S001.pdf
PDF 458 KB Posted
- Solicitation number
- 36C78626B0007
About this file
This is a structural design note sheet for the Dayton National Cemetery Gravesite Expansion project located at 4400 W Third Street, Dayton, Ohio 45428. The document establishes comprehensive design and construction standards governing all structural work on the project.
All work must comply with the PG-18-10 Structural Design Manual (7/1/2023) as approved by the Department of Veterans Affairs, along with the International Building Code 2024, ASCE/SEI 7-22, and VA Handbook H-18-8 Seismic Design Requirements. The contractor is responsible for verifying all contract documents, site conditions, and dimensions prior to commencing work and must notify the architect/engineer of any discrepancies. The contractor bears sole responsibility for temporary bracing, shoring, and structural protection during all demolition, construction, and installation phases. Design loads include wind loads (100 mph ultimate wind speed, 78 mph nominal, Importance Factor 1.0, Wind Exposure C) and seismic loads (Risk Category I, Seismic Design Category B, with specified spectral response parameters). Foundation design references a Geotechnical Report dated 04/04/2025 by Terracon and specifies minimum net allowable soil bearing pressures of 2,500 psf for continuous footings and 1,500 psf for pad footings. Concrete construction must conform to ACI codes with cast-in-place concrete compressive strengths of 5,000 psi for footings, walls, and piers. The document includes detailed reinforcing steel specifications, concrete cover requirements, lap splice schedules, and control joint spacing standards. A delegated design submittal requirement specifies that the contractor shall provide structural design of precast concrete columbarium units, stamped and signed by a state-licensed engineer, including design calculations for unit fabrication, connections to structural foundations, unit-to-unit connections, and connections to natural stone caps, with review by the Engineer of Record for code compliance and primary structure compatibility.
View the file
Other files
Show all 44
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL CONSTRUCTION NOTES:
1. ALL WORK SHALL COMPLY WITH THE PG-18-10 STRUCTURAL DESIGN MANUAL
DATED 7/1/2023 AS APPROVED BY THE DEPARTMENT OF VETERANS AFFAIRS. THE
FOLLOWING CODES APPLY:
-INTERNATIONAL BUILDING CODE 2024
-ASCE/SEI 7-22
-VA HANDBOOK H-18-8 SEISMIC DESIGN REQUIREMENTS
2. REFERENCE STANDARDS: UNLESS OTHERWISE NOTED (U.O.N.), ALL STANDARDS
SHALL BE CURRENT EDITION, WITH LATEST ADDENDA, IF APPLICABLE.
3. THE CONTRACTOR SHALL VERIFY ALL CONTRACT DOCUMENTS, SITE
ELEVATIONS, DIMENSIONS AND CONDITIONS PRIOR TO STARTING WORK AND
SHALL NOTIFY THE ARCHITECT/ ENGINEER OF ANY DISCREPANCIES OR
INCONSISTENCIES.
4. SPECIFIC NOTES AND DETAILS SHALL TAKE PRECEDENCE OVER GENERAL
NOTES.
5. THE CONTRACT STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE
FINISHED STRUCTURE. UNLESS OTHERWISE INDICATED, THEY DO NOT INDICATE
THE MEANS OR METHOD OF CONSTRUCTION. TEMPORARY BRACING AND
SHORING AGAINST WIND AND ERECTION CONDITIONS DURING CONSTRUCTION
OF THE BUILDING, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE
CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PROTECTION OF THE
STRUCTURE DURING ALL PHASES OF DEMOLITION, CONSTRUCTION, AND
INSTALLATION.
6. NO AREA OF THE STRUCTURE SHALL BE LOADED WITH CONSTRUCTION
MATERIALS OR EQUIPMENT THAT EXCEEDS FINAL DESIGN CRITERIA.
7. VERIFY LOCATION OF BOX OUTS AND OPENINGS WITH MECHANICAL
CONTRACTORS. OPENING SIZES AND LOCATIONS SHOWN FOR PIPES, DUCTS ETC.
ARE FOR GENERAL INFORMATION ONLY AND SHALL BE VERIFIED WITH THE
MECHANICAL CONTRACTOR BEFORE COMMENCING THE WORK.
8. IF MECHANICAL AND ELECTRICAL EQUIPMENT SIZES, WEIGHTS, OR LOCATIONS
DO NOT COINCIDE WITH EQUIPMENT SHOWN ON PLANS, COORDINATE
ADJUSTMENTS WITH THE STRUCTURAL ENGINEER.
