This is a set of structural and electrical bid documents for a gravesite expansion project at Dayton National Cemetery in Dayton, Ohio (Project 18125, Building 810-CM3033), issued February 5, 2026, by the U.S. Department of Veterans Affairs, Office of Construction and Facilities Management.
The structural documents (Sheets S-001 through S-104) establish design requirements and construction standards for columbarium units, memorial walls, and entry walls with associated foundations and piers. All work must comply with the PG-18-10 Structural Design Manual, International Building Code 2024, ASCE/SEI 7-22, and VA Handbook H-18-8 for seismic design. Concrete compressive strengths are specified at 5000 psi for footings, walls, and piers. Design loads include ultimate wind speed of 100 mph (78 mph nominal), seismic design category B with mapped spectral responses of Ss=0.2 and S1=0.08, and soil bearing pressures of 2500 psf for continuous footings and 1500 psf for pad footings per the geotechnical report dated December 20, 2024 by Terracon. The contractor shall provide delegated design submittals for precast concrete columbarium units, including structural calculations and connection details, stamped by a licensed engineer. Foundation plans show footing schedules (FC2 through FS6x31), pier schedules (P1 through P7), and reinforcing details with #5 and #6 bars at specified spacing. Control joints in concrete slabs shall be placed at maximum 10-foot spacing for 4-inch slabs, 12 feet for 5-inch slabs, and 15 feet for 6-inch slabs in a square pattern. The electrical documents (Sheets E-001, ES101, E501, and MP111) specify installation of a 250 kW diesel generator with sound-attenuating enclosure, 208V 800A automatic transfer switch, remote shutdown capability, and associated underground ductbank with concrete encasement. Service entrance conductors use parallel copper runs per sizing charts; all underground utilities must be verified before excavation and located prior to digging. A temporary 250 kW portable generator provides power during service changeovers to minimize facility downtime.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL CONSTRUCTION NOTES:
1. ALL WORK SHALL COMPLY WITH THE PG-18-10 STRUCTURAL DESIGN MANUAL
DATED 7/1/2023 AS APPROVED BY THE DEPARTMENT OF VETERANS AFFAIRS. THE
FOLLOWING CODES APPLY:
-INTERNATIONAL BUILDING CODE 2024
-ASCE/SEI 7-22
-VA HANDBOOK H-18-8 SEISMIC DESIGN REQUIREMENTS
2. REFERENCE STANDARDS: UNLESS OTHERWISE NOTED (U.O.N.), ALL STANDARDS
SHALL BE CURRENT EDITION, WITH LATEST ADDENDA, IF APPLICABLE.
3. THE CONTRACTOR SHALL VERIFY ALL CONTRACT DOCUMENTS, SITE
ELEVATIONS, DIMENSIONS AND CONDITIONS PRIOR TO STARTING WORK AND
SHALL NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES OR
INCONSISTENCIES.
4. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL
NOTES.
5. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE
FINISHED STRUCTURE. UNLESS OTHERWISE INDICATED, THEY DO NOT INDICATE
THE MEANS OR METHOD OF CONSTRUCTION. TEMPORARY BRACING AND
SHORING AGAINST WIND AND ERECTION CONDITIONS DURING CONSTRUCTION
OF THE BUILDING, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE
CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PROTECTION OF THE
STRUCTURE DURING ALL PHASES OF DEMOLITION, CONSTRUCTION, AND
INSTALLATION.
6. NO AREA OF THE STRUCTURE SHALL BE LOADED WITH CONSTRUCTION
MATERIALS OR EQUIPMENT THAT EXCEEDS FINAL DESIGN CRITERIA.
7. VERIFY LOCATION OF BOX OUTS AND OPENINGS WITH MECHANICAL
CONTRACTORS. OPENING SIZES AND LOCATIONS SHOWN FOR PIPES, DUCTS ETC.
ARE FOR GENERAL INFORMATION ONLY AND SHALL BE VERIFIED WITH THE
MECHANICAL CONTRACTOR BEFORE COMMENCING THE WORK.
8. IF MECHANICAL AND ELECTRICAL EQUIPMENT SIZES, WEIGHTS, OR LOCATIONS
DO NOT COINCIDE WITH EQUIPMENT SHOWN ON PLANS, COORDINATE
ADJUSTMENTS WITH THE STRUCTURAL ENGINEER.
9. HOLES, PIPES, SLEEVES, ETC. NOT SHOWN ON THE DRAWINGS MUST BE
APPROVED BY THE STRUCTURAL ENGINEER BEFORE PLACEMENT THROUGH
STRUCTURAL MEMBERS.
10. CONTRACTOR SHALL PROVIDE A CAST-IN SLEEVE FOR ALL HORIZONTAL
ELEMENTS THAT EXTEND THROUGH FOOTING. IE: DRAIN TILE, ELECTRICAL
CONDUIT, MECHANICAL PIPING, ETC. ALL SLEEVES SHALL BE COORDINATED
WITH ARCHITECT/ENGINEER.
11. SHOP DRAWINGS PREPARED BY SUPPLIERS, SUBCONTRACTORS, ETC., SHALL BE
DIMENSIONED, REVIEWED, COORDINATED, AND SIGNED/ STAMPED BY THE
GENERAL CONTRACTOR PRIOR TO SUBMITTING TO THE STRUCTURAL ENGINEER.
12. FABRICATOR SHALL CLEARLY NOTE CHANGES MADE IN THE SHOP DRAWINGS
WHICH DO NOT COMPLY WITH THE CONTRACT DOCUMENTS. REVIEWED
APPROVAL SHOP DRAWINGS SHOWING ENGINEERS COMMENTS ACCOMPANIED
WITH RECORD SET SHOP SHOP DRAWINGS, SHALL BE AVAILABLE FOR
REFERENCE AT THE CONSTRUCTION SITE.
13. CONCRETE ANCHORS SHALL BE SIMPSON 'TITEN HD" SCREW ANCHORS OR
EQUIVALENT (U.O.N.). INSTALL ANCHORS USING THE MANUFACTURER'S
RECOMMENDATIONS.
FOUNDATION NOTES:
1. FOOTING ELEVATIONS ARE TO TOP OF FOOTING (T.O. FTG.), UNLESS
OTHERWISE NOTED.
2. FOOTINGS ARE DESIGNED FOR A MINIMUM NET ALLOWABLE SOIL
BEARING PRESSURE OF 2500psf FOR CONTINUOUS AND 1500 psf FOR
PAD FOOTINGS. FOUNDATION DESIGN COMPLIES W/ GEOTECHNICAL
REPORT DATED: 12/20/2024 BY TERRACON
3. FOOTINGS SHALL BEAR ON NATURAL UNDISTURBED SOIL OR
ENGINEERED FILL. SOILS SHALL BE OBSERVED AND APPROVED BY A
GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT OF FOOTING
CONCRETE. IF NATURAL UNDISTURBED SOILS ARE NOT ENCOUNTERED
AND/OR INADEQUATE SOILS ARE NOTED AT FOOTING BEARING LEVEL,
ARCHITECT/ENGINEER SHALL BE NOTIFIED PRIOR TO PROCEEDING
WITH FURTHER WORK AT THOSE FOOTING LOCATIONS.
4. PROTECT FOOTINGS FROM THE ACTION OF WATER OR FREEZING.
5. FOOTINGS ARE CENTERED UNDER WALLS ABOVE - UNLESS
OTHERWISE NOTED.
6. PRIOR TO PLACEMENT OF FOOTING CONCRETE, CLEAN FOOTING
EXCAVATIONS OF SNOW, WATER AND DEBRIS.
7. FOOTINGS MAY NOT BE EARTH FORMED.
EXCAVATION & BACKFILL NOTES:
1. EXCAVATION AND BACKFILL SHALL BE EXECUTED IN ACCORDANCE WITH THE
PROJECT SPECIFICATIONS.
2. BACKFILL, & COMPACTION SHALL BE INSPECTED AND CERTIFIED BY A LICENSED
GEOTECHNICAL ENGINEER. REPORTS ARE TO BE SUBMITTED TO THE
ARCHITECT/ ENGINEER.
3. FOOTING EXCAVATIONS SHALL BE EXCAVATED TO PROPER LINE AND LEVEL TO
ENSURE MINIMUM CONCRETE COVER OF FOOTING REINFORCEMENT FOR
FOOTING DEPTH.
4. BACKFILL SHALL BE COMPACTED BY MECHANICAL MEANS. FLOODING OR
WATER INUNDATION SHALL NOT BE PERMITTED.
5. BACKFILL SHALL BE PLACED IN ALTERNATING LIFTS ON EACH SIDE OF THE
FOUNDATION WALLS TO MAINTAIN STABILITY OF THE FOUNDATION WALLS.
6. BACKFILL SHALL NOT BE PLACED AGAINST BASEMENT FOUNDATION WALLS
UNLESS WALLS ARE ADEQUATELY BRACED TOP AND BOTTOM. FINAL WALL
BRACING IS BASEMENT SLAB OR ENGINEERED BACKFILL AND 1ST FLOOR
STRUCTURE. IF THESE ELEMENTS ARE NOT IN PLACE AT TIME OF BACKFILL,
CONTRACTOR SHALL PROVIDE AN ENGINEERED, TEMPORARY BRACING
SYSTEM. THE TEMPORARY BRACING SYSTEM PROPOSED SHALL BE SUBMITTED
TO THE ARCHITECT/ ENGINEER FOR REVIEW PRIOR TO BACKFILLING.
CONCRETE NOTES:
1. CONCRETE CONSTRUCTION SHALL CONFORM TO AMERICAN CONCRETE
INSTITUTE (ACI) CODES AND SPECIFICATIONS, LATEST EDITION. ACI 301
"SPECIFICATIONS FOR STRUCTURAL CONCRETE" ACI 315 "DETAILS &
DETAILING OF CONCRETE REINFORCEMENT" ACI 318 "BUILDING CODE
REQUIREMENTS FOR REINFORCED CONCRETE".
2. CONCRETE MIX DESIGN SHALL BE BY AN INDEPENDENT TESTING
LABORATORY.
