This data file contains a detailed lighting inventory and modernization specifications for the Boone Army Aviation Support Facility (AASF), a 34,185 square-foot complex operated by the Iowa Army National Guard in Boone, Iowa. The spreadsheet documents existing lighting conditions across 34 rooms and exterior areas as of a site visit conducted on January 7, 2026, identifying current fixture types, quantities, and required upgrades. The project scope encompasses the replacement of existing T8, T5, and can light fixtures with LED alternatives, installation of occupancy sensors in 21 rooms, conversion of specific fixtures to 2x2 flat panel LEDs, addition of ceiling-mounted occupancy sensors and dimmer switches, and modernization of exterior wall packs and display lighting. A mandatory pre-bid walkthrough is scheduled for February 12, 2026, at 9:00 AM, with bids due by March 5, 2026, at 2:00 PM CST. The solicitation requires bidders to submit responses as a lump sum amount.
Pricing terms allow the State of Iowa sixty days from invoice submission to process payment in accordance with Iowa Code 8A.514. No specific budget range or award value is disclosed in the available documentation, and no set-aside designations or restrictions limiting participation to disadvantaged enterprises are identified, indicating the procurement is open to qualified bidders. The project is funded through the Iowa Department of Public Defense with no incumbent vendors or current contractors identified. Bidders must meet specified insurance requirements, certify their bids, authorize release of information, and acknowledge federal terms and conditions. The issuing officer is Philip Payton (515-975-6211, philip.payton@dpd.iowa.gov), and the RFB Number is 582-RFB-2490-2026.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| L7 ldn6.pdf | ||
| L1 blt-2x4.pdf | ||
| Footcandles.pdf | ||
| Typical Office-Classroom Fixture.pdf | ||
| OC1 BCS-WS-CS-DT-300.pdf | ||
| L4 clx-strip-light-spec-sheet.pdf | ||
| SOW BooneAASF_ReLighting.docx | DOCX document | |
| 1370207-event.pdf | ||
| R2-3_LED Linear Recessed.pdf | ||
| L5 - AVX_led.pdf | ||
| R1_LED Downlight.pdf | ||
| LB1 dl_pgn_spec_WallPack.pdf | ||
| F1-2_LED Flat Panel.pdf | ||
| 19A25-AASF1-001-11x17.pdf | ||
| L6 LED_V70269_CS51922.pdf | ||
| R4_LED Retrofit.pdf |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Boone Army Aviation Support Facility (AASF) Modernize Lighting Date: 17DEC25/Sit visit 7January 2026
| Room Type | Room# | Lighting Type | Quantity | Notes | |||||
| Entry | 128 | Can lights | 2 | ||||||
| Lobby/corricdor101B | 138/101B | Can lights | 2 | 7-2x2 T8 / 8-2x4 drop ceiling T8s | |||||
| Copy room | 129A | 1x4 covered T8s | 3 | Convert to 2x2 flat panel LED | |||||
| Office | 129B | 1x4 covered T8s | 4 | Convert to 2x2 flat panel LED, Need OCS | |||||
| Office | 130 | 2x4 T8 3 bulb covered | 2 | with OC (validate switch or ceiling) | |||||
| Office | 131 | 2x4 T8 3 bulb covered | 2 | add OC swiltch | |||||
| Office | 132 | 2x4 T8 3 bulb covered | 3 | add OC swiltch | |||||
| Office | 134 | 2x4 T8 3 bulb covered | 2 | add OC swiltch | |||||
| Office | 135 | 2x4 T8 3 bulb covered | 2 | add OC swiltch | |||||
| Office | 136 | 2x4 T8 3 bulb covered | 4 | no oc needed | |||||
| Entry | 137 | Can lights | 1 | ||||||
| Garage | 139 | 1x4 Double T8 | 8 | ||||||
| Office | 153 | 2'x4' T8 3 bulb covered | 6 | add OC swiltch | |||||
| Work Room | 138B | ||||||||
| Lockers Male | 141 | 1.5'x4', 4 bulb drop lights | 12 | Occ sensor needed (see photo) | |||||
| Janitorial | 145 | 1x4 drop | 1 | has oc switch | |||||
| Female Latrine | 147 | 2 cans, 2 2x4 | add occ senser | ||||||
| Male Latrine | 144 | 3 cans, 2 2x4 | |||||||
| w/ 2 wall monuted | switching and occupancy needs reviewed | ||||||||
| Breakroom | 127 | 2x4 T8 3 bulb covered | 19 | Need occ added to ceiling | |||||
| Classroom | 123 | This is combined with RM 127 | |||||||
| Publications | |||||||||
| (Converted to office) | 122 | 2x4 T8 3 bulb covered | 6 | add occ to ceiling | |||||
| Office | 118 | 2x4 T8 3 bulb covered | 4 | add occ switch | |||||
| Mechanical | 119 | 1x4 covered T8s | |||||||
| (combined together) | 4 | no occ needed | |||||||
| Mechanical | 120 | 1x4 covered T8s | |||||||
| (combined together) | 2-Jan | add occ switch | |||||||
| Electrical | 121 | 1x4 covered T8s | |||||||
| (combined together) | 2 | has oc switch | |||||||
| Office | 152 | 2x4 T8 3 bulb covered | 4 | add occ switch | |||||
| Office | 151 | 2x4 T8 3 bulb covered | 4 | switch covered, change to ceiling occupany | |||||
| Hanger | 101 | 2x4 10 bulb T5 | 28 | ||||||
| Work Room | 117 | 2x4 T5 with 2 switches | 8 | Need occ added to ceiling | |||||
| Work room | 117A | 1x4 covered T8s | |||||||
| (combined together) | 2 | add occ switch | |||||||
| FOTS | 117B | added to RM 117 | |||||||
| Latrine | 116 | 1x4 wall mounted T8 | 1 | see photo | |||||
| Electrical | 113 | 1x4 | 6 | Need occ added to ceiling | |||||
| Battery | 114 | explosion proof | 3 | no occ needed | |||||
| Parts Storage | 112 | 1x4 covered T8s | 13 | (1 2x4 light that needs to be replaced like the rest of the lights in the room) add occ in ceiling | |||||
| Tool storage | 100 | 1x4 Double T8 | 2 | Light will need to be relocated to accoodate room | |||||
| Office | 111 | 1x4 covered T8s | 4 | no occ needed | |||||
| Corridor | 101D | 1x4 | 2 | change to 2x2 flat panelled LED add occ to ceiling | |||||
| Hazmat Storage | 109 | 1x4 chained and caged | 8 | add occ to ceiling (see photo) | |||||
| Hazmat Storage(outside) | 107 | expolsion proof | 6 | no occ needed (see photo_ | |||||
| Work Room | 106 | 1x4 Double T8 | 16 | 3 1x4 on wall that need switching added, | |||||
| Work Room | 105 | 1x4 Double T8 | 16 | Need occ added to ceiling | |||||
| Office | 104 | 1x4 Double T8 | 6 | Need occ added to ceiling | |||||
| Storage | 102 | 1x4 Double T8 | 6 | occ switch needed | |||||
| Vault | 102A | No access | no change to room | ||||||
| Storage | 102B | combined with 102 | |||||||
| Storage | 102C | combined with 102 |
Work Room 108 1x4 lights see photo, 47 simplify switching add ceiling occ
| Exterior Lighting Armory | |||
| Wall Packs | wall lighting | 8 | North and west side of building only |
| Street Lights | complete | ||
| Flag and Displays | complete |