CDRL_A006_Activity_Hazard_Analysis.pdf
PDF 160 KB Posted
- Solicitation number
- N6449824R4028
About this file
This document contains a Contract Data Requirements List (CDRL) and details for a federal contract opportunity. The CDRL outlines requirements for an Activity Hazard Analysis to be submitted under a contract for cooling water equipment and system preventative maintenance, repair, and cooling water analysis and chemical treatment services. Key details include: the contractor must prepare and submit AHAs for applicable work activities, updating them as conditions change; distribution of the AHA is restricted; it is required once initially unless changes are requested; and revisions must be submitted within 48 hours of any work condition or hazard changes.
The related federal contract opportunity is a solicitation from the Department of the Navy Naval Sea Systems Command for cooling water equipment and system preventative maintenance/repair and cooling water analysis and chemical treatment services at various Naval Surface Warfare Center Philadelphia Division government buildings. This is a 100% small business set-aside with a competitive single award Firm Fixed Price IDIQ contract. A site visit will be held on February 20, 2024, with an RSVP deadline of February 16, 2024.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0002_N6449824R4028.pdf | ||
| Amendment_0001_N6449824R4028.pdf | ||
| Attachment_7_PPQ.docx | DOCX document | |
| CDRL_A009_Asbestos_Containing_Material_Report.pdf | ||
| Attachment_5_Performance Requirements.docx | DOCX document | |
| CDRL_A007_Accident_Reports.pdf | ||
| Attachment_1_CoolingWater_PNBC_Site_Map.pdf | ||
| CDRL_A001_Contract Status Report.pdf | ||
| CDRL_A008_OSHA Citations and Violations CAR.pdf | ||
| Attachment_2_ELINS.xlsx | XLSX spreadsheet | |
| Attachment_6_PM_Checklists_1_thru_8.docx | DOCX document | |
| RFP N6449824R4028.pdf | ||
| CDRL_A005_Accident_Prevention_Plan.pdf | ||
| Attachment_6A_PM_Checklist_9.docx | DOCX document | |
| CDRL_A003_Contractors_Personnel_Roster.pdf | ||
| Attachment_3_Equipment List.xlsx | XLSX spreadsheet | |
| Attachment_4_Historical Repair Call.xlsx | XLSX spreadsheet | |
| CDRL_A002_Contractors_Maintenace_Program_Plan.pdf | ||
| CDRL_A004_Contractors_Quality_Management_Plan.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST (CDRL)
(1 Data Item) Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
REQUIRED
a. ADDRESSEE
b. COPIES
8. APP CODE
11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM.
Draft
Final
Reg Repro
16. REMARKS
15. TOTAL ▬▬▬▬►
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page of Pages
| A CONTRACT LINE ITEM NO: TBD | |
| B EXHIBIT: A | |
| D SYSTEMITEM: Cooling Water/Chemical Treatment | |
| E CONTRACTPR NO: TBD | |
| F CONTRACTOR: TBD | |
| 1 DATA ITEM NO: A006 | |
| 2 TITLE OF DATA ITEM: Safety Summary Report | |
| 3 SUBTITLE: Activity Hazard Analysis (AHA) | |
| 17 PRICE GROUP: | |
| 4 AUTHORITY Data Acquisition Document No: DI-SAFT-82155 | |
| 5 CONTRACT REFERENCE: PWS Section 4.6. See BLK 16. | |
| 6 REQUIRING OFFICE: Code 1022 | |
| 7 DD 250 REQ: LT | |
| 8 APP CODE: N/A | |