3. CAST-IN-PLACE CONCRETE SHALL BE SUBJECT TO TESTING BY AN
INDEPENDENT TESTING LABORATORY. SEE PROJECT SPECIFICATIONS FOR
REQUIREMENTS.
4. NON WELDED REINFORCING STEEL SHALL BE GRADE 60 DEFORMED,
BILLET-STEEL, ASTM A615, U.O.N. ALL WELDED WIRE FABRIC (WWF) SHALL
BE PLAIN, ASTM A185.
5. WELDED REINFORCING STEEL SHALL BE GRADE 60, LOW CARBON, ASTM
A706.
6. PROVIDE EXTRA REINFORCEMENT AROUND ALL OPENINGS GREATER THAN
12" SQUARE OR 12" IN DIAMETER, INCLUDING DOOR OPENINGS, IN
CONCRETE WALLS & SLABS. PROVIDE 2 - #5 BARS @ 3" O.C., ON EACH SIDE
OF THE OPENING EXTENDING 24" BEYOND THE CORNER OF THE OPENING &
2 - #5 BARS AT 3" O.C. BY 3'-0" LONG DIAGONAL BARS AT EACH CORNER.
PLACE DIAGONAL BARS CENTERED ON CORNER @ 2" CLEAR OF CORNER.
ADDITIONAL REINFORCEMENT SHALL BE PROVIDED AT EACH LAYER OF
REINFORCING.
7. REINFORCING STEEL SHALL BE BENT, SPLICED, AND PLACED IN
ACCORDANCE WITH THE ACI 301 (LATEST EDITION).
8. PROVIDE ADEQUATE SUPPORT BARS AND ACCESSORIES TO HOLD
REINFORCING BARS FIRMLY IN PLACE TO SPECIFIED COVERAGES.
9. CONTROL JOINTS SHALL BE PLACED IN A SQUARE PATTERN WITH A
MAXIMUM SPACING OF 10' - 0" O.C. FOR 4" THICK SLAB, 12' - 0" O.C. FOR 5"
THICK SLAB, 15' - 0" O.C. FOR 6" THICK SLAB. WHERE A SQUARE PATTERN IS
NOT POSSIBLE, THE MAXIMUM LONG SIDE TO SHORT SIDE OF THE JOINT
PATTERN SHALL NOT EXCEED A RATIO OF 1.5:1. CONSTRUCTION JOINTS
SHALL BE LOCATED BY THE CONTRACTOR AS REQUIRED FOR
CONSTRUCTION WITH A MAXIMUM OF 3,000 SQUARE FEET.
10. CAST DOWELS, WITH STD 90 DEGREE HOOK, IN FOOTINGS FOR CONCRETE
PIERS AND WALLS ABOVE. DOWELS SHALL BE THE SAME SIZE AND NUMBER
AS THE VERTICAL REINFORCING. (U.O.N.)
11. CONCRETE MIX DESIGNS REQUIREMENTS: - AGGREGATES SHALL
CONFORM TO ASTM C33. - CONCRETE EXPOSED TO FREEZE THAW SHALL
HAVE 4.5%-7.5% AIR. - WATER/CEMENT RATIO 0.4 MAX. FOR FOOTINGS AND
WALLS, 0.4 MAX. FOR SLABS - NO FLY ASH IN EXPOSED SLABS, 0.25 MAX.
FLY ASH/CEMENT RATIO IN ALL OTHER APPLICATIONS - WATER PROOFING
ADMIXTURE ADD FOR EXTERIOR EXPOSED CONCRETE.
12 INJECTION ADHESIVE ANCHORS SHALL BE SIMPSON "SET-3G" USING
STANDARD 36 KSI THREADED RODS (U.O.N.). SEE SPECIFICATIONS FOR
USAGE. INSTALL ANCHORS IN STRUCTURAL CONFORMANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS.
CAST-IN-PLACE CONCRETE COMPRESSIVE STREGNTHS
FOOTINGS 5000 psi
EXTERIOR FOUNDATION WALLS 5000 psi
PIERS 5000 psi
WALLS 5000 psi
REINFORCING CLEAR CONCRETE COVER
CONCRETE ON SOIL 3"
SLABS ON GRADE MIDHEIGHT
FORMED WALLS & STRUCTURAL SLABS EXPOSED TO EARTH OR
WEATHER: #6 THRU #18
2"
FORMED WALLS & STRUCTURAL SLABS EXPOSED TO EARTH OR
WEATHER: #5 OR SMALLER
1 1/2"
FORMED WALLS & STRUCTURAL SLABS NOT EXPOSED TO EARTH OR
WEATHER: #11 AND SMALLER
3/4"
BEAMS AND COLUMNS (COVER TO STIRRUPS OR TIES) 1 1/2"
CONC. REINFORCING BAR LAP SPLICE
SCHEDULE
BAR SIZE
f'c = 3000 psi.
f'c = 4000 psi.
f'c = 5000 psi.
CLASS
"B"
CLASS
"B"
CLASS
"B"
#3 22" 20" 18"
#4 30" 26" 22"
#5 36" 32" 28"
#6 44" 38" 34"
#7 64" 54" 50"
#8 72" 62" 56"
#9 82" 70" 64"
#10 92" 80" 70"
#11 102" 88" 78"
BAR LAP SCHEDULE NOTES:
A. REINFORCING BAR LAP SPLICE SCHEDULE APPLIES TO UNCOATED, GRADE 60
REINFORCING BAR NORMAL WEIGHT CONCRETE.
B. PROVIDE CLASS "B" LAP UNLESS OTHERWISE NOTED.
C. FOR EPOXY COATED BAR, MULTIPLY THE NOTED LENGTHS BY 1.5.
D. FOR LIGHT WEIGHT CONCRETE, MULTIPLY THE NOTED LENGTHS BY 1.3.
E. MAXIMUM SPACING OF BARS BEING LAPPED IS ONE FIFTH THE LAP SPLICE
LENGTH, NOT TO EXCEED 6".
F. TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12" OF FRESH CONCRETE
PLACED BELOW HORIZONTAL REINFORCEMENT.FOR TOP BARS, MULTIPLY THE
NOTED LENGTHS BY 1.3.
16. DESIGN LOADS:
LATERAL LOADS (WIND -
MSFRS)
IMPORTANCE FACTOR 1.0 Iw
ULTIMATE WIND SPEED (3 SECOND GUST) 100MPH.
NOMINAL WIND SPEED 78MPH.
RISK CATEGORY I
WIND EXPOSURE "C"
INTERNAL PRESSURE COEFF +/- 0.18
LATERAL LOADS
(SEISMIC - MSFRS)
RISK CATEGORY l
SEISMIC IMPORTANCE FACTOR Ie = 1
MAPPED SPECTRAL RESPONSE Ss = 0.2
MAPPED SPECTRAL RESPONSE S1 = 0.08
DESIGN SPECTRAL RESPONSE Sds = 0.14
DESIGN SPECTRAL RESPONSE Sd1 = 0.07
SITE CLASS C
SEISMIC DESIGN CATEGORY B
SEISMIC FORCE RESISTING SYSTEM RIGID
NON-BUILDING
STRUCTURE
DESIGN BASE SHEAR V = 0.042W
SEISMIC RESPONCE COEFFICIENT Cs = 0.042
RESPONSE MODIFICATION FACTOR N/A
ANALYSIS PROCEDURE RIGID
NON-BUILDING
STRUCTURE
ABBREVIATIONS & SYMBOLS:
+/- PLUS OR MINUS
@ AT
A.B. ANCHOR BOLT
A.P.A. AMERICAN PLYWOOD
ASSOCIATION
A.S.T.M. AMERICAN SOCIETY OF TESTING
MATERIALS
ARCH. ARCHITECTURAL
B.B. BOND BEAM
B.O. BOTTOM OF
BLK. BLOCK
BM. BEAM
BOT. BOTTOM
BRG. BEARING
C CHANNEL
C.M.U. CONCRETE MASONRY UNIT
CCJ CONSTRUCTION CONTROL JOINT
CJ CONTROL JOINT
CL. CENTER LINE
CLR. CLEAR
COL. COLUMN
CONC. CONCRETE
CONN. CONNECTION
CONT. CONTINUOUS
D.L. DEAD LOAD
D.T. DOUBLE TEE / DRAIN TILE
DBL. DOUBLE
DIA. DIAMETER
DIM. DIMENSION
DWL. DOWEL
E.F. EACH FACE
E.J. EXPANSION JOINT
E.W. EACH WAY
EA. EACH
EL. ELEVATION
ELEV. ELEVATOR
EQ. EQUAL
EX. EXISTING
EXC. EXCAVATION
EXP. EXPANSION
F.D. FLOOR DRAIN
FDN. FOUNDATION
FT. FEET
FTG. FOOTING
G.C. GENERAL CONTRACTOR
G.T. GIRDER TRUSS
GA. GAUGE
GALV. GALVANIZE
HC. HOLLOWCORE
HORIZ. HORIZONTAL
HSS HOLLOW STRUCTURAL SECTION
I.F. INSIDE FACE
INT. INTERIOR
JST. JOIST
KLF. KIPS PER LINEAR FOOT
KSI. KIPS PER SQUARE INCH
L ANGLE
LB LEDGER BEAM
LL LIVE LOAD / DOUBLE ANGLE
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG. LONGITUDINAL
LWC LIGHT WEIGHT CONCRETE
M.C. MECHANICAL CONTRACTOR
MAS. MASONRY
MAX. MAXIMUM
MECH. MECHANICAL
MFG. MANUFACTURER
MIN. MINIMUM
MISC. MISCELLANEOUS
MTL. METAL
N. NORTH
N.T.S. NOT TO SCALE
NS. NON-SHRINK
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.F. OUTSIDE FACE
O.H. OVERHEAD
OPNG. OPENING
ORIG. ORIGINAL
P.A.F. POWDER ACTUATED FASTENER
P.C. PRECAST CONCRETE
PART. PARTITION
PL. PLATE
PLF POUNDS PER LINEAR FOOT
PNL. PANEL
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PW PLYWOOD
R. OR
RAD.
