEG 26A
POLICE
CEG 27
POLICE
INVESTIGATION
CEG 28
STORAGE
CEG 29A
CEG 29
LOCKSMITH OFFICE
CEG 29B
MECH
CEG29C
STORAGE
CWG
31D
EMS STORAGE
CWG 31
EMS STORAGE
CWG 47
MAIL ROOM
CWG 30
UPS
TRACKING
CWG
30B
REPRODUCTION
STORAGE
CWG 31
A
EEO OFFICE
CWG
15-C
COPY RM.
CEG 26B
STORAGE
CEG 57OFFICE
CEG 56C
OFFICE
CEG 20A
POLICE
CEG 21
OFFICE
CEG20
POLICE
CEG 19A
STAIR
OFFICE
CEG 16D
CHIEF OFFICE
CEG 16C
CEG 19B
POLICE
CEG 19
FIRE CONTROL
CEG 18
OFFICE
CEG 16B
POLICE
CEG 16
POLICE OFFICE
CEG 16A
CORRIDOR
CE C1
CEG 5C
POLICE
CEG 5A
CEG 5B
CEG 7
CEG6CEG5
EVIDENCE
CEG 4
POLICE DISPATCH
CEG 1
STORAGE
CEG 3
COMM
CEG 52
VENDING
CEG 51
STORAGE
CEG 53
OFFICE
CEG 54
A
OFFICE
CEG 54
B
CLINICAL
CEG 54
OFFICE
CEG 54D
OFFICE
CEG 54
C
OFFICE
CEG 55B
OFFICE
CEG 55A
OFFICE
CEG55D
OFFICE
CEG 55COFFICE
CEG 55E OFFICE
CEG 56B
OFFICE
CEG 56
A
OFFICE
CEG 56D
OFFICE
CEG 56
E
OFFICE
CEG 46OFFICE
CEG 47
HSRD OFFICE
CEG 50
HSRD OFFICE
CEG 49
HSRD OFFICE
CEG 37
TRAINEE
CEG 31
CEG 30
ISS
OFFICE
CWG
16D
OFFICE
POLICE TRAINING
CWG 20
D
INFO SYSTEMS
SECURITY
CWG 16
VNGE OFFICE
CWG 26
VNGE OFFICE
CWG 27
OFFICEELEVATOR
ELEVATOR
CORRIDOR
CE C2
WOMEN
CEG 48D
MEN
CEG 48E
PASSENGER
ELEVATOR LOBBY
CWC 45
FEMALE
TLT
MALE
TLT
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:0
:2
A
M
B01-FX100CE
B01 PARTIAL GROUND LEVEL PLAN - FIRE
PROTECTION - SECTION CE
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"B01-FX100CE
1 B01 - PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION CE
SHEET NOTES:
1. SHEET INCLUDED FOR REFERENCE ONLY. NO
FIRE PROTECTION SCOPE IN THIS AREA.
F
E
D
C
B
A
987654321
CORRIDOR
CB1-9
HAC
DB1104
BMSA STORAGE
DB1103
TOILET
CWG40
TOILET
CWG41
BREAK ROOM
CWG 42
WAREHOUSE
CWG
32G
STORAGE
CWG
31D
WAREHOUSE
STORAGE
CWG 32
F
PHARMACY STORAGE
CWG 32
E
NITROUS OXIDE
CWG 33
NARCOTICS AND
ALCOHOL VAULT
CWG 32
A
OFFICE
CWG 35
LAUNDRY
CWG 39
WAREHOUSE
STORAGE
CWG 32
D
STORAGE
CWG 32
H
LAUNDRY
CWG 51
A
LAUNDRY
CWG
51B
EMS
CWG 46
BREAK ROOM /
STORAGE
CWG 48
EMS STORAGE
CWG 31
GA ELECTRIC
CWG
47A
EMS STORAGE
CWG 47
WRAPPING RM.
CWG
39A
UNIFORM ISSUE
CWG
39B
WASH RM.
CWG 51
UNIFORM STORAGE
CWG 52
MED
WASH
CWG 53
PATHOLOGY
STORAGE/LAB
EMS STORAGE
CWG 12
LAB STORAGE
LAB STORAGE
CWG 9
CONFERENCE RM.
CWG
15D
EEO OFFICE
CWG
15-C
ELEVATOR
ELEVATOR
ELEC CLOSET
TELECOM
ELEVATOR
S2
ELEVATOR
S3
PASSENGER
ELEVATOR LOBBY
CWC 45
TEL CLOSET
SIGN
CLOSET
TR
CWG 1
SVC ELEVATOR LOBBY
CWC 44
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:0
:2
A
M
B01-FX100CW
B01 PARTIAL GROUND LEVEL PLAN - FIRE
PROTECTION - SECTION CW
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"B01-FX100CW
1 B01 - PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION CW
SHEET NOTES:
1. TELECOMMUNICATIONS ROOMS SHALL BE
PROVIDED WITH STANDARD RESPONSE
SPRINKLER HEADS WITH PROTECTIVE CAGES.
IN ALL OTHER SPACES WHERE SPRINKLER
REWORK IS REQUIRED, PROVIDE QUICK
RESPONSE SPRINKLER HEADS.
2. FOR NEW TRS CONSTRUCTED AS BUILDING
ADDITIONS OR NEW ROOMS IN LARGER
SPACES, PROVIDE SIDEWALL SPRINKLER
HEADS.
3. FOR RENOVATED TRS, PROVIDE SIDEWALL OR
UPRIGHT SPRINKLER HEADS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING SPRINKLER
PIPING SERVING TRS.
A. WHERE FP PIPING ROUTED OVER A TR IS
BRANCH PIPING SERVING ONLY THE TR,
DEMOLISH PIPING TO OUTSIDE OF TR AND
PROVIDE NEW SIDEWALL SPRINKLER
HEAD.
B. WHERE FP PIPING ROUTED OVER A TR IS
BRANCH PIPING SERVING THE TR AND
OTHER DOWNSTREAM SPACES, PROVIDE
NEW UPRIGHT SPRINKLER HEAD. BRANCH
PIPING TO REMAIN.
4. ANY CPVC SPRINKLER BRANCH PIPING
LOCATED IN OR SERVING TR SPACES SHALL BE
DEMOLISHED AND REPLACED WITH STEEL.
5. REFER TO PLUMBING DRAWINGS FOR LAYOUT
OF PIPE DRIP PAN SYSTEMS. SPRINKLER
HEADS SHALL BE LOCATED SUCH THAT
COVERAGE IS NOT IMPEDED BY DRIP PANS.
PROVIDE SPRINKLERS ABOVE AND BELOW
DRIP PANS WHERE REQUIRED BY SIZE OF
PANS.
6. SPRINKLER COVERAGE SHALL BE MAINTAINED
THROUGHOUT CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR DEMOLITION
AND NEW WORK REFLECTED CEILING PLANS
AND PHASING PLANS. PROVIDE TEMPORARY
UPRIGHT HEADS AS REQUIRED TO PROTECT
SPACES DURING CONSTRUCTION.
7. MECHANICAL EQUIPMENT IS SHOWN FOR
REFERENCE ONLY.
0 8' 16'4'
KEYNOTES:
1. EXTEND EXISTING FIRE PROTECTION SYSTEM
FROM EXISTING MAIN IN ADJACENT CORRIDOR
AND PROVIDE SPRINKLER HEADS IN OUTLINED
AREAS AS REQUIRED TO PROVIDE FULL
COVERAGE PER NFPA 13.
2726252423222120
F
E
D
C
B
A
FP
F P
MECH EQUIP
AREA WAYSTAIR
HEALTH INFO RM.
OFFICE
6027 A
OFFICE
6018C
OFFICE
6018B
OFFICE
6018A
MAS
MASS CONFERENCE
CENTER
ELEC
AMBULATORY CARE &
PROCESSING OFFICE
TRANSCRIPTION
6008A
OFFICE
OFFICE
ROI
TRANSCRIPTION
RELEASE OF INFO
GENERAL OFFICE
OFFICE
6018D
OFFICE
6018E
BUSINESS OFFICE
SUPPLY
OFFICE
6018F
OFFICE
6002A
OFFICE
OFFICE
6002B
BREAK ROOM
HAC
CREDIT UNION
EMS STORAGE
SUPV MED
NURSE
OFFICE
MEN
WOMEN
PUMP RM.
MEN
WOMEN
STAIR
MEDICAL RECORDS
OFFICE
6005A
OFFICE
OFFICE
CEG22B
OFFICE
CEG 22C
HSCPAC OFFICE
ELEVATOR MACHS
ELEVATOR
ELEVATOR
CORRIDOR
60-C4
CORRIDOR
60-C2
CORRIDOR
50-C1
ELEVATOR LOBBY
FILE SURV OFFICE
6003A
OFFICE
CEG 20A
POLICE
CEG 21
MEN
WOMEN
TR
CORRIDOR
60-C2
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
BW
CW CE
BE
AE
7C
7D 7E
7B
7A
GF
E D
J
5A
5BE
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:0
:2
A
M
B01-FX100J
B01 PARTIAL GROUND LEVEL PLAN - FIRE
PROTECTION - SECTION J
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"B01-FX100J
1 B01 - PARTIAL GROUND LEVEL PLAN - FIRE PROTECTION - SECTION J
SHEET NOTES:
1. TELECOMMUNICATIONS ROOMS SHALL BE
PROVIDED WITH STANDARD RESPONSE
SPRINKLER HEADS WITH PROTECTIVE CAGES.
IN ALL OTHER SPACES WHERE SPRINKLER
REWORK IS REQUIRED, PROVIDE QUICK
RESPONSE SPRINKLER HEADS.
2. FOR NEW TRS CONSTRUCTED AS BUILDING
ADDITIONS OR NEW ROOMS IN LARGER
SPACES, PROVIDE SIDEWALL SPRINKLER
HEADS.
3. FOR RENOVATED TRS, PROVIDE SIDEWALL OR
UPRIGHT SPRINKLER HEADS. CONTRACTOR
SHALL FIELD VERIFY ALL EXISTING SPRINKLER
PIPING SERVING TRS.
A. WHERE FP PIPING ROUTED OVER A TR IS
BRANCH PIPING SERVING ONLY THE TR,
DEMOLISH PIPING TO OUTSIDE OF TR AND
PROVIDE NEW SIDEWALL SPRINKLER
HEAD.
B. WHERE FP PIPING ROUTED OVER A TR IS
BRANCH PIPING SERVING THE TR AND
OTHER DOWNSTREAM SPACES, PROVIDE
NEW UPRIGHT SPRINKLER HEAD. BRANCH
PIPING TO REMAIN.
4. ANY CPVC SPRINKLER BRANCH PIPING
LOCATED IN OR SERVING TR SPACES SHALL BE
DEMOLISHED AND REPLACED WITH STEEL.
5. REFER TO PLUMBING DRAWINGS FOR LAYOUT
OF PIPE DRIP PAN SYSTEMS. SPRINKLER
HEADS SHALL BE LOCATED SUCH THAT
COVERAGE IS NOT IMPEDED BY DRIP PANS.
PROVIDE SPRINKLERS ABOVE AND BELOW
DRIP PANS WHERE REQUIRED BY SIZE OF
PANS.
6. SPRINKLER COVERAGE SHALL BE MAINTAINED
THROUGHOUT CONSTRUCTION. REFER TO
ARCHITECTURAL DRAWINGS FOR DEMOLITION
AND NEW WORK REFLECTED CEILING PLANS
AND PHASING PLANS. PROVIDE TEMPORARY
UPRIGHT HEADS AS REQUIRED TO PROTECT
SPACES DURING CONSTRUCTION.
7. MECHANICAL EQUIPMENT IS SHOWN FOR
REFERENCE ONLY.
0 8' 16'4'
KEYNOTES:
1. REWORK SPRINKLER HEADS IN OUTLINED
AREAS AS REQUIRED TO PROVIDE FULL
COVERAGE PER NFPA 13.
2. EXISTING PIPING ROUTED THROUGH TR TO
REMAIN. PROVIDE NEW UPRIGHT SPRINKLER
HEAD.
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
GF
E D
BW
CW CE
J
BE
AE
7D 7E
7B7C
7A
5A
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BE5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:0
:3
A
M
B01-FX101
B01 FIRST LEVEL PLAN - OVERALL VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1" = 20'-0"B01-FX101
1 B01 - FIRST LEVEL PLAN - OVERALL
SHEET NOTES:
1. REFER TO SECTION PLANS ON SUBSEQUENT
DRAWINGS FOR ADDITIONAL INFORMATION.
2. HATCHED AREAS INDICATE LOCATIONS OF
NEW TELECOMMUNICATION ROOMS.
S
T
U
U.7
V
V.8
W
18.818.417.517.116.215.915.3
14.9
1413121110
14.113.112.811.911.110.69.89.2 9.79.3
LOCKED COURTYARD
1 BED PATIENT RM 5
AE128
TOILET
AE125A
TOILET
AE126A
2 BED
PATIENT RM-3
AE125
2 BED
PATIENT RM-4
AE124
1 BED
PATIENT RM 7
AE130
1 BED
PATIENT RM 8
AE131
PATIENT RM - 9
PATIENT RM-10
AE133
TOILET
AE133A
TOILET
AE132A
2 BED
PATIENT RM-11
AE144
TOILET
AE144A
TOILET
AE145A
2 BED
PATIENT RM-12
AE145
1 BED
PATIENT RM - 13
AE146
TOILET
AE146A
1 BED
PATIENT RM - 14
AE147
1 BED
PATIENT RM 15
AE148
1 BED
PATIENT RM-16
AE149
TOILET
AE149A
E647
E648
E649E650
E651
VIEWING RM.
AW102J
CONTROL
RM
AW102A
COMPUTER RM
AW102B
CT SCANNER
AW102C
DINING
AE116
CART STAGING
AE116A
TOILET
AW102T
STAFF BREAK RM.
AE112
WAITING
NURSE MGMT
AE167
LAUNDRY
AE166
OFFICE
AE165
PATIENT
CLOTHING
AE115
E676
PT. TLT
AE164
PATIENT
AE114
STAFF
TOILET
AE113
E680
PSYCHIATRIST OFFICE
AE117
CONULTATION
AE117A
SOCIAL WORK
OFFICE
AE118
OFFICE
AE119
2 BED
PATIENT RM 2
AE120
MED DOC OFFICE
AE160A
CONSULTATION
AE160
SOCIAL ACTIVITY
AE159
NURSE
AE158
PATIENT RM -4
AE157
TOILET
TOILET
AE156
MEDS
AE134B
UTILITY
E694
SECLUSION -1
AE137A
CORRIDOR
ANTE RM
AE137
TOILET
SECLUSION - 2
AE137/B
ELECTRICAL
AE139
EXAM RM.
AE140
EQUIP
AE141
SOILED
UTILITY
AE142
E705
SUPPLY
AW102D
AE135
TOILET
AE120A
TOILET
AE121
ACTIVITY RM
AE122
ACTIVITY RM.
AE155
AE161
STORAGE
1 BED
PATIENT RM-6
AE129
TOILET
AE129A
TOILET
AE130A
TOILET
AE131A
STAIR
NO 9
STORAGE
TOILET
AE148A
TOILET
AE147A
ELECTRICALCHART/ TEAM
CONFERENCE ROOM
AE134A
WAITING RM
MR102
MENS
TOILET
WOMENS
TOILET
101 NORTH SEVENTH STREET
LOUISVILLE, KY 40202
P: 502.236.2344 www.imegcorp.com
PROJECT #22005162.00
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
KEYPLAN N
AW
GF
E D
BW
CW CE
J
BE
AE
7D 7E
7B7C
7A
5A
10360 Ellison Circle Omaha, NE 68134 Phone: 402.991.5520 www.specializedeng.com SES Project : 22122
1221 N. Pennsylvania St.
Indianapolis, IN 46202 Phone: 317.800.6388 www.guidondesign.com
GD Project : 22.3101
5BE5BW
35% SCHEMATIC DESIGN 10/31/2022
65% DESIGN DEVELOPMENT 05/03/2023
95% CONSTRUCTION DOCUMENTS 08/16/2023
100% FINAL BID DOCUMENTS 09/27/2023
100% FINAL STAMPED BID DOCUMENTS 10/11/2023
B
IM
/2
.3
V A
M e m p h is
E H
R M
I n fr a s tr u c tu re /6
-7
.B
A
.M P
R
A
L L S e c ti o n .r v t
/1 /2
:0
:4
A
M
B01-FX101AE
B01 PARTIAL FIRST LEVEL PLAN - FIRE
PROTECTION - SECTION AE
VA MEMPHIS INFRASTRUCTURE
UPGRADE
MEMPHIS, TN
614-22-700
10/11/2023 LDH CAH
100% FINAL STAMPED
BID DOCUMENTS
FULLY SPRINKLERED
SCALE: 1/8" = 1'-0"B01-FX101AE
1 B01 - PARTIAL FIRST LEVEL PLAN - FIRE PROTECTION - SECTION AE
SHEET NOTES:
1. SHEET INCLUDED FOR REFERENCE ONLY. NO
FIRE PROTECTION SCOPE IN THIS AREA.
S
T
U
U.7
V
V.8
W
9.2 9.79.3
87654321
8.37.97.16.25.84.94.13.62.71.91.30.70.3
MHC PSA
OFFICE
AE157A
MHC MD OFFICE
AE157 B
SHAFT
MHC PSYCH
OFFICE
AE157C
STAIR PSYCH RESIDENT
AW156D
OFFICE
AW156C
OFFICE
AW156B
PSYCH
RESIDENT
AW156A
PSYCH
RESIDENT
AW155D
OFFICE
AW155C
MHC MD OFFICE
AE 158B
MHC PSYCH
OFFICE
AE158A
MHC FAMILY
THERAPIST
AE158C
MHC OFFICE
AW159A
MHC CHIEF OFFICE
AW159B
MHC OFFICE
AW159C
OFFICE
AW155B
MHC OFFICE
AW154
AW160B
MHC OFFICE
AW160C
MHO
PSYCHE
OFFICE
AW160D
MHC PSYCH
OFFICE
AW160A
STORAGE
AW159D
STORAGE
PATIENT TOILET
AW153
HSK
AW152
BREAK RM
AW151
ELECTRICAL
AW163
STAFF TLT
AW162B
STAFF TLT
AW162A
STORAGE
AW161
TELECOM
TLT
MHC SMALL GROUP
THERAPY
AW150
MHC NURSE
OFFICE
AW149
MHC NP OFFICE
AW148
OFFICE EXAM - 3
AW147
OFFICE EXAM - 2
AW146
MHC GROUP THERAPY
AW144
OFFICE
AW164A
OFFICE
AW164B
OFFICE
AW164C
PATIENT
TLT
AW165
INTAKE / MHC SUPPLY
STORAGE
AW166
MEN
AW142B WOMEN
AW142C
WAITING
AW142
MHC GROUP THERAPY
AW 143 RECEPTION
AW142A
LOCKED COURTYARDOFFICE
G136
MECH
G119
OFFICE
G131
OFFICE
G130
STG
G149
LOUNGE
G114
BREAK
G117
BATH
G117A
ON CALL
G122
BATH
G122A
ON CALL
G123
ON CALL
G125
BATH
G125 A
ON CALL
G127
LIN
G118
HAC
G120
ON CALL
G124ON CALL
G116
BATH
G115A
BATH
G124A
ON CALL
G115
ON CALL
G126
CORRIDOR
AW1-C6
CORRIDOR
AW1-C5F
EXAM
AW145
CORRIDOR
AW1-C5D
CORRIDOR
AW1-C5A
CORRIDOR
AW1-
C5E
CORRIDOR
AW1-C5C
CORRI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .