C250192_SOW_Verification.pdf
PDF 355 KB Posted
- Attached to
- Enterprise Asset Management Phase 2
- Solicitation number
- 250192
- Issued by
- Orange County, California
About this file
This Scope of Work Verification form pertains to the Orange County Transportation Authority (OCTA) Enterprise Asset Management System Phase 2 project in California. The document establishes guidelines for preparing scopes of work and specifications, requiring clear and concise descriptions that identify all characteristics and specific tasks without imposing unreasonable requirements or favoring particular vendors. The requisition (R000680) carries a budget of $1,500,000 for a two-year contract term. Project Manager Michael J. Bosche signed the verification on March 18, 2026, and submitted it with the corresponding scope of work document.
An addendum to the standard verification form clarifies that neither the standard independent preparation certification nor the "brand name or equal" exception applies to this requisition. OCTA specifically requires a vendor capable of working with Hexagon's Enterprise Asset Management (EAM) SaaS solution, which the organization recently implemented. The project seeks to expand the capabilities of the existing Hexagon EAM system rather than procure a new or alternative solution, making the vendor's specific expertise with this platform a critical requirement.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Enterprise_Asset_Management_Phase_2_(Addendum_#3_Revision).pdf | ||
| C250192_PP-APPROVED.pdf | ||
| C250192_PS.pdf | ||
| C250192_Exhibit_A,_Attachment_A_Business_Requirements.pdf | ||
| C250192_Exhibit_A,_SOW.pdf | ||
| C250192_Exhibit_C_Proposed_Agreement.pdf | ||
| C250192_RFP_Exhibit_B_Price_Summary_Sheet.pdf | ||
| C250192_Exhibit_D_Level_1_Safety_Specifications_Rev_8.pdf | ||
| C250192_PP.pdf | ||
| C250192_Exhibit_C_Proposed_Agreement_gmedits.docx | DOCX document | |
| C250192_PP_GMEDITS.docx | DOCX document | |
| C250192_Form_700_Legal_Counsel_Response_03-18-26.pdf | ||
| C250192_Public_Record_Draft.pdf | ||
| C250192_ICE_R000680.pdf | ||
| C250192_PP.docx | DOCX document | |
| C250192_PS.docx | DOCX document | |
| C250192_Public_Notice.doc | DOC document | |
| C250192_R000680.pdf |
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK VERIFICATION
This Form Must Be Submitted with Scope of Work (SOW)
FA-CAMM-071.docm (03/16/18) Page 1 of 1
The following general rules shall apply when preparing scopes of work and specifications:
a) Provide a clear and concise Scope of Work (SOW) and not impose unreasonable requirements.
b) Specifications and Scopes of Work shall identify all characteristics and specific tasks and functions of the items or services to be procured, and meet the Authority’s requirements.
c) Whenever possible, the expected quality of services to be provided or the performance characteristics of the item shall be specified.
d) The requestor shall identify all optional items, and the solicitation documents shall set forth the expected needs and the manner in which the related bid prices will be considered.
e) Brand name specifications must be accompanied by an explanation that clearly indicates that the specification is not intended to be restrictive.
f) The salient characteristics represented by the brand names shall be identified to allow for evaluation of possible “or g) Because standard specifications and requirements allow for more efficient operations and result in lower prices, they shall be used wherever suitable.
h) Industry, federal, state and local government specifications and requirements can be used.
Consultants are prohibited from writing the Scope of Work or assisting in the development or writing the Scope of Work in which they may bid.
INSTRUCTIONS
Project Managers (PM) must select one of the following certifications and submit this form with the scope of work/specifications. This form must be signed by the Project Manager and one of the following: the PM’s Department Manager or Director or Executive Director.
☐ I certify that the attached SOW/specifications was independently prepared to invite competition;
does not include reference to a brand name, or include unreasonable restrictions or an intent to favor any specific vendor or brand product.
OR
☐ The SOW/specifications prepared includes a “brand name or equal” description because it was determined to be “impractical or uneconomical” (as referenced in FTA Circular 4220.1F -revised March 18, 2013) to write a clear and accurate description of the technical requirements of the goods or services to be acquired. However, the specific features or salient characteristics of the named brand which must be met by offerors of “an equal” proposal have been clearly stated, as required by Federal Transit Administration regulations. (FTA Circular 4220.1F – revised March 18, 2013)
*SEE ATTACHED
R000680 Requisition Number Dept. Manager/Director/Executive Director Signature
Michael J. Bosché Project Manager Signature
IS 3/18/2026
Department Date
Addendum to Scope of Work Verification Requisition R000680
Neither option in the Scope of Work Verification form applies to this requisition. OCTA is seeking a vendor who can work specifically with Hexagon’s EAM. Hexagon EAM is the SaaS solution recently implemented at OCTA, the requisition is asking to expand the capabilities of that solution and not implement a new, different solution.
R000680 Requisition Number
Michael J. Bosché Project Manager Signature
Information Systems 3/18/2026 Department Date