| 9 DIST STATEMENT REQUIRED: See BLK 16 | |
| 10 FREQUENCY: See BLK 16 | |
| 12 DATE OF FIRST SUBMISSION: See BLK 16 | |
| 11 AS OF DATE: See BLK 16 | |
| H DATE: 2 Oct 2023 | |
| a ADDRESSEE16 REMARKS: Tech POC | |
| Draft16 REMARKS: 0 | |
| Reg16 REMARKS: 1 | |
| Repro16 REMARKS: | |
| a ADDRESSEE16 REMARKS_2: COR | |
| Draft16 REMARKS_2: 0 | |
| Reg16 REMARKS_2: 1 | |
| Repro16 REMARKS_2: | |
| a ADDRESSEE16 REMARKS_3: Alternate TPOC | |
| Draft16 REMARKS_3: 0 | |
| Reg16 REMARKS_3: 1 | |
| Repro16 REMARKS_3: | |
| a ADDRESSEE16 REMARKS_4: KO | |
| Draft16 REMARKS_4: 0 | |
| Reg16 REMARKS_4: 1 | |
| Repro16 REMARKS_4: | |
| a ADDRESSEE16 REMARKS_5: | |
| Draft16 REMARKS_5: | |
| Reg16 REMARKS_5: | |
| Repro16 REMARKS_5: | |
| a ADDRESSEE16 REMARKS_6: | |
| Draft16 REMARKS_6: | |
| Reg16 REMARKS_6: | |
| Repro16 REMARKS_6: | |
| a ADDRESSEE16 REMARKS_7: | |
| Draft16 REMARKS_7: | |
| Reg16 REMARKS_7: | |
| Repro16 REMARKS_7: | |
| a ADDRESSEE16 REMARKS_8: | |
| Draft16 REMARKS_8: | |
| Reg16 REMARKS_8: | |
| Repro16 REMARKS_8: | |
| a ADDRESSEE16 REMARKS_9: | |
| Draft16 REMARKS_9: | |
| Reg16 REMARKS_9: | |
| Repro16 REMARKS_9: | |
| a ADDRESSEE16 REMARKS_10: | |
| Draft16 REMARKS_10: | |
| Reg16 REMARKS_10: | |
| Repro16 REMARKS_10: | |
| a ADDRESSEE16 REMARKS_11: | |
| Draft16 REMARKS_11: | |
| Reg16 REMARKS_11: | |
| Repro16 REMARKS_11: | |
| a ADDRESSEE16 REMARKS_12: | |
| Draft16 REMARKS_12: | |
| Reg16 REMARKS_12: | |
| Repro16 REMARKS_12: | |
| a ADDRESSEE16 REMARKS_13: | |
| Draft16 REMARKS_13: | |
| Reg16 REMARKS_13: | |
| Repro16 REMARKS_13: | |
| a ADDRESSEE16 REMARKS_14: | |
| Draft16 REMARKS_14: | |
| Reg16 REMARKS_14: | |
| Repro16 REMARKS_14: | |
| a ADDRESSEE16 REMARKS_15: | |
| Draft16 REMARKS_15: | |
| Reg16 REMARKS_15: | |
| Repro16 REMARKS_15: | |
| a ADDRESSEE16 REMARKS_16: | |
| Draft16 REMARKS_16: | |
| Reg16 REMARKS_16: | |
| Repro16 REMARKS_16: | |
| a ADDRESSEE16 REMARKS_17: | |
| Draft16 REMARKS_17: | |
| Reg16 REMARKS_17: | |
| Repro16 REMARKS_17: | |
| a ADDRESSEE16 REMARKS_18: | |
| Draft16 REMARKS_18: | |
| Reg16 REMARKS_18: | |
| Repro16 REMARKS_18: | |
| a ADDRESSEE16 REMARKS_19: | |
| Draft16 REMARKS_19: | |
| Reg16 REMARKS_19: | |
| Repro16 REMARKS_19: | |
| a ADDRESSEE16 REMARKS_20: | |
| Draft16 REMARKS_20: | |
| Reg16 REMARKS_20: | |
| Repro16 REMARKS_20: | |
| a ADDRESSEE16 REMARKS_21: | |
| Draft16 REMARKS_21: | |
| Reg16 REMARKS_21: | |
| Repro16 REMARKS_21: | |
| a ADDRESSEE16 REMARKS_22: | |
| Draft16 REMARKS_22: | |
| Reg16 REMARKS_22: | |
| Repro16 REMARKS_22: | |
| a ADDRESSEE16 REMARKS_23: | |
| Draft16 REMARKS_23: | |
| Reg16 REMARKS_23: | |
| Repro16 REMARKS_23: | |
| a ADDRESSEE16 REMARKS_24: | |
| Draft16 REMARKS_24: | |
| Reg16 REMARKS_24: | |
| Repro16 REMARKS_24: | |
| a ADDRESSEE16 REMARKS_25: | |
| Draft16 REMARKS_25: | |
| Reg16 REMARKS_25: | |
| Repro16 REMARKS_25: | |
| a ADDRESSEE16 REMARKS_26: | |
| Draft16 REMARKS_26: | |
| Reg16 REMARKS_26: | |
| Repro16 REMARKS_26: | |
| a ADDRESSEE16 REMARKS_27: | |
| Draft16 REMARKS_27: | |
| Reg16 REMARKS_27: | |
| Repro16 REMARKS_27: | |
| a ADDRESSEE16 REMARKS_28: | |
| Draft16 REMARKS_28: | |
| Reg16 REMARKS_28: | |
| Repro16 REMARKS_28: | |
| a ADDRESSEE16 REMARKS_29: | |
| Draft16 REMARKS_29: | |
| Reg16 REMARKS_29: | |
| Repro16 REMARKS_29: | |
| Draft15 TOTAL: | |
| Reg15 TOTAL: 4 | |
| J DATE: 2 Oct 2023 | |
| 18 ESTIMATED TOTAL PRICE: | |
| Repro15 TOTAL: | |
| Pages: 1 | |
| Page: 1 | |
| 2023-10-02T07:50:03-0400 | |
| WALDING.LAUREN.MICHELLE.1607979312 |
| 2023-10-02T13:55:10-0400 | |
| LAGATTA.MARK.D.1398632172 |
| 13 DATE IF SUBSEQUENT SUBM: See BLK 16 |
| Remarks: Block 4: |
1. The Contractor shall prepare Activity Hazard Analyses (AHAs) for all applicable work activities performed under this contract. AHAs for recurring work shall be submitted with the APP and shall be updated as work activities or conditions change and additional AHAs prepared as new work activities are required. AHAs for non-recurring and one-time (e.g., non-recurring work task orders) work occurrences shall be submitted at least two working days prior to start of work. Specifically,
a. for contract modifications to recurring work requirements where changes are germane to the original contract, the Contractor shall revise applicable AHAs within 15 calendar days after modification is signed;
b. for contracts with non-recurring work Exhibit Line Item Numbers (ELINs), the Contractor shall submit an AHA on non-recurring work task orders, with the associated proposal, whenever the service environment or required task is different from the recurring work priced services; and
c. for construction (including renovation or alteration) task orders placed on the non-recurring work portion of contract, the Contractor shall submit a separate AHA for each task order with the associated proposal.
2. The Contractor shall follow the Risk Management Process for the development of Activity Hazard Analysis (AHA) in accordance with paragraph 01.A.14 and Appendix A of U.S. Army Corps of Eng Manual EM 385-1-1. A formatted outline of an AHA is provided in Figure 1-2 of EM 385-1-1.
3. During performance of services, the Contractor's Site Safety & Health Officer (SSHO), or other OSHA competent person, shall periodically review the AHA at each service site and for each sub-annex to assess the effectiveness of the Contractor’s overall APP. If changes to the AHAs are required, such changes shall be submitted to the Contracting Officer for review and acceptance.
Block 9: Distribution authorized to personnel listed in Block 14, Distribution Statement B.
Other requests for this document shall be referred to Commander, Naval Surface Warfare Center, Philadelphia Division, 5001 South Broad Street, Building 4, Philadelphia, PA 19112.
Block 10: The AHA is required once, unless changes are made or requested by the Government.
Block 12 The AHA shall be submit no later than 15 days after award but prior to commencing any work.
Block 13 The Contractor shall review, update, and submit revisions to the AHA whenever a change in work conditions, hazards, or activities occur no later than 48 hours after the change.
BLK 14: Submit via electronic mail in a digital format that can be read by Microsoft Office 2010 applications (or earlier) or Adobe PDF applications.
***END***