Attachment_4_Historical Repair Call.xlsx

XLSX spreadsheet 53 KB Posted

Attached to
NSWCPD Cooling Water Equipment and Systems Preventative Maintenance/Repair and Cooling Water Analysis and Chemical Treatment Services at the PNBC
Solicitation number
N6449824R4028
Issued by

About this file

This document contains historical repair records and service calls for cooling water equipment and systems at various NSWCPD government buildings from 2004 through 2022. It provides details on specific equipment issues, repairs, and completion dates at buildings 77H, 87, 633 and others. Non-wear-and-tear repairs are also outlined from 2009 through 2021, including motor replacements, pump overhauls, control replacements, and other mechanical issues. This record would inform requirements for preventative maintenance and repair services of cooling water assets at the Philadelphia Navy Yard, as outlined in solicitation N6449824R4028.

The solicitation requests proposals for a competitive single award Firm Fixed Price IDIQ contract to provide preventative maintenance/repair services for cooling water equipment and systems, as well as cooling water analysis and chemical treatment services. It is a 100% small business set-aside located at various NSWCPD government buildings at the Philadelphia Navy Yard. Interested parties must attend an in-person site visit on February 20, 2024, with RSVP due by February 16. The contract type, small business set-aside, agency, location, opportunity date and additional event details are specified.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4A - Service Calls 2004-2022

PWS ATTACHMENT 4A OF COOLING WATER MAINTEANANCE AND REPAIR CONTRACT -- NSWCPD COOLING WATER HISTORICAL SERVICE CALLS, THROUGH 2022
"For informational purposes only"12/Sep/2023
TICKET #BLDG #DESCRIPTIONR/EDATECOMPLETION DATEBEYOND SCOPE (Y/N)Service Call Notes
FY 2004
Repair pump 1AE30/Apr/2004UnknownN
Troubleshoot/repair soft start 2AR27/Sep/2004UnknownN
Troubleshoot/repair VFD 1AE30/Sep/2004UnknownN
FY 2005
Troubleshoot valves and controlsE17/Nov/2004UnknownN
Install DDC fansR14/Dec/2004UnknownN
repair wiring soft start 2AR13/Jan/2005UnknownN
Troubleshoot/repair soft start 2AR17/Feb/2005UnknownN
Repair cooling tower valveE19/May/2005UnknownN
repair slide gateE27/Sep/2005UnknownN
Troubleshoot/repair soft start 2AR27/Sep/2005UnknownN
FY 2006
Troubleshoot/repair controlsR21/Nov/2005UnknownN
Troubleshoot/repair pump 1AE12/Jan/2006UnknownN
Troubleshoot pumpE31/May/2006UnknownN
FY 2007
Troubleshoot/repair VFD 1A groundE23/Oct/2006UnknownN
Troubleshoot pump 1A failureE26/Jul/2007UnknownN
Troubleshoot tower valve failureE31/Jul/2007UnknownN
Troubleshoot 2B starter failureE31/Jul/2007UnknownN
Troubleshoot pump 1C failureE28/Sep/2007UnknownN
FY 2008
Repair CT sensor conduitR12/Dec/2007UnknownN
Troubleshoot pump 1B failureE12/Dec/2007UnknownN

FY 2009

FY 2010

FY 2011

FY 2012

FY 2013

FY 2014

FY 2015
87During system operation, the supply pumps will turn off for no apparent reason and then turn back on again. Shutdown causes loss of pressure and affects test data collection. Cooling tower valves V-3 and V-4 work intermittently, could be the cause of the pump problems. Work needs to be scheduled and coordinated with test site operations.R23/Feb/2015UnknownN
77HThe 36" bypass valve BPV-2 will not operate. Investigate and identify the reason why the valve will not operateR7/Feb/2015UnknownN
87Cooling tower pumps 2 and 2A will not run, suspect the heat trace failed and the pump casing is frozen. Check heat trace system and determine cause for pump failure.R23/Sep/2015UnknownN
87A significant leak from the discharge piping associated with Pump 2, underneath the cooling tower, has appeared. Remove the insulation from the pipe and identify the cause of the leak and make repairs. If the required repairs are beyond the scope of this service call, stop work and inform the Government representative. Note: the piping is heat traced, reinstall pipe insulation after cause of leak has been determined and additional material / equipment is required after the end of the heating season.R23/Mar/2015UnknownN
FY 2016
87We need service call to address the CB valves for both of the Bldg 87 cooling tower return pumps, which are not closing. We don't know for sure what the cause of the issue is, but we suspect that the linkages to the MCC cabinet may have become misalignedR24/Aug/2016UnknownN
FY 2017
77HWe have a failed pressure transducer in the Bldg. 77H Cooling Water System. Please have Municipal Maintenance purchase and replace the failed pressure transducer on a Service Call.R9/May/2017UnknownN
87No information.E13/Jul/2017UnknownN
77HThe Bldg 77H Cooling Water System Tank #1 Outlet Temperature Detector Failed. Detector is an Automated Logic ALC/TIK (30 to 234F) 4mA ti 20mA 2 wire 8 to 35vDCR17/Jul/2017UnknownN
FY 2018
87E002-001. Cooling tower at Bldg 87 requires cleaning.R23/Jul/2018UnknownN
77HTank #4 and Tank #5 at the building 77H tank farm each have leaking fire suppression valves. These valves are no longer in use - recommend removal/disposal of the valves and installation of blank flanges. NSWCPD test site personnel can coordinate. Re: fuel level in tanks to prevent additional leaks during the repair.R23/Jul/2018UnknownN
77HE002-003. Existing head tank supply valve (Keystone butterfly valve) in Bldg 77H needs to be replaced with like, including valve operator. Coating color to match existing surroundings.R25/Jul/2018UnknownN
FY 2019
77HPump Set One (Pump C) is leaking oil from the motor and Pump 1A is receiving a high voltage alarm. This leaves only one pump at Pump set 1 fully operational.R16/Oct/2018UnknownN
77HReplace two 30-inch air operated valves CW01 and CW02R6/Feb/2019UnknownN
87E002-001. Cooling tower at Bldg 87 requires cleaning.R8/Apr/2019UnknownN
77HTank #4 and Tank #5 at the building 77H tank farm each have leaking fire suppression valves. These valves are no longer in use - recommend removal/disposal of the valves and installation of blank flanges. NSWCPD test site personnel can coordinate. Re: fuel level in tanks to prevent additional leaks during the repair.R8/Apr/20196-Sep-18N
77HE002-003. Existing head tank supply valve (Keystone butterfly valve) in Bldg 77H needs to be replaced with like, including valve operator. Coating color to match existing surroundings.R8/Apr/2019UnknownN
77HPump Set One (Pump C) is leaking oil from the motor and Pump 1A is receiving a high voltage alarm. This leaves only one pump at Pump set 1 fully operational.R8/Apr/201931-Oct-18N
77HCustomer requests the replacement for 30-inch air-operated valves CW01 and CW02, which are shown as IPS an DDG51 on the equipment listR9/Apr/20193-Apr-19N
FY 2020
87A main control valve on the Bldg 87 cooling tower failed, and you will contact Municipal Maintenance to address as soon as possible. Clarify with them that this is a separate and higher-priority issue than the other recent service requests related to that system. Given the mission-critical nature of this issue, please provide status updates ASAP! Thanks!E23/Oct/2019UnknownN
FY 2021
87Please address leaks in the cooling Tower in Building 87. This call was already addressed. Just officially sending the service call request to you. Thanks!E8/Mar/2021UnknownN
633Bilge pump BP-2 (a Vertiflo 800 per the equipment inventory) in Bldg 633 needs troubleshooting; apparently it keeps tripping the breaker and isn’t operational. Shop personnel suspected an obstruction got pulled into it.R8/Mar/2021UnknownN
77HThere appears to be a software problem that caused a heater over-temp alarm on all three pumps at Pump set 1. Personnel on-site couldn’t like it to any power issues, and it definitely isn’t a legitimate alarm because pump 1C is tagged out.R8/Mar/2021UnknownN
FY 2022
77HHead Tank Freeze Protection Circulation Pump has a mechanical seal that is leaking.R17/Feb/2022UnknownN
87Cooling tower and suction piping to pump CTP2A. Leaks along the bottom seam and at basin heaters. Investigate and repair.17/Mar/2022UnknownN

&"Times New Roman,Regular"&9&Z&F &"Times New Roman,Regular"Page &P of &N

4B - Non-Wear-and-Tear Repairs

PWS ATTACHMENT 4B OF COOLING WATER EQUIPMENT AND SYSTEM MAINTENANCE AND REPAIR CONTRACT -- NSWCPD COOLING WATER HISTORICAL NON-WEAR-AND-TEAR REPAIRS
"For informational purposes only"12/Sep/2023
BLDG #DESCRIPTIONDATECOMPLETION DATEBEYOND SCOPE (Y/N)

