B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part2.pdf
PDF 44 MB Posted
- Attached to
- YELL 307127 - Rehabilitate historic Structures
- Solicitation number
- 140P2024R0177
About this file
This document appears to be a set of construction drawings for the rehabilitation of historic structures at Fort Yellowstone in Yellowstone National Park. It is part of Solicitation 140P2024R0177, issued by the Department of the Interior National Park Service National Office, to rehabilitate historic structures under project YELL 307127. The drawings provide detailed design specifications for exterior rehabilitation work, including roofing, siding, windows, and other architectural features. This document is a technical appendix to the overall solicitation and does not directly address the required products or services, response dates, pricing terms, or other key solicitation details. The solicitation is for a civilian contract opportunity.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING ID: FMSS 3851
BUILDING #: 03
BUILDING NAME: FIELD OFFICER'S QUARTERS
YEAR BUILT DATE: 1909
LEVELS: FOUR (4) INCLUDING BASEMENT
CONSTRUCTION TYPE: IIIB
BUILDING SPECIFIC NOTES
B A R R A C K S
S T
O F F
IC
E R S
R O W
S T A B L E
S T
POWER HOU
SE RD.
WASHTUB R
OW
PO
W
ER
HO
US
E
BY
PA
SS
HI
GH
WA
Y
10 11 12
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b T
N P S
Y E L L
E x te ri o r R e h a b .r vt
BUILDING #03 COVER
N/A
AM/JH/IE
TM/HC
03-A001 307127
09/06/2024
CONSTRUCTION DRAWINGS
NOT TO SCALE
BUILDING AREA PLAN
WEST ELEVATION OF BLDG. 3
SUMMARY OF WORK - BUILDING #3
SEE DRAWINGS FOR AREA OF WORK AND TREATMENT APPROACH.
SCOPE OF WORK INCLUDES BUT IS NOT LIMITED TO:
- REPLACE CONCRETE SLABS AT ENTRY PORCHES.
- NEW PRECAST CONCRETE CHIMNEY CAPS AT CHIMNEYS.
- REPAIR, REPOINT, AND CLEAN MASONRY AT BUILDING FOUNDATIONS, WALLS, PORCHES, AND CHIMNEYS
- NEW METAL HANDRAILS AT REPLACED STAIRS
- NEW CHIMNEY BRACING.
- REPAIR AND/OR REPLACE WOOD STAIRS, RAILINGS, AND GUARDRAILS.
- REPAIR AND/OR REPLACE WOOD TRIM COMPONENETS
- REPAIR, REPLACE, AND/OR INSTALL NEW WOOD LATTICE UNDER PORCHES AND STAIRS.
- REPAIR CRACKED ROOF TILES.
- REPLACE METAL STEP FLASHING AT PORCH ROOFS.
- RESTORE GUTTERS AND DOWNSPOUTS. ADD SPLASH BLOCKS.
- RESTORE WOOD DOORS, STORM DOORS, WINDOWS, AND STORM WINDOWS.
- REMOVE EXISTING PAINT AND PAINT ALL WOOD AND METAL COMPONENTS.
- NEW DRYER VENT TERMINATIONS.
FOR DRAWING SHEET INDEX, REFERENCE G-001
SUMMARY OF WORK - BUILDING #3
- REMOVE SATELLITE DISHES AND PROVIDE NEW FREESTANDING METAL POST MOUNT.
- REROUTE (E) RADON SYSTEM TO VENT THROUGH (E) CHIMNEY.
- REPAIR OF GRASS SOD AT AREAS DISTURBED DURING CONSTRUCTION.
- STRUCTURAL REPAIR OF MASONRY FOUNDATION WALLS.
- STRUCTURAL REPAIR AND UPGRADE OF BUILDING WALL FRAMING AND SHEATHING.
- STRUCTURAL UPGRADE OF ROOF FRAMING AND SHEATHING.
- NEW STRUCTURAL FRAMING AND FOUNDATIONS AT REHABILITATED PORCHES AND STAIRS.
- NEW STRUCTURAL STRAPPING AND BRACING AT CHIMNEYS
- REPLACEMENT OF AREAS OF CONCRETE SIDEWALK ADJACENT TO PORCHES AND STAIRS AND SELECT
RUNS OF SIDEWALK.
- NEW RADON SYSTEM TO VENT THROUGH (E) CHIMNEY.
- INSTALLATION OF GRAVEL DRAINAGE TRENCHES AT BUILDING PERIMETERS.
- GRADING AT BUILDING PERIMETERS.
- REPAIR OF ASPHALT AT DISTURBED AREAS AND NEW ASPHALT AT ACCESSIBLE PARKING.
- INSTALLATION OF PARKING WHEEL STOPS.
E.
W
I L L I A
M I V E S
Date:
(C-3530)
L I
C E NS E D A R C H I T ECT
S T A T E
O F W Y O M I N
G9/6/2024
TP
TP
TP
TP
TP
UGC
W
UGE
SS
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-BPLANTING PLAN
03-L101 307127
09/06/2024
EK
SK
SK
CONSTRUCTION DRAWINGS
KEYMAP
02-L101
03-L101
04-L101
05-L101
06-L101
07-L101
08-L101
09- L101
14-L101
33-L101 32-L101 31-L101 30-L101
10-L101 11-L101
12-L101
3.D
3.C
3.B
3.1 3.2 3.3
3.A
55' - 7 1/4"
33' - 8" 21' - 11 1/4"
NIC:
PROVIDE SIMPSON AC POST
CAP TO BEAM ABV & (2)
SIMPSON RPBZ POST TO FTG,
TYP UNO; TO BE ADDED AT
FUTURE INTERIOR PHASE
(N)2'-0"SQx10"DP
CONC FTG W/
(3) #4 EA WAY
(TYP AT PORCH)
(E) STONE PIER
(E) CONC FDN WALL
T/FTG = 3'-0"
BELOW GRADE
(TYP AT PORCH)
(E) CONC PORCH
FDN ELEMENTS
(E) CONC FDN WALL
(E) CONC FDN WALL
(E) CONC WALL
(E) CONC WALL
(E) 18"SQ
CONC COL
(E) TUBE
STEEL COL
(E) 8x10
TIMBER COL
(N) 10"Ø CONC
SONOTUBE W/ (4)
#4 VERT & #3 TIES @
8" OC (TYP AT PORCH)
(N) PT COL TO BE
4x4 MIN & MATCH
(E) BLW PORCH TYP
03-S503
03-S501
TYP
TYP
(N) 18"Wx10"DP CONC
PAD W/ (3) #4 LONG
BARS AT STAIR
STRINGERS. MONOLITHIC
POUR W/ WALKWAY,
ADD'L INFO PER CIVIL
A S
R E Q 'D
(E) CONC PAD
1. STRUCTURAL GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS
AND LEGEND PER S-001, S-002, S-003 & S-004.
2. VERIFY ALL DIMENSIONS AND ELEVATIONS WITH THE
ARCHITECTURAL DRAWINGS. ALL EXISTING DIMENSIONS SHALL BE
FIELD VERIFIED.
3. ADDITIONAL INFORMATION ON LOCATIONS AND EXTENTS OF
REPOINTING PER ARCHITECTURAL DRAWINGS.
4. NIC : 'NOT IN CONTRACT' AND INDICATES WORK TO BE
INCLUDED IN A FUTURE PHASE OF WORK.
FOUNDATION PLAN NOTES:
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b S tr u c t_
N P S
Y E L L
E x te ri o r R e h a b R .r vt
FOUNDATION PLAN
LMB
JNH
LMB
03-S101 307127
09/06/24
CONSTRUCTION DRAWINGS
BUILDING 3 FOUNDATION PLAN
PROJECT
NORTH
SCALE OF FEET
0' 4' 8'4'
3.B
3.1 3.2 3.3
3.A
55' - 7 1/4"
33' - 8" 21' - 11 1/4"
(E F L O O R
J O
IS
T S
(E) FLOOR JOISTS @ 16"
(E) PORCH JOISTS;
REPLACE DAMAGED
JOISTS AS NEEDED,
ASSUME 50%
REPLACEMENT
(E) PORCH JOISTS,
REPLACE DAMAGED
JOISTS AS NEEDED;
ASSUME 50%
REPLACEMENT
(E) DIAGONAL
PLANK SHEATHING
(E) BUILT-UP TIMBER BEAM BELOW
REPAIR CONC
STAIRS ON
GRADE PER
1-5/03-S501
(N) 4" CONC SLAB
ON GRADE W/ #4
@ 18" OC EW
(E) FLOOR JOISTS @ 16"
NIC:
(N) LATERAL CONNECTIONS
FROM FLOOR TO WALL,
TYP AT PERIMETER; TO BE
ADDED AT A FUTURE
INTERIOR PHASE
02-S502
02-S502
NIC
TYP
02-S502
02-S502
NIC TYP
CONTROL JOINT AT
12'-0" MAX &
2/03-S503
02-S501
DECKING SCOPE
PER ARCH
DECKING SCOPE
PER ARCH
03-S503
(N) PT 2x12 STAIR
STRINGER @ 3'-0"
OC MAX
(N) PT 2x10
(TYP AT LANDINGS)
(N) HUC HANGER
TO (E) RIM JOIST
(VIF) TYP, OR
LEDGER PL PER
3/03-S503
(N) HUC HANGER TYP
(N) PT (2)2x10
MIN (VIF) TYP
(DROPPED BEAM)
(N) HUC HANGER
TO (E) RIM JOIST
(VIF) TYP, OR
LEDGER PL PER
3/03-S503
(N) HUC
HANGER TYP
(N) PT 2x10
LEDGER MIN (VIF)
NIC:
(N) 1/2" FLOOR
SHEATHING OVER (E)
FLOOR PLANKS PER
1/03-S502
NIC
TYP
1. STRUCTURAL GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS
AND LEGEND PER S-001, S-002, S-003 & S-004.
2. VERIFY ALL DIMENSIONS AND ELEVATIONS WITH THE
ARCHITECTURAL DRAWINGS. ALL EXISTING DIMENSIONS SHALL BE
FIELD VERIFIED.
3. ALL WOOD IN CONTACT WITH CONCRETE, SOIL OR EXPOSED TO
WEATHER SHALL BE PRESSURE-TREATED. COORDINATE FINISH
CARPENTRY WOOD MATERIALS WITH ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS.
4. NIC: "NOT IN CONTRACT" AND INDICATES WORK TO BE INCLUDED
IN A FUTURE PHASE OF WORK.
5. 'SIMPSON' TYPE FASTENERS AND ANCHORS WERE USED AS A
BASIS OF DESIGN. REFERENCE GENERAL NOTES FOR FURTHER
GUIDANCE ON FASTENER AND ANCHOR SELECTION.
FLOOR FRAMING PLAN NOTES:
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b S tr u c t_
N P S
Y E L L
E x te ri o r R e h a b R .r vt
FIRST FLOOR FRAMING
PLAN
LMB
JNH
LMB
03-S201 307127
09/06/24
CONSTRUCTION DRAWINGS
BUILDING 3 LEVEL 1 FRAMING PLAN
PROJECT
NORTH
SCALE OF FEET
0' 4' 8'4'
3.B
3.1 3.2 3.3
3.A
55' - 7 1/4"
33' - 8" 21' - 11 1/4"
(E F L O O R
J O
IS
T S
OUTLINE OF
LOW PORCH ROOF
OUTLINE OF
LOW PORCH ROOF
NIC:
(N) LATERAL CONNECTIONS
FROM FLOOR TO WALL,
TYP AT PERIMETER; TO BE
ADDED AT A FUTURE
INTERIOR PHASE
02-S502
02-S502
NIC
TYP
02-S502
02-S502
NIC TYP
(E) DIAGONAL
PLANK SHEATHING
NIC:
(N) 1/2" FLOOR
SHEATHING OVER
(E) FLOOR
PLANKS PER
1/03-S502
1. STRUCTURAL GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS
AND LEGEND PER S-001, S-002, S-003 & S-004.
2. VERIFY ALL DIMENSIONS AND ELEVATIONS WITH THE
ARCHITECTURAL DRAWINGS. ALL EXISTING DIMENSIONS SHALL BE
FIELD VERIFIED.
3. ALL WOOD IN CONTACT WITH CONCRETE, SOIL OR EXPOSED TO
WEATHER SHALL BE PRESSURE-TREATED. COORDINATE FINISH
CARPENTRY WOOD MATERIALS WITH ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS.
4. NIC: "NOT IN CONTRACT" AND INDICATES WORK TO BE INCLUDED
IN A FUTURE PHASE OF WORK.
5. 'SIMPSON' TYPE FASTENERS AND ANCHORS WERE USED AS A
BASIS OF DESIGN. REFERENCE GENERAL NOTES FOR FURTHER
GUIDANCE ON FASTENER AND ANCHOR SELECTION.
FLOOR FRAMING PLAN NOTES:
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b S tr u c t_
N P S
Y E L L
E x te ri o r R e h a b R .r vt
SECOND FLOOR FRAMING
PLAN
LMB
JNH
LMB
03-S202 307127
09/06/24
CONSTRUCTION DRAWINGS
BUILDING 3 LEVEL 2 FRAMING PLAN
PROJECT
NORTH
SCALE OF FEET
0' 4' 8'4'
3.B
3.1 3.2 3.3
3.A
55' - 7 1/4"
33' - 8" 21' - 11 1/4"
(E F L O O R
J O
IS
T S
OUTLINE OF
LOW PORCH ROOF
PER 03-S202
OUTLINE OF
LOW PORCH ROOF
PER 03-S202
SHADING INDICATES
PARTIAL HEIGHT THIRD
FLOOR WALL ABOVE
NIC:
(N) LATERAL CONNECTIONS
FROM FLOOR TO WALL, TYP
AT PERIMETER; TO BE ADDED
AT A FUTURE INTERIOR
PHASE
02-S502
02-S502
NIC
TYP
02-S502
02-S502
NIC TYP
(E) DIAGONAL
PLANK SHEATHING
NIC:
(N) 1/2" FLOOR
SHEATHING OVER
(E) FLOOR
PLANKS PER
1/03-S502
1. STRUCTURAL GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS
AND LEGEND PER S-001, S-002, S-003 & S-004.
2. VERIFY ALL DIMENSIONS AND ELEVATIONS WITH THE
ARCHITECTURAL DRAWINGS. ALL EXISTING DIMENSIONS SHALL BE
FIELD VERIFIED.
3. ALL WOOD IN CONTACT WITH CONCRETE, SOIL OR EXPOSED TO
WEATHER SHALL BE PRESSURE-TREATED. COORDINATE FINISH
CARPENTRY WOOD MATERIALS WITH ARCHITECTURAL DRAWINGS AND
SPECIFICATIONS.
4. NIC: "NOT IN CONTRACT" AND INDICATES WORK TO BE INCLUDED
IN A FUTURE PHASE OF WORK.
5. 'SIMPSON' TYPE FASTENERS AND ANCHORS WERE USED AS A
BASIS OF DESIGN. REFERENCE GENERAL NOTES FOR FURTHER
GUIDANCE ON FASTENER AND ANCHOR SELECTION.
FLOOR FRAMING PLAN NOTES:
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b S tr u c t_
N P S
Y E L L
E x te ri o r R e h a b R .r vt
THIRD FLOOR FRAMING
PLAN
LMB
JNH
LMB
03-S203 307127
09/06/24
CONSTRUCTION DRAWINGS
BUILDING 3 LEVEL 3 FRAMING PLAN
PROJECT
NORTH
SCALE OF FEET
0' 4' 8'4'
3.B
3.1 3.2 3.3
3.A
55' - 7 1/4"
33' - 8" 21' - 11 1/4"
ROOF OUTLINE
CHIMNEY COLLAR &
CONN TO (E) ROOF
PER 3&5/03-S502
CHIMNEY COLLAR
PER 5/03-S502
CHIMNEY COLLAR
PER 5/03-S502
NIC:
(N) 1/2" ROOF
SHEATHING OVER (E)
ROOF PLANKS PER
1/03-S502
HSS2x2x1/4
CHIMNEY BRACING
PER 4/03-S502
HSS2x2x1/4
CHIMNEY BRACING
PER 4/03-S502
1. STRUCTURAL GENERAL NOTES, DESIGN CRITERIA, ABBREVIATIONS
AND LEGEND PER S-001, S-002, S-003 & S-004.
2. VERIFY ALL DIMENSIONS AND ELEVATIONS WITH THE
ARCHITECTURAL DRAWINGS. ALL EXISTING DIMENSIONS SHALL BE
FIELD VERIFIED.
3. ALL DUCTS, CHASES AND PIPES SHALL BE PER MECHANICAL,
PLUMBING, ELECTRICAL AND SPRINKLER DRAWINGS.
4. NIC: "NOT IN CONTRACT" AND INDICATES WORK TO BE INCLUDED
IN A FUTURE PHASE OF WORK.
5. 'SIMPSON' TYPE FASTENERS AND ANCHORS WERE USED AS A
BASIS OF DESIGN. REFERENCE GENERAL NOTES FOR FURTHER
GUIDANCE ON FASTENER AND ANCHOR SELECTION.
ROOF FRAMING PLAN NOTES:
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b S tr u c t_
N P S
Y E L L
E x te ri o r R e h a b R .r vt
ROOF FRAMING PLAN
LMB
JNH
LMB
03-S204 307127
09/06/24
CONSTRUCTION DRAWINGS
BUILDING 3 ROOF FRAMING PLAN
PROJECT
NORTH
SCALE OF FEET
0' 4' 8'4'
PRODUCT GUIDE:
EUCOPATCH-FAST-SETTING
PATCHING AND REPAIR MATERIAL
EUCOPATCH-FLOWABLE MEDIUM
DEPTH MATERIAL
DURAL PREP AC-BONDING AGENT
& ANTI-CORROSION COATING
BARACADE WB244-WATER REPELLANT
CONCRETE SEALER FOR ALL EXISTING
STAIR AND LANDING SURFACES
DURAL 452 GEL HIGH STRENGTH
EPOXY BONDING ADHESIVE FOR
STRUCTURAL CRACK
NOTE:
ALL PRODUCTS NOTED ARE MANUFACTURED
BY THE EUCLID CHEMICAL COMPANY AND
WERE USED AS A BASIS OF DESIGN.
REFERENCE GENERAL NOTES FOR FURTHER
GUIDANCE ON CONCRETE REPAIR MATERIAL
SELECTION.
2" 2"
(A) CLEAN &
REMOVE ANY
UNSOUND CONC
(B) DRILL & EPOXY
EMBED 2-#3 HOOKED
BARS, MIN 3" EMBED
EA SIDE, USE 'HILTI'
HIT-HY 200
(A) APPLY SURFACE COAT
OF BONDING AGENT
(B) APPLY REPAIR MORTAR
PATCH TO FILL; FINISH
FLUSH WITH EXISTING
(C) APPLY SEALANT
TO LANDING AND
STAIR SURFACE
DAMAGED OR
SPALLING AREA
EXISTING CONDITION
STEP 1: PRE REPAIR AREA
STEP 2: CONC REPAIR
(A) CLEAN & REMOVE
ALL UNSOUND CONC
ALONG CRACK
(B) APPLY SURFACE
COAT BONDING AGENT
(A) INSTALL INJECTION
PORTS PER MANUF
(B) INJECT ADHESIVE
FROM BOTTOM UP
PER MANUF
RECOMMENDATIONS
(C) GRIND OFF CAPPING
ADHESIVE FLUSH TO
EXISTING
(D) APPLY SEALANT TO
LANDING AND STAIR
SURFACE
(E) CRACK IN STAIR
OR LANDING
EXISTING CONDITION: ELEVATION VIEW
STEP 1: PREP CRACK AREA STEP 2: INSTALL PORTS / EPOXY INJECTION
STEP 3: FINISH COAT
(E) DETERIORATED
CONCRETE
(A) CLEAN & REMOVE ALL
UNSOUND CONCRETE
(B) CLEAN EXPOSED REBAR,
REMOVE LOOSE RUST & METAL
(A) SPRAY RUST INHIBITOR BONDING
AGENT TO ALL SURFACES BEFORE
EPOXY PATCH
(C) APPLY SEALANT TO LANDING
AND STAIR SURFACES
(B) APPLY REPAIR MORTAR
PATCH TO FILL; FINISH FLUSH
TO EXISTING
EXISTING CONDITION
STEP 1: PREP REBAR &
CONCRETE AREA
STEP 2: INSTALL PORTS / EPOXY INJECT
STEP 3: FINISH COAT
(E) SPALLED
CONCRETE
EXISTING CONCRETE
WALL OR SLAB
CHIP & REMOVAL
ALL UNSOUND MATERIAL
(C) APPLY SEALANT TO
LANDING AND STAIR
SURFACES
(A) SPRAY BONDING
AGENT / RUST
INHIBITOR TO ALL
SURFACES
(B) INSTALL THIN
PARGE COAT FLUSH
TO EXISTING
EXISTING CONDITION
STEP 1: PREP REPAIR AREA STEP 2: CONCRETE REPAIR
NOTE:
SEE 1/ -S501 FOR PRODUCT
DESCRIPTIONS TO TAGS
(E) POST ABOVE
(N) POST BELOW
PER PLAN
(N) DROPPED BEAM
PER PLAN
(E) OR (N)
DECKING PER ARCH
NEW WORK NEW WORK- PLAN VIEW
RE-INSTALLED
(E) OR REPLACED
RIM JOIST
(N) DROPPED BEAM
PER PLAN
(E) OR REPLACED
PORCH JOIST,
BLOCKED OVER BEAM
RE-INSTALLED
(E) OR REPLACED
RIM JOIST
(N) POST PER PLAN
HANGER PER PLAN
(E) OR REPLACED
PORCH JOISTPLAN
NOTE:
CONTACT CONTRACTING
OFFICER IF (E) FRAMING
CONDITIONS DIFFER FROM
THOSE SHOWN
(E) JOIST PER PLAN
(E) TIMBER
BEAM PER PLAN
(N) (2) 1/2"Øx5"
TITEN HD W/ 4" EMBED
(E) CONC COL
PER PLAN
(N) L6x6x3/8x0'-6"
W/ (2) 3/8"Øx5" LAG
SCREWS, EA SIDE OF
CONC COL
TYP
1 1/2"
T Y P
TYP
4"
S E C T
IO
N
SECTION
(E) CONC COL
PER PLAN
2"2"2"
DETAIL TO BE COMPLETED AT
FUTURE INTERIOR PHASE.
NOT IN CONTRACT
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
NOTE:
'SIMPSON' TYPE FASTENERS AND ANCHORS WERE
USED AS A BASIS OF DESIGN.
REFERENCE GENERAL NOTES FOR FURTHER
GUIDANCE ON FASTENER AND ANCHOR SELECTION.A
u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b S tr u c t_
N P S
Y E L L
E x te ri o r R e h a b R .r vt
STRUCTURAL DETAILS
LMB
JNH
LMB
03-S501 307127
09/06/24
CONSTRUCTION DRAWINGS
CONCRETE REPAIR PRODUCT GUIDE
TYPICAL CONCRETE REPLACEMENT AT MISSING SECTION
TYPICAL CONCRETE CRACK REPAIR
TYPICAL EXPOSED AND CORRODED REBAR REPAIR
TYPICAL SPALLING CONCRETE REPAIR
(N) POST BELOW PORCH AND CONNECTION TO (E) POST ABV
TIMBER BEAM TO CONCRETE COLUMN CONNECTION
(E) ROOF PLANKING
PLY/OSB SHTG, SEE
PLAN FOR THICKNESS
16GAx1 1/2" STAPLES
@ 12" OC, FIELD, SEE
NOTE #2
16GAx1 1/2" STAPLES
@ 6" OC, PANEL EDGE,
SEE NOTE #2
PLY / OSB SHTHG,
SEE PLAN FOR
THICKNESS
SUPPLEMENT (E) NAILING,
MIN ADD (2)0.131"Øx2 1/2"
NAILS PER PLANK @ EA
RAFTER
(E
RA
FT
ER
S
BE
LO
W, S
PA
CIN
G
VA
RIE
S
SHEATHING OVERLAY ATTACHMENT REQUIREMENTS
NOTE:
1. (E) PLANKING NOT
SHOWN FOR CLARITY
2. CONTRACTOR TO
VERIFY STAPLES DO
NOT PENETRATE INTO
BLDG
3. PLY/ OSB
SHEATHING EDGES ARE
NOT REQUIRED TO
ALIGN W/ (E) RAFTERS
PRENAILING REQUIREMENTS
DETAIL TO BE
COMPLETED AT
FUTURE INTERIOR
PHASE; NOT IN
CONTRACT
(N) 0.148"Øx3" NAILS
@6"OC INTO BLKG
(E) FLOOR JOIST,
PER PLAN
(2) 5/8"Ø EPOXY
THREADED ROD
PER FACE, 5"
EMBED (8 TOTAL)
(N) 3x BLKG TO
MATCH JOIST DEPTH
FOR (3) BAYS
(N) SHTHG ATOP
(E) FLOOR SHTHG
(N) PANEL
EDGE NAIL
(E) BRICK CHIMNEY
1'-0"
6"
NOTE:
FLOOR ATTACHMENTS TO CHIMNEY ARE NOT IN
CONTRACT AND WILL OCCUR AT A FUTURE
PHASE OF INTERIOR WORK
5/03
NOTE:
CONTACT CONTRACTING
OFFICER IF (E) FRAMING
CONDITIONS DIFFER
FROM THOSE SHOWN
(E) CHIMNEY
ELEVATION
3" 1 1/2"
STEEL COLLAR
PER -S502
(E) RAFTER
3x6 BLKG AT PERIMETER
OF SHTHG PATCH;
0.131"Øx2 1/2" NAILS
@ 4"OC, STAGG, TO (N)
& (E) SHTHG
PL1/4x3"W COLLAR
EXTENSION TO ALIGN W/
(E) RAFTER FRAMING W/
(2) 1/2"Ø THRU BOLTS
M A X
"M
IN
3/163 SIDES
REMOVE (E) SHTHG AS REQ'D TO
INSTALL COLLAR CONN; REPLACE
W/ SHTHG PATCH TO MATCH
THICKNESS OF (E)
(N) 2x BLKG EA BAY W/
DIAPHRAGM EDGE NAILING
PER PLAN NOTES
(N) 3/4"Ø EPOXY
ANCHOR @ 4'-0" OC
MAX W/ 4" EMBED
PLAN
DETAIL TO BE COMPLETED
AT FUTURE INTERIOR
PHASE: NOT IN CONTRACT
(N) SIMPSON LTTP2
@ 5'-0" OC MAX
AT EA STRAP,
(N) 3/4"Ø EPOXY
ANCHOR W/ 8" EMBED
ROD COUPLER
AS REQD
CONT 2x BLKG
AT STRAP
(E) JOIST, TYP
(N) PT 2x10 W/ 3/4"Ø
THRD ROD, DOWELED &
EPOXIED INTO STONE
WALL W/ 8" EMBED
GRID
NIC:
(N) SHTHG PER PLAN
4x BLKG AT HDU2 PER PLAN
W/ 5/8"Ø THRD ROD,
DOWELED & EPOXIED INTO
STONE WALL @ 5'-0" MAX
(E) STONE WALL
PER PLAN
EMBED
8"
PROVIDE 0.148Øx3"
NAILS @ 4" OC
STAGGERED INTO
(N) BLOCKING
DETAIL TO BE
COMPLETED AT
FUTURE INTERIOR
PHASE; NOT IN
CONTRACT
(E) STONE CHIMNEY
CAREFULLY COORDINATE
DIMENSIONS OF COLLAR
BANDS & MITER EXTERIOR
CORNERS
CHIMNEY CORNER
ANGLE BEYOND
6"
TRIM WEB OF WT
CONN TO ROOF
PER -S502
3"
S E
C T
IO
N
(N) WT4x5, GRIND OUT
MORTAR JOINT 3/8"-1/2"
TO INSTALL; EMBED WEB MIN
2" INTO GROUT W/ EPOXY
BASED MORTAR
SECTION
(E) STONE CHIMNEY
FACE OF GROUT
1" MAX FROM
PL1/4x1"SQ @ 6"OC, BOTH LEGS OF WT; ADD'L
COMPRESSIBLE WASHER
TO LEVEL PER ARCH
PLAN
(N) WT COLLAR
W/ PL SPACERS
PER SECTION VIEW
L4x4x1/4x0'-4" TYP
(2) INT CORNERS
TRIM WT WEBS
AT INT CORNERS
3/16
ANGLE TO
EXT WT 3/16
INT WT TO
ANGLE
3/03
(E) STONE CHIMNEY
PLAN
EDGE OF (E) ROOF
(E
HI
P
BE
AM
SECTION
(E) WALL BLW
(N) STEEL COLLAR
BRACE PER -S502
(E) ROOF FRAMING
5/03
SECTION
(N) STEEL COLLAR
BRACE PER 5/03-S502
(N) HSS2x2x1/4 BRACE
W/ END PL1/4
PL3/8 EA MEMBER W/
5/8"Ø THRU BOLT
(6) 1/2"Øx6" LAG
SCREWS TOP PL TO BLKG;
SELECT REMOVAL OF INT
OR EXT FINISHES REQ'D
(E) RAFTER
(E) DBL TOP PL
(E) ROOF SHTHG
PL1/4x4x0'-7" W/
(4) 5/8"Ø LAG
SCREWS INTO BLKG
2"Ø PIPE STANDOFF
W/ END PL1/4
6x BLKG TO MATCH
(E) RAFTER DEPTH
T Y P
T Y P
2"
TYP
1"
3/16
PLAN
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
NOTE:
'SIMPSON' TYPE FASTENERS AND ANCHORS WERE
USED AS A BASIS OF DESIGN.
REFERENCE GENERAL NOTES FOR FURTHER
GUIDANCE ON FASTENER AND ANCHOR SELECTION.A
u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b S tr u c t_
N P S
Y E L L
E x te ri o r R e h a b R .r vt
STRUCTURAL DETAILS
LMB
JNH
LMB
03-S502 307127
09/06/24
CONSTRUCTION DRAWINGS
(E) ROOF PLANKING NAILING AND (N) SHEATHING NAILING
(N) CONN AT (E) CHIMNEY TO (E) FLOOR
(N) CHIMNEY COLLAR CONNECTION TO (E) ROOF
(N) WALL TO DIAPHRAGM
CONNECTION-PERPENDICULAR
WALL TO DIAPHRAGM
CONNECTION - PARALLEL
(N) STEEL COLLAR AT (E) STONE CHIMNEY
CHIMNEY BRACE AT (E) DORMER FRAMING - PLAN
P E R
A R C H
R
IS
E R
D
IM
M
IN
TREAD DIM PER ARCH
(N) SOG &
REINF PER PLAN
#4 @ 18"OC EW
3/4" KEY
(2) #4B 6"
SIDEWALK
PER CIVIL
M
IN
#4 x
@ 18"OC T/SLAB
PER PLAN
24"
(E) CONC FDN WALL
TIES
PER PLAN
VERT REINF
PER PLAN
AT SQUARE PIER AT ROUND PIER
T Y P
C L R
P E R
P L A N
PER PLAN
TIES
PER PLAN
VERT REINF
PER PLAN
P E R
P L A N
T Y P
C L R
3/4" CHAMFER,
TYP
PLANS
PER PLAN
REINF PER PLAN
T/FTG
PER PLAN
SECTION
CONC PIER &
REINF PER PLANT/PIER
PER PLAN
3/4" CHAMFER, TYP
GRID
P L A N
P E R
H O O P T Y P
T O s t
POST WHERE
OCCURS PER PLAN
SIMPSON ABU POST BASE
C L R
STAIR TREADS &
RISERS PER ARCH
P E R
A R C H
R
IS
E R S
PT 2x4 PL W/ 3/8"Ø
TITEN HD @ 12"OC
PT STRINGER
PER PLAN
CONC PAD &
REINF PER PLAN
TREADS PER ARCH (E) PORCH
BEAM (VIF)
6" DEPTH MIN
(N) SIMPSON
LSC HGR
(E) STONE PIER;
REPOINT PER ARCH
(N) SIMPSON EPB44PHDG
POST BASE; DRILL &
EPOXY 4" THREADED
ROD INTO STONE PIER
(N) SKIRT BOARD PER PLAN
(N) POST PER PLAN
(N) DECKING
PER PLAN
(E) BEAM BEYOND
(E) PORCH JOIST,
REPLACE AS
NEEDED PER PLAN
NOTES:
1. ALL TABULATED VALUES ARE IN INCHES.
2. VALUES FOR UNCOATED REINFORCING AND NORMAL WEIGHT CONCRETE
WITH CLEAR SPACING > db, CLEAR COVER > db AND MINIMUM STIRRUPS OR
TIES THROUGHOUT Ld OR CLEAR SPACING > 2db AND CLEAR COVER > db.
3. TOP REINFORCING = HORIZONTAL REINFORCING WITH MORE THAN 12" OF
FRESH CONCRETE BELOW OR AS NOTED ON DOCUMENTS AS "TOP BAR".
GRADE 60 REINFORCING
BAR
SIZE
MISCELLANEOUS
BARS
TOP BARS
(see note #3)
HOOKED
BARS
Ld Splice Ld Splice Ldh f'c=4000psi
#3
#4
#5
#6
#7
#8
REINF PER PLAN
VAPOR BARRIER WHERE REQD
COMPACTED STRUCT FILL OR
COMPETENT NATIVE SOIL PER
GEOTECH REPORT
SUBGRADE PREPARATION
PER GEOTECH REPORT
CONSTRUCTION JOINT
CONTROL JOINT
SUBGRADE PREPARATION
PER GEOTECH REPORT
VAPOR BARRIER WHERE REQD
COMPACTED STRUCT FILL OR
COMPETENT NATIVE SOIL PER
GEOTECH REPORT
NOTES:
5/8"Ø x 24" SMOOTH BAR
@ 24"OC, GREASE ONE
SIDE IN DOWEL INSERT
REINF PER PLAN
1. CONSTRUCTION JOINT IS A JOINT
BETWEEN DIFFERENT POURS. CONTROL
JOINT IS A CRACK CONTROL JOINT
WITHIN THE SAME POUR.
2. USE "EARLY ENTRY DRY-CUT SAW"
AS SOON AS POSSIBLE WITHOUT
CAUSING RAVELING OF CONCRETE
EDGES. SAWCUT ALONG SHORT
DIRECTION OF POUR FIRST.
3. ALIGN A CONSTRUCTION OR CONTROL
JOINT WITH RE-ENTRANT SLAB
CORNERS, EACH WAY, TYPICAL.
4. CONSTRUCTION/CONTROL JOINT TO
ENCLOSE APPROXIMATE SQUARE AREAS
225 SQUARE FEET MAXIMUM, WITH
MAXIMUM PANEL ASPECT RATIO OF 1.3
TO 1.0.
5. CONTRACTOR TO SUBMIT
CONSTRUCTION/CONTROL JOINT PLAN TO
STRUCTURAL ENGINEER OF RECORD FOR
REVIEW/APPROVAL.
PER
PLAN
t
PER
PLAN
t t/4 SAWCUT DEPTH OR t/4
PREMOLDED JOINT (1 1/2" MIN)
T/SLAB
PER PLAN
T/SLAB
PER PLAN
REPRESENTATIVE PHOTO OF
BUILDING 33 CRAWLSPACE
REPRESENTATIVE PHOTO OF
BUILDING 33 CRAWLSPACE
DECKING PER ARCH
FULL DEPTH 2x
BLKG OVER BEAM
(E) JOIST
FRAMING ABV PT 2x12x1'-6" PL W/ (4)
1/2"Ø EPOXY ANCHORS INTO
(E) STONE FDN WALL BYND.
ADJ ANCHOR LOCATIONS UP TO
2" TO LOCATE IN SOLID STONE
(N) DROPPED BEAM &
HANGER PER PLAN
NOTE:
CONTACT CONTRACTING
OFFICER IF (E) FRAMING
CONDITIONS DIFFER FROM
THOSE SHOWN
TYP
1" MIN
TYP
2"
T Y P
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
NOTE:
'SIMPSON' TYPE FASTENERS AND ANCHORS WERE
USED AS A BASIS OF DESIGN.
REFERENCE GENERAL NOTES FOR FURTHER
GUIDANCE ON FASTENER AND ANCHOR SELECTION.A
u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b S tr u c t_
N P S
Y E L L
E x te ri o r R e h a b R .r vt
STRUCTURAL DETAILS
LMB
JNH
LMB
03-S503 307127
09/06/24
CONSTRUCTION DRAWINGS
TYPICAL STAIR ON GRADE
EXTERIOR SPREAD FOOTING AT WOOD POST
TYPICAL EXTERIOR STAIRS TO CONC SLAB
(N) COLUMN TO (E) STONE PIER CONNECTION
LAP SPLICE AND DEVELOPMENT LENGTH SCHEDULE
SLAB ON GRADE
JOINT DETAILS WITH REINFORCING
LEDGER PLATE CONNECTION AT (N) PORCH BEAM
UP
3.C
3.B
3.1 3.2
3.3
3.A
BASEMENT
3.001
LAUNDRY
3.002
W.C.
3.003
GAME ROOM
3.004
UNEXCAVATED
CRAWLSPACE
55' - 7"
03-A1071
03-A106
03-A108
03-A109 1
(E)DS
(E)DS
DEMOLITION PLAN NOTES
1. SEE SHEET G-003 FOR GENERAL NOTES AND SYMBOLS.
2. SEE SPECIFICATIONS 02 41 19 SELECTIVE DEMOLITION FOR
DEMOLITION REQUIREMENTS.
3. COORDINATE DEMOLITION IN CONJUNCTION WITH
REHABILITATION AND NEW CONSTRUCTION.
4. WHERE NOTES IN THE DRAWINGS REQUIRE THE REMOVAL
OF A BUILDING ELEMENT OR SYSTEM OR A COMPLETE
COMPONENT COMPRISED OF MULTIPLE ELEMENTS, THE
CONTRACTOR SHALL DISASSEMBLE AND COMPLETELY
REMOVE FROM THE SITE EACH ITEM IN ITS ENTIRETY SO
AS TO ACCOMMODATE THE INSTALLATION OF THE NEW
WORK TO FOLLOW.
5. VENT TERMINATIONS, CONDUITS, DUCTS, PANELS, AND
PIPES LOCATED ON OR IN WALLS SCHEDULED FOR
DEMOLITION AND/OR REPAIR SHALL BE REMOVED AS PART
OF THE WORK UNLESS OTHERWISE NOTED. REINSTALL
ACTIVE SYSTEM ITEMS AT COMPLETION OF
DEMOLITION/REPAIR WORK IN LOCATION INDICATED ON
DRAWINGS. IF NEW LOCATION IS NOT PROVIDED, REINSTALL
IN SAME LOCATION.
6. EMBEDMENTS AND HOLES DRAWN AS 6" DIAMETER CIRCLES
FOR CLARITY. ACTUAL EMBEDMENT SIZES MAY VARY.
7. REMOVE, RESTORE, AND REINSTALL ALL WOOD SIDING AND
TRIM, UON. REPLACE WOOD SIDING AND TRIM REQUIRING
LEVEL 3 REPAIR. SEE SPECIFICATIONS 02 41 19 SELECTIVE
DEMOLITION, WOOD SIDING SALVAGE TABLE FOR
APPROXIMATE REPLACEMENT QUANTITIES.
8. REPAIR ALL EXTERIOR DOORS. SEE DOOR SCHEDULE FOR
REPAIR LEVELS.
DEMOLITION PLAN LEGEND
(E) WALL TO REMAIN
(E) DOWNSPOUT(E)DS
ROOF SLOPE ( X" RISE / X" RUN)SLOPE
(E) VENT
REPAIR OR REMOVE - SEE KEYNOTES
HO
(E) CEILING OR WALL INVESTIGATION
HOLE - PATCH TO MATCH (E) ADJACENT
ROOF REPAIR - SEE GENERAL NOTES
(E) MASONRY WALL
WH (E) WATER HEATER
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b T
N P S
Y E L L
E x te ri o r R e h a b .r vt
DEMOLITION BASEMENT
FLOOR PLAN
N/A
AM/JH/IE
TM/HC
03-A101 307127
09/06/2024
CONSTRUCTION DRAWINGS
PROJECT
NORTH
SCALE OF FEET
0 4 84
LEVEL 0
DEMOLITION KEYNOTES
10 REMOVE RADON VENT, TERMINATION PIPING, AND FAN.
CONNECT EXISTING CRAWLSPACE/BASEMENT PIPING TO NEW
RADON SYSTEM COMPONENTS
90 REPAIR WINDOW AND REPLACE MISSING PANE OF GLASS.
SEE WINDOW SCHEDULE.
E.
W
I L L I A
M I V E S
Date:
(C-3530)
L I
C E NS E D A R C H I T ECT
S T A T E
O F W Y O M I N
G9/6/2024
UP
UP
DN
3.D
3.C
3.B
3.1 3.2
3.3
3.A
3A.111A
3A.103
3A.101
STUDY
3.102
HALLVESTIBULE
3.101
STAIRWELL
3.103
STORAGE
ROOM
3.104
KITCHEN
3.106
PANTRY
3.105
W.C.
3.107DINING ROOM
3.108
PARLOR
3.109
CLOS.
3A.111B
55' - 7"
FRONT
PORCH
REAR
PORCH
DN
03-A1071
03-A1072
03-A106
03-A108
03-A107
03-A109 1
OUTLINE OF ROOF ABOVE
SOUTH
PORCH
(E)DS
(E)DS
(E)DS
(E)DS
(E)DS
(E)DS
(E)DS
DEMOLITION PLAN NOTES
1. SEE SHEET G-003 FOR GENERAL NOTES AND SYMBOLS.
2. SEE SPECIFICATIONS 02 41 19 SELECTIVE DEMOLITION FOR
DEMOLITION REQUIREMENTS.
3. COORDINATE DEMOLITION IN CONJUNCTION WITH
REHABILITATION AND NEW CONSTRUCTION.
4. WHERE NOTES IN THE DRAWINGS REQUIRE THE REMOVAL
OF A BUILDING ELEMENT OR SYSTEM OR A COMPLETE
COMPONENT COMPRISED OF MULTIPLE ELEMENTS, THE
CONTRACTOR SHALL DISASSEMBLE AND COMPLETELY
REMOVE FROM THE SITE EACH ITEM IN ITS ENTIRETY SO
AS TO ACCOMMODATE THE INSTALLATION OF THE NEW
WORK TO FOLLOW.
5. VENT TERMINATIONS, CONDUITS, DUCTS, PANELS, AND
PIPES LOCATED ON OR IN WALLS SCHEDULED FOR
DEMOLITION AND/OR REPAIR SHALL BE REMOVED AS PART
OF THE WORK UNLESS OTHERWISE NOTED. REINSTALL
ACTIVE SYSTEM ITEMS AT COMPLETION OF
DEMOLITION/REPAIR WORK IN LOCATION INDICATED ON
DRAWINGS. IF NEW LOCATION IS NOT PROVIDED, REINSTALL
IN SAME LOCATION.
6. EMBEDMENTS AND HOLES DRAWN AS 6" DIAMETER CIRCLES
FOR CLARITY. ACTUAL EMBEDMENT SIZES MAY VARY.
7. REMOVE, RESTORE, AND REINSTALL ALL WOOD SIDING AND
TRIM, UON. REPLACE WOOD SIDING AND TRIM REQUIRING
LEVEL 3 REPAIR. SEE SPECIFICATIONS 02 41 19 SELECTIVE
DEMOLITION, WOOD SIDING SALVAGE TABLE FOR
APPROXIMATE REPLACEMENT QUANTITIES.
8. REPAIR ALL EXTERIOR DOORS. SEE DOOR SCHEDULE FOR
REPAIR LEVELS.
DEMOLITION PLAN LEGEND
(E) WALL TO REMAIN
(E) DOWNSPOUT(E)DS
ROOF SLOPE ( X" RISE / X" RUN)SLOPE
(E) VENT
REPAIR OR REMOVE - SEE KEYNOTES
HO
(E) CEILING OR WALL INVESTIGATION
HOLE - PATCH TO MATCH (E) ADJACENT
ROOF REPAIR - SEE GENERAL NOTES
(E) MASONRY WALL
WH (E) WATER HEATER
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b T
N P S
Y E L L
E x te ri o r R e h a b .r vt
DEMOLITION FIRST FLOOR
PLAN
N/A
AM/JH/IE
TM/HC
03-A102 307127
09/06/2024
CONSTRUCTION DRAWINGS
PROJECT
NORTH
SCALE OF FEET
0 4 84
LEVEL 1
DEMOLITION KEYNOTES
29 REPAIR CONCRETE STAIRS. SEE STRUCTURAL DRAWINGS FOR
ADDITIONAL INFORMATION
64 REPAIR WOOD PORCH ASSEMBLY. SEE PLANS AND
ELEVATIONS FOR LEVEL OF REPAIR. REMOVE AND REINSTALL
WOOD COMPONENTS AS NEEDED TO FACILITATE STRUCTURAL
REPAIRS. SEE STRUCTURAL DRAWINGS FOR ADDITIONAL
INFORMATION
69 DEMO CONCRETE PORCH SLAB. PROTECT IN-PLACE
ADJACENT ELEMENTS
74 REMOVE AND REINSTALL (E) ELECTRIC PANELS FOLLOWING
EXTERIOR IMPROVEMENTS.
94 DEMO WOOD STAIR ASSEMBLY. SEE STRUCTURAL DRAWINGS
FOR ADDITIONAL INFORMATION
E.
W
I L L I A
M I V E S
Date:
(C-3530)
L I
C E NS E D A R C H I T ECT
S T A T E
O F W Y O M I N
G9/6/2024
DN
UP
3.D
3.C
3.B
3.1 3.2
3.3
3.A
BEDROOM
3.201
BATHROOM
3.207
HALL
STORAGE
CLOSET
3.202
CLOSET
BEDROOM
3.203
BATHROOM
3.204
BEDROOM
3.205BEDROOM
3.206
CLOS.
CLOS.
CLOSET
55' - 7"
03-A1071
03-A106
03-A108
03-A109 1
3 3
OUTLINE OF ROOF ABOVE
50 50
4" / 12"
4" / 12"
(E)DS
(E)DS
(E)DS
(E)DS
(E)DS(E)DS
(E)DS
DEMOLITION PLAN NOTES
1. SEE SHEET G-003 FOR GENERAL NOTES AND SYMBOLS.
2. SEE SPECIFICATIONS 02 41 19 SELECTIVE DEMOLITION FOR
DEMOLITION REQUIREMENTS.
3. COORDINATE DEMOLITION IN CONJUNCTION WITH
REHABILITATION AND NEW CONSTRUCTION.
4. WHERE NOTES IN THE DRAWINGS REQUIRE THE REMOVAL
OF A BUILDING ELEMENT OR SYSTEM OR A COMPLETE
COMPONENT COMPRISED OF MULTIPLE ELEMENTS, THE
CONTRACTOR SHALL DISASSEMBLE AND COMPLETELY
REMOVE FROM THE SITE EACH ITEM IN ITS ENTIRETY SO
AS TO ACCOMMODATE THE INSTALLATION OF THE NEW
WORK TO FOLLOW.
5. VENT TERMINATIONS, CONDUITS, DUCTS, PANELS, AND
PIPES LOCATED ON OR IN WALLS SCHEDULED FOR
DEMOLITION AND/OR REPAIR SHALL BE REMOVED AS PART
OF THE WORK UNLESS OTHERWISE NOTED. REINSTALL
ACTIVE SYSTEM ITEMS AT COMPLETION OF
DEMOLITION/REPAIR WORK IN LOCATION INDICATED ON
DRAWINGS. IF NEW LOCATION IS NOT PROVIDED, REINSTALL
IN SAME LOCATION.
6. EMBEDMENTS AND HOLES DRAWN AS 6" DIAMETER CIRCLES
FOR CLARITY. ACTUAL EMBEDMENT SIZES MAY VARY.
7. REMOVE, RESTORE, AND REINSTALL ALL WOOD SIDING AND
TRIM, UON. REPLACE WOOD SIDING AND TRIM REQUIRING
LEVEL 3 REPAIR. SEE SPECIFICATIONS 02 41 19 SELECTIVE
DEMOLITION, WOOD SIDING SALVAGE TABLE FOR
APPROXIMATE REPLACEMENT QUANTITIES.
8. REPAIR ALL EXTERIOR DOORS. SEE DOOR SCHEDULE FOR
REPAIR LEVELS.
DEMOLITION PLAN LEGEND
(E) WALL TO REMAIN
(E) DOWNSPOUT(E)DS
ROOF SLOPE ( X" RISE / X" RUN)SLOPE
(E) VENT
REPAIR OR REMOVE - SEE KEYNOTES
HO
(E) CEILING OR WALL INVESTIGATION
HOLE - PATCH TO MATCH (E) ADJACENT
ROOF REPAIR - SEE GENERAL NOTES
(E) MASONRY WALL
WH (E) WATER HEATER
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b T
N P S
Y E L L
E x te ri o r R e h a b .r vt
DEMOLITION SECOND
FLOOR PLAN
N/A
AM/JH/IE
TM/HC
03-A103 307127
09/06/2024
CONSTRUCTION DRAWINGS
PROJECT
NORTH
SCALE OF FEET
0 4 84
LEVEL 2
DEMOLITION KEYNOTES
3 REMOVE FLASHING
50 REMOVE ROOF MORTAR AT STEP FLASHING
E.
W
I L L I A
M I V E S
Date:
(C-3530)
L I
C E NS E D A R C H I T ECT
S T A T E
O F W Y O M I N
G9/6/2024
3.B
3.1 3.2
3.3
3.A
BEDROOM
3.302
STAIR HALL
CLOSET
BEDROOM
3.303
BATHROOM
3.304
BEDROOM
3.305
BEDROOM
3.301 CLOS.CLOS.
55' - 7"
DN
03-A1071
03-A106
03-A108
03-A109 1
(E)DS
(E)DS
(E)DS
(E)DS
(E)DS
(E)DS
(E)DS
(E)DS
DEMOLITION PLAN NOTES
1. SEE SHEET G-003 FOR GENERAL NOTES AND SYMBOLS.
2. SEE SPECIFICATIONS 02 41 19 SELECTIVE DEMOLITION FOR
DEMOLITION REQUIREMENTS.
3. COORDINATE DEMOLITION IN CONJUNCTION WITH
REHABILITATION AND NEW CONSTRUCTION.
4. WHERE NOTES IN THE DRAWINGS REQUIRE THE REMOVAL
OF A BUILDING ELEMENT OR SYSTEM OR A COMPLETE
COMPONENT COMPRISED OF MULTIPLE ELEMENTS, THE
CONTRACTOR SHALL DISASSEMBLE AND COMPLETELY
REMOVE FROM THE SITE EACH ITEM IN ITS ENTIRETY SO
AS TO ACCOMMODATE THE INSTALLATION OF THE NEW
WORK TO FOLLOW.
5. VENT TERMINATIONS, CONDUITS, DUCTS, PANELS, AND
PIPES LOCATED ON OR IN WALLS SCHEDULED FOR
DEMOLITION AND/OR REPAIR SHALL BE REMOVED AS PART
OF THE WORK UNLESS OTHERWISE NOTED. REINSTALL
ACTIVE SYSTEM ITEMS AT COMPLETION OF
DEMOLITION/REPAIR WORK IN LOCATION INDICATED ON
DRAWINGS. IF NEW LOCATION IS NOT PROVIDED, REINSTALL
IN SAME LOCATION.
6. EMBEDMENTS AND HOLES DRAWN AS 6" DIAMETER CIRCLES
FOR CLARITY. ACTUAL EMBEDMENT SIZES MAY VARY.
7. REMOVE, RESTORE, AND REINSTALL ALL WOOD SIDING AND
TRIM, UON. REPLACE WOOD SIDING AND TRIM REQUIRING
LEVEL 3 REPAIR. SEE SPECIFICATIONS 02 41 19 SELECTIVE
DEMOLITION, WOOD SIDING SALVAGE TABLE FOR
APPROXIMATE REPLACEMENT QUANTITIES.
8. REPAIR ALL EXTERIOR DOORS. SEE DOOR SCHEDULE FOR
REPAIR LEVELS.
DEMOLITION PLAN LEGEND
(E) WALL TO REMAIN
(E) DOWNSPOUT(E)DS
ROOF SLOPE ( X" RISE / X" RUN)SLOPE
(E) VENT
REPAIR OR REMOVE - SEE KEYNOTES
HO
(E) CEILING OR WALL INVESTIGATION
HOLE - PATCH TO MATCH (E) ADJACENT
ROOF REPAIR - SEE GENERAL NOTES
(E) MASONRY WALL
WH (E) WATER HEATER
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b T
N P S
Y E L L
E x te ri o r R e h a b .r vt
DEMOLITION THIRD FLOOR
PLAN
N/A
AM/JH/IE
TM/HC
03-A104 307127
09/06/2024
CONSTRUCTION DRAWINGS
PROJECT
NORTH
SCALE OF FEET
0 4 84
LEVEL 3
DEMOLITION KEYNOTES
E.
W
I L L I A
M I V E S
Date:
(C-3530)
L I
C E NS E D A R C H I T ECT
S T A T E
O F W Y O M I N
G9/6/2024
3.B
3.1 3.2
3.3
3.A
9" / 12"
9" / 12"
9" / 12"
9" / 12"
9" / 12"
9" / 12"
9" / 12"
9" / 12"
9" / 12"
9" / 12"
4" / 12"
9" / 12"
9" / 12"
55' - 7"
4" / 12"
(E)DS
(E)DS
(E)DS
03-A1071
03-A106
03-A108
03-A109 1
(E)DS
(E)DS
(E)DS
(E)DS
(E)DS
DEMOLITION PLAN LEGEND
(E) WALL TO REMAIN
(E) DOWNSPOUT(E)DS
ROOF SLOPE ( X" RISE / X" RUN)SLOPE
(E) VENT
REPAIR OR REMOVE - SEE KEYNOTES
HO
(E) CEILING OR WALL INVESTIGATION
HOLE - PATCH TO MATCH (E) ADJACENT
ROOF REPAIR - SEE GENERAL NOTES
(E) MASONRY WALL
WH (E) WATER HEATER
DEMOLITION ROOF PLAN NOTES
1. SEE SHEET G-003 FOR GENERAL NOTES AND SYMBOLS.
2. REFER TO ENTIRE CONSTRUCTION DOCUMENTS FOR
COORDINATION AND EXTENT OF ADDITIONAL WORK NOT
SHOWN ON ARCHITECTURAL DRAWINGS.
3. AT CLAY TILE ROOFS - REMOVE GUTTERS FOR
RESTORATION. REPLACE WOOD FASCIA NAILER AND TRIM (E)
GUTTER STRAPS AS NEEDED FOR GUTTER REINSTALLATION.
4. AT METAL SHINGLE ROOFS: REMOVE ROOF SHINGLES,
WEATHER BARRIER, FLASHING, FURRING, AND GUTTERS DOWN
TO TOP LAYER OF SHEATHING. REPLACE OUTERMOST 1X
SHEATHING BOARD IN KIND WHERE INDICATED PER
STRUCTURAL DRAWINGS. SALVAGE METAL ROOF SHINGLES
AND FINIALS. PROVIDE TO CONTRACTING OFFICER.
5. AT WOOD SHINGLE ROOFS: REMOVE ROOF SHINGLES,
WEATHER BARRIER, FLASHING, FURRING, AND GUTTERS DOWN
TO TOP LAYER OF SHEATHING. REPLACE OUTERMOST 1X
SHEATHING BOARD IN KIND AT ALL EAVE LOCATIONS.
6. WHERE A LOWER ROOF IS OBSCURED, SEE PLAN LEVEL
WHERE NOT OBSCURED FOR ADDITIONAL INFORMATION.
7. ROOF SLOPES ARE APPROXIMATE AND FOR REFERENCE
ONLY.
8. CONFIRM LOCATION OF ALL EXISTING AND NEW ROOF
PENETRATIONS WITH CONTRACTING OFFICER BEFORE
COMMENCEMENT OF WORK.
9. MAINTAIN 12 INCHES CLEAR BETWEEN ALL ROOF-MOUNTED
EQUIPMENT FOR FLASHING INSTALLATION.
10. REPLACE ALL ROOF & WALL INSULATION, UNO
11. NOT EVERY ROOF AND FLASHING CONDITION IS
ILLUSTRATED OR DETAILED. ROOFING BLOCKING, FURRING,
FLASHING, REGLETS, COPING, ETC. SHALL BE INSTALLED FOR
A FULLY WATERPROOF ASSEMBLY IN ACCORDANCE WITH
ROOFING MANUFACTURER'S REQUIREMENTS AND DESIGN AND
REFERENCE STANDARDS OF SMACNA’S ARCHITECTURAL SHEET
METAL MANUAL CURRENT EDITION.
12. EMBEDMENTS AND HOLES ARE DRAWN AS 6" DIA CIRCLES
FOR VISIBILITY. ACTUAL EMBEDMENT SIZES MAY VARY.
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b T
N P S
Y E L L
E x te ri o r R e h a b .r vt
DEMOLITION ROOF PLAN
N/A
AM/JH/IE
TM/HC
03-A105 307127
09/06/2024
CONSTRUCTION DRAWINGS
PROJECT
NORTH
SCALE OF FEET
0 4 84
ROOF
DEMOLITION KEYNOTES
1 REMOVE EMBEDMENT
27 REMOVE, RESTORE, AND REINSTALL (E)
GUTTER AND (E) DOWNSPOUT. SEE EXTERIOR
DETAILS
111 REPLACE SINGLE ROOF TILE
112 REPLACE MULTIPLE ROOF TILE UNITS
191 DEMO (E) TERRACOTTA FLUE LINER DOWN
TO T.O. UPPERMOST MASONRY COURSE.
E.
W
I L L I A
M I V E S
Date:
(C-3530)
L I
C E NS E D A R C H I T ECT
S T A T E
O F W Y O M I N
G9/6/2024
0' - 0"
LEVEL 1
20' - 8 1/2"
LEVEL 3
10' - 8 1/2"
LEVEL 2
-8' - 4"
LEVEL 0
28' - 8"
ROOF
3.13.23.3
3.N0.01
3.N1.01
3.N2.01
3.N2.02
3.N1.02
3.N2.03
3.N1.03
3.N0.02 3.N0.03
3.N1.04
3.N2.04
3.N3.023.N3.01
AT RAFTER
TAILS, TYP.
AT DORMERS, TYP.
DEMOLITION EXTERIOR ELEVATION NOTES
1. SEE SHEET G-003 FOR GENERAL NOTES AND SYMBOLS.
2. SEE SPECIFICATIONS 02 41 19 SELECTIVE DEMOLITION FOR
ALL DEMOLITION ACTIVITIES.
3. COORDINATE DEMOLITION IN CONJUNCTION WITH
REHABILITATION AND NEW CONSTRUCTION.
4. CONDUIT, WIRING, ATTIC AND CRAWLSPACE VENTS, DRYER
VENTS, ELECTRICAL PANELS, PIPES, AND MISCELLANEOUS
DEVICES LOCATED ON OR IN WALLS SCHEDULED FOR
DEMOLITION AND/OR REPAIR SHALL BE REMOVED AS PART
OF THE WORK UNLESS OTHERWISE NOTED. REINSTALL
ACTIVE SYSTEMS AT COMPLETION OF DEMOLITION/REPAIR
WORK IN LOCATION INDICATED ON DRAWINGS. IF NEW
LOCATION IS NOT INDICATED, PROVIDE IN CONCEALED
LOCATION. COORDINATE ALL NEW ROUTING WITH
CONTRACTING OFFICER.
5. REMOVE AND SALVAGE ALL SHIPLAP/HORIZONAL SIDING AND
TRIM FOR REPAIR AND REINSTALLATION. LEVEL 2 WOOD
REPAIR, UON. SEE SPECIFICATIONS FOR BUILDING-SPECIFIC
SALVAGE ESTIMATES.
6. SEE SPECIFICATIONS 04 03 00 HISTORIC TREATMENT FOR
MASONRY FOR THE CLEANING OF ALL MASONRY SURFACES.
AT BUILDINGS #2-3: CLEAN ALL MASONRY SURFACES
INCLUDING CHIMNEYS, WALLS, PORCHES, AND EXPOSED
FOUNDATIONS.
7. AT BUILDINGS #2-3: REPOINT EXTERIOR OF ALL STONE
FOUNDATION WALLS FROM TOP OF FOOTING TO UNDERSIDE
OF BASEMENT WINDOW LINTEL WITH TYPE 2A, CONCAVE
MORTAR JOINT. SEE SHEET A801 WALL SECTIONS &
FOUNDATION DETAILS, MORTAR TYPES DETAIL. COORDINATE
REPOINTING BELOW GRADE WITH EXCAVATION WORK
DESCRIBED IN CIVIL DRAWINGS.
8. AT BUILDINGS #4-33: REPOINT EXTERIOR OF ALL STONE
FOUNDATION WALLS FROM TOP OF FOOTING TO WATER
TABLE. SEE KEYNOTES FOR TYPE OF MORTAR JOINT. SEE
SHEET A801 FOR WALL SECTIONS, FOUNDATION DETAILS,
AND JOINT TYPES. COORDINATE REPOINTING BELOW GRADE
WITH EXCAVATION WORK IN CIVIL DRAWINGS.
9. AT BUILDINGS #4-33: REPOINT ALL BRICK CHIMNEYS USING
TYPE 1A, CONCAVE MORTAR JOINT. SEE SHEET A801 WALL
SECTIONS, FOUNDATION DETAILS, AND JOINT TYPES.
10. AT BUILDINGS #4-7: REPAINT BRICK CHIMNEYS.
11. REMOVE ALL WINDOW SASHES FOR RESTORATION AND
REINSTALLATION. SEE WINDOW SCHEDULES FOR REPAIR
LEVELS.
12. REMOVE ALL BUILDING IDENTIFICATION SIGNAGE AND
"PRIVATE RESIDENCE" SIGNAGE. SALVAGE FOR
REINSTALLATION.
REMOVE (E) SURFACE CONDUIT/WIRE.
SEE GENERAL SHEET NOTE 4
DEMOLITION EXTERIOR ELEVATION LEGEND
REPAIR OR REMOVE - COORDINATE SELECT AREAS
OF REPAIR WITH OVERALL SIDING REPAIR. SEE
KEYNOTES IN PLANS AND ELEVATIONS AND
SPECIFICATIONS FOR DETAILED INFORMATION
REMOVE SIDING & TRIM, SEE GENERAL NOTES 4 & 5
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b T
N P S
Y E L L
E x te ri o r R e h a b .r vt
DEMOLITION EXTERIOR
ELEVATIONS
N/A
AM/JH/IE
TM/HC
03-A106 307127
09/06/2024
CONSTRUCTION DRAWINGS
SCALE OF FEET
0 4 84
NORTH ELEVATION
DEMOLITION KEYNOTES
1 REMOVE EMBEDMENT
15 REPOINT MORTAR
16 REPAIR STONE
22 LEVEL 1 WOOD REPAIR
27 REMOVE, RESTORE, AND REINSTALL (E) GUTTER AND (E)
DOWNSPOUT. SEE EXTERIOR DETAILS
28 REPAIR SPALLING
30 LEVEL 1 CRACK REPAIR
31 LEVEL 2 CRACK REPAIR
32 LEVEL 3 CRACK REPAIR
36 CLEAN SOILING (CEMENTITIOUS)
39 CLEAN SOILING (RUST STAINING)
72 REMOVE (E) DRYER VENT & INSTALL NEW VENT
TERMINATION
E.
