BRACE_Plan_Set_Appvl_Letter_04_08_25.pdf

PDF 124 KB Posted

Attached to
Buckwalter Recreation Athletic Complex Expansion
Solicitation number
120925
Issued by
Beaufort County, South Carolina

About this file

The document is a Final Plan Approval from the Town of Bluffton, South Carolina, for a development project located at 800 Buckwalter Parkway. The application, submitted by Eric Walsnovich of Wood + Partners, Inc. on behalf of the Town of Bluffton, proposes the construction of four new soccer fields, a new restroom building, renovations to an existing restroom, new parking areas, driveways, sidewalks, storm water management facilities, utilities, lighting, site furnishings, and landscaping. The project is situated within the Buckwalter Planned Unit Development on approximately 142.9 acres, identified by tax map number R610 038 000 0053 0000. The development plan was approved on 04/08/2025 with an expiration date of 04/08/2027.

The project received various approvals throughout its planning stages, including review by the Design Review Committee (DRC) on November 15, 2023, MS4 approval on 4/24/24, and an NPDES Permit on 2/13/25. The next steps involve the applicant scheduling and hosting a Pre-Construction Meeting with Town Staff, design engineers, site general contractors, and other necessary personnel. Following this meeting, the applicant will receive a Conditional Notice to Proceed for installing tree protection fencing and erosion control devices. After inspection and approval, a final Notice to Proceed will be issued to commence horizontal construction as depicted in the Final Plan Approval.

View the file

Other files

File Type Posted
Buckwalter_Recreation_Athletic_Complex_Expansion_(Addendum_#12_Revision).pdf PDF
Musco_Sports_Lighting_Addendum_rev_2-18-26.pdf PDF
BRACE_Pricing_Table_Template_021026.xlsx XLSX spreadsheet
Master_Services_Contract_Watermarked_Locked.pdf PDF
CIVIL_CAD_FILE.dwg DWG drawing
BRACE_BID_PLANS.pdf PDF
LA_BASE_CAD_FILE.dwg DWG drawing
SURVEY_CAD_FILE.dwg DWG drawing
BRACE_BID_SPECIFICATIONS_MANUAL.pdf PDF
LA_PLANTING_CAD_FILE.dwg DWG drawing
Buckwalter_Recreation_Athletic_Complex_Expansion_(Addendum_#7_Revision).pdf PDF
BRACE_Pricing_Table_Template_110725.xlsx XLSX spreadsheet
Master_Services_Contract_Watermarked_Locked.pdf PDF
Buckwalter_Recreation_Athletic_Complex_Expansion_(Addendum_#2_Revision).pdf PDF
00_BRACE_LANDSCAPE_ARCHITECT_SPECIFICATIONS_rev110325.pdf PDF
BRACE_L-100_revised_10.28.25.pdf PDF
J21055-Buckwalter-IFC_Plan_Set-20250317.dwg DWG drawing
BRACE_L-102_revised_10.28.25.pdf PDF
01-21050-000-Base.dwg DWG drawing
00_BRACE_LANDSCAPE_ARCHITECT_SPECIFICATIONS_rev110325.pdf PDF
01-21050-000-Base.dwg DWG drawing
01-21050-400-Landscape.dwg DWG drawing
J21055-Buckwalter-IFC_Plan_Set-20250317.dwg DWG drawing
01-21050-400-Landscape.dwg DWG drawing
BRACE_L-100_revised_10.28.25.pdf PDF
BRACE_L-102_revised_10.28.25.pdf PDF
Buckwalter_Recreation_Athletic_Complex_Expansion.pdf PDF
BRACE_Pricing_Table_Template.xlsx XLSX spreadsheet
BRACE_Pricing_Table_Template.xlsx XLSX spreadsheet
BRACE_Plan_Set_Approved_04_08_25.pdf PDF
BRACE_Plan_Set_Approved_04_08_25.pdf PDF
BRACE_Plan_Set_Approved_04_08_25.pdf PDF
00_BRACE_LANDSCAPE_ARCHITECT_SPECIFICATIONS.pdf PDF
00_BRACE_LANDSCAPE_ARCHITECT_SPECIFICATIONS.pdf PDF
00_BRACE_LANDSCAPE_ARCHITECT_SPECIFICATIONS.pdf PDF
02_BRACE_ARCHITECT_SPECIFICATIONS.pdf PDF
02_BRACE_ARCHITECT_SPECIFICATIONS.pdf PDF
02_BRACE_ARCHITECT_SPECIFICATIONS.pdf PDF
01_BRACE_IRRIGATION_SPECIFICATIONS.pdf PDF
01_BRACE_IRRIGATION_SPECIFICATIONS.pdf PDF
01_BRACE_IRRIGATION_SPECIFICATIONS.pdf PDF
BRACE_Plan_Set_Appvl_Letter_04_08_25.pdf PDF
BRACE_Plan_Set_Appvl_Letter_04_08_25.pdf PDF
03_BRACE_CIVIL_SPECIFICATIONS.pdf PDF
03_BRACE_CIVIL_SPECIFICATIONS.pdf PDF
03_BRACE_CIVIL_SPECIFICATIONS.pdf PDF
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Exhibit_4_-_Monthly_Compliance_Status_Report.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TOWN OF BLUFFTON

FINAL PLAN APPROVAL

APPLICATION NO.: DP-10-23-018587

APPLICATION TYPE: Development Plan

PARCEL NO.: R610 038 000 0053 0000

PROPERTY ADDRESS: 800 BUCKWALTER PARKWAY,

BLUFFTON SC 29910

ZONING DISTRICT:

ISSUE DATE: 04/08/2025

APPROVAL DATE: 04/08/2025

EXPIRATION DATE: 04/08/2027

Eric Walsnovich Wood and Partners, Inc.

Stephen Steese Town of Bluffton

APPLICANT: OWNER:

DESCRIPTION:A request by Eric Walsnovich of Wood + Partners, Inc, on behalf of the property owner, Town of Bluffton, for approval of a public project. The project proposes the construction of four new soccer fields; a new restroom building; renovations to the existing restroom building; new parking areas, driveways and sidewalks; storm water management facilities; associated utilities; lighting; site furnishings and landscaping. The property is zoned Buckwalter Planned Unit Development and consists of approximately

142.9 acres identified by tax map number R610 038 000 0053 0000 located within the Buckwalter Recreation Center Master Plan.

Status: Comments on the public project were reviewed at the November 15, 2023, meeting of the DRC.

Status 4/24/24: The Public Project received MS4 approval.

Status 2/13/25: The Public Project received NPDES Permit.

Status 3/25/25: The Applicant resubmitted for FDP Approval.

Status 4/8/25: The Public Project is APPROVED.

TOWN OF BLUFFTON APPROVAL SIGNATURE DATE

The Applicant must schedule and host a Pre-Construction Meeting with Town Staff, the design engineer, the site general contractor, and any other necessary personnel involved in the horizontal construction. After the this meeting is conducted, the Applicant will be provided a Conditional Notice to Proceed authorizing the installation of tree protection fencing and erosion control devices. Upon installation of such fencing and devices, the Applicant must schedule Pre-Clearing and Stormwater Inspections of the completed work. Once approved by the Town, the Applicant will be provided a Notice to Proceed authorizing the commencement of horizontal construction as depicted in this Final Plan Approval.

Theodore D. Washington Municipal Building 20 Bridge Street P.O. Box 386 Bluffton, South Carolina 29910

Telephone (843) 706-4522 Fax (843) 706-4518 Town Web Site www.townofbluffton.sc.gov

Email- growthmanagementcs@townofbluffton.com

4/8/25

File details come from the government source that posted it. Updated .