This demolition plan document outlines the specific scoreboard removal requirements across three municipal locations in Milpitas, California as part of the city's Scoreboard Replacement Project (Bid No. 25-1038). The project requires complete demolition and removal of seven existing scoreboards: three at Dixon Landing Park (Fields 1, 2, and 3), one at Cardoza Park, and three at Milpitas Sports Center (one major scoreboard on the west side, one minor scoreboard on the east side, and one senior scoreboard). For each scoreboard, the contractor must remove the scoreboard structure, electrical disconnect, supporting infrastructure, and footings to their full and complete depth. A mandatory pre-bid conference is scheduled for May 22, 2025, at 10:00 am, with electronic bids due by June 17, 2025, at 12:00 pm Pacific Time. The project has a 75-calendar-day completion timeline from the Notice to Proceed.

All voids resulting from footing removal must be filled with engineered slurry fill leveled to the existing grade at each location. The contractor must possess C-45 and C-10 licensing classifications and must perform at least 50% of the work directly, with the option to subcontract up to 50%. The City of Milpitas will supply all seven new Daktronics scoreboards for installation by the contractor. Performance and payment bonds equal to 100% of contract value are required, and all work is subject to prevailing wage requirements. The procurement allows for a local purchasing preference, potentially giving bidders within 10% of the lowest bid an advantage, and contractors must maintain active registration with the California Secretary of State and comply with Milpitas business license requirements. The bid constitutes a firm offer that cannot be withdrawn for 90 days after the bid opening date.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCATION: DIXON LANDING PARK

Dixon Field 2 Scoreboard

Remove scoreboard, remove electrical disconnect, remove existing scoreboard supporting structure and remove footings full and complete depth.

Dixon Field 3 Scoreboard remove electrical disconnect, remove existing scoreboard supporting structure and

Dixon Field 1 Scoreboard remove electrical disconnect, remove existing scoreboard supporting structure and

Note: Void left from removal of existing footings to be filled with engineered slurry fill to level of existing grade.

ATTACHMENT D: DEMOLITION PLAN BY LOCATION

LOCATION: CARDOZA PARK

Cardoza Scoreboard Remove scoreboard, remove electrical disconnect, remove existing scoreboard supporting structure and remove footings full and

Note: Void left from removal of existing footings to be filled with engineered slurry fill to level of existing grade.

LOCATION: MILPITAS SPORTS CENTER

One Major (west side) and

One Minor (east side)

Scoreboards (total of two)

Remove scoreboards, remove electrical disconnects, remove existing scoreboard supporting structure and

Senior Scoreboard

Remove scoreboard, remove electrical disconnect, remove existing scoreboard supporting structure and remove footings full and complete depth.

File details come from the government source that posted it. Updated .