B08_Section_J_Attachment_9_307127_Rehab_Exteriors_Ft_Yellowstone_Final_Paint_Schemes.pdf
PDF 10 MB Posted
- Attached to
- YELL 307127 - Rehabilitate historic Structures
- Solicitation number
- 140P2024R0177
About this file
This document is the Attachment 9 - Final Paint Schemes for the Rehabilitation of Historic Structures solicitation YELL 307127 issued by the National Park Service. The solicitation is for the rehabilitation and exterior painting of historic structures at Yellowstone National Park. Key details include:
The solicitation requires a contractor to provide all labor, materials, equipment, and transportation necessary to rehabilitate and paint the exterior of the historic structures. The work includes surface preparation, applying new paint systems, and repairing minor structural and architectural elements. The solicitation provides detailed specifications for the required paint colors and finishes. The period of performance is 365 calendar days from the notice to proceed. Proposals are due by June 15, 2024, and the anticipated award date is August 1, 2024. This is a small business set-aside procurement issued by the Department of the Interior, National Park Service National Office.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Park Service
Yellowstone National Park
307127 YELL Rehabilitate Exteriors of
Historic Fort Yellowstone Buildings
Paint Color Schemes
(Buildings 2, 3, 4, 6, 10, 32)
17 March 2023
DOUBLE CAPTAIN’S QUARTERS, BUILDING #02, FMSS 2815 (1909)
Building Color Charts
FIELD OFFICER’S QUARTERS, BUILDING #03, FMSS 3851 (1909)
RAFTER TAIL
SW 2833
PORCH DECK
PORCH POST
RAFTER TAIL
SW 2832
WINDOW TRIM
SW 2833
SW 2833
WINDOW JAMB
SW 6258SW 2833
WINDOW
SASH
SW 2816SW 2833
*based on sample from sister building
FRONT DOOR
WINDOW TRIM
SW 2833
SW 2833
WINDOW JAMB
SW 6258
WINDOW
SASH
*based on sample from sister building
PORCH DECK
PORCH RAIL
SW 2832
SW 2816SW 2833
FRONT DOOR
*based on sample from sister building
*based on sample from sister building
GUTTER SHINGLE SIDING SW 2816SW 2833
SW 0024
PORCH POST & RAIL
SW 2816
WINDOW TRIM
GUTTER SHINGLE SIDING SW 2816SW 2833
DOUBLE CAPTAIN’S QUARTERS, BUILDING #02, FMSS 2815 (1909)
Building Color Charts
FIELD OFFICER’S QUARTERS, BUILDING #03, FMSS 3851 (1909)
RAFTER TAIL
SW 2833
PORCH DECK
PORCH POST
RAFTER TAIL
SW 2832
WINDOW TRIM
SW 2833
SW 2833
WINDOW JAMB
SW 6258SW 2833
WINDOW
SASH
SW 2816SW 2833
*based on sample from sister building
FRONT DOOR
WINDOW TRIM
SW 2833
SW 2833
WINDOW JAMB
SW 6258
WINDOW
SASH
*based on sample from sister building
PORCH DECK
PORCH RAIL
SW 2832
SW 2816SW 2833
FRONT DOOR
*based on sample from sister building
*based on sample from sister building
SW 0024
PORCH POST & RAIL
SW 2816
WINDOW TRIM
10 Yellowstone National Park | Fort Yellowstone Paint Color Analysis | December 2021
DOUBLE OFFICER’S QUARTERS, BUILDING #04, FMSS 5944 (1897)
WINDOW
SASH
FRONT GABLE SHINGLE SIDING
SW 2833
PORCH POST
DOUBLE OFFICER’S QUARTERS, BUILDING #05, FMSS 5947 (1897)
RAFTER
BRACKET
SW 2816
SW 2816
SW 6258
FRONT GABLE SHINGLE SIDING
SW 2833
PORCH POST PORCH RAIL
SW 0024
SW 2816
SW 6258
*based on sample from sister building
*based on sample from sister building
WINDOW
SASH
CHIMNEY
CHIMNEY
WINDOW TRIM
SW 2816
WINDOW TRIM
SW 2816
SW 2816
DOOR TRIM
SW 2816
DOOR TRIM
*based on sample from sister building
*based on sample from sister building
*based on sample from sister building
SW 2833
SIDING
SW 2833
SIDING
10 Yellowstone National Park | Fort Yellowstone Paint Color Analysis | December 2021
DOUBLE OFFICER’S QUARTERS, BUILDING #04, FMSS 5944 (1897)
WINDOW
SASH
FRONT GABLE SHINGLE SIDING
SW 2833
PORCH POST
DOUBLE OFFICER’S QUARTERS, BUILDING #05, FMSS 5947 (1897)
RAFTER
BRACKET
SW 2816
SW 2816
SW 6258
FRONT GABLE SHINGLE SIDING
SW 2833
PORCH POST PORCH RAIL
SW 0024
SW 2816
SW 6258
*based on sample from sister building
*based on sample from sister building
WINDOW
SASH
CHIMNEY
CHIMNEY
WINDOW TRIM
SW 2816
WINDOW TRIM
SW 2816
SW 2816
DOOR TRIM
SW 2816
DOOR TRIM
*based on sample from sister building
*based on sample from sister building
*based on sample from sister building
SW 2833
SIDING
SW 2833
SIDING
SW 2833SW 2816
SIDING &
GUTTER
FRONT DOOR
SW 0024 SW 0024
PORCH POST & RAIL RAFTER
BRACKET
WINDOW, FASCIA,
& VENT TRIM SW 2816
SHINGLE SIDING & LOUVER
DOUBLE OFFICER’S QUARTERS, BUILDING #06, FMSS 5954 (1891)
DOUBLE OFFICER’S QUARTERS, BUILDING #07, FMSS 5956 (1891)
TRIM
SW 0024
SIDING
SW 0024
WINDOW TRIM
SW 0042
SW 6347
WINDOW
SASH
EYEBROW
WINDOW
PORCH
BRACKET
LATTICE
SW 0024SW 0024
SW 6258
TRIM
SW 0024
SIDING
SW 2816
WINDOW TRIM
SW 0042
SW 6347
WINDOW
SASH
LATTICE
SW 6258
SW 0042
SW 0042
CHIMNEY
CHIMNEY
SW 2816
WINDOW JAMB
SW 2816
WINDOW JAMB
*based on sample from sister building
*based on sample from sister building
EYEBROW
WINDOW
PORCH
BRACKET
SW 0024SW 0042
*based on sample from sister building
*based on sample from sister building
Note: Original layer of linseed oil paint present on all building components except window sash.
Note: Original layer of linseed oil paint present on all building components except window sash, jamb, and porch bracket.
10 Yellowstone National Park | Fort Yellowstone Paint Color Analysis | December 2021
DOUBLE OFFICER’S QUARTERS, BUILDING #04, FMSS 5944 (1897)
WINDOW
SASH
FRONT GABLE SHINGLE SIDING
SW 2833
PORCH POST
DOUBLE OFFICER’S QUARTERS, BUILDING #05, FMSS 5947 (1897)
RAFTER
BRACKET
SW 2816
SW 2816
SW 6258
FRONT GABLE SHINGLE SIDING
SW 2833
PORCH POST PORCH RAIL
SW 0024
SW 2816
SW 6258
*based on sample from sister building
*based on sample from sister building
WINDOW
SASH
CHIMNEY
CHIMNEY
WINDOW TRIM
SW 2816
WINDOW TRIM
SW 2816
SW 2816
DOOR TRIM
SW 2816
DOOR TRIM
*based on sample from sister building
*based on sample from sister building
*based on sample from sister building
SW 2833
SIDING
SW 2833
SIDING
SW 2833SW 2816
SIDING &
GUTTER
FRONT DOOR
SW 0024 SW 0024
PORCH POST & RAIL RAFTER
BRACKET
WINDOW, FASCIA,
QUARTERMASTER STOREHOUSE, BUILDING #10, FMSS 6022 (1891/1909/1926)
COMMISSARY, BUILDING #11, FMSS 6023 (1891/1909/1926)
WINDOW
SASH
SW 6258
WINDOW
SASH
FASCIA TRIM
SW 6258SW 2816
SHINGLE
SIDING
*based on sample from sister building
SW 2816
SHINGLE
SIDING
*based on sample from sister building
SW 0024
VENT TRIM/
LOUVERS
PORCH
POST
SW 2816SW 0024
FRONT
DOOR
*based on sample from sister building
SW 0024
VENT TRIM/
LOUVERS
PORCH
POST
SW 2816SW 0024
FRONT
DOOR
*based on sample from sister building
FASCIA TRIM
SW 2833
WINDOW TRIM
SW 2833
SW 2833
WINDOW JAMB
*based on sample from sister building
SW 2833
SIDING
*sample taken from later alteration
FASCIA TRIM
SW 2833
WINDOW TRIM
SW 2833
SW 2833
WINDOW JAMB
*based on sample from sister building
SW 2833
SIDING
10 Yellowstone National Park | Fort Yellowstone Paint Color Analysis | December 2021
DOUBLE OFFICER’S QUARTERS, BUILDING #04, FMSS 5944 (1897)
WINDOW
SASH
FRONT GABLE SHINGLE SIDING
SW 2833
PORCH POST
DOUBLE OFFICER’S QUARTERS, BUILDING #05, FMSS 5947 (1897)
RAFTER
BRACKET
SW 2816
SW 2816
SW 6258
FRONT GABLE SHINGLE SIDING
SW 2833
PORCH POST PORCH RAIL
SW 0024
SW 2816
SW 6258
*based on sample from sister building
*based on sample from sister building
WINDOW
SASH
CHIMNEY
CHIMNEY
WINDOW TRIM
SW 2816
WINDOW TRIM
SW 2816
SW 2816
DOOR TRIM
SW 2816
DOOR TRIM
*based on sample from sister building
*based on sample from sister building
*based on sample from sister building
SW 2833
SIDING
SW 2833
SIDING
SW 2833SW 2816
SIDING &
GUTTER
FRONT DOOR
SW 0024 SW 0024
PORCH POST & RAIL RAFTER
BRACKET
WINDOW, FASCIA,
16 Yellowstone National Park | Fort Yellowstone Paint Color Analysis | December 2021
NONCOMMISSIONED SERGEANT’S QUARTERS, BUILDING #32, FMSS 6062 (1891)
NONCOMMISSIONED SERGEANT’S QUARTERS, BUILDING #33, FMSS 6064 (1897)
WINDOW
SASH
WINDOW TRIM
SW 0024
SW 0024
WINDOW JAMB
SW 6258
SW 2816
PORCH POST PORCH TRIM
SW 0024
SW 0024
SIDING
*based on sample from sister building
*based on sample from sister building
WINDOW
SASH
FASCIA TRIM
SW 2806
WINDOW TRIM
SW 2806
SW 2806
WINDOW JAMB
SW 6258SW 2833 SW 2833
SHINGLE
SIDING
SW 0042
PORCH
POST
SW 2806
SIDING
*based on sample from sister building
HORIZONTAL TRIM
*based on sample from sister building
*based on sample from sister building
FASCIA TRIM
SW 2806
SHINGLE
SIDING
Note: Original layer of linseed oil paint present on all building components except window sash.
*inconclusive
10 Yellowstone National Park | Fort Yellowstone Paint Color Analysis | December 2021
DOUBLE OFFICER’S QUARTERS, BUILDING #04, FMSS 5944 (1897)
WINDOW
SASH
FRONT GABLE SHINGLE SIDING
SW 2833
PORCH POST
DOUBLE OFFICER’S QUARTERS, BUILDING #05, FMSS 5947 (1897)
RAFTER
BRACKET
SW 2816
SW 2816
SW 6258
FRONT GABLE SHINGLE SIDING
SW 2833
PORCH POST PORCH RAIL
SW 0024
SW 2816
SW 6258
*based on sample from sister building
*based on sample from sister building
WINDOW
SASH
CHIMNEY
CHIMNEY
WINDOW TRIM
SW 2816
WINDOW TRIM
SW 2816
SW 2816
DOOR TRIM
SW 2816
DOOR TRIM
*based on sample from sister building
*based on sample from sister building
*based on sample from sister building
SW 2833
SIDING
SW 2833
SIDING
SW 2833SW 2816
SIDING &
GUTTER
FRONT DOOR
SW 0024 SW 0024
PORCH POST & RAIL RAFTER
BRACKET
WINDOW, FASCIA,
| Building 2 |
| Building 3 |
| Building 4 |
| Building 6 |
| Building 10 |
| Building 32 |
| Paint Schemes_Cover |
File details come from the government source that posted it. Updated .