CN-370000-PL263-T402CO1.pdf
PDF 75 KB Posted
- Contract number
- PL263
- Issued by
- Florida
About this file
This is a Task Assignment Change Order Form for DEP Contract No. PL263, issued by the Florida Department of Environmental Protection (FDEP). The document represents Change Order Number 1 to Task Assignment 402, managed by contractor Gary Knight and FDEP Contract Manager Joseph Wilson. The contractor is responsible for preparing presentation maps for new and amended Florida Forever projects.
The change order increases the task amount by $2,500, bringing the total task assignment from $8,950 to $11,490, due to a larger number of maps needed than originally anticipated. The contract covers three primary service areas: (1) Agenda and Annual Report Maps, which include digitally revising existing maps ($100), text revisions ($25), preparing new single-page maps ($250), and preparing multiple-page overview maps ($100-$50); (2) Project Re-design Meeting Maps, ranging from $250 for new single-page maps to $100 per additional page; and (3) Web Tools maintenance at $1,875 quarterly for updating and maintaining the FNAI Interactive Conservation Lands Tool. All quarterly invoices are due 15 days after quarter-end, with the final invoice due June 17, 2016. Products must be delivered at the end of each quarter, with the final quarter deliverables due by June 16, 2016. The funding source is identified as Org. Code I37 10 24 00 000 with project code 80047 for Fiscal Year 2009.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PL263 - TA 402 Details: Prepare Presentation Maps for New & Amended Florida Forever Projects
A. Agenda and Annual Report Maps. Prepare or revise electronic color maps (jpeg format), provide an ARCView project file and printed copies of agenda maps for the Florida Forever projects. Each map must fit on letter-size paper (8½ x 11) and include the following information: (a) project boundary; (b) proposed boundary amendments (if applicable) with noncontiguous additions denoted by letters; (c) acquired (public) lands within the boundary (if applicable); (d) remaining essential parcels within the boundary; (e) other protected lands, denoting the name of the managed area (when appropriate); (f) other conservation land acquisition projects within the map view, denoting the name of the project area (when appropriate) and distinguishing if they are Board of Trustees projects or other program projects; (g) township, range and section lines and numbers; (h) county, state, and federal highways with identifiers; (i) project site names (if applicable), city names and names of lakes, rivers and other noteworthy geographic features; and
(j) explanation box that includes map title (project name and, if appropriate, map sheet number), county where project is located, map legend, scale bar, inset map of general location relative to county boundaries, and compass directions. The scale for these maps will be no greater than 5 miles per inch, with a preferred scale between 1 and 3 miles per inch. For large multiple-sites projects that span more than one map page at 5 miles per inch, a general overview map indicating the location of the sites relative to the map sheets will also be prepared. Invoices will be submitted (mail or electronically) 15 days after the end of each quarter to DEP CONTRACT MANAGER for completed maps with final invoice due on June 17, 2016. Products are due at end of each quarter, except the last quarter, they are due June 16, 2016.
B. Project Re-design Meeting Maps. Prepare or revise electronic and paper maps for project re-design meetings following the same design and layout set forth above; paper maps will be prepared at a scale appropriate for group discussion depending on the complexity of the information depicted, from 8.5 x 11 inches up to poster size. Ownership boundaries will be clearly delineated on the maps to facilitate project re-design deliberations. Map requests will be made no less than two weeks prior to the time they are needed.
C. Interactive Conservation Lands and FFBOT Projects Web Tool. Update and add new FFBOT project boundaries and relevant summary information into FNAI's Interactive Conservation Lands Tool and serve on FNAI website. Invoices will be submitted (mail or electronically) 15 days after the end of each quarter to DEP CONTRACT MANAGER for completed work with final invoice due on June 17, 2016. Products are due at end of each quarter except the last quarter; they are due June 16, 2016.
Costs per Tasks The number of new maps and revised maps cannot be predicted but the total amount of the Task Assignment will not exceed $11,490:
Agenda and Annual Report Maps:
• Digitally revise existing single page map (dsp) ................................................. $100
• Text revision of existing single page map (tsp) ................................................... $25
• Prepare new single page map, including new color maps (nsp) ......................... $250
• Prepare multiple page maps o New overview map (nov)...................................................................... $100 o Revised overview map (rov) ................................................................... $50 o Other ......................................... priced as above for each sheet or indicated.
Project Re-design Meeting Maps:
• Prepare new single page map ........................................................................... $250
• Prepare multiple page maps o First map page ...................................................................................... $250 o Additional map pages ........................................................................... $100
Web Tools:
• Update & maintenance of Web site (quarterly) ...............................................$1,875
All invoices shall include the reporting period covered for the invoice amount billed.
(For Example: Reporting Period: July 1, 2015 – September 30, 2015)
| Details for TA 402 Change Order 1 - Maps.pdf |
| PL263 - TA 402 Details: Prepare Presentation Maps for New & Amended Florida Forever Projects |