RADIUS
R.D. ROOF DRAIN
REINF. REINFORCING
REQD. REQUIRED
S.A. STUD ANCHOR
S.B. SOIL BORING
S.D. SEE DETAIL
S.D.L. SUPERIMPOSED DEAD LOAD
S.E.R. STRUCTURAL ENGINEER OF
RECORD
S.L. SNOW LOAD
S.L.L. SUPERIMPOSED LIVE LOAD
S.S. STAINLESS STEEL
SCHED. SCHEDULE
SHT. SHEET
SIM. SIMILAR
SPA. SPACING / SPACES
SPECS. SPECIFICATIONS
SQ. SQUARE
STD. STANDARD
STL. STEEL
T & B TOP & BOTTOM
T & G TONGUE & GROOVE
T.M.L. TOP OF MASONRY LEDGE
T.O. TOP OF
T.O.B. TOP OF BEAM
T.O.J. TOP OF JOIST
T.O.S. TOP OF STEEL
T.O.W. TOP OF WALL
T.S.E. TOP OF STEEL ELEVATION
T.S.W. TOP OF STEM WALL
TEMP. TEMPORARY
THK. THICK / THICKENED
TRANS. TRANSVERSE
TYP. TYPICAL
U.O.N. UNLESS OTHERWISE NOTED
V. / VER. VERIFY
VERT. VERTICAL
W.L. WIND LOAD
W/ WITH
W/O WITH OUT
WD. WOOD
WTS. WEIGHTS
WWF WELDED WIRE FABRIC
DEFERRED SUBMITTAL SCHEDULE:
PRECAST COLUMBARIUM NICHES & CONNECTIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IRRIGATION:
WATER IN
MOTION, INC.
GEOTECHNICAL:
TERRACON
COST ESTIMATING:
OCMI
175 JAMES AVENUE NORTH
MINNEAPOLIS, MN 55405
952.229.1911
TIMOTHY MALOOLY
611 LUNKEN PARK DRIVE
CINCINNATI, OHIO 45226
513.612.9020
JEFF DUNLAP, PE
2100 NORTH GREENVILLE AVENUE
RICHARDSON, TEXAS 75082
469.431.0571
KYLE VEATER
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
4400 W THIRD ST. DAYTON, OH
45428
BID DOCUMENTS
2/5/2026
C U s e rs \d w e n tl a n d \D o c u m e n ts \1
S R
V T d w e n tl a n d G
T X
W
.r v t
/2
/2
:2
:1
P
M
NOTE SHEET
2/5/2026 SV DW18125
S-001
810-CM3033
PRE-CAST CONCRETE COLUMBARIUM UNITS - DELEGATED DESIGN REQUIREMENTS:
1. THE CONTRACTOR SHALL PROVIDE STRUCTURAL DESIGN OF THE PRE-CAST CONCRETE
COLUMBARIUM UNITS. STRUCTURAL DESIGN SHALL BE SUBMITTED BY THE CONTRACTOR TO THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND ENGINEER OF RECORD (EOR) AS A
DELEGATED DESIGN SUBMITTAL. DELEGATED SUBMITTALS SHALL INCLUDE DRAWINGS AND
CALCULATIONS STAMPED AND SIGNED BY AN ENGINEER APPROPRIATELY LICENSED IN THE STATE OF
CONSTRUCTION.
2. THE PURPOSE OF THE EOR'S REVIEW SHALL BE IN DETERMINING THE DRAWINGS AND
CALCULATIONS HAVE BEEN PROPERLY SEALED, THAT THE LOAD CRITERIA IS IN GENERAL
CONFORMANCE WITH THE CONTRACT DOCUMENTS AND THE REFERENCED BUILDING CODE(S), AND
THAT CONNECTIONS TO THE PRIMARY STRUCTURE COMPLY WITH THE STRUCTURE'S DESIGNED
CAPABILITIES.
INCLUDED IN THE STRUCTURAL CALCULATIONS AND DESIGN, AT MINIMUM, SHALL BE:
A. DESIGN OF PRE-CAST CONCRETE COLUMBARIUM UNITS.
B. CONNECTION OF PRE-CAST UNITS TO STRUCTURAL FOUNDATIONS, BOTTOM AND TOP.
C. CONNECTION OF PRE-CAST UNITS, BACK TO BACK AND END TO END.
D. CONNECTION OF PRE-CAST UNITS TO NATURAL STONE CAPS.
3. REFER TO SPECIFICATION 03 48 24 - PRE-CAST CONCRETE COLUMBARIUM UNITS.
4. THE STRUCTURAL ENGINEER WILL RELY ON THE SPECIALTY ENGINEER'S SEAL AS CERTIFICATION THAT THE ITEMS DESIGNED BY THE SPECIALTY ENGINEER COMPLY WITH THE CRITERIA SET FORTH IN
THE CONTRACT DOCUMENTS AND APPLICABLE CODES AND STANDARDS. THE STRUCTURAL
ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ADEQUACY OF DESIGNS PROVIDED BY OTHERS.
Revisions: Date:
ARCHITECT/ENGINEER OF RECORDCONSULTANTS
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18125Date:
GEOTECHNICAL
TERRACON
JEFF DUNLAP, PE
IRRIGATION
WATER IN
MOTION, INC.
TIMOTHY MALOOLY
COST ESTIMATING
OCMI
KYLE VEATER
175 James Avenue North Minneapolis, MN 55405 952.229.1911
611 Lunken Park Drive Cincinnati, Ohio 45226 513.612.9020
2100 North Greenville Ave. Richardson, Texas 75082 469.431.0571
U.S. Department of Veterans Affairs
Office of Design and Construction
Services
Project Title
Location
4400 W THIRD ST, DAYTON, OH 45428
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
Issue Date
FEBRUARY 5, 2026
BID DOCUMENTS
Project Number
Building Number
810-CM3-033
1 2
A
B
C
D
E
M
G
I
J
K
L
N
O
P
Q
F
H
14' - 3" 14' - 3" 14' - 3" 14' - 3" 14' - 3" 14' - 3" 14' - 3" 14' - 3" 14' - 0"
128' - 0"
8'
7"
3'
1/
4"
5'
3/
4"
1'
7"
1'
1/
4"
8'
7"
3"
1/
2"
3'
0"
2'
3/
4"
2'
1/
4"
3'
0"
3'
3/
4"
2'
1/
4"
3'
0"
4'
1/
2"
/4
FS5
FS6x26
FS5
FS5
FS5
FS5
FS5FS5
FS5
FS5
FC4
FC4
FC4 FC4
FC4
FC4
P3
P6
P2
P1
P7 P6
P2 P2
P4
P1
P5
2' - 3" TYP.
3' - 9"
2'
3"
2' - 9 1/2"
2'
3"
2'
3"
2' - 9 1/2" 2'
3"
2' - 3"
FC3.5
FC3.5
3 4 5 6 7 8 9
FS6x23
FS6x31
FS6x26
FS6x23
FS6x22
FS6x26
FS6x23
P1
P1
P1
P1
P1
P1
P1
P1
P1 P1 P1
P1 P1
P14
S-102
S-102
S-102
S-102
FC2
FC2
FC2
FC2
S-102
S-102
S-102
S-102
S-102
S-102
S-102
S-102
TYP @
ALL PIERS
TYP @
ALL PIERS
North
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IRRIGATION:
WATER IN
MOTION, INC.
GEOTECHNICAL:
TERRACON
COST ESTIMATING:
OCMI
175 JAMES AVENUE NORTH
MINNEAPOLIS, MN 55405
952.229.1911
TIMOTHY MALOOLY
611 LUNKEN PARK DRIVE
CINCINNATI, OHIO 45226
513.612.9020
JEFF DUNLAP, PE
2100 NORTH GREENVILLE AVENUE
RICHARDSON, TEXAS 75082
469.431.0571
KYLE VEATER
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
4400 W THIRD ST. DAYTON, OH
45428
BID DOCUMENTS
2/5/2026
C U s e rs \d w e n tl a n d \D o c u m e n ts \1
S R
V T d w e n tl a n d G
T X
W
.r v t
/2
/2
:2
:1
P
M
COLUMBARIUM FOUNDATION
PLAN
2/5/2026 SV DW18125
S-101
1. VERIFY ALL DIMENSIONS WITH LANDSCAPE ARCHITECTURAL DRAWINGS.
2. SEE SHEET S-001 FOR GENERAL STRUCTURAL NOTES.
3. P# = PIER MARK - SEE PIER SCHEDULE ON THIS SHEET.
4. FC/S/T# = FOOTING MARK - SEE FOOTING SCHEDULE ON THIS SHEET.
5. TOP OF FOOTING ELEVATION IS INDICATED AS 2'-8" BELOW THE TOP OF
MASONRY LEDGE. SEE LA DRAWINGS FOR CONFIRMATION OF FINAL
ELEVATIONS. THE MINIMUM TOP OF FOOTING ELEVATION SHALL BE 2'-8"
BELOW FINISHED GRADE. NOTIFY ENGINEER IMMEDIATELY IF SITE
CONDITIONS DO NOT ALLOW THIS REQUIREMENT TO BE MET.
6. STEP WALL FOOTING EVERY 1'-0" OF GRADE CHANGE S.D. 3/S-102.
SHEET NOTES:
1/8" = 1'-0"
FOOTING & FOUNDATION PLAN
T.O. EXT. FOOTING EL. =VARIES SEE
Schedule - Footings
MARK WIDTH DEPTH
REINFORCING
COMMENTS
TRANSVERSE LONGITUDINAL
FC2 2'-0" CONT. 1'-0" #5 @ 1'-0" O.C. 2 - #5
FC3.5
3'-6" CONT. 1'-0" #5 @ 1'-0" O.C. 4 - #5 RIENF.@ TOP
& BOT.
FC4 4'-0" CONT. 1'-0" #5 @ 1'-0" O.C. 4 - #5
FS5 5'-0" x 5'-0" 1'-0" 7 - #5 7 - #5
FS6x22 6'-0" x 22'-0" 1'-0" #5 @ 11" O.C. 8 - #5
FS6x23 6'-0" x 23'-0" 1'-0" #5 @ 11" O.C. 8 - #5
FS6x26 6'-0" x 26'-0" 1'-0" #5 @ 11" O.C. 8 - #5
FS6x31 6'-0" x 31'-0" 1'-0" #5 @ 11" O.C. 8 - #5
Schedule Notes - Pier
MARK PIER SIZE COMMENTS
P1 2'-3 1/2"x5'-4" S.D. 8/S-102
P2 3'-3 1/2"x3'-3 1/2" S.D. 8/S-102
P3 2'-3 1/2x3'-3 1/2" S.D. 8/S-102
P4 2'-3 1/2x3'-3 1/2" S.D. 8/S-102
P5 3'-3 1/2"x3'-3 1/2" S.D. 8/S-102
P6 2'-3 1/2x3'-3 1/2" S.D. 8/S-102
P7 3'-3 1/2"x3'-3 1/2" S.D. 8/S-102
810-CM3033
SHEET NOTE #5 & #6
L6X6X5/16 ANGLE @ EACH PIER FACE WITH NICHE ABUTMENT.
FASTEN WITH (2) 1/2" DIA. SIMPSON "TITEN HD" SCREW ANCHORS,
3 1/4" MIN EMBED. SEE LANDSCAPE DETAILS 3/LS300 & 10/LS503.
KEY NOTES:
Revisions: Date:
ARCHITECT/ENGINEER OF RECORDCONSULTANTS
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18125Date:
GEOTECHNICAL
TERRACON
JEFF DUNLAP, PE
IRRIGATION
WATER IN
MOTION, INC.
TIMOTHY MALOOLY
COST ESTIMATING
OCMI
KYLE VEATER
175 James Avenue North Minneapolis, MN 55405 952.229.1911
611 Lunken Park Drive Cincinnati, Ohio 45226 513.612.9020
2100 North Greenville Ave. Richardson, Texas 75082 469.431.0571
U.S. Department of Veterans Affairs
Office of Design and Construction
Services
Project Title
Location
4400 W THIRD ST, DAYTON, OH 45428
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
Issue Date
FEBRUARY 5, 2026
BID DOCUMENTS
Project Number
Building Number
810-CM3-033
T.S.W
EL. = SEE LA
T.M.L.
EL. = SEE LA
T.S.W
EL. = SEE LA
T.M.L.
EL. = SEE LA
T.O.W
EL. = SEE LA
T.M.L.
EL. = SEE LA
T.O.W
EL. = SEE LA
T.M.L.
EL. = SEE LA
T.S.W
EL. = SEE LA
T.O.W
EL. = SEE LA
T.S.W
EL. = SEE LA
T.O.W
EL. = SEE LA
T.S.W
EL. = SEE LA
T.O.W
EL. = SEE LA
T.S.W
EL. = SEE LA
T.O.W
EL. = SEE LA
T.O.W
EL. = SEE LA
T.M.L.
EL. = SEE LA
T.S.W
EL. = SEE LA
T.O.W
EL. = SEE LA
T.S.W
EL. = SEE LA
T.O.W
EL. = SEE LA
T.S.W
EL. = SEE LA
T.O.W
EL. = SEE LA
T.M.L.
EL. = SEE LA T.M.L.
EL. = SEE LA
T.M.L.
EL. = SEE LA T.M.L.
EL. = SEE LA
T.M.L.
EL. = SEE LA
T.M.L.
EL. = SEE LA
T.M.L.
EL. = SEE LA
BOND BREAK
SLAB ON GRADE
SEE LA
#5 @ 1'-4" O.C.
EACH WAY
TYPICAL
SEE PLAN FOR
FOOTING SIZE,
REINF. & ELEV.
TYPICAL
DWL. TO MATCH
@ EACH VERT.
TYPICAL
#4 @ 1'-4" O.C.
EACH WAY
#4 DWL. @ 1'-4" O.C.
GRANULAR FILL
BOND BREAK
SLAB ON GRADE
SEE LA
3" CLR. - U.O.N.
8"
8"
V E
R
IF
Y
#4 DWL. @ 1'-4" O.C.
8" VERIFY
#3 @ EACH NOSING
6"
3" CLR.
1" CLR. - TYP.
2'
8" M
IN
NOTE:
1. REFER TO LA PLANS FOR FINAL LOCATIONS OF WALL
CONSTRUCTION JOINTS. NOTIFY LANDSCAPE ARCHITECT IF
JOINTS EXCEED CRITERIA BELOW.
2. JOINT MAXIMUM SPACING = 20'-0" FOR WALLS 3'-0" OR GREATER.
3. JOINT MAXIMUM SPACING = 30'-0" FOR WALLS 2'-0" - 3'-0"
4. JOINT MAXIMUM SPACING = 45'-0" FOR WALLS 2'-0" AND SMALLER
1"
1/2"
S
IZ
E
R E
IN
F
S E
E P
LA
N
F O
R
1 1/2"
6" 6"
SEE SCHED.
LAP SPLICE3" CLR.VERT. CAULK JOIST @
EACH FACE
2" x 6" x 6" LONG. VERT. KEYWAY (2" x 4" x 6" @ 8" WALL) EVENLY
SPACED BETWEEN HORIZ. REINF.
SPACING. KEYWAY CONT. WHERE
WATERSTOP IS REQUIRED
VERT. CAULK
VERT. ROD STOCK
WATERSTOP
WHERE
REQUIRED
SEE SCHED.
LAP SPLICE2a U.O.N.
a
SEE PLAN
3" CLR. - TYP.
DEPTH 1'-0" MIN.
EQUAL TO FTG.
2a U.O.N.
NOTES:
1. SEE PLAN FOR FOOTING SIZE AND REINFORCING.
2. SLOPED OR STEPPED FOOTINGS SHALL BE CAST AS A UNIT.
3. STEPPED FOOTING LINES SHOWN ON PLAN ARE @ BOTTOM OF FOOTING.
SEE PLAN FOR
FOOTING SIZE,
REINF. & ELEV.
3" CLR. TYP.
DWL. TO MATCH
@ EACH VERT.
#5 HORIZ @ 1'-6" O.C.
@ EA. VERTICAL ROW
4-ROWS OF #5 VERTS
@ 1'-0" O.C.
3' - 9"
PRECAST NICHE
UNIT - SEE LA
STAINLESS STEEL ANCHORS
INTO NICHE UNITS BY PC
SUPPLIER
5 1/2" 2' - 10" 5 1/2"
TYP.
1 1/2" CLR.
GRID
EQ EQ EQ
STONE CAP - SEE LA
VARIES
SEE LA/CIVIL
STAINLESS STEEL
ANCHORAGE BY
PC SUPPLIER
1/2" JOINT
M
IN
STONE VENEER
SEE LA
SEE PLAN FOR
FOOTING SIZE,
REINF. & ELEV.
3" CLR. TYP.
DWL. TO MATCH
@ EACH VERT.
#5 HORIZ @ 1'-0" O.C.
@ EA. VERTICAL ROW
3-ROWS OF #5 VERTS
@ 1'-0" O.C.
2' - 3"
PRECAST NICHE
UNIT - SEE LA
5" 1' - 5" 5"
TYP.
1 1/2" CLR.
GRID
STONE CAP - SEE LA
VARIES
SEE LA/CIVIL
STAINLESS STEEL
ANCHORAGE BY
PC SUPPLIER
1/2" JOINT
M
IN
STAINLESS STEEL ANCHORS
INTO NICHE UNITS BY PC
SUPPLIER
STONE VENEER
SEE LA.
SEE PLAN FOR
FOOTING SIZE,
REINF. & ELEV.
3" CLR. TYP.
DWL. TO MATCH
@ EACH VERT.
#5 HORIZ @ 1'-6" O.C.
@ EA. VERTICAL ROW
3-ROWS OF #5 VERTS
@ 1'-6" O.C.
1' - 6"
1/2" DIA. x6" HAS-R 316 STAINLESS
STEEL THREADED ROD W/ HILTI HIT-HY
200 ADHEASIVE 4 PER CAP
5" 8" 5"
STONE CAP - SEE LA
VARIES
SEE LA/CIVIL
M
IN
STONE VENEER
SEE L.A.
2" CLR. TYP.
#5 @ 1'-6" EA. WAY
SEE PLAN FOR
FOOTING SIZE,
REINF. & ELEV.
3" CLR. TYP.
DWL. TO MATCH
@ EACH VERT.
#5 HORIZ @ 1'-0" O.C.
@ EA. VERTICAL ROW
3-ROWS OF #5 VERTS
@ 1'-0" O.C.
2' - 9 1/2"
STONE VENEER
SEE LA
5" 1' - 11 1/2" 5"
TYP.
1 1/2" CLR.
GRID
STONE CAP - SEE LA
VARIES
SEE LA/CIVIL
M
IN
1/2" DIA. x6" HAS-R 316 STAINLESS
STEEL THREADED ROD W/ HILTI HIT-HY
200 ADHEASIVE 4 PER CAP
5'
4"
2' - 3 1/2"
GRID
MARK P1
RUN FDN. WALL
REINF. THRU PIER
TYP.
GRID
1/
2" 2'
1/ 2"
3'
1/
2"
3' - 3 1/2"
GRID
MARK P2
RUN FDN. WALL
REINF. THRU PIER
TYP.
GRID
5" 1'
5"
5"
3'
1/
2"
2' - 3 1/2"
GRID
MARK P3
RUN FDN. WALL
REINF. THRU PIER
TYP.
GRID
5" 1'
5"
5"
MARK P4
3'
1/
2"
3' - 3"
GRID
MARK P5
RUN FDN. WALL
REINF. THRU PIER
TYP.
GRID
5" 1'
5"
5"
20-#6 VERTS WITH #
3 TIES @ 1'-0" O.C.
18-#6 VERTS WITH
#3 TIES @ 1'-0" O.C.
14-#6 VERTS WITH
#3 TIES @ 1'-0" O.C.
20-#6 VERTS WITH
#3 TIES @ 1'-0" O.C.
DWL. TO MATCH
@ EA. VERT.
SEE PLAN FOR
FOOTING SIZE,
REINF. & ELEV.
STONE VENEER
SEE LA
SEE PLAN
3" CLR. TYP.
TYP.
1 1/2" CLR.
VARIES
SEE LA/CIVIL
GRID
3-#3 TIES
@ 3" O.C.
STONE CAP
SEE LA1/2" DIA.x6" HAS-R 316
STAINLESS STEEL
THREADED ROD W/ HILTI
HIT-HY 200 ADHESIVE 4
PER CAP
6" 1' - 3 1/2" 6"
6" 2'
2"
2'
2" 6"
3'
9"
2' - 9 1/2"
1' - 11 1/2"
2'
3"
2'
3"
6"
1'
3/
4" 1'
3/ 4"
6"
6" 1' - 3 1/2" 6"
3'
1/
2"
2' - 3 1/2"
GRID
RUN FDN. WALL
REINF. THRU PIER
TYP.
GRID
5" 1'
5"
5"
14-#6 VERTS WITH
#3 TIES @ 1'-0" O.C.
2'
3"
6"
1'
3/
4" 1'
3/ 4"
6"
6" 1' - 3 1/2" 6" 1' - 5"
2' - 3"
2'
3"
MARK P6
3'
1/
2"
3' - 3 1/2"
GRID
RUN FDN. WALL
REINF. THRU PIER
TYP.
GRID
5" 1'
5"
5"
18-#6 VERTS WITH
#3 TIES @ 1'-0" O.C.
2' - 9 1/2"
1' - 11 1/2"
2'
3"
3'
1/
2"
3' - 3 1/2"
GRID
MARK P7
RUN FDN. WALL
REINF. THRU PIER
TYP.
GRID
1/
4"
1'
5"
1/ 4"
20-#6 VERTS WITH
#3 TIES @ 1'-0" O.C.
2'
1/
2"
6"
1' - 1 3/4" 1' - 1 3/4"
6"
M
IN
1' - 4 7/8"
/4
1'
3/
4"
1'
3/
4"
/4
6"
1'
3/
4" 1'
3/ 4"
6"
10 1/4"
/4
/4
6" 1'
3/ 4"
1'
3/
4"
6"
/4
2'
1/
2"
1' - 4 5/8"
/4
SIZE & REINF.
SEE PLAN FOR
6"
1' - 1 3/4" 1' - 1 3/4"
6"
6"
1' - 1 3/4" 1' - 1 3/4"
6" 6"
1' - 1 3/4" 1' - 1 3/4"
6"
6"
1'
3/
4" 1'
3/ 4"
6"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IRRIGATION:
WATER IN
MOTION, INC.
GEOTECHNICAL:
TERRACON
COST ESTIMATING:
OCMI
175 JAMES AVENUE NORTH
MINNEAPOLIS, MN 55405
952.229.1911
TIMOTHY MALOOLY
611 LUNKEN PARK DRIVE
CINCINNATI, OHIO 45226
513.612.9020
JEFF DUNLAP, PE
2100 NORTH GREENVILLE AVENUE
RICHARDSON, TEXAS 75082
469.431.0571
KYLE VEATER
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
4400 W THIRD ST. DAYTON, OH
45428
BID DOCUMENTS
2/5/2026
C U s e rs \d w e n tl a n d \D o c u m e n ts \1
S R
V T d w e n tl a n d G
T X
W
.r v t
/2
/2
:2
:1
P
M
FOOTING & FOUNDATION DETAILS
2/5/2026 SV DW18125
S-102
810-CM3033
1/2" = 1'-0"S-102
1 STAIR DETAIL
1/2" = 1'-0"S-102
2 WALL CONSTRUCTION JOINT DETAIL
1/2" = 1'-0"S-102
3 STEPPED FOOTING DETAIL
1/2" = 1'-0"S-102
4 EXTERIOR WALL DETAIL
1/2" = 1'-0"S-102
5 EXTERIOR WALL DETAIL
1/2" = 1'-0"S-102
6 EXTERIOR WALL DETAIL
1/2" = 1'-0"S-102
7 EXTERIOR WALL DETAIL
1/2" = 1'-0"S-102
8 EXTERIOR PIER DETAIL
Revisions: Date:
ARCHITECT/ENGINEER OF RECORDCONSULTANTS
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18125Date:
GEOTECHNICAL
TERRACON
JEFF DUNLAP, PE
IRRIGATION
WATER IN
MOTION, INC.
TIMOTHY MALOOLY
COST ESTIMATING
OCMI
KYLE VEATER
175 James Avenue North Minneapolis, MN 55405 952.229.1911
611 Lunken Park Drive Cincinnati, Ohio 45226 513.612.9020
2100 North Greenville Ave. Richardson, Texas 75082 469.431.0571
U.S. Department of Veterans Affairs
Office of Design and Construction
Services
Project Title
Location
4400 W THIRD ST, DAYTON, OH 45428
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
Issue Date
FEBRUARY 5, 2026
BID DOCUMENTS
Project Number
Building Number
810-CM3-033
T.M.L.
EL. = SEE LA
T.S.W.
EL. = SEE LA
T.M.L.
EL. = SEE LA
T.M.L.
EL. = SEE LA
T.S.W.
EL. = SEE LA
T.O.W.
EL. = SEE LA
T.M.L.
EL. = SEE LA
T.O.W.
EL. = SEE LA
T.M.L.
EL. = SEE LA
A.9
2'
1/
4"
P1P1
A
B
1 2 3
11' - 6 1/4" 11' - 6 1/4"
FS4.5x27.5
P1P1 3'
1/ 2"
1/
2"
S-103
DWL. TO MATCH
@ EA. VERT.
SEE PLAN FOR
FOOTING SIZE,
REINF. & ELEV.
3" CLR. TYP.
DWL. TO MATCH
@ EACH VERT.
#5 HORIZ @ 1'-4" O.C.
@ EA. VERTICAL ROW
4-ROWS #5 VERTS
@ 1'-4" O.C.
5"
1' - 2 1/4" 3"
5"
1 1/2" TYP.
CONCRETE MEMORIAL
WALL
5" 8"
PRECAST
PANEL SEE L.A.
STONE VENEER SEE L.A.
1/2" DIA. x6" HAS-R 316 STAINLESS
STEEL THREADED ROD W/ HILTI HIT-HY
200 ADHEASIVE 4 PER CAP
2' -8
M
IN
1' - 2 1/4"
#5 @ 1'-6" EACH WAY
STONE CAP
SEE L.A.
5/
8"
1'
1/
2"
5/
8"
5 1/4"
1' - 1 3/4" 1' - 1 3/4"
5 1/4"
GRID
MARK P1
RUN FDN. WALL
REINF. THRU PIER
TYP.
8-#6 VERTS. W/
3-TIES @ 1'-0" O.C.
U.O.N.
SEE PLAN FOR
FOOTING SIZE,
REINF. & ELEV.
STONE VENEER
SEE LA
3" CLR. TYP.
TYP.
3" CLR.
DWL. TO MATCH
@ EACH VERT.
3 - #3 TIES
@ 3" O.C.
SEE PLAN
GRID
3" TYP.
SIZE & REINF.
SEE PLAN FOR
CONCRETE MEMORIAL
WALL PIER.
3' - 2"
2'
3/
4"
2' - 3 1/4"
1' - 4 3/4"
STONE CAP-CONNECTION
BY SUPPLIER
8" 1' - 2 1/4" 5"
2' -8
M
IN
1/2" DIA. x6" HAS-R 316 STAINLESS
STEEL THREADED ROD W/ HILTI HIT-HY
200 ADHEASIVE 4 PER CAP
North
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IRRIGATION:
WATER IN
MOTION, INC.
GEOTECHNICAL:
TERRACON
COST ESTIMATING:
OCMI
175 JAMES AVENUE NORTH
MINNEAPOLIS, MN 55405
952.229.1911
TIMOTHY MALOOLY
611 LUNKEN PARK DRIVE
CINCINNATI, OHIO 45226
513.612.9020
JEFF DUNLAP, PE
2100 NORTH GREENVILLE AVENUE
RICHARDSON, TEXAS 75082
469.431.0571
KYLE VEATER
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
4400 W THIRD ST. DAYTON, OH
45428
BID DOCUMENTS
2/5/2026
C U s e rs \d w e n tl a n d
\D o c u m e n ts \1
D
N C
M E
M O
R
IA
L W
A L
L
S R
V T d w e n tl a n d
G T
X
W .r v t
/2
/2
:4
:3
A
M
MEMORIAL WALL FOUNDATION
PLAN
2/5/2026 SV DW18125
S-103
1. VERIFY ALL DIMENSIONS WITH LANDSCAPE ARCHITECTURAL DRAWINGS.
2. SEE SHEET S-101 FOR GENERAL STRUCTURAL NOTES.
3. P# = PIER MARK - SEE PIER SCHEDULE ON THIS SHEET.
4. FC/S/T# = FOOTING MARK - SEE FOOTING SCHEDULE ON THIS SHEET.
5. TOP OF FOOTING ELEVATION IS INDICATED AS 2'-8" BELOW THE TOP OF
MASONRY LEDGE. SEE LA DRAWINGS FOR CONFIRMATION OF FINAL
ELEVATIONS. THE MINIMUM TOP OF FOOTING ELEVATION SHALL BE 2'-8"
BELOW FINISHED GRADE. NOTIFY ENGINEER IMMEDIATELY IF SITE
CONDITIONS DO NOT ALLOW THIS REQUIREMENT TO BE MET.
SHEET NOTES:
1/2" = 1'-0"
FOOTING & FOUNDATION PLAN
T.O. EXT. FOOTING EL. = VARIES
Schedule - Footings
MARK WIDTH DEPTH
REINFORCING
COMMENTS
TRANSVERSE LONGITUDINAL
FS4.5x27.5 4'-6" x 27'-6" 1'-0" #5 @ 1'-0" O.C. 7 - #5 REINF. @ TOP & BOT.
Schedule Notes - Pier
MARK PIER SIZE COMMENTS
P1 2'-2 3/4"X3'-2" S.D. 2/S-103
1/2" = 1'-0"S-103
1 FOUNDATION WALL DETAIL
1/2" = 1'-0"S-103
2 EXTERIOR PIER DETAIL
810-CM3033
SEE SHEET NOTE #5
Revisions: Date:
ARCHITECT/ENGINEER OF RECORDCONSULTANTS
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18125Date:
GEOTECHNICAL
TERRACON
JEFF DUNLAP, PE
IRRIGATION
WATER IN
MOTION, INC.
