This document is the Statement of Work (SOW) for the rehabilitation of historic structures at Yellowstone National Park under Solicitation Number 140P2024R0177. The SOW outlines the detailed specifications and requirements for the rehabilitation work, including scope of work, standards and codes to be met, general requirements, materials and construction, and quality control. Key details include:

The project involves rehabilitation of historic structures within Yellowstone National Park under project number YELL 307127. The work includes exterior and interior repairs, restoration, and replacement of building components to preserve the historic integrity of the structures. The SOW provides extensive technical requirements for materials, methods, and quality standards to be met. The solicitation is being issued by the National Park Service, a civilian agency within the Department of the Interior. No set-asides or pricing terms are specified in the provided documents. The anticipated award date is not included.

View the file

Other files

File Type Posted
Sol_140P2024R0177_Amd_0006.pdf PDF
B09_Amend_6_140P2024R0177_0006.pdf PDF
B09-140P2024R0177-Amd_5_0005.pdf PDF
Sol_140P2024R0177_Amd_0005.pdf PDF
Sol_140P2024R0177_Amd_0004.pdf PDF
B09-140P2024R0177-Amd_4_0004.pdf PDF
B09-140P2024R0177-Amd_3_0003.pdf PDF
Sol_140P2024R0177_Amd_0003.pdf PDF
001_YELL_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_06_SEPT_2024_REV_01_Part3_0002.pdf PDF
001_YELL_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_06_SEPT_2024_REV_01_Part7_0002.pdf PDF
001_YELL_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_06_SEPT_2024_REV_01_Part2_0002.pdf PDF
Sol_140P2024R0177_Amd_0002.pdf PDF
001_YELL_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_06_SEPT_2024_REV_01_Part1_0002.pdf PDF
001_YELL_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_06_SEPT_2024_REV_01_Part4_0002.pdf PDF
001_YELL_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_06_SEPT_2024_REV_01_Part6_0002.pdf PDF
B09-140P2024R0177-Amd_2_0002.pdf PDF
001_YELL_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_06_SEPT_2024_REV_01_Part5_0002.pdf PDF
B09-140P2024R0177-Amendment_1_0001.pdf PDF
Pre-Proposal_Conference_Sign_In_Sheet_0001.jpg JPG image
YELL_307127_-_Ft_Yell_Preproposal_Conference_2024-09-24_0001.pptx PPTX presentation
Sol_140P2024R0177_Amd_0001.pdf PDF
B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part5.pdf PDF
B08_Section_J_Attachment_19__Solit_PSP_Vol_I_Past_Performance_Questionnaire.pdf PDF
B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part3.pdf PDF
B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part6.pdf PDF
B08_Section_J_Attachment_6_307127_Rehab_Ft_Yellowstone_Closeout_and_O_M_23_AUG_2024.xlsx XLSX spreadsheet
B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part4.pdf PDF
B08_Section_J_Attachment_16_307127_Rehab_Exteriors_Ft_Yellowstone_CPS_Blank.xlsx XLSX spreadsheet
Sol_140P2024R0177.pdf PDF
B08_Section_J_Attachment_11_307127_Rehab_Exteriors_Ft_Yellowstone_XRF_analysis_Report.pdf PDF
B08_P2024R0177_YELL_307127_1442_Solit_Clauses_9_24_24.pdf PDF
B08_Section_J_Attachment_18_Letter_of_Comm.pdf PDF
B08_Section_J_Attachment_10_307127_Hazardous_Materials_Report.pdf PDF
B08_Section_J_Attachment_14_Wage_Determination.pdf PDF
B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part1.pdf PDF
B08_Section_J_Attachment_15_Contract_Admin_Form.pdf PDF
B08_Section_J_Attachment_7_307127_Rehab_Exteriors_Ft_Yellowstone_Condition_Assessment.pdf PDF
B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part7.pdf PDF
B08_Section_J_Attachment_1_307127_Rehab_Exteriors_Ft_Yellowstone_CD_Drawings_23_AUG_2024_Part2.pdf PDF
B08_Section_J_Attachment_12_Rehab_Exteriors_Ft_Yellowstone_Radon_Assessment_Report.pdf PDF
B08_Section_J_Attachment_17_General_References_Form.pdf PDF
B08_Section_J_Attachment_4_YELL_307127_StatementOfStructuralTestsSpecialInspections.pdf PDF
Pages_from_B08_Section_J_Attachment_19__Solit_PSP_Vol_I_Project_Experience_Questionnaire.pdf PDF
B08_Section_J_Attachment_13_307127_Rehab_Ft_Yellowstone_Phasing_Plan.pdf PDF
B08_Section_J_Attachment_9_307127_Rehab_Exteriors_Ft_Yellowstone_Final_Paint_Schemes.pdf PDF
B08_Section_J_Attachment_5_307127_Rehab_Ft_Yellowstone_Submittal_List_23_AUG_2024.xlsx XLSX spreadsheet
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .