Attachment_6A_PM_Checklist_9.docx
DOCX document 17 KB Posted
- Solicitation number
- N6449824R4028
About this file
This document includes a preventative maintenance checklist and details for a related federal contract opportunity. The maintenance checklist outlines inspection and testing procedures for head tank freeze protection pumps and bilge pumps. It requires mechanics to check equipment mounting, operation, insulation, connections and indicator lights. Vibration readings must be recorded from multiple locations on the pumps and motors.
The associated federal contract opportunity is a competitive small business set-aside solicitation issued by the Naval Surface Warfare Center Philadelphia Division. It seeks proposals for preventative maintenance, repair, and chemical treatment services for cooling water equipment and systems at various government buildings at the Philadelphia Navy Yard. Services will be acquired through an indefinite delivery, indefinite quantity contract with fixed pricing. A mandatory site visit will be held on February 20, 2024, with requests to attend due no later than February 16.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0002_N6449824R4028.pdf | ||
| Amendment_0001_N6449824R4028.pdf | ||
| Attachment_7_PPQ.docx | DOCX document | |
| CDRL_A009_Asbestos_Containing_Material_Report.pdf | ||
| Attachment_5_Performance Requirements.docx | DOCX document | |
| CDRL_A007_Accident_Reports.pdf | ||
| Attachment_1_CoolingWater_PNBC_Site_Map.pdf | ||
| CDRL_A001_Contract Status Report.pdf | ||
| CDRL_A008_OSHA Citations and Violations CAR.pdf | ||
| Attachment_2_ELINS.xlsx | XLSX spreadsheet | |
| Attachment_6_PM_Checklists_1_thru_8.docx | DOCX document | |
| RFP N6449824R4028.pdf | ||
| CDRL_A005_Accident_Prevention_Plan.pdf | ||
| CDRL_A006_Activity_Hazard_Analysis.pdf | ||
| CDRL_A003_Contractors_Personnel_Roster.pdf | ||
| Attachment_3_Equipment List.xlsx | XLSX spreadsheet | |
| Attachment_4_Historical Repair Call.xlsx | XLSX spreadsheet | |
| CDRL_A002_Contractors_Maintenace_Program_Plan.pdf | ||
| CDRL_A004_Contractors_Quality_Management_Plan.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Preventive Maintenance Checklist Checklist #9 Head Tank Freeze Protection Pump/Bilge Pump Date:__________ Unit ID:______________________ Mechanic:__________________
RESULTS/REMARKS
Cooling Water Equipment and Systems Repair and Maintenance Contract PWS Attachment 6A – Check List No. 9 9 February 2022
1. Check mounting bolts and hardware are secure. Tighten as required.
2. Check for unusual noise, vibration, signs of overheating, etc.
3. Grease motor and pump.
4. Check vibration.
5. Check for deteriorated or damaged wire insulation, corrosion, signs of overheating, etc. Remove accumulated dirt and dust.
6. Check for any loose connections. Tighten as required.
7. Check for satisfactory condition of starter contacts.
8. Measure and record insulation resistance of motor feeder and load cables.
9. Observe starter during motor operations.
10. Check indicating lights.
Additional Comments:
Vibration Readings - In line with discharge:
Top of motor _______________________ Bottom of motor _____________________ Base ______________________________ Vibration Readings - 90 deg. from discharge:
Top of motor ________________________ Bottom of motor _____________________ Base _______________________________
I certify that the checklist was completed as required.
Mechanic’s signature__________________________
File details come from the government source that posted it. Updated .