TIMOTHY MALOOLY
COST ESTIMATING
OCMI
KYLE VEATER
175 James Avenue North Minneapolis, MN 55405 952.229.1911
611 Lunken Park Drive Cincinnati, Ohio 45226 513.612.9020
2100 North Greenville Ave. Richardson, Texas 75082 469.431.0571
U.S. Department of Veterans Affairs
Office of Design and Construction
Services
Project Title
Location
4400 W THIRD ST, DAYTON, OH 45428
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
Issue Date
FEBRUARY 5, 2026
BID DOCUMENTS
Project Number
Building Number
810-CM3-033
T.M.L.
EL. = SEE PLAN
T.S.W.
EL. = SEE LA T.O.W.
EL. = SEE LA
T.M.L.
EL. = SEE PLAN
T.S.W.
EL. = SEE LA
T.O.W.
EL. = SEE LA
T.M.L.
EL. = SEE LA
T.M.L.
EL. = SEE PLAN
T.S.W.
EL. = SEE LA
A B C D E F
20' - 4 1/2" 15' - 8 1/4" 36' - 7 5/8" 12' - 10 1/4" 20' - 4 3/8"
2'
9"
2'
9"
P1P2P1P2P1 P1
FS5FS5FS5 FS5 FS5 FS5
FC4
FC4
2'
1/
2"
S-104
S-104
S-104
S-104
DWL. TO MATCH
@ EA. VERT.
SEE PLAN FOR
FOOTING SIZE,
REINF. & ELEV.
3" CLR. TYP.
DWL. TO MATCH
@ EACH VERT.
#5 HORIZ @ 1'-4" O.C.
@ EA. VERTICAL ROW
5-ROWS #5 VERTS @
1'-4" O.C.
5" 1' - 11" 5"
1 1/2" TYP.
CONCRETE ENTRY WALL
5" 5"
STONE VENEER SEE L.A.
STONE CAP-
SEE LA
2' -8
M
IN
3-ROWS #5 @
1'-4" O.C. EACH
WAY
1/2" DIA. x6" HAS-R 316 STAINLESS
STEEL THREADED ROD W/ HILTI HIT-HY
200 ADHEASIVE 4 PER CAP
2'
1/
2"
3' - 7 1/2"
GRID
MARK P2
RUN FDN. WALL
REINF. THRU PIER
TYP.
14-#6 VERTS. W/
3-TIES @ 1'-0" O.C.
U.O.N.
DWL. TO MATCH
@ EA. VERT.
SEE PLAN FOR
FOOTING SIZE,
REINF. & ELEV.
STONE VENEER
SEE LA
3" CLR. TYP.
TYP.
3" CLR.
DWL. TO MATCH
@ EACH VERT.
3 - #3 TIES
@ 3" O.C.
SIZE & REINF.
SEE PLAN FOR
GRID
3" TYP.
#5 HORIZ @ 8" O.C.
@ EA. FACE
#5 VERT @ 8" O.C.
EACH FACE
SIZE & REINF.
SEE PLAN FOR
6" 1' - 3 3/4" 1' - 3 3/4"
6"
CONCRETE ENTRY
WALL PIER
6" 2' - 7 1/2" 6"
6" 1'
1/ 2"
6"
2'
1/
2"
3' - 6"
GRID
MARK P1
RUN FDN. WALL
REINF. THRU PIER
TYP.
14-#6 VERTS. W/
3-TIES @ 1'-0" O.C.
U.O.N.
GRID
5" 1' - 11" 5"
6" 1'
1/ 2"
6"
STONE CAP-CONNECTION
BY SUPPLIER
2' -8
M
IN
5 1/4"
1' - 3 3/4" 1' - 3 3/4"
5 1/4"
5" 11 1/2" 11 1/2" 5"
DWL. TO MATCH
@ EA. VERT.
SEE PLAN FOR
FOOTING SIZE,
REINF. & ELEV.
3" CLR. TYP.
DWL. TO MATCH
@ EACH VERT.
#5 HORIZ @ 1'-4" O.C.
@ EA. VERTICAL ROW
5-ROWS #5 VERTS @
1'-4" O.C.
5" 1' - 11" 5"
1 1/2" TYP.
CONCRETE ENTRY WALL
5" 5"
STONE VENEER SEE L.A.
STONE CAP-
SEE LA
2' -8
M
IN
3-ROWS #5 @
1'-4" O.C. EACH
WAY
1/2" DIA. x6" HAS-R 316 STAINLESS
STEEL THREADED ROD W/ HILTI HIT-HY
200 ADHEASIVE 4 PER CAP
1"
7"
BASE PLATE, POST, &
CONNECTION PER
MANUFACTURER.
North
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IRRIGATION:
WATER IN
MOTION, INC.
GEOTECHNICAL:
TERRACON
COST ESTIMATING:
OCMI
175 JAMES AVENUE NORTH
MINNEAPOLIS, MN 55405
952.229.1911
TIMOTHY MALOOLY
611 LUNKEN PARK DRIVE
CINCINNATI, OHIO 45226
513.612.9020
JEFF DUNLAP, PE
2100 NORTH GREENVILLE AVENUE
RICHARDSON, TEXAS 75082
469.431.0571
KYLE VEATER
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
4400 W THIRD ST. DAYTON, OH
45428
BID DOCUMENTS
2/5/2026
C U s e rs \d w e n tl a n d
\D o c u m e n ts
\1
E
N T
R A
N C
E W
A L
L
S R
V T d w e n tl a n d
G T
X
W .r v t
/2
/2
:4
:2
A
M
ENTRY WALL FOUNDATION PLAN
2/5/2026 SV DW18125
S-104
1. VERIFY ALL DIMENSIONS WITH ARCHITECTURAL DRAWINGS.
2. SEE SHEET S-101 FOR GENERAL STRUCTURAL NOTES.
3. P# = PIER MARK - SEE PIER SCHEDULE ON THIS SHEET.
4. FC/S/T# = FOOTING MARK - SEE FOOTING SCHEDULE ON THIS SHEET.
5. TOP OF FOOTING ELEVATION IS INDICATED AS 2'-8" BELOW THE TOP OF
MASONRY LEDGE. SEE LA DRAWINGS FOR CONFIRMATION OF FINAL
ELEVATIONS. THE MINIMUM TOP OF FOOTING ELEVATION SHALL BE 2'-8"
BELOW FINISHED GRADE. NOTIFY ENGINEER IMMEDIATELY IF SITE
CONDITIONS DO NOT ALLOW THIS REQUIREMENT TO BE MET.
SHEET NOTES:
1/8" = 1'-0"
ENTRANCE WALL FOUNDATION PLAN
T.O. EXT. FOOTING EL. =VARIES
Schedule Notes - Pier
MARK PIER SIZE COMMENTS
P1 2'-3 1/2"x3'-7 1/2" S.D. 2/S-104
P2 2'-3 1/2"x3'-7 1/2" S.D. 2/S-104
Schedule - Footings
MARK WIDTH DEPTH
REINFORCING
COMMENTS
TRANSVERSE LONGITUDINAL
FC4 4'-0" CONT. 1'-0" #5 @ 1'-0" O.C. 4 - #5 REINF. @ TOP & BOT.
FS5 5'-0" x 5'-0" 1'-0" 7 - #5 7 - #5 REINF. @ TOP & BOT.
1/2" = 1'-0"S-104
1 FOUNDATION WALL DETAIL
1/2" = 1'-0"S-104
2 EXTERIOR PIER DETAIL
810-CM3033
SEE SHEET NOTE #5
1/2" = 1'-0"S-104
3 FOUNDATION WALL DETAIL
Revisions: Date:
ARCHITECT/ENGINEER OF RECORDCONSULTANTS
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18125Date:
GEOTECHNICAL
TERRACON
JEFF DUNLAP, PE
IRRIGATION
WATER IN
MOTION, INC.
TIMOTHY MALOOLY
COST ESTIMATING
OCMI
KYLE VEATER
175 James Avenue North Minneapolis, MN 55405 952.229.1911
611 Lunken Park Drive Cincinnati, Ohio 45226 513.612.9020
2100 North Greenville Ave. Richardson, Texas 75082 469.431.0571
U.S. Department of Veterans Affairs
Office of Design and Construction
Services
Project Title
Location
4400 W THIRD ST, DAYTON, OH 45428
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
Issue Date
FEBRUARY 5, 2026
BID DOCUMENTS
Project Number
Building Number
810-CM3-033
OS
DL
CO
T
CO
LC
F
F
F
DH
DCL
XXX
XXXX
XX
L1 L2 L3
J
J F1
DO
M
N
X
TV
XXXX
CR
CK
TV
CC
DC
ES
IC
ML
RX
REX
MD
XXX
OS
1P 1 Pole (2P, 3P, 4P, ETC.)