W
I L L I A
M I V E S
Date:
(C-3530)
L I
C E NS E D A R C H I T ECT
S T A T E
O F W Y O M I N
G9/6/2024
20' - 8 1/2"
LEVEL 3
10' - 8 1/2"
LEVEL 2
-8' - 4"
LEVEL 0
28' - 8"
ROOF
3.D3.C3.B3.A
3.E3.01 3.E3.02 3.E3.03
3.E2.03
3.E2.023.E2.01
3.E1.05
3.E0.023.E0.01
3.E1.02 3.E1.04
3.E1.03
SEE DEMO ROOF PLAN
FOR ROOF SCOPE
AT RAFTER
TAILS, TYP.22
AT DORMERS, TYP.
0' - 0"
LEVEL 1
10' - 8 1/2"
LEVEL 2
3.B
3.E1.01
DEMOLITION EXTERIOR ELEVATION NOTES
1. SEE SHEET G-003 FOR GENERAL NOTES AND SYMBOLS.
2. SEE SPECIFICATIONS 02 41 19 SELECTIVE DEMOLITION FOR
ALL DEMOLITION ACTIVITIES.
3. COORDINATE DEMOLITION IN CONJUNCTION WITH
REHABILITATION AND NEW CONSTRUCTION.
4. CONDUIT, WIRING, ATTIC AND CRAWLSPACE VENTS, DRYER
VENTS, ELECTRICAL PANELS, PIPES, AND MISCELLANEOUS
DEVICES LOCATED ON OR IN WALLS SCHEDULED FOR
DEMOLITION AND/OR REPAIR SHALL BE REMOVED AS PART
OF THE WORK UNLESS OTHERWISE NOTED. REINSTALL
ACTIVE SYSTEMS AT COMPLETION OF DEMOLITION/REPAIR
WORK IN LOCATION INDICATED ON DRAWINGS. IF NEW
LOCATION IS NOT INDICATED, PROVIDE IN CONCEALED
LOCATION. COORDINATE ALL NEW ROUTING WITH
CONTRACTING OFFICER.
5. REMOVE AND SALVAGE ALL SHIPLAP/HORIZONAL SIDING AND
TRIM FOR REPAIR AND REINSTALLATION. LEVEL 2 WOOD
REPAIR, UON. SEE SPECIFICATIONS FOR BUILDING-SPECIFIC
SALVAGE ESTIMATES.
6. SEE SPECIFICATIONS 04 03 00 HISTORIC TREATMENT FOR
MASONRY FOR THE CLEANING OF ALL MASONRY SURFACES.
AT BUILDINGS #2-3: CLEAN ALL MASONRY SURFACES
INCLUDING CHIMNEYS, WALLS, PORCHES, AND EXPOSED
FOUNDATIONS.
7. AT BUILDINGS #2-3: REPOINT EXTERIOR OF ALL STONE
FOUNDATION WALLS FROM TOP OF FOOTING TO UNDERSIDE
OF BASEMENT WINDOW LINTEL WITH TYPE 2A, CONCAVE
MORTAR JOINT. SEE SHEET A801 WALL SECTIONS &
FOUNDATION DETAILS, MORTAR TYPES DETAIL. COORDINATE
REPOINTING BELOW GRADE WITH EXCAVATION WORK
DESCRIBED IN CIVIL DRAWINGS.
8. AT BUILDINGS #4-33: REPOINT EXTERIOR OF ALL STONE
FOUNDATION WALLS FROM TOP OF FOOTING TO WATER
TABLE. SEE KEYNOTES FOR TYPE OF MORTAR JOINT. SEE
SHEET A801 FOR WALL SECTIONS, FOUNDATION DETAILS,
AND JOINT TYPES. COORDINATE REPOINTING BELOW GRADE
WITH EXCAVATION WORK IN CIVIL DRAWINGS.
9. AT BUILDINGS #4-33: REPOINT ALL BRICK CHIMNEYS USING
TYPE 1A, CONCAVE MORTAR JOINT. SEE SHEET A801 WALL
SECTIONS, FOUNDATION DETAILS, AND JOINT TYPES.
10. AT BUILDINGS #4-7: REPAINT BRICK CHIMNEYS.
11. REMOVE ALL WINDOW SASHES FOR RESTORATION AND
REINSTALLATION. SEE WINDOW SCHEDULES FOR REPAIR
LEVELS.
12. REMOVE ALL BUILDING IDENTIFICATION SIGNAGE AND
"PRIVATE RESIDENCE" SIGNAGE. SALVAGE FOR
REINSTALLATION.
REMOVE (E) SURFACE CONDUIT/WIRE.
SEE GENERAL SHEET NOTE 4
DEMOLITION EXTERIOR ELEVATION LEGEND
REPAIR OR REMOVE - COORDINATE SELECT AREAS
OF REPAIR WITH OVERALL SIDING REPAIR. SEE
KEYNOTES IN PLANS AND ELEVATIONS AND
SPECIFICATIONS FOR DETAILED INFORMATION
REMOVE SIDING & TRIM, SEE GENERAL NOTES 4 & 5
0' - 0"
LEVEL 1
3.2
3.S1.03
3.S1.04
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b T
N P S
Y E L L
E x te ri o r R e h a b .r vt
DEMOLITION EXTERIOR
ELEVATIONS
N/A
AM/JH/IE
TM/HC
03-A107 307127
09/06/2024
CONSTRUCTION DRAWINGS
SCALE OF FEET
0 4 84
EAST ELEVATION
EAST ELEVATION PORCH
DEMOLITION KEYNOTES
1 REMOVE EMBEDMENT
3 REMOVE FLASHING
15 REPOINT MORTAR
16 REPAIR STONE
18 REMOVE AREA OF METAL CORROSION, REPAIR OR
REPLACE
22 LEVEL 1 WOOD REPAIR
23 LEVEL 2 WOOD REPAIR
24 LEVEL 3 WOOD REPAIR
27 REMOVE, RESTORE, AND REINSTALL (E) GUTTER AND (E)
DOWNSPOUT. SEE EXTERIOR DETAILS
28 REPAIR SPALLING
30 LEVEL 1 CRACK REPAIR
31 LEVEL 2 CRACK REPAIR
32 LEVEL 3 CRACK REPAIR
38 CLEAN SOILING (PAINT SPLATTERS)
43 REPAIR STONE DELAMINATION
71 REMOVE (E) VENT
73 REMOVE AND SALVAGE (E) LIGHT FIXTURE
SOUTH ELEVATION PORCH
E.
W
I L L I A
M I V E S
Date:
(C-3530)
L I
C E NS E D A R C H I T ECT
S T A T E
O F W Y O M I N
G9/6/2024
20' - 8 1/2"
LEVEL 3
10' - 8 1/2"
LEVEL 2
-8' - 4"
LEVEL 0
28' - 8"
ROOF
3.1 3.2 3.3
3.S3.03 3.S3.023.S3.01
3.S2.01
3.S1.01 3.S1.02
3.S0.01 3.S0.02
3.S1.09
3.S0.03
3.S2.04
3.S2.03
3.S2.02
3.S1.083.S1.07
3.S1.06
3.S1.05
AT BACK FACE OF CHIMNEY
30 37
SEE DEMO ROOF PLAN
FOR ROOF SCOPE
AT RAFTER
TAILS, TYP.
AT DORMERS, TYP.
DEMOLITION EXTERIOR ELEVATION NOTES
1. SEE SHEET G-003 FOR GENERAL NOTES AND SYMBOLS.
2. SEE SPECIFICATIONS 02 41 19 SELECTIVE DEMOLITION FOR
ALL DEMOLITION ACTIVITIES.
3. COORDINATE DEMOLITION IN CONJUNCTION WITH
REHABILITATION AND NEW CONSTRUCTION.
4. CONDUIT, WIRING, ATTIC AND CRAWLSPACE VENTS, DRYER
VENTS, ELECTRICAL PANELS, PIPES, AND MISCELLANEOUS
DEVICES LOCATED ON OR IN WALLS SCHEDULED FOR
DEMOLITION AND/OR REPAIR SHALL BE REMOVED AS PART
OF THE WORK UNLESS OTHERWISE NOTED. REINSTALL
ACTIVE SYSTEMS AT COMPLETION OF DEMOLITION/REPAIR
WORK IN LOCATION INDICATED ON DRAWINGS. IF NEW
LOCATION IS NOT INDICATED, PROVIDE IN CONCEALED
LOCATION. COORDINATE ALL NEW ROUTING WITH
CONTRACTING OFFICER.
5. REMOVE AND SALVAGE ALL SHIPLAP/HORIZONAL SIDING AND
TRIM FOR REPAIR AND REINSTALLATION. LEVEL 2 WOOD
REPAIR, UON. SEE SPECIFICATIONS FOR BUILDING-SPECIFIC
SALVAGE ESTIMATES.
6. SEE SPECIFICATIONS 04 03 00 HISTORIC TREATMENT FOR
MASONRY FOR THE CLEANING OF ALL MASONRY SURFACES.
AT BUILDINGS #2-3: CLEAN ALL MASONRY SURFACES
INCLUDING CHIMNEYS, WALLS, PORCHES, AND EXPOSED
FOUNDATIONS.
7. AT BUILDINGS #2-3: REPOINT EXTERIOR OF ALL STONE
FOUNDATION WALLS FROM TOP OF FOOTING TO UNDERSIDE
OF BASEMENT WINDOW LINTEL WITH TYPE 2A, CONCAVE
MORTAR JOINT. SEE SHEET A801 WALL SECTIONS &
FOUNDATION DETAILS, MORTAR TYPES DETAIL. COORDINATE
REPOINTING BELOW GRADE WITH EXCAVATION WORK
DESCRIBED IN CIVIL DRAWINGS.
8. AT BUILDINGS #4-33: REPOINT EXTERIOR OF ALL STONE
FOUNDATION WALLS FROM TOP OF FOOTING TO WATER
TABLE. SEE KEYNOTES FOR TYPE OF MORTAR JOINT. SEE
SHEET A801 FOR WALL SECTIONS, FOUNDATION DETAILS,
AND JOINT TYPES. COORDINATE REPOINTING BELOW GRADE
WITH EXCAVATION WORK IN CIVIL DRAWINGS.
9. AT BUILDINGS #4-33: REPOINT ALL BRICK CHIMNEYS USING
TYPE 1A, CONCAVE MORTAR JOINT. SEE SHEET A801 WALL
SECTIONS, FOUNDATION DETAILS, AND JOINT TYPES.
10. AT BUILDINGS #4-7: REPAINT BRICK CHIMNEYS.
11. REMOVE ALL WINDOW SASHES FOR RESTORATION AND
REINSTALLATION. SEE WINDOW SCHEDULES FOR REPAIR
LEVELS.
12. REMOVE ALL BUILDING IDENTIFICATION SIGNAGE AND
"PRIVATE RESIDENCE" SIGNAGE. SALVAGE FOR
REINSTALLATION.
REMOVE (E) SURFACE CONDUIT/WIRE.
SEE GENERAL SHEET NOTE 4
DEMOLITION EXTERIOR ELEVATION LEGEND
REPAIR OR REMOVE - COORDINATE SELECT AREAS
OF REPAIR WITH OVERALL SIDING REPAIR. SEE
KEYNOTES IN PLANS AND ELEVATIONS AND
SPECIFICATIONS FOR DETAILED INFORMATION
REMOVE SIDING & TRIM, SEE GENERAL NOTES 4 & 5
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b T
N P S
Y E L L
E x te ri o r R e h a b .r vt
DEMOLITION EXTERIOR
ELEVATIONS
N/A
AM/JH/IE
TM/HC
03-A108 307127
09/06/2024
CONSTRUCTION DRAWINGS
SCALE OF FEET
0 4 84
SOUTH ELEVATION
DEMOLITION KEYNOTES
1 REMOVE EMBEDMENT
3 REMOVE FLASHING
10 REMOVE RADON VENT, TERMINATION PIPING, AND FAN.
CONNECT EXISTING CRAWLSPACE/BASEMENT PIPING TO NEW
RADON SYSTEM COMPONENTS
14 REMOVE SERVICE EQUIPMENT
15 REPOINT MORTAR
16 REPAIR STONE
18 REMOVE AREA OF METAL CORROSION, REPAIR OR REPLACE
22 LEVEL 1 WOOD REPAIR
23 LEVEL 2 WOOD REPAIR
24 LEVEL 3 WOOD REPAIR
DEMOLITION KEYNOTES
27 REMOVE, RESTORE, AND REINSTALL (E) GUTTER AND (E)
DOWNSPOUT. SEE EXTERIOR DETAILS
28 REPAIR SPALLING
30 LEVEL 1 CRACK REPAIR
31 LEVEL 2 CRACK REPAIR
37 CLEAN SOILING (EFFLORESCENCE)
39 CLEAN SOILING (RUST STAINING)
42 REPAIR EXFOLIATION
43 REPAIR STONE DELAMINATION
72 REMOVE (E) DRYER VENT & INSTALL NEW VENT TERMINATION
73 REMOVE AND SALVAGE (E) LIGHT FIXTURE
90 REPAIR WINDOW AND REPLACE MISSING PANE OF GLASS. SEE
WINDOW SCHEDULE.
E.
W
I L L I A
M I V E S
Date:
(C-3530)
L I
C E NS E D A R C H I T ECT
S T A T E
O F W Y O M I N
G9/6/2024
20' - 8 1/2"
LEVEL 3
10' - 8 1/2"
LEVEL 2
28' - 8"
ROOF
3.D 3.C 3.B 3.A
3.W3.01 3.W3.02 3.W3.03
3.W2.043.W2.03
3.W1.04
3.W0.01
3.W1.03
3.W2.02
3.W2.01
3.W1.01
3.W1.02
31 28
AT GRIDLINE 3.1 AT GRIDLINE 3.1
SEE DEMO ROOF PLAN
FOR ROOF SCOPE
AT RAFTER
TAILS, TYP.
AT DORMERS, TYP.
DEMOLITION EXTERIOR ELEVATION NOTES
1. SEE SHEET G-003 FOR GENERAL NOTES AND SYMBOLS.
2. SEE SPECIFICATIONS 02 41 19 SELECTIVE DEMOLITION FOR
ALL DEMOLITION ACTIVITIES.
3. COORDINATE DEMOLITION IN CONJUNCTION WITH
REHABILITATION AND NEW CONSTRUCTION.
4. CONDUIT, WIRING, ATTIC AND CRAWLSPACE VENTS, DRYER
VENTS, ELECTRICAL PANELS, PIPES, AND MISCELLANEOUS
DEVICES LOCATED ON OR IN WALLS SCHEDULED FOR
DEMOLITION AND/OR REPAIR SHALL BE REMOVED AS PART
OF THE WORK UNLESS OTHERWISE NOTED. REINSTALL
ACTIVE SYSTEMS AT COMPLETION OF DEMOLITION/REPAIR
WORK IN LOCATION INDICATED ON DRAWINGS. IF NEW
LOCATION IS NOT INDICATED, PROVIDE IN CONCEALED
LOCATION. COORDINATE ALL NEW ROUTING WITH
CONTRACTING OFFICER.
5. REMOVE AND SALVAGE ALL SHIPLAP/HORIZONAL SIDING AND
TRIM FOR REPAIR AND REINSTALLATION. LEVEL 2 WOOD
REPAIR, UON. SEE SPECIFICATIONS FOR BUILDING-SPECIFIC
SALVAGE ESTIMATES.
6. SEE SPECIFICATIONS 04 03 00 HISTORIC TREATMENT FOR
MASONRY FOR THE CLEANING OF ALL MASONRY SURFACES.
AT BUILDINGS #2-3: CLEAN ALL MASONRY SURFACES
INCLUDING CHIMNEYS, WALLS, PORCHES, AND EXPOSED
FOUNDATIONS.
7. AT BUILDINGS #2-3: REPOINT EXTERIOR OF ALL STONE
FOUNDATION WALLS FROM TOP OF FOOTING TO UNDERSIDE
OF BASEMENT WINDOW LINTEL WITH TYPE 2A, CONCAVE
MORTAR JOINT. SEE SHEET A801 WALL SECTIONS &
FOUNDATION DETAILS, MORTAR TYPES DETAIL. COORDINATE
REPOINTING BELOW GRADE WITH EXCAVATION WORK
DESCRIBED IN CIVIL DRAWINGS.
8. AT BUILDINGS #4-33: REPOINT EXTERIOR OF ALL STONE
FOUNDATION WALLS FROM TOP OF FOOTING TO WATER
TABLE. SEE KEYNOTES FOR TYPE OF MORTAR JOINT. SEE
SHEET A801 FOR WALL SECTIONS, FOUNDATION DETAILS,
AND JOINT TYPES. COORDINATE REPOINTING BELOW GRADE
WITH EXCAVATION WORK IN CIVIL DRAWINGS.
9. AT BUILDINGS #4-33: REPOINT ALL BRICK CHIMNEYS USING
TYPE 1A, CONCAVE MORTAR JOINT. SEE SHEET A801 WALL
SECTIONS, FOUNDATION DETAILS, AND JOINT TYPES.
10. AT BUILDINGS #4-7: REPAINT BRICK CHIMNEYS.
11. REMOVE ALL WINDOW SASHES FOR RESTORATION AND
REINSTALLATION. SEE WINDOW SCHEDULES FOR REPAIR
LEVELS.
12. REMOVE ALL BUILDING IDENTIFICATION SIGNAGE AND
"PRIVATE RESIDENCE" SIGNAGE. SALVAGE FOR
REINSTALLATION.
REMOVE (E) SURFACE CONDUIT/WIRE.
SEE GENERAL SHEET NOTE 4
DEMOLITION EXTERIOR ELEVATION LEGEND
REPAIR OR REMOVE - COORDINATE SELECT AREAS
OF REPAIR WITH OVERALL SIDING REPAIR. SEE
KEYNOTES IN PLANS AND ELEVATIONS AND
SPECIFICATIONS FOR DETAILED INFORMATION
REMOVE SIDING & TRIM, SEE GENERAL NOTES 4 & 5
TITLE OF SHEETSUB SHEET NO.DESIGNED:
TECH REVIEW:
DATE:
PMIS NO.
SHEET
DRAWING NO.
OF
REHABILITATE EXTERIORS OF
HISTORIC FORT YELLOWSTONE BUILDINGS
YELLOWSTONE NATIONAL PARK
DRAWN:
173853-B
A u to d e s k
D o c s T
N P S
Y e ll
E x te ri o r R e h a b T
N P S
Y E L L
E x te ri o r R e h a b .r vt
DEMOLITION EXTERIOR
ELEVATIONS
N/A
AM/JH/IE
TM/HC
03-A109 307127
09/06/2024
CONSTRUCTION DRAWINGS
SCALE OF FEET
0 4 84
WEST ELEVATION
DEMOLITION KEYNOTES
1 REMOVE EMBEDMENT
2 REMOVE METAL SURFACE CORROSION
3 REMOVE FLASHING
15 REPOINT MORTAR
16 REPAIR STONE
22 LEVEL 1 WOOD REPAIR
24 LEVEL 3 WOOD REPAIR
26 REPLACE DAMAGED METAL
27 REMOVE, RESTORE, AND REINSTALL (E) GUTTER AND (E)
DOWNSPOUT. SEE EXTERIOR DETAILS
28 REPAIR SPALLING
29 REPAIR CONCRETE STAIRS. SEE STRUCTURAL DRAWINGS
FOR ADDITIONAL INFORMATION
30 LEVEL 1 CRACK REPAIR
31 LEVEL 2 CRACK REPAIR
32 LEVEL 3 CRACK REPAIR
37 CLEAN SOILING (EFFLORESCENCE)
38 CLEAN SOILING (PAINT SPLATTERS)
39 CLEAN SOILING (RUST STAINING)
41 REPAIR ERODED MASONRY, LEVEL 2 UON
43 REPAIR STONE DELAMINATION
75 (E) HOSE BIB TO REMAIN
E.
W
I L L I A
M I V E S
Date:
(C-3530)
L I
C E NS E D A R C H I T ECT
S T A T E
O F W Y O M I N
G9/6/2024
03-A301
03-A303
03-A3021
03-A304 1
BASEMENT
3.001
LAUNDRY
3.002
W.C.
3.003
GAME ROOM
3.004
UNEXCAVATED
CRAWLSPACE
3.D
3.C
3.B
3.1 3.2
3.3
55' - 7"
3.A
03-A801
03-A801
FLOOR PLAN NOTES
1. SEE SHEET G-003 FOR GENERAL NOTES AND SYMBOLS.
2. SEE DEMOLITION DRAWINGS FOR DEMOLITION AND SALVAGE
INFORMATION.
3. SEE CIVIL DRAWINGS FOR GRAVEL BED AT FOUNDATION
PERIMETER.
4. SEE SHEET A901 FOR WINDOW & DOOR SCHEDULE.
5. DIMENSIONS ARE TO FACE OF FINISH (EXISTING WALLS), UON.
6. DIMENSIONS AND REFERENCE TAGS ARE SHOWN ON ENLARGED
PLANS WHEN ENLARGED PLANS ARE PROVIDED.
7. SLOPE RADON BRANCH PIPING 1/8" PER FOOT, TYP UON.
8. WOOD PORCH FLOORING TONGUE & GROOVE, UON.
FLOOR PLAN LEGEND
(E) BRICK WALL
(E) WATER HEATERWH
RADON VENT
(E) WOOD WALL
(E) CONCRETE WALL
(E) STONE WALL
WOOD WALL
REPAIRED AREA/COMPONENT
ROOF SLOPE ( X" RISE / X" RUN)SLOPE
(E) VENT
EXISTING / NEW / REINSTALLED DOWNSPOUT(E/N/R)DS
WOOD ROOF SHINGLE
METAL ROOF SHINGLE
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .