This is a Task Assignment Change Order Form (Change Order No. 1) issued by the Florida Department of Environmental Protection (FDEP), Division of Recreation and Parks, for the Mike Roess Gold Head Branch State Park Bathhouse Replacement project. The change order involves the consulting firm CPH, LLC, represented by Kayla Sheffield, P.E., and is managed by FDEP Contract Manager Vu Nguyen. The contract number is CN802, with Project Number 61498C and Task Assignment Number 10. The change order was dated May 9, 2025, and has been digitally signed by all required FDEP and consultant representatives.

Change Order 1 authorizes additional design services for stormwater improvements and corresponding permitting tasks totaling $21,558.91 in fixed price costs with no reimbursable expenses. The scope includes four subtasks: Subtask 5A—Geotechnical Professional Services ($4,489.10), which encompasses geotechnical engineering, drilling services, and laboratory testing; Subtask 6A—Updated Clay County Development Plan Permitting ($2,750.53); Subtask 6B—SJRWMD Permitting ($5,720.96) for filing under General Permit 62-330.488; and Subtask 7A—100% Civil Plans for Stormwater Improvements ($8,598.32). The project schedule spans 120 calendar days for the longest activity (SJRWMD permitting), with deliverables including a geotechnical report, permitting applications and approvals, and final construction plans in PDF and CADD formats. Payment is contingent upon FDEP approval of deliverables for each subtask. The task amount with all change orders totals $82,976.26, increasing from the original task amount of $61,417.35. The funding source is project 61498C with a 29-digit FLAIR code allocation of $21,558.91.

View the file

Other files

File Type Posted
CN-370000-CN802-T12.pdf PDF
CN-370000-CN802-T13.pdf PDF
CN-370000-CN802-T14.pdf PDF
CN-370000-CN802-T1CO1.pdf.crdownload CRDOWNLOAD file
CN-370000-CN802-T5.pdf PDF
CN-370000-CN802-T6.pdf PDF
CN-370000-CN802-T7.pdf PDF
CN-370000-CN802-T8CO2.pdf PDF
CN-370000-PL522-T9.pdf PDF
CN-370000-CN802-CMC1.pdf PDF
CN-370000-CN802-T11.pdf PDF
CN-370000-CN802-T15.pdf PDF
CN-370000-CN802-T15CO1.pdf PDF
CN-370000-CN802-T1CO1.pdf PDF
CN-370000-CN802-T2.pdf PDF
CN-370000-CN802-T5CO2.pdf PDF
CN-370000-CN802-T1.pdf PDF
CN-370000-CN802-T10.pdf PDF
CN-370000-CN802-T13CO1.pdf PDF
CN-370000-CN802-T3.pdf PDF
CN-370000-CN802-T4.pdf PDF
CN-370000-CN802-T4CO1.pdf PDF
CN-370000-CN802-T7CO1.pdf PDF
CN-370000-CN802-T8.pdf PDF
CN-370000-CN802-T8CO3.pdf PDF
CN-370000-CN802-T10CO2.pdf PDF
CN-370000-CN802-T13CO2.pdf PDF
CN-370000-CN802-T13CO3.pdf PDF
CN-370000-CN802-T3CO1.pdf PDF
CN-370000-CN802-T5CO1.pdf PDF
CN-370000-CN802-T8CO1.pdf PDF
CN-370000-CN802.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Division of Recreation and Parks

Task Assignment Change Order Form

FLORIDA DEPARTMENT OF

ENVIRONMENTAL PROTECTION

DRP-085

Rev. 0 /2025 1 of 2

FDEP Contract No: Project Number:

Task Assignment No: Change Order No:

Project Location Project

Consultant�s Name:

Consultant�s Representative:

Phone: Email:

FDEP Contract Manager:

Phone: Email:

Description of Change:

Change in Task Amount

Item Reimbursement Fixed Fee Total

Original Task Amount

Task Amount Including All Previous Change Orders Net Increase/Decrease in Task Amount for this Change Order Task amount with All Change Orders

CN802 61498C

10 1

Mike Roess Gold Head Branch State Park Bathhouse Replacement

CPH, LLC

Kayla Sheffield, P.E.

(904) 705-3125 ksheffield@cphcorp.com

Vu Nguyen

(850) 245-2630 vu.nguyen@floridadep.gov

Additional design services for storm-water improvements and corresponding permitting tasks, per the attached dated May 9, 2025. Subtasks utilizing CN210 rates are indicated by *.

FLORIDA DEPARTMENT OF Division of Recreation and Parks

ENVIRONMENTAL PROTECTION Task Assignment Change Order Form

Change in Task Time

Original Task Execution Date Original Task End Date Present Task End Date Net Change in Days New Task End Date

Funding Information

29 Digit FLAIR Code:

Project # Grant # Org Code Cat/Year Fund Module Object Code

EO Amount

Total

Approval Signatures

Budget Representative, FDEP

Project Manager, FDEP

Contract Authority, FDEP

Signature

Signature

Signature

Signature

Signature

Date

Date

Date

Date

Date

DRP-085

Rev. 2 of 2

Fund

Representative, Signature

May 21, 2025

Mr. Rene Marcil Project Manager Bureau of Design and Construction Florida Department of Environmental Protection 3900 Commonwealth Boulevard, MS 520 Tallahassee, FL 32399

RE: Mike Roess Gold Head State Park CN802 TA10

Change Order 1

Dear Rene, For your review, CPH, LLC, has provided a proposal summary and man-hour documentation for additional services associated with the Gold Head State Park project.

Please review the attached Proposal Summary and deliverables.

Sincerely, Kayla Sheffield

Kayla Sheffield, PE

CPH, LLC

5200 Belfort Road Suite 220

Jacksonville, FL 32256 Phone: 904.332.0999

Fax: 904.332.0997

Gold Head State Park CN802 TA10 Change Order 1

Task 5: Geotechnical Services

Description:

5A Geotechnical Professional Services Geotechnical engineering services.

Mobilization of drill crew and equipment, perform 3 auger borings to depths of 6 ft and 3 double ring infiltrometer tests at depths of 2 ft. Transmit report with description of field and laboratory test procedures and results.

Deliverables:

5A PDF of signed Geotechnical Report

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 5A Geotechnical Professional Services Firm Name Position Classification Fee Per

Unit Units Total Fixed

Price Cost Geotech Professional Services

UES Principal Engineer $201.93 2 hrs $403.86 UES Project Engineer (PE) $122.58 7 hrs $858.06 UES Technical Secretary $84.00 1 hr $84.00 UES CADD Technician $85.50 3 hrs $256.50 UES Staff Engineer Utility Locates $110.34 2 hrs $220.68

Subtotal $1,823.10 Geotech Drilling Services

UES Mobilization/Demobilization of Equipment

$750.00 1 ea $750.00

UES Manual Auger Borings (3 @ 6 ft) $12.00 18 ft $216.00 UES Double Ring Infiltrometer Tests $500.00 3 ea $1,500.00

Subtotal $2,466.00 Geotech Laboratory Testing

UES Fine Aggregate/Soil Wash #200 $30.00 5 ea $150.00 UES Moisture Content Test $10.00 5 ea $50.00

Subtotal $200.00 Subtask 5A $4,489.10

Total for Task 5: $4,489.10

Task 6: Updated Permitting *

6A Clay County Development Plan Permitting * CPH will submit stormwater improvements revisions to Development Plan Permit.

6B - SJRWMD Permitting * CPH will 1) coordinate, prepare and file stormwater improvements to SJRWMD for the 62-330.488 General Permit to Governmental Entities for Certain Public Use Facilities at Public Natural Areas and 2) prepare responses to one (1) Request for Additional Information (RAI) from SJRWMD.

Deliverables:

6A PDF copies of application and approval from County 6B - PDF copies of application and approval from SJRWMD

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 6A Updated Clay County Permitting * Firm Name Position Classification Hourly

Rate Hours Total Fixed

Price Cost CPH, LLC Senior Project Manager $132.61 6 $795.66 CPH, LLC Project Manager $98.73 15 $1,480.95 CPH, LLC Administrative $59.24 8 $473.92

Subtask 6A $2,750.53

Subtask 6B Updated SJRWMD Permitting *

Rate Hours Total Fixed

Price Cost CPH, LLC Senior Project Manager $132.61 8 $1,060.88 CPH, LLC Project Manager $98.73 40 $3,949.20 CPH, LLC Administrative $59.24 12 $710.88

Subtask 6B $5,720.96

Total for Task 6: $8,471.49

Task 7: 100% Civil Plans Stormwater Improvements *

7A CPH will prepare and submit Specifications and Final Construction Plans to owner for review and final comments. Incorporate owner comments into plans and specifications. Provide Final Construction Plans, Specifications and Permits in PDF and hard copy format.

Deliverable:

7A PDF/CADD file of 100% Civil Stormwater Improvements Plans

Performance Measure: Deliverables will be reviewed by the Department to confirm they are complete, accurate, and timely.

Fixed Price Cost:

Subtask 7A 100% Civil Plans Stormwater Improvements *

Rate Hours Total Fixed

Price Cost CPH, LLC Senior Project Manager $132.61 15 $1,989.15 CPH, LLC Project Manager $98.73 25 $2,468.25 CPH, LLC Senior Design Technician $73.34 50 $3,667.00 CPH, LLC Administrative $59.24 8 $473.92

Subtask 7A $8,598.32

Total for Task 7: $8,598.32

Project Schedule:

Activity Duration (Calendar Days) Subtask 5A - Geotech Professional Services 30 days Subtask 6A Updated Clay County Permitting 90 days Subtask 6B Updated SJRWMD Permitting 120 days Subtask 7A 100% Civil Plans Stormwater Improvements 30 days

Summary of Fees:

Subtask Subtask Fixed Price Cost Subtask Reimbursable

Subtask 5A Geotech Professional Services 4,489.10 Subtask 6A Updated Clay County Permitting $2,750.53 Subtask 6B Updated SJRWMD Permitting $5,720.96

Subtask 7A 100% Civil Plans Stormwater Improvements $8,598.32

Total Fixed Price Cost: $21,558.91 Total Reimbursable Cost: $0.00

Overall Total Cost: $21,558.91

Payment will be made upon approval of deliverables for each subtask by FDEP in the amount specified.