A, Amp Ampere AC Above Counter ACLG Above Ceiling ADO Automatic Door Opener AF Amp Frame AFF Above Finished Floor AFG Above Finished Grade AFI Arc Fault Circuit
Interrupter AHU Air Handling Unit AL Aluminum ALT Alternate AMP Ampere AMPL Amplifier ANNUN Annunciator APPROX Approximately AQ-STAT Aquastat ARCH Architect, Architectural AS Amp Switch AT Amp Trip ATS Automatic Transfer Switch AUTO Automatic AUX Auxiliary AV Audio Visual AWG American Wire Gauge BATT Battery BD Board BLDG Building BMS Building Management System C Conduit CAB Cabinet CAT Catalog CATV Cable Television CB Circuit Breaker CCTV Closed Circuit Television CKT Circuit CLG Ceiling COMB Combination CMPR Compressor CONN Connection CONST Construction CONT Continuation Or Continuous CONTR Contractor CONV Convector CP Circulating Pump CRT Cathode-Ray Tube CT Current Transformer CTR Center CU Copper DCP Domestic Water Circulating Pump DEPT Department DET Detail DIA Diameter DISC Disconnect DIST Distribution DN Down DPR Damper DS Safety Disconnect Switch DT Double Throw DWG Drawing EC Electrical Contractor ELEC Electric, Electrical ELEV Elevator ELU Emergency Lighting Unit EM Emergency EMS Energy Management System EMT Electrical Metallic Tubing EP Electric Pneumatic EQUIP Equipment EWC Electric Water Cooler EXIST Existing EXH Exhaust EXP Explosion Proof FA Fire Alarm FABP Fire Alarm Booster Power
Supply Panel FACP Fire Alarm Control Panel FCU Fan Coil Unit FIXT Fixture FLR Floor FLUOR Fluorescent FU Fuse FUDS Fused Safety Disconnect Switch GA Gauge GAL Gallon GALV Galvanized GC General Contractor GEN Generator GFI Ground Fault Circuit Interrupter GFP Ground Fault Protector GND Ground GRS Galvanized Rigid Steel (Conduit) GYP BD Gypsum Board HOA Hands-Off-Automatic Switch HORIZ Horizontal HP Horsepower HPF High Power Factor HT Height HTG Heating HTR Heater HV High Voltage HVAC Heating, Ventilating And Air
Conditioning IC Interrupting Capacity IG Isolated Ground IMC Intermediate Metal Conduit INCAND Incandescent IR Infrared I/W Interlock With J-BOX Junction Box KV Kilovolt KVA Kilovolt-Ampere KVAR Kilovolt-Ampere Reactive KW Kilowatt KWH Kilowatt Hour LOC Locate Or Location LT Light LTG Lighting LTNG Lightning LV Low Voltage MAX Maximum MAG.S Magnetic Starter M/C Momentary Contact MC Mechanical Contractor
Electrical Abbreviations
Electrical DeviceTags: Uppercase letter(s) indicates Panel ID and circuit number. Lowercase letter indicates designation of controlling switch (where applicable).
Switch ID indicated by a lowercase letter. Switch IDs are unique per space. A switch with an ID "a" controls all devices within the space in which it is located tagged with "a". A switch without a tagged ID controls all lighting fixtures within a space. ID tags may be used on control devices other than switches, such as occupancy sensors or contactors.
Equipment Tags: Equipment ID is indicated by an underlined tag adjacent to the equipment. See the equipment connection schedule for description, electrical requirements, and panel and circuit number. Symbols/graphic appearance of equipment varies.
Solid, arced lines connecting equipment, devices, or fixtures indicate unswitched power circuiting. Wires are only intended to indicate to what circuit devices are connected. Actual connections, circuit routing, installtion, junction boxes, etc. shall be field-determined by the contractor.
Home run to branch circuit panelboard. The equipment name and circuit number(s) are indicated, separated by a hyphen. Homeruns are only intended to indicate panel and circuit number. Actual homerun location shall be field-determined by the contractor.
Power Symbols
Electrical Symbol Legend
Room
MCB Main Circuit Breaker MCC Motor Control Center MDC Main Distribution Center MDP Main Distribution Panel MFR Manufacturer MFS Main Fused Disconnect Switch MH Manhole MIC Microphone MIN Minimum MISC Miscellaneous MLO Main Lugs Only MMS Manual Motor Starter MOA Multioutlet Assembly MSP Motor Starter Panelboard MSBD Main Switchboard MSS Motor Starter Switch MT Mount MT.C Empty Conduit MTS Manual Transfer Switch MTR Motor, Motorized N.C. Normally Closed NEC National Electrical Code NEMA National Electrical
Manufacturer's Association NFDS Non-Fused Safety Disconnect
Switch NIC Not In Contract NL Night Light N.O. Normally Open NPF Normal Power Factor NTS Not To Scale OC On Center OH Overhead OL Overloads PA Public Address PB Pull Box Or Pushbutton PE Pneumatic Electric PED Pedestal PF Power Factor PH Phase PIV Post Indicating Valve PNL Panel PP Power Pole PR Pair PRI Primary PROJ Projection PRV Power Roof Ventilator PT Potential Transformer PVC Polyvinyl Chloride (Conduit) PWR Power QUAN Quantity RCPT Receptacle REQD Required RM Room RSC Rigid Steel Conduit RTU Roof Top Unit SC Surface Conduit SEC Secondary SHT Sheet SIM Similar SLD Single-Line Diagram S/N Solid Neutral SPEC Specification SPKR Speaker SP Spare SPP Single-Point Power SR Surface Raceway SS Stainless Steel SSW Selector Switch S/S Stop/Start Pushbuttons STA Station STD Standard SURF Surface Mounted SW Switch SWBD Switchboard SYM Symmetrical SYS System TEL Telephone TERM Terminal TL Twist Lock TR Tamper Resistant T-STAT Thermostat TTC Telephone Terminal Cabinet TV Television TVTC Television Terminal Cabinet TYP Typical UC Under Counter UE Underground Electrical UG Underground UH Unit Heater UT Underground Telephone UTIL Utility UV Ultraviolet V Volt VA Volt-Amperes VDT Video Display Terminal VERT Vertical VFD Variable Frequency Drive VOL Volume W Watt W/ With WG Wire Guard WH Water Heater W/O Without WP Weatherproof XFMR Transformer XFR Transfer
∠ Angle @ At ▲ Delta ' Feet " Inches # Number Ø Phase C Center Line P Plate
Exit Light, Wall-Mounted.
Shading and arrows indicate faces and directional chevrons.
Wall-mounted fixtures, Typical (Various Symbols)
Emergency Lighting Unit, Wall-Mounted, Remote Battery
Emergency Lighting Unit, Wall-Mounted, Integral Battery
Emergency Lighting Unit, Ceiling-Mounted, Integral Battery Emergency Lighting Unit, Ceiling-Mounted, Remote Battery
Lighting Fixtures, Typical, Rectangular (Various Symbols) Filled circles indicate recessed.
Open circles indicate surface-mounted.
Diagonal line indicates lensed.
Outer dots indicate suspended.
Lighting Fixtures, Typical, Round (Various Symbols) Center dot indicates pendant.
Diagonal line indicates lensed.
Chevron indicates wall wash.
Strip Fixture
Directional Light, Track Light, Flood Light
Exit Light, Ceiling-Mounted.
Shading and arrows indicate faces and directional chevrons.
Linear Light, Tape Light
Exit/ELU Combo
Diagonal hatch indicates light on a critical circuit.
Solid hatch indicates light on an emergency or life safety circuit.
Pole/Area Lights
Post-Top Area Light
Bollard Light
Single-Pole Switch Two-Pole Switch Three-Pole Switch Switch Modifiers:
3: 3-Way 4: 4-Way K: Keyed D: Dimming T: Timer
OS: Occupancy Sensor VS: Vacancy Sensor AC: Above-Counter LV: Low-Voltage M: Motor-Rated
Lighting Contactor
Lighting Control Panel
Occupancy Sensor
Daylight Harvesting Sensor
Smoke Detector
Heat Detector
Carbon Monoxide Detector
Beam Detector T: Transmitter R: Receiver
Combination Detector (Up to Three)
Duct Smoke Detector
Manual Pull Station
Horn, Wall
Horn, Ceiling
Strobe, Wall, Candela as indicated
Strobe, Ceiling, Candela as indicated
Horn/Strobe, Wall, Candela as indicated
Horn/Strobe, Ceiling, Candela as indicated
Remote Indicator w/ Test Switch, Wall
Remote Indicate w/ Test Switch, Ceiling
Door Holder
Door Closer
Fire Service Phone
Addressible Module AIM: Addressible Input Module AOM:Addressible Output Control Module AIO: Addressible Input/Output Module
Fire Alarm Control Unit EVAC: Voice Evacuation Control Panel FAA: Fire Alarm Annunciator FACP: Fire Alarm Control Panel FATC: Fire Alarm Terminal Cabinet NACP: Notification Appliance Circuit Panel FAMN: Fire Alarm Mass Notification Control Panel
Supervisory or Interface Device PIV: Post Indicator Valve Supervisory PS: Pressure Switch R: Non-Addressible Relay VS: Valve Supervisory Switch WF: Water Flow Switch
Simplex Receptacle
Duplex Receptacle
Quadruplex Receptacle
Special Receptacle, Type as Indicated
W all
Ce ilin g
Flo or
Receptacle Modifiers:
##": Height AFF OC AC: Above Counter GFI: Ground-Fault Circuit Interrupter WP: Weatherproof In-Use Cover
Half shading indicates split (typically switched) Outside shading indicates emergency circuit Center shading indicates isolated ground
Multioutlet Assembly Filled squares indicate 120V outlet Open squares indicate with USB
Cord Reel, Device Varies
Drop Cord, Device Varies
Junction Box Floor Box, see schedule for type
Emergency Power Off
Door Opener Push Plate
Power Meter Safety Switch, Fused
Safety Switch, Unfused
Motor Starter
Combination Starter/Disconnect
Ground Rod
Ground Rod with Test Well
Lightning Protection Air Terminal
Lightning Protection Conductor Splice
Static Ground Receptacle
Data Outlet
Telephone Outlet
Data/Telephone Outlet
W all
Ce ilin g
Flo or
Outlet Modifiers:
##": Height AFF OC AC: Above Counter
Wireless Access Point
Nurse Call Corridor Light Number of lights as indicated
Nurse Call Device B: Code Blue D: Duty Station E: Emergency P: Patient Call S: Staff
TV Outlet
Nurse Call Control Unit NCAP: Nurse Call Annunciator Panel NCHS: Nurse Call Host Constroller NCPA: Nurse Call Power Supply NCTC: Nurse Call Terminal Cabinet NCUPS: Uninterruptable Power Supply
Lighting Symbols
Contactor
Single-Pole Switch Two-Pole Switch Three-Pole Switch Switch Modifiers:
K: Keyed T: Timer AC: Above-Counter M: Motor-Rated
Fire Alarm Symbols
Grounding and Lightning Protection Symbols
Security Camera PTZ: Pan/Tilt/Zoom
Card Reader
Card Reader with Keypad
Closed Circuit TV Outlet
Door Contact
Electric Strike
Intercom
Magnetic Lock
Request to Exit Button
Request to Exit Sensor
Motion Detector
Security Control Unit SCP: Security Control Panel SPS: Security Power Supply Unit
Telecom Symbols
Nurse Call Symbols
Security Symbols a
A A1a
Equipment is tagged with Panel Name and with Panel ID in parentheses. Panel ID is intended as a design documentation aid only. Do not include Panel ID in field-applied circuit directories or labels.
