BRACE_Pricing_Table_Template_021026.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Buckwalter Recreation Athletic Complex Expansion
Solicitation number
120925
Issued by
Beaufort County, South Carolina

About this file

This is a pricing table template for the Buckwalter Recreation Athletic Complex Expansion project, a comprehensive construction contract issued by Beaufort County, South Carolina. The project encompasses multiple construction phases organized into a base bid and one alternate, with detailed line items spanning site preparation and demolition, erosion control, site grading, drainage systems, utilities (sewer, water, and electric), building construction, site paving and walls, soccer fields, site furnishings, and landscaping. The base bid includes 13 major sections (A through L) covering foundational work such as site mobilization, bonds and insurance, clearing and grubbing, tree protection, and removal of existing infrastructure, followed by specialized work including the installation of artificial turf soccer fields, concrete paving, retaining walls, fencing, and comprehensive landscaping with irrigation systems. Alternate 1 (ALT 1) addresses work south of the existing traffic circle and includes similar categories with modified scope items, including a new restroom building, additional drainage infrastructure, and expanded utilities connections. The sealed bid submission deadline is December 9, 2025, at 3:00 pm EST, with a non-mandatory pre-bid conference scheduled for October 29, 2025, at 2:00 pm. The contract term is 540 days from the Notice to Proceed, with contractors required to commence work within 15 calendar days of receiving the notice.

The pricing table requires bidders to supply unit costs and quantities for each line item, with section totals and a combined base bid total calculated automatically. Notable priced items in the template include Soccer Backstop Netting at $240.00 per linear foot, Diamond Rail Fence at $540.00 per linear foot, and 4 Foot Chain Link Fence and Gates at $790.00 per linear foot. The project requires a 5% bid bond and compliance with South Carolina Department of Transportation Standard Specifications for Highway Construction (2025 Edition). Bidders must submit a Good Faith Efforts Checklist and Proposed Utilization Plan for Small and Minority Business Participation. Payment terms are structured as monthly progress payments at 90% of completed work with 10% retainage held until final completion. Liquidated damages are assessed at $600 per calendar day for project delays. Contractors must be licensed or hold Irrigation Association Certification, with irrigation systems requiring a minimum water pressure of 115 psi. Insurance requirements include worker's compensation, commercial general liability, and automobile liability coverage, with Beaufort County named as an additional insured. Project funding is derived from state, federal, and/or Beaufort County appropriations, though a specific total project budget is not identified in this pricing template.

View the file

Other files

File Type Posted
Buckwalter_Recreation_Athletic_Complex_Expansion_(Addendum_#12_Revision).pdf PDF
Musco_Sports_Lighting_Addendum_rev_2-18-26.pdf PDF
Master_Services_Contract_Watermarked_Locked.pdf PDF
Summary_of_Revisions.docx DOCX document
CIVIL_CAD_FILE.dwg DWG drawing
BRACE_BID_SPECIFICATIONS_MANUAL.pdf PDF
LA_PLANTING_CAD_FILE.dwg DWG drawing
BRACE_BID_PLANS.pdf PDF
LA_BASE_CAD_FILE.dwg DWG drawing
Buckwalter_Recreation_Athletic_Complex_Expansion_(Addendum_#7_Revision).pdf PDF
BRACE_Pricing_Table_Template_110725.xlsx XLSX spreadsheet
Master_Services_Contract_Watermarked_Locked.pdf PDF
Buckwalter_Recreation_Athletic_Complex_Expansion_(Addendum_#2_Revision).pdf PDF
00_BRACE_LANDSCAPE_ARCHITECT_SPECIFICATIONS_rev110325.pdf PDF
BRACE_L-100_revised_10.28.25.pdf PDF
J21055-Buckwalter-IFC_Plan_Set-20250317.dwg DWG drawing
01-21050-000-Base.dwg DWG drawing
00_BRACE_LANDSCAPE_ARCHITECT_SPECIFICATIONS_rev110325.pdf PDF
01-21050-000-Base.dwg DWG drawing
01-21050-400-Landscape.dwg DWG drawing
J21055-Buckwalter-IFC_Plan_Set-20250317.dwg DWG drawing
01-21050-400-Landscape.dwg DWG drawing
BRACE_L-100_revised_10.28.25.pdf PDF
BRACE_L-102_revised_10.28.25.pdf PDF
BRACE_L-102_revised_10.28.25.pdf PDF
Buckwalter_Recreation_Athletic_Complex_Expansion.pdf PDF
BRACE_Pricing_Table_Template.xlsx XLSX spreadsheet
BRACE_Pricing_Table_Template.xlsx XLSX spreadsheet
BRACE_Plan_Set_Approved_04_08_25.pdf PDF
BRACE_Plan_Set_Approved_04_08_25.pdf PDF
BRACE_Plan_Set_Approved_04_08_25.pdf PDF
00_BRACE_LANDSCAPE_ARCHITECT_SPECIFICATIONS.pdf PDF
00_BRACE_LANDSCAPE_ARCHITECT_SPECIFICATIONS.pdf PDF
00_BRACE_LANDSCAPE_ARCHITECT_SPECIFICATIONS.pdf PDF
02_BRACE_ARCHITECT_SPECIFICATIONS.pdf PDF
02_BRACE_ARCHITECT_SPECIFICATIONS.pdf PDF
02_BRACE_ARCHITECT_SPECIFICATIONS.pdf PDF
01_BRACE_IRRIGATION_SPECIFICATIONS.pdf PDF
01_BRACE_IRRIGATION_SPECIFICATIONS.pdf PDF
01_BRACE_IRRIGATION_SPECIFICATIONS.pdf PDF
BRACE_Plan_Set_Appvl_Letter_04_08_25.pdf PDF
BRACE_Plan_Set_Appvl_Letter_04_08_25.pdf PDF
BRACE_Plan_Set_Appvl_Letter_04_08_25.pdf PDF
03_BRACE_CIVIL_SPECIFICATIONS.pdf PDF
03_BRACE_CIVIL_SPECIFICATIONS.pdf PDF
03_BRACE_CIVIL_SPECIFICATIONS.pdf PDF
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pricing_Table_Template Line Item Description Unit of Measure Unit Cost Quantity Total

Base Bid Section

A. Site Preparation and Demolition
A.1Site MobilizationLS
A.2Bonds & InsuranceLS
A.3Construction StakingLS
A.4Traffic ControlLS
A.5Asbuilt Construction PlansLS
A.6Tree ProtectionLF
A.7Clearing & GrubbingSF
A.8Removal & Disposal - Asphalt PavingSF
A.9Removal & Disposal - Concrete SidewalksSF
A.10Remove and Reinstall Existing Well PumpLS
A.11Remove Existing 8" Sanitary Sewer Stub-outEA
A.12Remove Existing 3" Sanitary Sewer Force MainLF
A.13Miscellaneous (Provide Description and Unit)
Site Prep and Demolition Section Total0.00
B. Erosion Control
B.1Silt FenceLF
B.2Stabilized Construction EntranceEA
B.3Rip Rap Outlet ProtectionSY
B.4Sediment TubeLF
B.5Erosion Control BlanketSF
B.6Concrete WashoutEA
B.7Inlet ProtectionEA
B.8Porous BafflesEA
B.9Turf Reinforcement MatSF
B.10Emergency SpillwayLS
B.11Permanent SeedingSF
B.12Erosion Control MaintenanceLS
B.13Miscellaneous (Provide Description and Unit)
Erosion Control Section Total0.00
C. Site Grading
C.1Unsatisfactory soil removal and replacementCY
C.2Rough Grading (Cut)CY
C.3Rough Grading (Fill)CY
C.4Fine GradingSY
C.5Select Fill (Imported)CY
C.6Miscellaneous (Provide Description and Unit)
Site Grading Section Total0.00
D. Site Drainage
D.1Infiltration Device with OverdrainSF
D.26" Field Drain Outfall w/ Pop Up EmitterEA
D.324" Nyloplast Drainage Basin w/ Concrete CollarEA
D.46" PVC Field Drain System (Perforated, Solid Pipe)LF
D.518" RCPLF
D.624" RCPLF
D.76" PVC Solid Drain PipeLF
D.88" ACO K200 Trench DrainLF
D.93' x 3' Catch BasinEA
D.10General PVC Conduit for Irrigation, Lighting, Etc.LF
D.116" Perforated PVC Underdrain in Infiltration AreasLF
D.12Relocate Existing Catch Basin and Convert to Junction BoxEA
D.13Miscellaneous (Provide Description and Unit)
Site Drainage Section Total0.00
E. Utilities - Sewer
E.1Sanitary Sewer CleanoutEA
E.23" PVC Sewer Pipe w/ fittingsLF
E.36" PVC Sewer Pipe w/ fittingsLF
E.48" PVC Sewer Pipe w/ fittingsLF
E.5ManholeEA
E.6Service Tie InEA
E.7Air Release Pedestal AssemblyEA
E.8Miscellaneous (Provide Description and Unit)
Utilities-Sewer Section Total0.00
F. Utilities - Water
F.1Relocate Existing Fire HydrantLS
F.2Connect to Existing BJSWA 8" Waterline (Tee and Gate Valve w/ Box)EA
F.38" PVC Waterline with fittingsLF
F.4Miscellaneous (Provide Description and Unit)
Utilities-Water Section Total0.00
G. Utilities - Site Electric
G.1Coordination with Dominion Energy and Musco LightingLS
G.4Miscellaneous (Provide Description and Unit)
Utilities-Site Electric0.00
H. Buildings
H.1Concessions Building RenovationsLS
H.2Miscellaneous (Provide Description and Unit)
Building Section Total0.00
I. Site Paving and Walls
I.1Concrete Header CurbLF
I.2Gravel Parking SpaceEA
I.3Concrete Handicap RampSF
I.4Concrete Steps and HandrailLS
I.5Concrete SidewalkSF
I.6Concrete Sidewalk w/ Turndown along Asphalt PavementSF
I.7ADA Detectable Warnings - Grouted PaversSF
I.8Concrete CurbLF
I.9Precast Concrete Wheel Stop w/ 24" Long #4 RebarEA
I.10Pavement Markings (Space Striping, Crosswalks, ADA, Stop Bar, Etc.)LS
I.11Pervious Concrete PavingSF
I.12Asphalt PavingSF
I.13Observation Wells in Pervious Concrete PavingEA
I.1418" Concrete Curb and GutterLF
I.1540" Max. Retaining Wall (Stucco Finish)LF
I.16Miscellaneous (Provide Description and Unit)
Site Paving and Walls Section Total0.00
J. Soccer Fields
J.1Artificial Turf Soccer FieldsSF
J.2Flush Ribbon Curb at Soccer FieldsLF
J.3Soccer Backstop NettingLF$ 240.00
J.4Miscellaneous (Provide Description and Unit)
Soccer Fields Section Total0.00
K. Site Furnishings
K.1Diamond Rail FenceLF$ 540.00
K.2Bike RackEA
K.3Security BollardEA
K.4Picnic Table (Square)EA
K.5Backed BenchEA
K.6Trash ReceptacleEA
K.74 Foot Chain Link Fence and GatesLF$ 790.00
K.8Handicap Ramp HandrailLF
K.9Stop SignEA
K.10Handicapped Parking SignEA
K.11Miscellaneous (Provide Description and Unit)
Site Furnishings Section Total0.00
L. Landscaping
L.1Crape Myrtle - LAIWEA
L.2Crape Myrtle - LAGNEA
L.3Southern Live Oak - QUVIEA
L.4Cabbage Palm - SASAEA
L.5Bald Cypress - TDEA
L.6Pinestraw BalesEA
L.7Centipede Sod - EROPSF
L.8Irrigation Well and Pump System (100% Complete & Installed)LS
L.9Automated Irrigation System (100% Completed & Installed)LS
L.10Miscellaneous (Provide Description and Unit)
Landscaping Section Total0.00

TOTAL BASE BID 0.00

ALT 1 - Area is South of the Existing Traffic Circle (See Sheet L-102 for approximate limits of work)

AA. Site Preparation and Demolition
AA.1Bonds & InsuranceLS
AA.2Construction StakingLS
AA.3Miscellaneous (Provide Description and Unit)LF
Site Preparation and Demolition Section Total0.00
AB. Erosion Control
AB.1Concrete WashoutEA
AB.2Inlet ProtectionEA
AB.3Porous BafflesEA
AB.4Turf Reinforcement MatSF
AB.5Emergency SpillwayLS
AB.7Miscellaneous (Provide Description and Unit)
Erosion Control Section Total0.00
AC. Site Grading
AC.1Fine GradingSY
AC.2Miscellaneous (Provide Description and Unit)
Site Grading Section Total0.00
AD. Site Drainage
AD.1Infiltration Device with OverdrainSF
AD.26" Field Drain Outfall w/ Pop Up EmitterEA
AD.324" Nyloplast Drainage Basin w/ Concrete CollarEA
AD.46" PVC Field Drain System (Perforated, Solid Pipe)LF
AD.518" RCPLF
AD.624" RCPLF
AD.73' x 3' Catch BasinEA
AD.8General PVC Conduit for Irrigation, Lighting, Etc.LF
AD.94" Perforated PVC Underdrain w/in Access RoadLF
AD.106" Perforated PVC Underdrain in Infiltration AreasLF
AD.11Miscellaneous (Provide Description and Unit)
Site Drainage Section Total0.00
AE. Utilities - Sewer
AE.1Sanitary Sewer CleanoutEA
AE.23" PVC Sewer Pipe w/ fittingsLF
AE.36" PVC Sewer Pipe w/ fittingsLF
AE.48" PVC Sewer Pipe w/ fittingsLF
AE.5ManholeEA
AE.6Service Tie InEA
AE.7Air Release Pedestal AssemblyEA
AE.8Miscellaneous (Provide Description and Unit)
Utilities-Sewer Section Total0.00
AF. Utilities - Water
AF.1Relocate Existing Fire HydrantLS
AF.2Connect to Existing BJSWA 8" Waterline (Tee and Gate Valve w/ Box)EA
AF.38" PVC Waterline with fittingsLF
AF.4Domestic Service #1 AssemblyLS
AF.5Domestic Service #2 AssemblyLS
AF.6Irrigation Service AssemblyLS
AF.7New Fire Hyrdrant AssemblyEA
AF.8Miscellaneous (Provide Description and Unit)
Utilities-Water Section Total0.00
AG. Utilities - Site Electric
AG.1Coordination with Dominion Energy and Musco LightingLS
AG.3Miscellaneous (Provide Description and Unit)
Utilities-Site Electric Section Total0.00
AH. Buildings
AH.1Restroom BuildingLS
AH.2Miscellaneous (Provide Description and Unit)
Buildings Section Total0.00
AI. Site Paving and Walls
AI.1Concrete Header CurbLF
AI.2Concrete SidewalkSF
AI.3Concrete Sidewalk w/ Turndown along Asphalt PavementSF
AI.4ADA Detectable Warnings - Grouted PaversSF
AI.5Concrete CurbLF
AI.6Precast Concrete Wheel Stop w/ 24" Long #4 RebarEA
AI.7Pavement Markings (Space Striping, Crosswalks, ADA, Stop Bar, Etc.)LS
AI.8Pervious Concrete PavingSF
AI.9Asphalt PavingSF
AI.10Observation Wells in Pervious Concrete PavingEA
AI.1118" Concrete Curb and GutterLF
AI.12Crushed Aggregate Service Drive w/ Steel EdgingSF
AI.13Miscellaneous (Provide Description and Unit)
Site Paving and Walls Section Total0.00
AJ. Soccer Fields
AJ.1Artificial Turf Soccer FieldsSF
AJ.2Flush Ribbon Curb at Soccer FieldsLF
AJ.3Soccer Backstop NettingLF240
AJ.4Miscellaneous (Provide Description and Unit)
Soccer Fields Section Total0.00
AK. Site Furnishings
AK.1Diamond Rail FenceLF450
AK.2Bike RackEA
AK.3Security BollardEA
AK.4Backed BenchEA
AK.5Trash ReceptacleEA
AK.64 Foot Chain Link Fence and GatesLF790
AK.7Hoover Fence Vehicular GatesEA
AK.8Handicap Ramp HandrailLF
AK.9Stop SignEA
AK.10Handicapped Parking SignEA
AK.11Miscellaneous (Provide Description and Unit)
Site Furnishings Section Total0.00
AL. Landscaping
AL.1Crape Myrtle - LAIWEA
AL.2Crape Myrtle - LAGNEA
AL.3Southern Live Oak - QUVIEA
AL.4Cabbage Palm - SASAEA
AL.5Bald Cypress - TDEA
AL.6PinestrawBales
AL.7Centipede Sod - EROPSF
AL.8Irrigation Well and Pump System (100% Complete & Installed)LS
AL.9Automated Irrigation System (100% Completed & Installed)LS
AL.10Miscellaneous (Provide Description and Unit)
Landscaping Section Total0.00

Total Alternate 0.00

&"Helvetica Neue,Regular"&12&K000000&P

File details come from the government source that posted it. Updated .