9. HOLES, PIPES, SLEEVES, ETC. NOT SHOWN ON THE DRAWINGS MUST BE
APPROVED BY THE STRUCTURAL ENGINEER BEFORE PLACEMENT THROUGH
STRUCTURAL MEMBERS.
10. CONTRACTOR SHALL PROVIDE A CAST-IN SLEEVE FOR ALL HORIZONTAL
ELEMENTS THAT EXTEND THROUGH FOOTING. IE: DRAIN TILE, ELECTRICAL
CONDUIT, MECHANICAL PIPING, ETC. ALL SLEEVES SHALL BE COORDINATED
WITH ARCHITECT/ENGINEER.
11. SHOP DRAWINGS PREPARED BY SUPPLIERS, SUBCONTRACTORS, ETC., SHALL BE
DIMENSIONED, REVIEWED, COORDINATED, AND SIGNED/ STAMPED BY THE
GENERAL CONTRACTOR PRIOR TO SUBMITTING TO THE STRUCTURAL ENGINEER.
12. FABRICATOR SHALL CLEARLY NOTE CHANGES MADE IN THE SHOP DRAWINGS
WHICH DO NOT COMPLY WITH THE CONTRACT DOCUMENTS. REVIEWED
APPROVAL SHOP DRAWINGS SHOWING ENGINEERS COMMENTS ACCOMPANIED
WITH RECORD SET SHOP SHOP DRAWINGS, SHALL BE AVAILABLE FOR
REFERENCE AT THE CONSTRUCTION SITE.
13. CONCRETE ANCHORS SHALL BE SIMPSON 'TITEN HD" SCREW ANCHORS OR
EQUIVALENT (U.O.N.). INSTALL ANCHORS USING THE MANUFACTURER'S
RECOMMENDATIONS.
FOUNDATION NOTES:
1. FOOTING ELEVATIONS ARE TO TOP OF FOOTING (T.O. FTG.), UNLESS
OTHERWISE NOTED.
2. FOOTINGS ARE DESIGNED FOR A MINIMUM NET ALLOWABLE SOIL
BEARING PRESSURE OF 2500psf FOR CONTINUOUS AND 1500 psf FOR
PAD FOOTINGS. FOUNDATION DESIGN COMPLIES W/ GEOTECHNICAL
REPORT DATED: 04/04/2025 BY TERRACON
3. FOOTINGS SHALL BEAR ON NATURAL UNDISTURBED SOIL OR
ENGINEERED FILL. SOILS SHALL BE OBSERVED AND APPROVED BY A
GEOTECHNICAL ENGINEER PRIOR TO PLACEMENT OF FOOTING
CONCRETE. IF NATURAL UNDISTURBED SOILS ARE NOT
ENCOUNTERED AND/OR INADEQUATE SOILS ARE NOTED AT FOOTING
BEARING LEVEL, ARCHITECT/ENGINEER SHALL BE NOTIFIED PRIOR TO
PROCEEDING WITH FURTHER WORK AT THOSE FOOTING LOCATIONS.
4. PROTECT FOOTINGS FROM THE ACTION OF WATER OR FREEZING.
5. FOOTINGS ARE CENTERED UNDER WALLS ABOVE - UNLESS
OTHERWISE NOTED.
6. PRIOR TO PLACEMENT OF FOOTING CONCRETE, CLEAN FOOTING
EXCAVATIONS OF SNOW, WATER AND DEBRIS.
7. FOOTINGS MAY NOT BE EARTH FORMED.
EXCAVATION & BACKFILL NOTES:
1. EXCAVATION AND BACKFILL SHALL BE EXECUTED IN ACCORDANCE WITH THE
PROJECT SPECIFICATIONS.
2. BACKFILL, & COMPACTION SHALL BE INSPECTED AND CERTIFIED BY A LICENSED
GEOTECHNICAL ENGINEER. REPORTS ARE TO BE SUBMITTED TO THE
ARCHITECT/ ENGINEER.
3. FOOTING EXCAVATIONS SHALL BE EXCAVATED TO PROPER LINE AND LEVEL TO
ENSURE MINIMUM CONCRETE COVER OF FOOTING REINFORCEMENT FOR
FOOTING DEPTH.
4. BACKFILL SHALL BE COMPACTED BY MECHANICAL MEANS. FLOODING OR
WATER INUNDATION SHALL NOT BE PERMITTED.
5. BACKFILL SHALL BE PLACED IN ALTERNATING LIFTS ON EACH SIDE OF THE
FOUNDATION WALLS TO MAINTAIN STABILITY OF THE FOUNDATION WALLS.
6. BACKFILL SHALL NOT BE PLACED AGAINST BASEMENT FOUNDATION WALLS
UNLESS WALLS ARE ADEQUATELY BRACED TOP AND BOTTOM. FINAL WALL
BRACING IS BASEMENT SLAB OR ENGINEERED BACKFILL AND 1ST FLOOR
STRUCTURE. IF THESE ELEMENTS ARE NOT IN PLACE AT TIME OF BACKFILL,
CONTRACTOR SHALL PROVIDE AN ENGINEERED, TEMPORARY BRACING
SYSTEM. THE TEMPORARY BRACING SYSTEM PROPOSED SHALL BE SUBMITTED
TO THE ARCHITECT/ ENGINEER FOR REVIEW PRIOR TO BACKFILLING.
CONCRETE NOTES:
1. CONCRETE CONSTRUCTION SHALL CONFORM TO AMERICAN CONCRETE
INSTITUTE (ACI) CODES AND SPECIFICATIONS, LATEST EDITION. ACI 301
"SPECIFICATIONS FOR STRUCTURAL CONCRETE" ACI 315 "DETAILS &
DETAILING OF CONCRETE REINFORCEMENT" ACI 318 "BUILDING CODE
REQUIREMENTS FOR REINFORCED CONCRETE".
2. CONCRETE MIX DESIGN SHALL BE BY AN INDEPENDENT TESTING
LABORATORY.
3. CAST-IN-PLACE CONCRETE SHALL BE SUBJECT TO TESTING BY AN
INDEPENDENT TESTING LABORATORY. SEE PROJECT SPECIFICATIONS FOR
REQUIREMENTS.
4. NON WELDED REINFORCING STEEL SHALL BE GRADE 60 DEFORMED,
BILLET-STEEL, ASTM A615, U.O.N. ALL WELDED WIRE FABRIC (WWF) SHALL
BE PLAIN, ASTM A185.
5. WELDED REINFORCING STEEL SHALL BE GRADE 60, LOW CARBON, ASTM
A706.
6. PROVIDE EXTRA REINFORCEMENT AROUND ALL OPENINGS GREATER THAN
12" SQUARE OR 12" IN DIAMETER, INCLUDING DOOR OPENINGS, IN
CONCRETE WALLS & SLABS. PROVIDE 2 - #5 BARS @ 3" O.C., ON EACH SIDE
OF THE OPENING EXTENDING 24" BEYOND THE CORNER OF THE OPENING &
2 - #5 BARS AT 3" O.C. BY 3'-0" LONG DIAGONAL BARS AT EACH CORNER.
PLACE DIAGONAL BARS CENTERED ON CORNER @ 2" CLEAR OF CORNER.
ADDITIONAL REINFORCEMENT SHALL BE PROVIDED AT EACH LAYER OF
REINFORCING.
7. REINFORCING STEEL SHALL BE BENT, SPLICED, AND PLACED IN
ACCORDANCE WITH THE ACI 301 (LATEST EDITION).
8. PROVIDE ADEQUATE SUPPORT BARS AND ACCESSORIES TO HOLD
REINFORCING BARS FIRMLY IN PLACE TO SPECIFIED COVERAGES.
9. CONTROL JOINTS SHALL BE PLACED IN A SQUARE PATTERN WITH A
MAXIMUM SPACING OF 10' - 0" O.C. FOR 4" THICK SLAB, 12' - 0" O.C. FOR 5"
THICK SLAB, 15' - 0" O.C. FOR 6" THICK SLAB. WHERE A SQUARE PATTERN IS
NOT POSSIBLE, THE MAXIMUM LONG SIDE TO SHORT SIDE OF THE JOINT
PATTERN SHALL NOT EXCEED A RATIO OF 1.5:1. CONSTRUCTION JOINTS
SHALL BE LOCATED BY THE CONTRACTOR AS REQUIRED FOR
CONSTRUCTION WITH A MAXIMUM OF 3,000 SQUARE FEET.
10. CAST DOWELS, WITH STD 90 DEGREE HOOK, IN FOOTINGS FOR CONCRETE
PIERS AND WALLS ABOVE. DOWELS SHALL BE THE SAME SIZE AND NUMBER
AS THE VERTICAL REINFORCING. (U.O.N.)
11. CONCRETE MIX DESIGNS REQUIREMENTS: - AGGREGATES SHALL
CONFORM TO ASTM C33. - CONCRETE EXPOSED TO FREEZE THAW SHALL
HAVE 4.5%-7.5% AIR. - WATER/CEMENT RATIO 0.4 MAX. FOR FOOTINGS AND
WALLS, 0.4 MAX. FOR SLABS - NO FLY ASH IN EXPOSED SLABS, 0.25 MAX.
FLY ASH/CEMENT RATIO IN ALL OTHER APPLICATIONS - WATER PROOFING
ADMIXTURE ADD FOR EXTERIOR EXPOSED CONCRETE.
12 INJECTION ADHESIVE ANCHORS SHALL BE SIMPSON "SET-3G" USING
STANDARD 36 KSI THREADED RODS (U.O.N.). SEE SPECIFICATIONS FOR
USAGE. INSTALL ANCHORS IN STRUCTURAL CONFORMANCE WITH THE
MANUFACTURER'S RECOMMENDATIONS.
CAST-IN-PLACE CONCRETE COMPRESSIVE STREGNTHS
FOOTINGS 5000 psi
EXTERIOR FOUNDATION WALLS 5000 psi
PIERS 5000 psi
WALLS 5000 psi
REINFORCING CLEAR CONCRETE COVER
CONCRETE ON SOIL 3"
SLABS ON GRADE MIDHEIGHT
FORMED WALLS & STRUCTURAL SLABS EXPOSED TO EARTH OR
WEATHER: #6 THRU #18
2"
FORMED WALLS & STRUCTURAL SLABS EXPOSED TO EARTH OR
WEATHER: #5 OR SMALLER
1 1/2"
FORMED WALLS & STRUCTURAL SLABS NOT EXPOSED TO EARTH OR
WEATHER: #11 AND SMALLER
3/4"
BEAMS AND COLUMNS (COVER TO STIRRUPS OR TIES) 1 1/2"
CONC. REINFORCING BAR LAP SPLICE
SCHEDULE
BAR SIZE
f'c = 3000 psi.
f'c = 4000 psi.
f'c = 5000 psi.
CLASS
"B"
CLASS
"B"
CLASS
"B"
#3 22" 20" 18"
#4 30" 26" 22"
#5 36" 32" 28"
#6 44" 38" 34"
#7 64" 54" 50"
#8 72" 62" 56"
#9 82" 70" 64"
#10 92" 80" 70"
#11 102" 88" 78"
BAR LAP SCHEDULE NOTES:
A. REINFORCING BAR LAP SPLICE SCHEDULE APPLIES TO UNCOATED, GRADE 60
REINFORCING BAR NORMAL WEIGHT CONCRETE.
B. PROVIDE CLASS "B" LAP UNLESS OTHERWISE NOTED.
C. FOR EPOXY COATED BAR, MULTIPLY THE NOTED LENGTHS BY 1.5.
D. FOR LIGHT WEIGHT CONCRETE, MULTIPLY THE NOTED LENGTHS BY 1.3.
E. MAXIMUM SPACING OF BARS BEING LAPPED IS ONE FIFTH THE LAP SPLICE
LENGTH, NOT TO EXCEED 6".
F. TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12" OF FRESH CONCRETE
PLACED BELOW HORIZONTAL REINFORCEMENT.FOR TOP BARS, MULTIPLY THE
NOTED LENGTHS BY 1.3.
16. DESIGN LOADS:
LATERAL LOADS (WIND -
MSFRS)
IMPORTANCE FACTOR 1.0 Iw
ULTIMATE WIND SPEED (3 SECOND GUST) 100MPH.
NOMINAL WIND SPEED 78MPH.
RISK CATEGORY I
WIND EXPOSURE "C"
INTERNAL PRESSURE COEFF +/- 0.18
LATERAL LOADS
(SEISMIC - MSFRS)
RISK CATEGORY l
SEISMIC IMPORTANCE FACTOR Ie = 1
MAPPED SPECTRAL RESPONSE Ss = 0.2
MAPPED SPECTRAL RESPONSE S1 = 0.08
DESIGN SPECTRAL RESPONSE Sds = 0.14
DESIGN SPECTRAL RESPONSE Sd1 = 0.07
SITE CLASS C
SEISMIC DESIGN CATEGORY B
SEISMIC FORCE RESISTING SYSTEM RIGID
NON-BUILDING
STRUCTURE
DESIGN BASE SHEAR V = 0.042W
SEISMIC RESPONCE COEFFICIENT Cs = 0.042
RESPONSE MODIFICATION FACTOR N/A
ANALYSIS PROCEDURE RIGID
NON-BUILDING
STRUCTURE
ABBREVIATIONS & SYMBOLS:
+/- PLUS OR MINUS
@ AT
A.B. ANCHOR BOLT
A.P.A. AMERICAN PLYWOOD
ASSOCIATION
A.S.T.M. AMERICAN SOCIETY OF TESTING
MATERIALS
ARCH. ARCHITECTURAL
B.B. BOND BEAM
B.O. BOTTOM OF
BLK. BLOCK
BM. BEAM
BOT. BOTTOM
BRG. BEARING
C CHANNEL
C.M.U. CONCRETE MASONRY UNIT
CCJ CONSTRUCTION CONTROL JOINT
CJ CONTROL JOINT
CL. CENTER LINE
CLR. CLEAR
COL. COLUMN
CONC. CONCRETE
CONN. CONNECTION
CONT. CONTINUOUS
D.L. DEAD LOAD
D.T. DOUBLE TEE / DRAIN TILE
DBL. DOUBLE
DIA. DIAMETER
DIM. DIMENSION
DWL. DOWEL
E.F. EACH FACE
E.J. EXPANSION JOINT
E.W. EACH WAY
EA. EACH
EL. ELEVATION
ELEV. ELEVATOR
EQ. EQUAL
EX. EXISTING
EXC. EXCAVATION
EXP. EXPANSION
F.D. FLOOR DRAIN
FDN. FOUNDATION
FT. FEET
FTG. FOOTING
G.C. GENERAL CONTRACTOR
G.T. GIRDER TRUSS
GA. GAUGE
GALV. GALVANIZE
HC. HOLLOWCORE
HORIZ. HORIZONTAL
HSS HOLLOW STRUCTURAL SECTION
I.F. INSIDE FACE
INT. INTERIOR
JST. JOIST
KLF. KIPS PER LINEAR FOOT
KSI. KIPS PER SQUARE INCH
L ANGLE
LB LEDGER BEAM
LL LIVE LOAD / DOUBLE ANGLE
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG. LONGITUDINAL
LWC LIGHT WEIGHT CONCRETE
M.C. MECHANICAL CONTRACTOR
MAS. MASONRY
MAX. MAXIMUM
MECH. MECHANICAL
MFG. MANUFACTURER
MIN. MINIMUM
MISC. MISCELLANEOUS
MTL. METAL
N. NORTH
N.T.S. NOT TO SCALE
NS. NON-SHRINK
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.F. OUTSIDE FACE
O.H. OVERHEAD
OPNG. OPENING
ORIG. ORIGINAL
P.A.F. POWDER ACTUATED FASTENER
P.C. PRECAST CONCRETE
PART. PARTITION
PL. PLATE
PLF POUNDS PER LINEAR FOOT
PNL. PANEL
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PW PLYWOOD
R. OR
RAD.
RADIUS
R.D. ROOF DRAIN
REINF. REINFORCING
REQD. REQUIRED
S.A. STUD ANCHOR
S.B. SOIL BORING
S.D. SEE DETAIL
S.D.L. SUPERIMPOSED DEAD LOAD
S.E.R. STRUCTURAL ENGINEER OF
RECORD
S.L. SNOW LOAD
S.L.L. SUPERIMPOSED LIVE LOAD
S.S. STAINLESS STEEL
SCHED. SCHEDULE
SHT. SHEET
SIM. SIMILAR
SPA. SPACING / SPACES
SPECS. SPECIFICATIONS
SQ. SQUARE
STD. STANDARD
STL. STEEL
T & B TOP & BOTTOM
T & G TONGUE & GROOVE
T.M.L. TOP OF MASONRY LEDGE
T.O. TOP OF
T.O.B. TOP OF BEAM
T.O.J. TOP OF JOIST
T.O.S. TOP OF STEEL
T.O.W. TOP OF WALL
T.S.E. TOP OF STEEL ELEVATION
T.S.W. TOP OF STEM WALL
TEMP. TEMPORARY
THK. THICK / THICKENED
TRANS. TRANSVERSE
TYP. TYPICAL
U.O.N. UNLESS OTHERWISE NOTED
V. / VER. VERIFY
VERT. VERTICAL
W.L. WIND LOAD
W/ WITH
W/O WITH OUT
WD. WOOD
WTS. WEIGHTS
WWF WELDED WIRE FABRIC
DEFERRED SUBMITTAL SCHEDULE:
PRECAST COLUMBARIUM NICHES & CONNECTIONS
PRECAST MARKER WALL ON MEMORIAL WALL & CONNECTIONS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
Office of
Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IRRIGATION:
WATER IN
MOTION, INC.
GEOTECHNICAL:
TERRACON
COST ESTIMATING:
OCMI
175 JAMES AVENUE NORTH
MINNEAPOLIS, MN 55405
952.229.1911
TIMOTHY MALOOLY
611 LUNKEN PARK DRIVE
CINCINNATI, OHIO 45226
513.612.9020
JEFF DUNLAP, PE
2100 NORTH GREENVILLE AVENUE
RICHARDSON, TEXAS 75082
469.431.0571
KYLE VEATER
DAYTON NATIONAL CEMETERY
GRAVESITE EXPANSION
4400 W THIRD ST. DAYTON, OH
45428
BID DOCUMENTS
2/5/2026
C U s e rs \J
B u e rm a n n \D o c u m e n ts \1
S
R
V T jb u e rm a n n S
R X
R
.r v t
/7
/2
:2
:1
P M
NOTE SHEET
2/5/2026 SV DW18125
S-001
810-CM3033
PRE-CAST CONCRETE COLUMBARIUM UNITS - DELEGATED DESIGN REQUIREMENTS:
1. THE CONTRACTOR SHALL PROVIDE STRUCTURAL DESIGN OF THE PRE-CAST CONCRETE
COLUMBARIUM UNITS. STRUCTURAL DESIGN SHALL BE SUBMITTED BY THE CONTRACTOR TO THE
CONTRACTING OFFICER'S REPRESENTATIVE (COR) AND ENGINEER OF RECORD (EOR) AS A
DELEGATED DESIGN SUBMITTAL. DELEGATED SUBMITTALS SHALL INCLUDE DRAWINGS AND
CALCULATIONS STAMPED AND SIGNED BY AN ENGINEER APPROPRIATELY LICENSED IN THE STATE OF
CONSTRUCTION.
2. THE PURPOSE OF THE EOR'S REVIEW SHALL BE IN DETERMINING THE DRAWINGS AND
CALCULATIONS HAVE BEEN PROPERLY SEALED, THAT THE LOAD CRITERIA IS IN GENERAL
CONFORMANCE WITH THE CONTRACT DOCUMENTS AND THE REFERENCED BUILDING CODE(S), AND
THAT CONNECTIONS TO THE PRIMARY STRUCTURE COMPLY WITH THE STRUCTURE'S DESIGNED
CAPABILITIES.
INCLUDED IN THE STRUCTURAL CALCULATIONS AND DESIGN, AT MINIMUM, SHALL BE:
A. DESIGN OF PRE-CAST CONCRETE COLUMBARIUM UNITS.
B. CONNECTION OF PRE-CAST UNITS TO STRUCTURAL FOUNDATIONS, BOTTOM AND TOP.
C. CONNECTION OF PRE-CAST UNITS, BACK TO BACK AND END TO END.
D. CONNECTION OF PRE-CAST UNITS TO NATURAL STONE CAPS.
3. REFER TO SPECIFICATION 03 48 24 - PRE-CAST CONCRETE COLUMBARIUM UNITS.
4. THE STRUCTURAL ENGINEER WILL RELY ON THE SPECIALTY ENGINEER'S SEAL AS CERTIFICATION THAT THE ITEMS DESIGNED BY THE SPECIALTY ENGINEER COMPLY WITH THE CRITERIA SET FORTH IN
THE CONTRACT DOCUMENTS AND APPLICABLE CODES AND STANDARDS. THE STRUCTURAL
ENGINEER SHALL NOT BE RESPONSIBLE FOR THE ADEQUACY OF DESIGNS PROVIDED BY OTHERS.
Revisions: Date:
ADDENDUM #2 7/8/2026
AMENDMENT 022
| Sheets |
| S-001 - NOTE SHEET |
File details come from the government source that posted it. Updated .