87 Remove/replace motor starter for cooling water pump. Starter is a size 5, reduced voltage starter, GE CR331, autotransformer type. 9-Apr-2009 9/30/09 Y

77HOverhaul pump 2C 250 hp motor19-Oct-201011/30/10Y
77HDue to safety issues a crane was required to remove the pump for overhaul26-Nov-20101/26/11Y
77HReplace the motor starter for lube pump 2B12-Apr-20115/30/11Y
77H/87preorder service calls23-May-2011UnknownN
77HOverhaul pump 2A1-Jul-20119/29/11Y
77HAfter removal and inspection of Cooling Water Pump 2A, several components of the pump were found to be damaged and cannot be repaired. As a result, replace the pump bowl assembly, including the impellor, wear rings, bearings, discharge bowl, suction bell and associated hardware. Request Contractor submit proposal for additional work under ELINs C700 and C701.1-Dec-20115/17/12Y
77H/87preorder service calls22-Feb-2012UnknownN
77Hrepair starter pump 2A electrical issue8-Nov-201211/23/12N
77H/87preorder service calls23-Jan-2013UnknownN

77H/87 preorder service calls 24-Jun-2014 Unknown N

87Replace basin heater in cell #39-Oct-2014UnknownY
87Replace cooling water system valve V2 including actuator9-Oct-2014UnknownY
77LRepair cooling tower pump28-Oct-2014UnknownY
87Remove, overhaul, re-install and test cooling water pump 1A3-Mar-2015UnknownY
87Replace 5 basin heaters and 3 temperature sensors8-Jun-2015UnknownY
87Replace flex hose and heat trace flex hose and replace insulation9-Jul-2015UnknownY
87From TF-1 2015-0076 Replace 5 basin heaters and 3 temperature sensors30-Jul-20158/29/15Y
87From TF-1-2015-0085 Replace flex hose and heat trace flex hose and replace insulation21-Jan-20163/4/16Y
633Relocate Bilge pump #8 controller30-Dec-2015UnknownY
87Drain tower clean out debris and clean level probes15-Mar-2016UnknownY
77H/87Add service calls8-Apr-2016UnknownY
87Replace circuit breaker for CTP-1A4-Oct-2016UnknownY
77H/87From TF-1 2017-0005. Replace circuit breaker for CTP-1A and repair fuel oil leak on 3-inch pipe24-Jan-201710-Mar-2017Y
633Replace bilge pumps and controllers29-Nov-2016UnknownY

77H add/remove equipment 9-Nov-2017 Unknown Y

77HReplace head tank supply valve10-Oct-2018UnknownY
77HFrom TF-1 2019-0042. Repair head tank supply valve20-May-20194-Jun-2019Y
633add equipment to the contract23-Apr-2019UnknownY
633architect services to modify design of B633 cooling tower30-Jul-2019UnknownY
77HRepairs to existing cooling water system18-Jun-2019UnknownY
77HReplace cooling tower control screens4-Dec-2019UnknownY
77HReplace hard drive for PCS-CPO1 Thermosystem. Replace solenoids for both CW01 and CW0218-Mar-20202-Apr-2020Y
87Replace cooling tower Actuator for V-118-Sep-2020UnknownY
77HCooling System - Pumpset 1 Screen1-Sep-2020UnknownY
77HRepairs to pump 1C31-Aug-2020UnknownY
87From TF-1 NSWC-0071-20. Replace actuator for cooling tower valve V19-Nov-20209-Dec-2020Y
87Replace cooling tower fan motor5-Mar-2021UnknownY
87From TF-1 NSWC-0080-21. Replace cooling tower fan motor14-Jun-202115-Aug-2021Y
77HFrom TF-1 NSWC-0038-21. Replace the touch screen pumpset 127-Jul-20211-Mar-2022Y
77HFrom TF-1 NSWC-0039-21. Repairs to pump 1C24-Aug-2111-Oct-2021Y
87Cooling Water System Repair Design3-Jun-21UnknownY
87Repair water leak at CTP110-Nov-21UnknownY
633Replace bilge pump #129-Nov-21UnknownY