Hatched fill indicates distribution panel or switchboard.
Solid fill indicates branch panel or load center.
Dashed box indicates code-required clearance (width and depth).
Door indicates front of recessed panel.
Panelboards are assigned an abbreviated indicator (or Panel ID) for use with circuit numbers. Panel ID is listed within the panel schedule and in the panel abbreviation schedule.
Power Distribution Equipment
HP
1A
(B
LP
1A
(C
MD
P(
A)
SB1(S)
Devices and fixtures are tagged with Panel ID and circuit number. For example, a device tagged with "A1" indicates the device is circuited to panel designated "A," circuit number 1. The panel schedule circuit number contans both the panel abbreviation and the circuit number.
XX-1
Transformer: Typically transformer names begin with or contain the letter "T". See Single-Line Diagram for description and requirements.
T1
Dashed, arced lines connecting equipment, devices, or fixtures indicate switched power.
Absence of a switch designation on a lighting fixture indicates fixture is controlled by the only switch in the space. An "x" in place of the switch designation indicates unswitched.
Bottom Value, Lowercase Letter: Switch ID
Lighting Tags
Top Value: Fixture Type ID (Underlined)
Bottom Value, Uppercase Letter(s): Panel ID Bottom Value, Number(s): Circuit Number a a
C1a L1 L2 L3
Wiring
Power Device and Equipment Tags
Construction Phasing
Existing to Remain
Existing to Be Demolished
New
(Typical All Symbols and Equipment)
Existing to Be Demolished
Area Not in Contract
Miscellaneous
Keynote
Callout:
Top Value: Detail Number on Sheet Bottom Value: Sheet Number of Detail
Room Name and Number
Smoke Damper
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseDESIGNER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
BID DOCUMENTS
4400 W THIRD ST. DAYTON, OH 45428
810CM3033
BID DOCUMENTS
C :\U se rs
\a w eb er
\D oc um en ts \1
_D ay to n
N C
A_ E_
R
_a w eb er
S4
6.
rv t 1/
/2
:4
2:
P M
E-001
ELECTRICAL SYMBOLS,
ABBREVIATIONS, GENERAL NOTES
FEBRUARY 5, 2026 WH ATW
Project Number
Electrical Sheet List
E-001 ELECTRICAL SYMBOLS,
ABBREVIATIONS, GENERAL NOTES
ES101 ELECTRICAL SITE PLAN
E501 ELECTRICAL DETAILS
Revisions: Date:
ARCHITECT/ENGINEER OF RECORDCONSULTANTS
Revisions:
1 3 6 0 5 1 s t A v e . N . # 1 0 0 P l y m o u t h , M N 5 5 4 4 1 P 7 6 3 . 4 1 2 . 4 0 0 0 | F 7 6 3 . 4 1 2 . 4 0 9 0 | a e - m n . c o m Anderson Engineering of Minnesota, LLC | Proj # 18125Date:
GEOTECHNICAL
TERRACON
JEFF DUNLAP, PE
IRRIGATION
WATER IN
MOTION, INC.
TIMOTHY MALOOLY
COST ESTIMATING
OCMI
KYLE VEATER
175 James Avenue North Minneapolis, MN 55405 952.229.1911
611 Lunken Park Drive Cincinnati, Ohio 45226 513.612.9020
2100 North Greenville Ave. Richardson, Texas 75082 469.431.0571
U.S. Department of Veterans Affairs
Office of Design and Construction
Services
E-001
J J
J
J
J
937937
937 938938
933 933
928929
1931931
933934
92993
94194
928929
991191
92392
911912
G
R
A
V
E
L
G R A V E L A R E A
EDGE OF GRAVEL
EDGE OF GRAVEL
G R A V E L
P A T H
G R A V E L P A T H
EDGE OF GR
AVEL
E D G E
O F G R A V E L
SECTION 15
SECTION 13
SECTION 12
SECTION 17
SECTION 19B SECTION 19A
SECTION 19
SECTION 6 SECTION 5
SECTION 2
SECTION A
SECTION G
SECTION I
SECTION R
SECTION 18B
MEMORIAL
SECTION
A
MEMORIAL
SECTION
B
MEMORIAL
SECTION
C
SECTION 9 SECTION8 SECTION 7
SECTION 14
SECTION 16
SECTION 18
SECTION 4
SECTION 3
SECTION 1
SECTION 11
CIVILIAN SECTIO
N
SECTION 18C
SECTION P
SECTION Q
SECTION 10
SECTION N
SECTION M
SECTION L
SECTION K SECTION H
SECTION F
SECTION E
SECTION D
SECTION C
SECTION B
SECTION S
SECTION I
OP
OQ
O
O
O
O
SECTION 20
SECTION 25
SECTION 21
SECTION 24
SECTION 26
SECTION 37
SECTION 36
SECTION 38
SECTION 39
SECTION 40
SECTION 41
SECTION 42
SECTION 28
SECTION 27
SECTION 29
SECTION 30
SECTION 31
SECTION 33
SECTION 34
SECTION 35
SECTION 46
SECTION 32
G A R A G E
D A K O T A
T E X A S
A V E N U E
A V E N U
E
A V E N U E
M C M A H O N
A V E N U E
W E S T 3 R
D S T R E E
T
M I C H I G A N
A V E N U E
N E W M E X I C O
P L A C E
C O L O R A D O
O H I O
A V E N U E
O H I O
V E N
U E
O H I O
V E N U E
SIG
N (
MC
MA
HO
N&
CO
LOR
ADO
CP #200002
N=641130.385 E=1472091.638
ELEV=945.32
CP #200801
N=640509.937 E=1473258.453
ELEV=924.25
SAN. SEWER MANHOLE
RIM = 936.61
INV E 12" - 15" VCP = 925.75
INV SE 8" VCP = 931.08
INV S 12" - 15" VCP = 926.07
STRUCTURE BOTTOM = 925.75
SAN. SEWER MANHOLE
RIM = 935.62
INV NE 12" - 15" VCP = 924.48
INV W 12" - 15" VCP = 924.65
STRUCTURE BOTTOM = 924.48
SAN. SEWER MANHOLE
RIM = 929.18
INV NE 12" VCP = 920.32
INV SW 12" VCP = 920.55
STRUCTURE BOTTOM = 920.32
SAN. SEWER MANHOLE
RIM = 939.42
INV W 12" VCP = 927.36
INV NE 12" VCP = 927.36
STRUCTURE BOTTOM = 927.36
SAN. SEWER MANHOLE
RIM = 938.65
INV E 12" VCP = 929.12
INV SW 12" VCP = 929.20
STRUCTURE BOTTOM = 929.12
SAN. SEWER MANHOLE
RIM = 921.32
TOP NW 18" VCP = 919.22' (NOT OPEN)
INV NORTH 12" VCP = 913.37
INV NE 18" VCP = 912.26
TOP SE 18" VCP = 919.22 (NOT OPEN)
INV SW 18" VCP = 912.26
STRUCTURE BOTTOM = 912.26
SAN. SEWER MANHOLE
RIM = 922.26
INV NE 18" VCP = 916.56
INV SW 18" VCP = 916.56
STRUCTURE BOTTOM = 916.56
SAN. SEWER MANHOLE
RIM = 931.69
INV NW 12" VCP = 926.84
INV NE 18" VCP = 926.29
INV SW 18" VCP = 926.29
STRUCTURE BOTTOM = 926.29
SAN. SEWER MANHOLE
RIM = 931.54
INV WEST 8" VCP = 926.89
INV SE 12" VCP = 926.89
INV SW 12" VCP = 926.89
STRUCTURE BOTTOM = 926.89
SAN. SEWER MANHOLE
RIM = 917.24
INV NE 18" VCP = 908.84
INV SW 18" VCP = 910.67
STRUCTURE BOTTOM = 908.84
SAN. SEWER MANHOLE
RIM = 939.45
INV NORTH 15" VCP = 933.19
INV NE 15" VCP = 933.21
INV EAST 15" VCP = 932.71
INV SOUTH 15" VCP = 932.71
STRUCTURE BOTTOM = 932.71
TOP OF 4" NE & SW = 936.06
SAN. SEWER MANHOLE
RIM = 943.16
INV NE 8" VCP = 937.32
INV SW 8" VCP = 937.32
BOTTOM OF STRUCTURE = 937.32
SAN. SEWER MANHOLE
RIM = 914.39
INV NORTH 6" PVC = 903.89
INV NE 8" PVC = 903.54
INV SW 8" VCP = 903.79
STRUCTURE BOTTOM = 903.54
SAN. SEWER MANHOLE
RIM = 903.62
INV NORTH 8" VCP = 897.35
INV SOUTH 8" VCP = 897.38
INV SW 8" VCP = 897.84
STRUCTURE BOTTOM = 897.35
SAN. SEWER MANHOLE
RIM = 911.32
NV NORTH = 898.45
INV SOUTH 8" VCP = 898.45
STRUCTURE BOTTOM = 898.45
BRICKS MISSING ON WEST SIDE
10.50' BELOW NO PIPE VISIBLE
SAN. SEWER MANHOLE
RIM = 925.55
INV NW 18" VCP = 915.84
INV SOUTH 18" VCP = 915.74
INV SW 12" VCP = 917.76
INV WEST 8" VCP = 920.20
STRUCTURE BOTTOM = 915.74
SAN. SEWER MANHOLE
RIM = 899.66
INV NORTH (SEALED PIPE)
INV NW 12" VCP = 895.11
INV SOUTH 12" VCP = 895.16
STRUCTURE BOTTOM = 895.11
SAN. SEWER MANHOLE
RIM = 899.46
INV NORTH 8" PVC = 894.71
INV SE 8" PVC INSIDE OF 12" PVC = 894.81
STRUCTURE BOTTOM = 894.71
CURB INLET
RIM = 927.45
INV NORTH 8" VCP = 926.00
INV SOUTH 8" VCP = 925.87
STRUCTURE BOTTOM = 925.85
CURB INLET
RIM = 927.40
INV WEST 8" VCP = 925.97
INV SOUTH 8" VCP = 925.95
STRUCTURE BOTTOM = 925.65
CURB INLET
RIM…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .