CN-370000-CN802-T4CO1.pdf

PDF 745 KB Posted

Attached to
Master Agreement FL|CN802|5b51e9e7bd3d59895b0119bd0be51065
Contract number
CN802
Issued by
Florida

About this file

This is a Task Assignment Change Order Form (Change Order No. 01) issued by the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks, for contract CN802. The project involves the Orman House Historic State Park Multi-Use Pavilion and Restrooms located in Panama City, Florida. The consultant is CPH Consulting, LLC, represented by Jason Toole, PE, with FDEP Contract Manager Laurinda Micheels overseeing the work. The change order was approved on April 29, 2026, by multiple FDEP officials and the consultant.

The change order authorizes additional services for revising the helical pile layout and verifying helical pile capacities at the project site. The scope includes reviewing pile capacity calculations provided by McCormick, determining if additional piles are required, coordinating with the general contractor, reviewing structural calculations and inspection reports, preparing a deficiency letter, and coordinating remediation efforts. The fixed fee cost for this subtask is $4,449.07, with no reimbursable expenses. The work is billed using rates from contract CN210 and includes labor from a Senior Project Manager (5 hours at $132.61/hour), Senior Structural Engineer (18 hours at $112.39/hour), Senior Design Tech Structural (20 hours at $73.34/hour), and Administrative staff (5 hours at $59.24/hour). The change order extends the task end date by 1,267 days, from the original end date of June 30, 2026, to a new end date of December 18, 2029. Funding is allocated from project 61444C using FLAIR code 37501000260, with the total change order amount of $4,449.07 charged to object code 131500.

View the file

Other files

File Type Posted
CN-370000-CN802-T12.pdf PDF
CN-370000-CN802-T13.pdf PDF
CN-370000-CN802-T14.pdf PDF
CN-370000-CN802-T1CO1.pdf.crdownload CRDOWNLOAD file
CN-370000-CN802-T5.pdf PDF
CN-370000-CN802-T6.pdf PDF
CN-370000-CN802-T7.pdf PDF
CN-370000-CN802-T8CO2.pdf PDF
CN-370000-PL522-T9.pdf PDF
CN-370000-CN802-T1.pdf PDF
CN-370000-CN802-T10.pdf PDF
CN-370000-CN802-T13CO1.pdf PDF
CN-370000-CN802-T3.pdf PDF
CN-370000-CN802-T4.pdf PDF
CN-370000-CN802-T7CO1.pdf PDF
CN-370000-CN802-T8.pdf PDF
CN-370000-CN802-T8CO3.pdf PDF
CN-370000-CN802-CMC1.pdf PDF
CN-370000-CN802-T11.pdf PDF
CN-370000-CN802-T15.pdf PDF
CN-370000-CN802-T15CO1.pdf PDF
CN-370000-CN802-T1CO1.pdf PDF
CN-370000-CN802-T2.pdf PDF
CN-370000-CN802-T5CO2.pdf PDF
CN-370000-CN802-T10 CO1.pdf PDF
CN-370000-CN802-T10CO2.pdf PDF
CN-370000-CN802-T13CO2.pdf PDF
CN-370000-CN802-T13CO3.pdf PDF
CN-370000-CN802-T3CO1.pdf PDF
CN-370000-CN802-T5CO1.pdf PDF
CN-370000-CN802-T8CO1.pdf PDF
CN-370000-CN802.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Recreation and Parks

Task Assignment Change Order Form

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

DRP-085

Rev. /2025 1 of 2

FDEP Contract No: Project Number:

Task Assignment No: Change Order No:

Project Location Project

Consultant’s Name:

Consultant’s Representative:

Phone: Email:

FDEP Contract Manager:

Phone: Email:

Description of Change:

Change in Task Amount

Item Reimbursement Fixed Fee Total Original Task Amount Task Amount Including All Previous Change Orders Net Increase/Decrease in Task Amount for this Change Order Task amount with All Change Orders

CN802 61444C

TA4 01

Orman House Historic State Park Multi-Use Pavilion and Restrooms

CPH Consulting, LLC Jason Toole PE

(850) 563-1490 jtoole@cphcorp.com

Laurinda Micheels

(850) 245-2781 Laurinda.Micheels@FloridaDEP.gov

This is a time extension change order and includes additional services to verify the helical pile capacities. Please see proposal dated April 20, 2026 and time extension email dated 4/21/26. The rates were used from CN210. Subtasks using rates per CN210 are indicated using an asterisk * in the subtask heading.

$ 750.00 $ 29,737.77

$ 750.00 $ 29,737.77

$ 0.00 $ 4,449.07

$ 750.00 $ 34,186.84

$ 30,487.77

$ 30,487.77

$ 4,449.07

$ 34,936.84

FFLORIDAA DEPARTMENTT OF Divisionn off Recreationn andd Parks ENVIRONMENTALL PROTECTIONN Task Assignment Change Order Form

Change in Task Time

Original Task Execution Date Original Task End Date Present Task End Date Net Change in Days New Task End Date

Funding Information

29 Digit FLAIR Code:

Project # Grant # Org Code Cat/Year Fund Module Object Code

EO Amount

Total

Approval Signatures

Budget Representative, FDEP

Project Manager, FDEP

Contract Authority, FDEP

Signature

Signature

Signature

Signature

Signature

Date

Date

Date

Date

Date

DRP-085

Rev. 2 of 2 d nta atu

02/19/2025 06/30/2026 06/30/2026 1,267 12/18/2029

61444C 37501000260 080039/23 000286 U3100 131500 AD $ 4,449.07

$ 4,449.07

Tamika Bass

Donald Finkbeiner

Jason Toole PE

Laurinda Micheels

David Matson

Tamika Bass Digitally signed by Tamika Bass Date: 2026.04.29 11:12:37 -04'00'

Donald J Finkbeiner

Digitally signed by Donald J Finkbeiner Date: 2026.04.29 11:37:45 -04'00'

Digitally signed by Jason L Toole DN: C=US, O=Unaffiliated, dnQualifier=A01410D000001929B9D924C00073E35, CN=Jason L Toole Reason: I am the author of this document Location: Florida Date: 2026.05.01 18:50:05-05'00' Foxit PhantomPDF Version: 10.1.0

Jason L Toole

Laurinda Micheels

Digitally signed by Laurinda Micheels Date: 2026.05.04 15:55:42 -04'00'

David Matson Digitally signed by David Matson Date: 2026.05.05 15:33:44 -04'00'

April 20, 2026 1031-C W. 23rd Street Panama City, FL 32405

Phone: 850.563.1490

Don Finkbeiner Design Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 520 Tallahassee, FL 32399

RE: CN802 TA4 CO1

Orman House Multi-Use Pavilion & Restroom

Dear Don, For your review, CPH Consulting, LLC., has provided a proposal summary and man-hour documentation for the services tasks identified below for the Helical Piles at Orman House Historic State Park:

- Revision of Helical Pile Layout

Please review the attached Proposal Summary and deliverables.

Sincerely, Brook K Sherrard, Director of Architecture

Pleaaasesseeeeeeeeeeeeeee rrrrrrrrrrrrreeview les.

Orman House Historical State Park Multi-Use Pavilion & Restroom

Contract Number CN802 TA4 CO1

Subtask 6: Revision of Helical Pile Layout

Description:

• CPH will review the capacities provided by McCormick and the current pile layout and determine if any additional piles are required and the location of those piles.

• Meetings and additional communication with the general contractor to discuss alternatives to the original pile foundation design.

• Review of the proposed helical pier foundation calculations by structural EOR

• Review of the Helical pier observation report by the third-party inspector

• Preparation and submittal of a deficiency letter

• Coordination meeting to review options to address deficiencies in the installed helical pier foundation system

• Review of revised “as installed” calculations

• Preparation of any required remediation

Deliverables:

Revised layout of helical piles and a deficiency letter

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 6 – Revision of Helical Pile Layout

Firm Name Position Classification Hourly Rate

Hours Total Fixed Price Cost

CPH, LLC Senior Project Manager $132.61 5 $663.05 CPH, LLC Senior Structural Engineer $112.39 18 $2,023.02 CPH, LLC Senior Design Tech (Structural) $73.34 20 $1,466.80 CPH, LLC Administrative $59.24 5 $296.20

Subtotal Task 6 $4,449.07

Estimated Reimbursable Cost:

Postage N/A Printing N/A Overnight Travel N/A

(if applicable) Mileage (@ $0.58 per mile) N/A Application Fees N/A Reimbursable Total Cost N/A

Project Schedule:

Activity Estimated Duration

(Calendar Days) Proposed Dates

Subtask 6 – Revision of Helical Pile Layout 7 TBD

Summary of Fees:

Subtask Subtask Fixed Price Cost Reimbursable Subtask 6 – Revision of Helical Pile Layout

$4,449.07

Total Cost: $4,449.07 $0.00

Overall Total Cost: $4,449.07

Payment will be made upon approval of deliverables for each subtask by the FDEP in the amount specified.