This document appears to be a Closeout and Operation & Maintenance (O&M) Requirements Template from the National Park Service (NPS) - Denver Service Center (DSC) related to the federal contract opportunity for YELL 307127 - Rehabilitate Historic Structures.

The template outlines various closeout and O&M requirements for the rehabilitation project, including submitting project record drawings, providing system training, delivering spare parts and extra stock, submitting warranties and guarantees, and providing O&M data. It specifies the required submittal dates, items to be completed, and who should receive the information. The template covers requirements across various specification sections such as metal roofing, wood shingles, sealants, doors, hardware, and landscaping. It also includes sample requirements for items like curb stop wrenches, gate valves, grinder pumps, and wall/floor tiles.

The related federal contract opportunity is for the rehabilitation of historic structures at Yellowstone National Park, with a solicitation number of 140P2024R0177. The contracting agency is the Department of the Interior National Park Service National Office.

View the file

Other files

File Type Posted
Sol_140P2024R0177_Amd_0006.pdf PDF
B09_Amend_6_140P2024R0177_0006.pdf PDF
B09-140P2024R0177-Amd_5_0005.pdf PDF
Sol_140P2024R0177_Amd_0005.pdf PDF
Sol_140P2024R0177_Amd_0004.pdf PDF
B09-140P2024R0177-Amd_4_0004.pdf PDF
B09-140P2024R0177-Amd_3_0003.pdf PDF
Sol_140P2024R0177_Amd_0003.pdf PDF
001_YELL_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_06_SEPT_2024_REV_01_Part3_0002.pdf PDF
001_YELL_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_06_SEPT_2024_REV_01_Part7_0002.pdf PDF
001_YELL_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_06_SEPT_2024_REV_01_Part2_0002.pdf PDF
Sol_140P2024R0177_Amd_0002.pdf PDF
001_YELL_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_06_SEPT_2024_REV_01_Part1_0002.pdf PDF
001_YELL_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_06_SEPT_2024_REV_01_Part4_0002.pdf PDF
001_YELL_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_06_SEPT_2024_REV_01_Part6_0002.pdf PDF
B09-140P2024R0177-Amd_2_0002.pdf PDF
001_YELL_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_06_SEPT_2024_REV_01_Part5_0002.pdf PDF
B09-140P2024R0177-Amendment_1_0001.pdf PDF
Pre-Proposal_Conference_Sign_In_Sheet_0001.jpg JPG image
YELL_307127_-_Ft_Yell_Preproposal_Conference_2024-09-24_0001.pptx PPTX presentation
Sol_140P2024R0177_Amd_0001.pdf PDF
B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part5.pdf PDF
B08_Section_J_Attachment_19__Solit_PSP_Vol_I_Past_Performance_Questionnaire.pdf PDF
B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part3.pdf PDF
B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part6.pdf PDF
B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part4.pdf PDF
B08_Section_J_Attachment_16_307127_Rehab_Exteriors_Ft_Yellowstone_CPS_Blank.xlsx XLSX spreadsheet
B08_Section_J_Attachment_2_307127_Rehab_Ft_Yellowstone_CD_Specifications_23_AUG_2024.pdf PDF
Sol_140P2024R0177.pdf PDF
B08_Section_J_Attachment_11_307127_Rehab_Exteriors_Ft_Yellowstone_XRF_analysis_Report.pdf PDF
B08_P2024R0177_YELL_307127_1442_Solit_Clauses_9_24_24.pdf PDF
B08_Section_J_Attachment_18_Letter_of_Comm.pdf PDF
B08_Section_J_Attachment_10_307127_Hazardous_Materials_Report.pdf PDF
B08_Section_J_Attachment_14_Wage_Determination.pdf PDF
B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part1.pdf PDF
B08_Section_J_Attachment_15_Contract_Admin_Form.pdf PDF
B08_Section_J_Attachment_7_307127_Rehab_Exteriors_Ft_Yellowstone_Condition_Assessment.pdf PDF
B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part7.pdf PDF
B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part2.pdf PDF
B08_Section_J_Attachment_12_Rehab_Exteriors_Ft_Yellowstone_Radon_Assessment_Report.pdf PDF
B08_Section_J_Attachment_17_General_References_Form.pdf PDF
B08_Section_J_Attachment_4_YELL_307127_StatementOfStructuralTestsSpecialInspections.pdf PDF
Pages_from_B08_Section_J_Attachment_19__Solit_PSP_Vol_I_Project_Experience_Questionnaire.pdf PDF
B08_Section_J_Attachment_13_307127_Rehab_Ft_Yellowstone_Phasing_Plan.pdf PDF
B08_Section_J_Attachment_9_307127_Rehab_Exteriors_Ft_Yellowstone_Final_Paint_Schemes.pdf PDF
B08_Section_J_Attachment_5_307127_Rehab_Ft_Yellowstone_Submittal_List_23_AUG_2024.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

307127 YELL

Closeout and Operation & Maintenance (O&M) Requirements Template
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
TopicSpecification SectionRequirementSubmittal DateCompletedReceived

by Park

017700Project Record Drawings
Project Record
Drawings
017823System Training: Irrigation System, Dry Well Maintenance, Infiltration Trench Maintenance, Radon System Monitoring
System017823System Training: Metal Shingle Paint Maintenance, Linseed Oil Paint Maintenance, Storm Windows Maintenance and Repair
Demonstration
and Training

Tools Spare Parts Equipment 087100 Tools: One set of each special wrench or tool applicable for each different or special hardware component

Extra Stock 073116 Metal Roof Shingles: Quantity equal to 5 percent of total installed, including appropriate quantities for each color, size, and shape 090391 Paint Material: Additional 3 percent, but not less than 1 gallon or 1 case of each material and color applied

013233Complete set of digital image electronic files
015639Tree/Vegetation Maintenance Schedule
017419Project Waste Management Plan worksheet for solid waste disposal and diversion
017700NPS Required forms for occupancy, Fire Alarm acceptance, and other similar forms or certificates
017700Environmental Record Documents: IAQ Management Plan
Reports017700Environmental Record Documents: Moisture Control Inspection and Reports
017700Environmental Record Documents: Material Safety Data Sheets
017700Pest Control Report
033000Concrete: Field Quality Control Reports
051200Structural Steel: Field Quality Control Reports
260519Low-Voltage Electrical Power Conductors & Cables: Field Quality Control Reports
312313Radon Mitigation System: Test and Inspection Report
017700Make final changeover of permanent locks and deliver keys to Contracting Officer. Advise Park personnel of changeover in security provisions.
Keys & Keying087100Keying Schedule: Submit three (3) copies of Keying Schedule
Schedule
O&M Data071300Sheet Membrane: Contractor to correct defective Work within a period of 5-years; remove and replace materials concealing waterproofing at no extra cost.
Warranties073116Metal Shingles: Manufacturer's 5-year warranty against deterioration of shingle finish.
Guarantees073116Metal Shingles: Manufacturer’s standard 30-year warranty on all metal component substrate material.
073116Metal Shingles: 30-year Material and Labor Roofing System Guarantee, issued by the installer.
073116Wood Shingles: Extended Correction Period: Correct defective work within 5-year period
073129Wood Shingles: Extended Correction Period: Correct defective work within 2-year period.
073213Clay Roof Tiles: Extended Correction Period: Correct defective work within 2-year period.
079200Joint Sealants: Provide 2-year manufacturer warranty for installed sealants and accessories that fail to achieve a watertight seal, exhibit loss of adhesion or cohesion, or do not cure.
079200Joint Sealants: Extended Correction Period: Correct defective work within 2-year period.
081433Interior Doors: Manufacturer's warranty for the life of installation
087100Locksets and Cylinders: Manufacturer's 3-year warranty, minimum.
087100Other hardware: Manufacturer's 2-year warranty, minimum.
088000Insulating Glass Units: Provide a five (5) year manufacturer warranty to include coverage for seal failure, interpane dusting or misting, including providing products to replace failed units.
329223Operating and Maintenance Data:Include directions for irrigation, fertilizing, aeration, mowing and spraying as required for proper maintenance through a full growing season and dormant period.
329223Warrant sod for a period of one (1) year from Date of Final Acceptance to be in a healthy, vigorous growing condition. As a part of the warranty period, replace at once any sod areas that die due to natural causes, poor maintenance, or which in Contracting Officer opinion are unhealthy. The Contracting Officer has final decision for replacement of all sod. Install

replacements as originally specified and warranted.

&8&K01+024Closeout and Operation & Maintenance (O&M) Requirements Template | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N

Sample

Closeout and Operation & Maintenance (O&M) Requirements Sample
National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
TopicSpecification SectionRequirementSubmittal DateCompletedReceived

by Park

1770Final Project Record Drawings.
Project Record
Drawings
15900Mechanical equipment control system DDC (Direct Digital Control) training.
System16720Fire alarm system demonstration.
Demonstration17000Telecommunications system training.
and Training
2515Two curb stop wrenches with T-handles seven feet in length.
Tools2512One six inch gate valve (type used on water main).
Spare Parts2531One ten horsepower grinder pump (type and configuration as specified).
Equipment

9870 Two gallons of wall paint (forest green).

One gallon of trim paint (battleship grey).

Extra Stock 10800 Twelve each of wall and floor tiles used in the restrooms.

7540EIP and PVC (Ethylene-Interpolymer and Polyvinyl Chloride) Thermoplastic roofing manufacturer's inspection report.
7532Renovation of CSPE (Chlorosulfonated Polyethylene Polymer) membrane roofing, manufacturer's inspection report.
Reports15680HVAC (heating, ventilation & air conditioning) Test and balance report.
8710Instructions for cylindrical lock sets, door closers, and panic exit devices.
Keys & Keying8711Instructions for card key lock system and software.
Schedule8710Keying schedule.
2512Gate valves, O&M data for gate and post indicator valves.
O&M Data2515O&M data for water meter.
Warranties2517O&M data for fire hydrants.
Guarantees7511Built-up asphalt roofing with five year guarantee.
7620Flashing and sheet metal with five year guarantee.
7810Tubular skylights with ten year manufacturer's guarantee.
8211Flush wood doors with manufacturer's two year guarantee.
9680Kowski carpet with five year warranty.
15480O&M data for propane water heater.
15733Air cooled air condition units with manufacturer's five year guarantee on compressor and two year warranty on refrigerant loss.